Loading...
HomeMy WebLinkAboutThreshold Inspection Reports June 2005-Feb. 2006 Engineering. Consulting. Testing February 10,2006 Mr. Todd Morley - Chief Bldg. Official City of Cape Canaveral Building Department 105 Polk Avenue Cape Canaveral, Florida 32920 Re: Threshold Inspection Services Residence Inn Cape Canaveral, Florida PSI Project No. 761-50044 Dear Mr. Morley: Professional Services Industries, Inc. (PSI) has performed Threshold Inspection services for the above-referenced project. The inspection services were provided for the owner and the building department having jurisdiction over the project in accordance with the threshold inspection plan for the project, provided by the engineer of record. Throughout the course of the construction of the structure, PSI has performed inspections and observations as required. Areas of deficiency were noted to the contractor for correction and were re-inspected as needed. Through this date, we have completed our inspections and/or re- inspections of the construction of the building's structural load bearing components as described in the approved Threshold Inspection Plan. In accordance with the requirements of the State of Florida, to the best of our knowledge, the structural load bearing components defined in the approved Threshold Inspection Plan have been constructed in substantial compliance with the permitted structural contract documents and as modified or approved by the structural engineer of record. All of the items found to be deficient and noted within our project punch-list have been corrected satisfactorily. This concludes our threshold inspection services. Should you have any questions or require additional information, please feel free to contact our office at your convenience. Sincerely, Professional Service Industries, Inc. ~ y~ --.-. ~ ,...-;;>" 'l .. J / / /' /. ~ ~--z-' 7-/0- R. Lance Reaves J. Rod Fruland, P.E. Department Manager Sr. Engineef, Construction Services Construction Services Florida Registration No. 27667 Special Inspector No. 0085 XC: WELBRO Building Corp (2) - Chris Cortellini, Paul Hayes AlA Acquisition Group - Roger Dobson R.L. Plowfield & Associates - Chris Scroggins Powell Design Group - Ron Brown BB & T - Ron Barley Professional Service Industries, Inc.. 1748 33rd Street. Orlando, FL 32839. Phone 407/304-5560. Fax 407/304-5561 FL Engineering Business 3684 ----,--------~._-_._--,--------- -----,,-_..-- Engineering.. Consulting.. Testing February 10, 2006 Mr. Todd Morley - Chief Bldg. Official City of Cape Canaveral Building Department 105 Polk Avenue Cape Canaveral, Florida 32920 Re: Threshold Inspection Services Residence Inn Cape Canaveral, Florida PSI Project No. 761-50044 Dear Mr. Morley: Professional Services Industries, Inc. (PSI) has performed Threshold Inspection services for the above-referenced project. The inspection services were provided for the owner and the building department having jurisdiction over the project in accordance with the threshold inspection plan for the project, provided by the engineer of record. Throughout the course of the construction of the structure, PSI has performed inspections and observations as required. Areas of deficiency were noted to the contractor for correction and were re-inspected as needed. Through this date, we have completed our inspections and/or re- inspections of the construction of the building's structural load bearing components as described in the approved Threshold Inspection Plan. In accordance with the requirements of the State of Florida, to the best of our knowledge, the structural load bearing components defined in the approved Threshold Inspection Plan have been constructed in substantial compliance with the permitted structural contract documents and as modified or approved by the structural engineer of record. All of the items found to be deficient and noted within our project punch-list have been corrected satisfactorily. This concludes our threshold inspection services. Should you have any questions or require additional information, please feel free to contact our office at your convenience. Sincerely, Professional Service Industries, Inc. Z -/0.