HomeMy WebLinkAboutAmend #2 Add'l Architectural Services 1-6-14 TASK ORDER CITY OF CAPE CANAVERAL NEW FIRE STATION #1 PROJECT AMENDMENT #2 ADDITIONAL ARCHITECTURAL SERVICES Section I. BACKGROUND The City of Cape Canaveral has an existing Fire Station at 190 Jackson Avenue that has been upgraded from previously constructed buildings. This Fire Station #1 is in need of replacement with a new Fire Station Facility. The City is constructing a new Fire Station to be an approximately 10,000 square ft building on that same site. The City of Cape Canaveral previously selected the professional consulting services of Baskerville-Donovan, Inc (BDI)/BRPH Team to assist the City on this important Fire Station project. This Task Order is for additional architectural services provided by BRPH for this important fire safety project. Section II. SCOPE OF SERVICES, Additional Architectural Services BRPH performed additional services modifying the design to make requested revisions during the review and approval of the Building Permit process. Section III. SUBCONSULTANTS The scope of work and all fee under this Task Order is for work performed by BRPH on architectural services. No engineering services by BDI are included in this scope of work or fee. Section IV. PERMITTING No additional permitting is required as a result of this Amendment. Section V. OWNER'S RESPONSIBILITY The Owner has no additional responsibilities as a result of this Amendment. Section VI. DELIVERABLES All work product prepared under this Amendment is included in the final construction documents (plans & specifications). Section VII. SCHEDULE This amendment results in no change to the project schedule. P:\1068 Cape Canaveral,106801.01 Fire Station 1\Contracts\Work Assignments and Additional Services\BDI-BRPH Team City of Cape Canaveral Fire Station-Add Service 12- 20-13.docm Section VIII. METHOD OF COMPENSATION The City of Cape Canaveral shall compensate the BDI/BRPH Team for the not-to-exceed lump sum fee amount of Five-Thousand Dollars and Zero Cents ($5,000) for the scope of services as specified prior in this task order. All fee shall be to BRPH for additional architectural services. A detailed breakdown of the fee is attached. SECTION IX. ACCEPTANCE If the above scope and fees meet your approval, please indicate by your signature in the space provided below and return one (1) signed copy which will constitute an "Agreement and Notice to Proceed"for the accomplishment of this work. BASKERVILLE-DONOVAN, INC. CITY OF CAPE CANAVERAL 71 ,A--e Thomas M. Vill, P.E., AICP David Greene Vice President/Regional Manager City Manager December 20, 2013 ( ( , l (`f Date Date P:\1068 Cape Canavera1\106801.01 Fire Station 1\Contracts\Work Assignments and Additional Services\BDI-BRPH Team City of Cape Canaveral Fire Station-Add Service 12-20-13.docm 2