- 0 R. Lance Reaves J. Rcd Fruland, P.E. Department Manager Sr. Engineer, Construction Services Construction Services Florida Registration No. 27667 Special Inspector ND. 0085 XC: WELBRO Building Corp (2) - Chris Cortellini, Paul Hayes AlA Acquisition Group - Roger Dobson R.L. Plowfield & Associates - Chris Scroggins Powell Design Group - Ron Brown BB & T - Ron Barley Professional Service Industries, Inc.' 1748 33rd Street. Orlando, FL 32839' Phone 407/304-5560' Fax 407/304-5561 FL Engineering Business 3684 -.------ Build On Engineering.. Consulting.. Testing REPORT OF IN-PLACE DENSITY TESTS TESTED FOR: A1AAcquisition Group, LTD., LLP DATE: 01/18/06 3425 Atlantic Avenue REPORT NO: 10 Cocoa Beach, FL 32931 PROJECT NO: 761-50044 Attn: Roger Dobson PROJECT: Residence Inn - Cape Canaveral, FL TECHNICIAN: K. Farrell MAXIMUM IN-PLACE ELEV. OPTIMUM LAB DRY DRY COMPACTION OF DATE MOISTURE DENSITY MOISTURE DENSITY COMPACTION REQUIREMENT TEST (2005) LOCATION (%) (PC F) (%) (PC F) (%) (%) (ft) PAVEMENT STABILIZED Reference: 0 = top of subgrade SUBGRADE . 11/28 Exitlane,50'W.ofA1A 9.0 125.0 10.1 124.9 99.9 98 0-1 11/28 Entrance lane, 100' W. of 9.0 125.0 9.5 124.5 99.6 98 0-1 A1A 11/28 Exitlane,200'W.ofA1A 9.0 125.0 8.1 123.3 98.6 98 0-1 11/28 East road by Bldg A, 30' N. 9.0 125.0 11.6 122.8 98.2 98 0-1 of south end 11/28 East road by Bldg A, 220' N. 9.0 125.0 9.9 122.5 98.0 98 0-1 of south end 11/30 Approx. center of north half 9.0 125.0 11.3 124.6 99.1 98 0-1 of Bldg. A east parking area 11/30 Approx. center of souih half 9.0 125.0 9.5 122.7 98.2 98 0-1 of Bide. A east parking area 12/02 Approx. center of west half 9.0 125.0 7.8 123.6 98.9 98 0-1 of Bide. A north parking area 12/02 Approx. center of east half of 9.0 125.0 7.9 122.7 98.2 98 0-1 Bldg. A north parking area 12/07 Approx. center of east side I 9.0 I 125.0 9.8 122.8 I' 98.2 98 0-1 of Bldg. A north driveway 12/07 Approx.centerofwestside 9.0 125.0 10.4 122.6 98.1 98 0-1 of Bldg. A north driveway 12/13 North road, approx. 50' S. of 9.6 116.3 11.1 114.6 98.5 98 0-8" dumpster pad 12/13 North road, approx. 150' E. 9.6 116.3 11.9 115.9 99.7 98 0-8" of dumpster pad 12/16 Approx. center of north end 9.6 116.3 10.7 116.1 99.8 98 0-8" of west road by Bldg. A THESE TEST RESUL TS APPL Y ONL Y TO THE SPECIFIC LOCATIONS NOTED AND MA Y NOT REPRESENT ANY OTHER LOCA TlONS OR ELEVA TlONS. REPORTS MA Y NOT BE REPRODUCED, EXCEPT IN FULL, WITHOUT WRITTEN PERMISSION BY PROFESSIONAL SERVICE INDUSTRIES, INC. NOTES: Proctor Method: Standard X Modified DENSITY TEST METHOD: X Drive Sleeve X Nuclear Gauge . Results do not meet project's requirement TESTS PERFORMED PER ASTM D2922-96&ASTM 03017-96 "Retest results do meet project's requirement DENSITIES SHOWN: Lbs. per cubic foot Respectfully Submitted, MOISTURE CONTENT: Percent of dry weight Professional Service Industries, Inc. PERCENT COMPACTION: Base on maximum dry density obtained on a representative sample 1 Jeffrey H.M. Begovich, P.E. Vice President/Construction Services Flnrirl~ R"gi~tration No. 51869 Professional Service Industries, Inc.. 1748 33rd Street. Orlando, FL 3283g. Phone 407/304-5560. Fax 407/304-5561 FL Engineering Business 3684 -------------------------.-.-----.------------ .-----._---------- Build On /Engineering.. Consulting OJ Testing REPORT OF IN-PLACE DENSITY TESTS TESTED FOR: A1AAcquisition Group, LTD., LLP DATE: 01/18/06 3425 Atlantic Avenue REPORT NO: 10 Cocoa Beach, FL 32931 PROJECT NO: 761-50044 Attn: Roger Dobson PROJECT: Residence Inn - Cape Canaveral, FL MAXIMUM IN-PLACE ELEV. OPTIMUM LAB DRY DRY COMPACTION OF DATE MOISTURE DENSITY MOISTURE DENSITY COMPACTION REQUIREMENT TEST (2005) LOCATION (%) (PC F) (%) (PC F) (%) (%) (ft) PAVEMENT STABILIZED Reference: 0 = top of subgrade SUBGRADE 12/16 Approx.centerofsouthend 9.6 116.3 8.3 '115.8 99.6 98 0-8" of north half of west road by Bldg. A 12/21 Approx.centerofsouthend 9.6 116.3 8.0 116.0 99.7 98 0-8" of south half of west road 12/21 Approx. center of north end 9.6 116.3 11.4 115.8 99.5 98 0-8" of south half of west road 12/21 Approx. center of south half 9.6 116.3 9.4 116.1 99.8 98 0-8" of west parking THESE TEST RESULTS APPL Y ONL Y TO THE SPECIFIC LOCATIONS NOTED AND MA Y NOT REPRESENT ANY OTHER LOCA TlONS OR ELEVA TlONS. REPORTS MA Y NOT BE REPRODUCED, EXCEPT IN FULL, WITHOUT WRITTEN PERMISSION BY PROFESSIONAL SERVICE INDUSTRIES, INC. NOTES: Proctor Method: Standard X Modified DENSITY TEST METHOD: X Drive Sleeve X Nuclear Gauge . Results do not meet project's requirement. TESTS PERFORMED PER ASTM D2922-96&ASTM D3017-96 "Retest results do meet project's requirement DENSITIES SHOWN: Lbs. per cubic foot Respectfully Submitted, MOISTURE CONTENT: Percent of dry weight Professional Service Industries, Inc. PERCENT COMPACTION: Base on maximum dry density obtained on a representative sample 2 Jeffrey H.M. Begovich. P.E. Vice President/Construction Services Flnrirl~ R"gi~tf8tion No. 51869 Professional Service Industries, Inc.' 1748 33rd Street. Orlando, FL 32839' Phone 407/304-5560' Fax 407/304-5561 FL Engineering Business 3684 . Build On Engineering · Consulting. Testing REPORT OF TRUSS SYSTEM INSPECTION TESTED FOR: A 1A Acquisition Group, LTD., LLP PROJECT: Residence Inn - Cape Canaveral, FL 3425 Atlantic Avenue REPORT NO: 10 Cocoa Beach, FL 32931 PROJECT NO: 761-50044 Attn: Roger Dobson DATE: 12/12/2005 TECHNICIAN: S. Corrigan REINFORCING STEEL PLACEMENT STRUCTURAL ELEMENT ELEVATION: Foundation PLAN LOCATION: Gatehouse, section "B" truss system Wall Column Floor Slab Stair X Other CRITERIA UTILIZED AS INSPECTION REFERENCE: Structural Plans: Sheet(s): 5401 Detail(s): all RFI: PDG Truss manufacturer As-Builts RFI: Dated: 1/12/05 RFI: CONDITIONS I CONSTRUCTIONS OBSERVED: No exceptions Deficiencies Proper sizing Proper grade of bars Proper quantity, spacing, & layout Proper splice lengths & splice locations Proper chairing and concrete cover Proper securement of reinforcing Proper layout of post tensioning cables Proper drape of post tensioning tendons Proper sheathing and anchor reinforcing Concrete strength verified Concrete consolidated during placement X Other: Truss System X DEFICIENCIES: REINSPECTION REQUIRED: REMARKS: NOTES: Contractor is responsible for scheduling any necessary reinspection after remedial work is performed. Tests may not be reproduced, except in full, without written permission from Professional Service Industries, Inc. Page 1 of 2 Professional Service Industries, Inc.. 1748 33rd Street. Orlando, FL 32839. Phone 407/304-5560. Fax 407/304-5561 FL Engineering Business 3684 Build On /Engineering .. Consulting.. Testing REPORT OF LIGHT GAUGE METAL FRAMING INSPECTION TESTED FOR: A1A Acquisition Group, L TO., LLP PROJECT: Residence Inn - Cape Canaveral, FL 3425 Atlantic Avenue REPORT NO: 10 Cocoa Beach, FL 32931 PROJECT NO: 761-50044 Attn: Roger Dobson DATE: 12/12/2005 TECHNICIAN: S. Corrigan REINFORCING STEEL PLACEMENT STRUCTURAL ELEMENT ELEVATION: Foundation PLAN LOCATION: Gatehouse, sectioin "B", light gauge metal framing Wall Column Floor Slab Stair X Other CRITERIA UTILIZED AS INSPECTION REFERENCE: Structural Plans: Sheet(s): 5501 - 5507 Detail(s): all RFI: POG RFI: Dated: 1/12/05 RFI: CONDITIONS I CONSTRUCTIONS OBSERVED: No exceptions Deficiencies Proper sizing Proper grade of bars Proper quantity, spacing, & layout Proper splice lengths & splice locations Proper chairing and concrete cover Proper securement of reinforcing Proper layout of post tensioning cables Proper drape of post tensioning tendons Proper sheathing and anchor reinforcing Concrete strength verified Concrete consolidated during placement X Other: light gauge metal framing X DEFICIENCIES: REINSPECTION REQUIRED: No REMARKS: Missing screws were marked and were being installed at time of inspection. NOTES: Contractor is responsible for scheduling any necessary reinspection after remedial work is performed. Tests may not be reproduced, except in full, without written permission from Professional Service Industries, Inc. Professional Service Industries, Inc.' 1748 33rd Street. Orlando, FE~3~J Phone 407/304-5560' Fax 407/304-5561 FL Engineering Business 3684 Build On Engineering .. Consulting" Testing LlMEROCK BEARING RATIO TEST RESULTS (FM 5-515) TESTED FOR: A1A Acquisition Group LTD., LLP 3425 Atlantic Avenue PROJECT: RESIDENCE INN Cocoa Beach, FL 32931 REPORT NO: 9 PROJECT NO: 761-50044 DATE TESTED: November 17, 2005 SAMPLE LOCATION: COMPOSITE SAMPLE FROM ENTRANCE ROADWAY SOIL DESCRIPTION: DARK BROWN SISIL TY FINE SAND 1000 , , ! I I I I I i I ! I ! ; i ! ~ " c j w I I I ::> ! ...J 100 < > c:: ro --.... ...J ! I I ........... , ! 1 r- ...... i ...... . I , I i i 10 - I , I 6.00 7.00 8.00 9.00 10.00 11.00 12.00 13.00 MOISTURE CONTENT (%) PROJECT LBR REQUIREMENT: 40 LBR VALUE: 102 125.00 .;:- u E: >-- :J: (!) 123.00 jjj s: t: z ::> ~ 121.00 Cl 119.00 6.00 7.00 8.00 9.00 10.00 11.00 12.00 13.00 MOISTURE CONTENT ("!o) OPT MOISTURE: 9.0 MAX DENSITY 125.0 NOTES: 1 TEST MEETS PROJECT REQUIREMENTS 2 50044-10 3 Professional Service Industries, Inc.' 1748 33rd Street. Orlando, FL 32839' Phone 407/304-5560' Fax 407/304-5561 FL Engineering Business 3684 Build On LlMEROCK BEARING RATIO TEST RESULTS Engineering.. Consulting.. Testing (FM 5-515) TESTED FOR: A1A Acquisition Group LTD., LLP 3425 Atlantic Avenue PROJECT: RESIDENCE INN Cocoa Beach, FL 32931 REPORT NO.: 9.00 PROJECT NO: 761-50044 DATE TESTED: iDecember 27,>2005 SAMPLE LOCATION: STOCKPILE SOIL DESCRIPTION: L1MEROCK 1000 , , , , , , ; r- ! ! I I ~ I i I ! ; I Ii! ....J 100 ' I <l: > ~ -- co A ..... ....J A!! ..... ! ' i ! ! I i I I i I 10 - ! ! I ' , I I I I I 5.00 6.00 7.00 8.00 9.00 10.00 11.00 12.00 13.00 14.00 MOISTURE CONTENT (%j PROJECT LBR REQUIREMENT: 100 LBR VALUE: 100 MOISTURE CONTENT (%) 118.00 I . i..... .... I I 'i. I '1' i i : I ! ! c- I! i Iii r ' <J 117 .OO-~-------~L----~-T, -----~_____r_- -~-----,--- -----------~-~-___r--.-----------. --~--~_____r-------~ c.. I '.' I! 1 ~ I I . I . , !i: Iii I Q i ! I I W I I ::: 116. 00 -----~-----~----- . .---~------t-~-----~--j !::: . I Z I ::l I . I >- I I , I! I g; 115.00 --------. - ---~-----+-. ---------- -------- "- ---------- ---------------,-------- I I I i I 114.00 _ __ 1 5.00 6.00 7.00 8.00 9.00 10.00 11.00 12.00 13.00 14.00 OPT MOISTURE: 10.0 MAX DENSITY: 116.8 NOTES: 1 TEST MEETS PROJECT REQUIREMENTS 2 50044-1 3 Professional Service Industries, Inc.. 1748 33rd Street. Orlando, FL 32839. Phone 407/304-5560. Fax 407/304-5561 FL Engineering Business 3684 ----~-~---- -~-~ ------- ----- ----~- --- --~-- -- -- ,_. _._._._---'-"----,--,-,,-,.--_.,--~,-,,_.,,- Engineering II Consulting II Testing November 22,2005 Mr. Todd Morley - Chief Bldg. Official City of Cape Canaveral Building Department 105 Polk Avenue Cape Canaveral, Florida 32920 Re: Summary of Special (Threshold) Inspection Services Residence Inn - Cape Canaveral, Florida PSI Project No. 761-50044, Report #8, (Progress Report # 5) Dear Mr. Morley: Professional Service Industries, Inc (PSI) is performing special inspection services for the Residence Inn project located in Cape Canaveral, Florida. This report is intended to summarize the status of our inspection services performed between October 1, 2005 and November 16, 2005. As construction has progressed within the structure PSI representatives have performed a series of inspections in accordance with the project's Special Inspection Plan. As deficiencies are discovered within the course of our inspections and observations, the contractor will be immediately notified so that corrective action may be performed. Any deficiencies not immediately corrected are entered into a running "punch-list" of non-conforming items. A current punch-list is attached for your review. PSI will maintain and update this punch-list as deficiencies are discovered, corrective actions are taken and re~inspections are performed. As of this date, forty (40) items need to be addressed. We trust that this summary of our services during this time period is complete and sufficient for your needs. If you have any questions, please do not hesitate to call. Respectfully submitted, PROFESSIONAL SERVICE INDUSTRIES, INC. Ii Rod Fruland, P.E. Senior Engineer Conslrucfion Services Florida Registration #27667 Special Inspector Reg. #85 Attachments: Inspection report Punch-list Xc: A 1 A Acquisition Group, Roger Dobson WELBRO Building Corp., Chris Cortellini R. L. Plowfield & Associates, Chris Scroggins Powell Design Group, Ron Brown BB & T, Ron Barley Professional Service Industries, Inc.' 1748 33rd Street. Orlando, FL 32839' Phone 407/304-5560' Fax 407/304-5561 ----_.,._,--,-,-,,-,--""-,-,---,.,-,~-,~-'''-,~,-_..'-,-,-+---,-,--,-'''-,-,----,.,-,-,,-,-,-----'''-~.,---,------""'---'-,-',- !Engineering.. Consulting" Testing REPORT OF REINFORCED CONCRETE INSPECTION TESTED FOR: A1AAcquisition Group, LTD., LLP PROJECT: Residence Inn - Cape Canaveral, FL 3425 Atlantic Avenue REPORT NO: 8 Cocoa Beach, FL 32931 PROJECT NO: 761-50044 Attn: Roger Dobson DATE: 1 0/7/2005 TECHNICIAN: S. Corrigan REINFORCING STEEL PLACEMENT STRUCTURAL ELEMENT ELEVATION: Foundation PLAN LOCATION: Area "B", lines 44 - 66, G - V X Wall Column Floor Slab Stair Other CRiTERiA UTiliZED AS INSPECTION REFERENCE: Structural Plans: Sheet(s): S212 Detall(s): 2, 3 RFI: PDG S302 3,4,7,11 RFI: Dated: 1/12/05 S101 RFI: CONDITIONS I CONSTRUCTIONS OBSERVED: No exceptions Deficiencies X Proper sizing X X Proper grade of bars X X Proper quantity, spacing, & layout X X Proper splice lengths & splice locations X X Proper chairing and concrete cover X X Proper securement of reinforcing X Proper layout of post tensioning cables Proper drape of post tensioning tendons Proper sheathing and anchor reinforcing X Concrete strength verified X X Concrete consolidated during placement X Other: DEFICIENCIES: REINSPECTION REQUIRED: NO REMARKS: NOTES: Contractor is responsible for scheduling any necessary reinspection after remedial work is performed. Tests may not be reproduced, except in full, without written permission from Professional Service Industries, Inc. Page 1 of 1 Professional Service Industries, Inc.' 1748 33rd Street. Orlando, FL 32839' Phone 407/304-5560' Fax 407/304-5561 REPORT OF NON-COMPLIANCE (PUNCHLIST) ITEMS PROJECT NAME: RESIDENCE INN PROJECT NO.: 761-50044 CLIENT: WELBRO CONSTRUCTION DESCRIPTION OF WORK: SPECIAL INSPECTIONS TECHNICIAN: STEVE CORRIGAN, MATT ODOM DATE OF REPORT: 11-16-05 DATE DESCRIPTION OF DEFICIENCY ACTION REQUIRED -, REINSPECTION , REI~~i~TED l INSPECTED TOP GRADE BEAM REINFORCING STEEL REMEDIATE PER ADDITIONAL 04-26-05/ 001 04-19-05 BARS DO NOT MATCH WITHIN GB-3/GB-7 DIRECTION OF REINFORCING STEEL 04-29-05 TRANSITION AREAS @ COL LINE E, R, ENGINEER OF ADDED PER (COMPLETE) AND P (BOTH ENDS OF BLDG) RECORD (RFI #034) REFERENCED RFI SEVERAL AUGERCAST PILES LIE REMEDIATE PER AREAS REFERENCED 04-26-05/ 002 04-19-05 OUTSIDE TOLERANCES STATED FOR DIRECTION OF REMEDIATED PER 05-16-05 LOCATION (#1244, 1248, 1258, 1414) ENGINEER OF REFERENCED RFI (COMI'LETE) RECORD (RFI #035) REMEDIATE PER AREAS REFERENCED 003 05-02-05 PILE FOUND TO BE MISSING (NO SURVEY DIRECTION OF REMEDIATED PER 05-16-05 MARKER IN-PLACE) - PILE #1264 ENGINEER O:F REFERENCED RFI (COMPLETE) RECORD (RFI #045) HOOK BARS DETAILED @ BALCONY AREAS ARE APPR 5' LONG IN-PLACE, 004 06-17-05 RATHER THAN 10' IN LENGTH - SEE REMEDIATE PER RINKER SHOP DRAWINGS, BAR MARK RFI #078 MK507 (COL LINE A TO L-88 TO 99- AREA C - 2ND FLOOR) SEVERAL CMU/PILASTER REINFORCING APPROVED AS-BUILT P-l REMOVED TO STEEL BARS NOT CENTERED WITHIN BY ENGINEER OF ELEV 4 COURSES 06-27-05 005 06-22-05 CELLS UPON COMPLETION OF GROUT RECORD VIA ABOVE SLAB AND (COMPLETE) PLACEMENT - RESTING ON CMU WEB CORRESPONDENCE REPLACED @ COL (AREA C - 2ND FLOOR) DATE:D 11-10-05 LINE L-89 ADDITIONAL #4 - 4' VERTICAL CMU REINFORCING STEEL BAR PLACED AS-BUILT CONDITION LOOSEL Y WITHIN BARS EXHIBIT INSUFFICIENT SPLICE VERBALLY BOTTOM OF CELL IN 006 06-22-05 LENGTH FROM LEVEL BELOW APPROVED VIA AREAS NOTED AS 06-22-05 (RANGE IN-PLACE 11 TO 30" - ENGINEER OF DEFICIENT (<26") 30" MIN REQUIRED AS PER S-101) (AREA C - 2ND FLOOR) RECORD (COL LINE C TO P-88 TO 99, Q TO U-95 TO 99 ONLY) /Ql!i' 1 REPORT OF NON-COMPLIANCE (PUNCHLIST) ITEMS PROJECT NAME: RESIDENCE INN PROJECT NO.: 761-50044 CLIENT: WELBRO CONSTRUCTION DESCRIPTION OF WORK: SPECIAL INSPECTIONS TECHNICIAN: STEVE CORRIGAN, MATT ODOM DATE OF REPORT: 11-16-05 DATE DESCRIPTION OF DEFICIENCY I ACTION REQUIRED J REINSPECTION I REI~~i~TED J INSPECTED ADDITIONAL FULL- VERTICAL P-l REINFORCING STEEL LENGTH #5 BAR BARS EXHIBIT INSUFFICIENT SPLICE APPROVED AS-BUILT PLACED WITHIN BY ENGINEER OF CELL IN AREAS 007 06-22-05 LENGTH FROM LEVEL BELOW RECORD VIA NOTED AS DEFICIENT 06-22-05 (RANGE IN-PLACE 27 TO 36" - CORRESPONDENCE (<35") (COMPLETE) 36" MIN REQUIRED AS PER S-101) (AREA C - 2ND FLOOR) DATED 11-10-05 (COL LINE C TO P-88 TO 99, Q TO U-95 TO 99 ONLY) VERTICAL CMU REINFORCING STEEL APPROVED AS-BUILT DOWEL NOT PRESENT FROM LEVEL BY ENGINEER OF 008 06-22-05 BELOW @ COL LINE E-96.5, E-97.8, E-98 RECORD VIA N/A N/A (CELL ADJ TO E-98 POURED SOLID CORRESPONDENCE (COMPLETE) WITH REINFORCEMENT) DATED 11-10-05 (AREA C - 2ND FLOOR) IN-PLACE CONDITION VERTICAL P-l REINI<'ORCING STEEL ACCEPT ABLE @ COL DOWEL (#6 BAR) NOT PRESENT FROM REMEDIATE PER LINE A-93, B-93, LEVEL BELOW @ COL LINE A-93 & B-93 CORRESPONDENCE (PROVIDED TWO ADJ 009 06-22-05 (#5 BARS IN PLACE FROM 1ST FLOOR), FROM ENGINEER CELLS ARE GROUTED 06-27-05 AND Q.I-95 (NO BAR OF ANY SIZE OF RECORD SOLID); #6 BAR PRESENT WITHIN W CELL OF DATED 11-10-05 PLACED INTO 2ND PILASTER, #6 BAR IN E CELL) FLOOR SLAB @ COL (AREA C - 2ND FLOOR) LINE Q.1-95 VIA DRILL/EPOXY MASONRY GROUT PLACED IN SINGLE FULL-HEIGHT LIFT (8'-8"), AND GROUT WAS VIBRATED ONLY ONCE APPROVED AS-BUILT FOLLOWING INITIAL PLACEMENT BY ENGINEER OF N/A 010 06-22-05 (REFERENCE ACI 530.1-02, PART 3.5- RECORD VIA N/A RECONSOLIDATION 01<' GROUT CORRESPONDENCE (COMPU:TE) REQUIRED AFTER INITIAL WATER LOSS DATED 11-10-05 AND SETTLEMENT HAS OCCURRED) (AREA C - 2ND FLOOR) IR~il 2 REPORT OF NON-COMPLIANCE (PUNCHLIST) ITEMS PROJECT NAME: RESIDENCE INN PROJECT NO.: 761-50044 CLIENT: WELBRO CONSTRUCTION DESCRIPTION OF WORK: SPECIAL INSPECTIONS TECHNICIAN : STEVE CORRIGAN, MATT ODOM DATE OF REPORT: 11-16-05 DATE DESCRIPTION OF DEFICIENCY I ACTION REQUIRED J REINSPECTION I DAT~ INSPECTED REINSPECTED ADDITIONAL "B" P-l PILASTER MISPLACED APPR 24" TO APPROVED AS-BUILT BARS WITHIN 2ND BY ENGINEER OF FLOOR SLAB 011 06-23-05 THE NORTH OF PLAN POSITION RECORD VIA EXTENDED TO 06-27-05 (ORIGINAL LOCATION COL LINE E-7) (COMPLETE) (AREA A-I ST FLOOR) CORRESPONDENCE DEVELOP INTO DATE:D 11-10-05 CURRENT P-l POSITION PILASTER DESIGNATION @ COL LINl<~ APPROVED AS-BUILT #6 BARS PLACED Q-77 & M-77 CHANGES FROM P-1 ON 1ST BY ENGINEER OF INTO 2ND FLOOR SLAB 012 06-23-05 FLOOR TO P-2 DESIGNATION ON RECORD VIA VIA DRILL/EPOXY 06-27-05 2ND FLOOR (BARS IN-PLACE FROM 1 ST CORRESPONDENCE WITHIN MISSING P-2 (COMPLETE) FLOOR ARE 2-#5 IN EACH LOCATION, DATED 11-10-05 REINFORCEMENT RATHER THAN 4-#6) (AREA C - 2ND FLR) AREAS I PILASTER VERTICAL REINFORCING APPROVED AS-BUlL T STEEL WITHIN P-l @ COL LINE N.I-89 BY ENGINEER OF N/A 013 06-24-05 CONSISTS OF 2-#5 BARS RECORD VIA N/A (COMPLETE) (RATHER THAN 2-#6 BARS) CORRESPONDENCE (AREA C _1ST & 2ND FLOOR) DATED 11-10-05 ADDITIONAL ADDITIONAL HORIZONTAL HORIZONTAL CMU ONLY ADDITIONAL REINF NOT HORIZONTAL REINFORCEMENT NOT BEING PLACED REQUIRED ASPER REINFORCEMENT N/A 014 06-24-05 ABOVE AND BELOW CMU OPENINGS AS PER PROJECT SPECIFICATIONS CORRESPONDENCE REQUIRED IS AS PER (COMPLETE) SECTION 04220, PART 3.03.C FROM ENGINEER S302,DETAIL 7 AND OF RECORD LINTEL SCHEDULE - DATED 11-10-05 LOCATION OF P-l PILASTER APPROVED AS-BUILT 2-#6 BARS INSTALLED MISPLACED FROM PLAN LOCATION BY ENGINEER OF INTO FOUNDATlON@ 06-25-05 015 06-25-05 RECORD VIA (APPR 8" S @ COL LINE A-I0 & B-I0) CORRESPONDENCE 1..5-39 (NOW CIP COL (COMPLETE) (APPR 16" W @ COL LINE 1..5-39 & L.5-41) DATED 11-10-05 @PLANLOCATION) {lfBl 3 ..~~. , '. .t..! REPORT OF NON-COMPLIANCE (PUNCHLIST) ITEMS PROJECT NAME: RESIDENCE INN PROJECT NO.: 761-50044 CLIENT: WELBRO CONSTRUCTION DESCRIPTION OF WORK: SPECIAL INSPECTIONS TECHNICIAN : STEVE CORRIGAN, MATT ODOM DATE OF REPORT: 11-16-05 DATE DESCRIPTION OF DEFICIENCY I ACTION REQUIRED -' REINSPECTION I_REI~~i~TED I INSPECTED #5 BARS PRESENT FROM LEVEL BELOW APPROVED AS-BUILT FULL-LENGTH #5 BAR PLACED ALONG IN P-l PILASTER LOCATIONS (#6 BARS BY ENGINEER OF WITH #6 BAR ABOVE 06-27-05 016 06-25-05 DETAILED) @ COL LINE Q.I-86, N-85, N-82, RECORD VIA 2ND FLOOR SLAB (COMPLETE) P-82, N-73, P-73, N.2-13.8, Q.I-16, R.6-7 CORRESPONDENCE ELEV A TION (2ND FLOOR) DATED 11-10-05 (AREA C ONLY) #6 BARS INSTALLED 1-#5 BAR ONLY PRESENT FROM LEVEL REMEDlA TE PER VIA DRILL/EPOXY BELOW @ P-l PILASTER LOCATIONS CORRESPONDENCE INTO FLOOR SLAB IN 017 06-25-05 FROM ENGINEER BOTH REFERENCED 07-06-05 (2-#6 BARS DETAILED) OF RECORD LOCATIONS @COLLINEN-39, Q.I-8 (2ND FLOOR) DATED 11-10-05 (TWO ADJ CELLS TO BE GROUTED SOLID) APPROVED AS-BUILT NO CLEAR COVER TO REINFORCING (STRUCTURALL Y) BY VERIFY ANY ISSUES 018 06-25-05 STEEL BANDS WITHIN CIP COLUMN (C-4) ENGINEER OF WITH ARCHITECT @ LINE S-26 (SW CORNER) & S-28 (NE RECORD VIA CONCERNING CORNER) (1ST FLOOR) CORRESPONDENCE FIRE RATING DATED 11-10-05 STD HOOK BARS HAVE NOT BEEN APPROVED AS-BUILT MK412 BARS PLACIW DETAILED IN SHOP DRAWINGS WITHIN WITHIN 2ND FLOOR SLAB EDGE @ TWO SIDES OF ELEVATOR BY ENGINEER OF' SLAB @ 18" OC 06-27-05 019 06-27-05 RECORD VIA AREAS, AS WELL AS CB-l, CB-3, CB-4 CORRESPONDENCE ALONG REVERSE (COMPLETE) (PARTIAL), CB-5, AND CB-6 (PARTIAL) DATED 11-10-05 SIDE OF ELEVATOR CONCRETE BEAM AREAS (AREA A) REMEDlATE PER COL CUT FROM BASE 1'8 COLUMN @ LINE }'-95 APPR 4" OUT- CORRESPONDENCE PLATE AND REPOSI- 020 06-27-05 OF-PLUMB (LEANING TO WEST) FROM ENGINEER TIONED UTILIZING 08-17-05 (1 ST FLOOR) OF RECORD W' ANGLE AS DATED 11-10-05 SUPPORT ON 3 SIDES 1"Qlil 4 REPORT OF NON-COMPLIANCE (PUNCHLIST) ITEMS PROJECT NAME: RESIDENCE INN PROJECT NO.: 761-50044 CLIENT: WELBRO CONSTRUCTION DESCRIPTION OF WORK: SPECIAL INSPECTIONS TECHNICIAN : STEVE CORRIGAN, MATT ODOM DATE OF REPORT: 11-16-05 DATE DESCRIPTION OF DEFICIENCY I ACTION REQillRED ] REINSPECTION I REI~~~~TED I INSPECTED IN-PLACE WELDS ACCEPTABLE; REMAINDER OF IMPROPER ELECTRODES BEING USED WELDS TO UTILIZE E7018 ELECTRODES 021 06-27-05 TO WELD TS COLUMNS TOGETHER (6011 E70XX ELECTRODES, USED TO WEIJD TS 07-28-05 BEING UTILIZED, E70XX SERIES TYPICALL Y (REF COLUMNS WITHIN (COMPLETE) SPECIFIED - SEE SHEET S-101) CORRESPONDENCE AREA A, 3RD FI~OOR FROM ENGINEER OF RECORD DATED 11-10-05) MANY CMU CELLS NOT COMPLETELY FILLED WITH MASONRY GROUT: COL LINE B-13,H-3,N.9-4,N.9..5,Q.1-8,R-13.1, REMEDIATE AS PER Q.9-16, T -12, T .5-12, U-12, U.5-12,H.5-22,J-22, CORRESPONDENCE 022 07-05-05 K-22,P .1-22,Q-26,HA-40,S.2-40.8,N -67 ,HA-67, FROM ENGINEER HA-68,P-68,S-77 ,R.2-89,J-88,F -96.5,A.8-89, OF RECORD A-96 (1 ST FLOOR); AND DATIW 11-10-05 COL LINE A.1-98,G-92,U-97.3,R.5-82,R.8-82, S.5-82,T-82,K-77,N-67 (2ND FLOOR) MANY CMU WALLS REINFORCED @ IDENTIFY AREAS 48" OC, RATHER THAN 32" OC AS PER (FOR REVIEW) AS PER 023 07-05-05 S-212, DETAIL 3 (W-1 DESIGNATION FOR CORRESPONDENCE INTERIOR 1 ST FLOOR AREAS) FROM ENGINEER OF RECORD (AREA A AND AREA C) DATED 11-10-05 ACCEPTABLE PROVIDED SILL TYPICAL CMU SILL REINFORCEMENT AREAS ARE GROUTED 024 07-05-05 (2-#5 BARS) NOT PLACED BENEATH AIR SOLID AS PER CORRESPONDENCE HANDLER OPENINGS IN ANY LOCATION FROM ENGINEER OF RECORD DATED 11-10-05 lfisi~ 5 REPORT OF NON-COMPLIANCE (PUNCHLIST) ITEMS PROJECT NAME: RESIDENCE INN PROJECT NO.: 761-50044 CLIENT: WELBRO CONSTRUCTION DESCRIPTION OF WORK: SPECIAL INSPECTIONS TECHNICIAN: STEVE CORRIGAN, MATT ODOM DATE OF REPORT: 11-16-05 DATE DESCRIPTION OF DEFICIENCY ACTION REQUIRED J REINSPECTION I REI~~~~TEn l INSPECTEn APPROVEn AS-BUILT CIP COLUMN@LINE S.2-84 APPR 2" OUT- BY ENGINEER OF N/A 025 07-06-05 OF-PLUMB (LEANING TO NORTH) RECORD VIA N/A (COMPLETE) (1 ST FLOOR) CORRESPONDENCE DATED 11-10-05 CIP COLUMN APPR 1" OUT-OF-PLUMB @ LINE S.2-28 (LEANING TO NORTH), APPROVED AS-BUILT S.2-33 (LEANING TO SOUTH), BY ENGINEER OF N/A 026 07-08-05 S.2-70 (LEANING TO NORTH); RECORD VIA N/A (COMPLETE) APPR 1.25" OUT-OF-PLUMB @ CORRESPONDENCE LINE S.2-37 (LEANING TO NORTH) DATED 11-10-05 (1 ST FLOOR) KO-1 REINFORCE- KO-1 BOND BEAM REINFORCING STEEL MENT NOT REQUIRED NOT PRESENT @ COL LINE A TO C-89, ASPER N/A 027 07-11-05 CORRESPONDENCE N/A C-88 TO 89, U-96.2 TO 99 FROM ENGINEER (COMPLETE) (3RD FLOOR SLAB ELEVATION) OF RECORD DATED 11-10-05 -- REMEDIATE AS PER ADDITIONAL "A" BARS NOT PRESENT SK-41,SK-42,SK-43 (SEE 028 07-11-05 WITHIN FLOOR SLAB @ CORRESPONDENCE FROM ENGINEER COL LINE N TO Q-96 (3RD FLOOR) OF RECORD DATED 11-10-05) BANDS PLACED @ 6" OC TYPICAL APPROVED AS-BUILT BY ENGINEER OF 029 07-11-05 WITHIN CB-2 BEAMS @ COL LINE S.2-68 RECORD VIA N/A N/A TO 70, U.1-94 TO 96.2, RATHER THAN AS CORRESPONDENCE (COMPLETE) PER S-301, DETAIL 2 (3RDFLOOR) DATED 11-10-05 lRJ~,i~ 6 REPORT OF NON-COMPLIANCE (PUNCHLIST) ITEMS PROJECT NAME: RESIDENCE INN PROJECT NO.: 761-50044 CLIENT: WELBRO CONSTRUCTION DESCRIPTION OF WORK: SPECIAL INSPECTIONS TECHNICIAN: STEVE CORRIGAN, MATT ODOM DATE OF REPORT: 11-16-05 DATE DESCRIPTION OF DEFICIENCY I ACTION REQUIRED J REINSPECTION I DATE ] INSPECTED REINSPECTED APPROVED AS-BUILT CIP COLUMN @ LINE S.2-19 OFFSET APPR BY ENGINEER OF N/A 030 07-13-05 2" S OF PLAN LOCATION RECORD VIA N/A (COMPLETE) (151' AND 2ND FLOOR) CORRESPONDENCE DATED 11-10-05 SEVERALCMU WALLS ON t';U FLOOR OFFSET FROM 151' FLOOR LOCATIONS (APPR OFFSET AND DIRECTION LISTED): COL LINE '1'-31 (1.625" TO NORTH), COL LINE '1'-22 (0.875" TO NORTH), APPROVED AS-BUILT COL LINE F-2 (0.625" TO EAST), BY ENGINEER OF 031 07-14-05 COL LINE H-l (0.625" TO EAST), RECORD VIA N/A N/A COL LINE L-2 (0.75" TO EAST), CORRESPONDENCE (COMPLETE) COL LINE V-90 (0.50" TO NORTH), DATED 11-10-05 COL LINE '1'-82 (0.625 TO SOUTH), COL LINE '1'-73 (1.0" TO SOUTH), COL LINE G.8-82 (0.50" TO NORTH), COL LINE H-99 (1.0" TO WEST), COL LINE U-35 (1.125" TO SOUTH) END OF CB-l BEAM @COLLINEL.5-68 DETAIL AS-BUILT NOT BEARING ON CMU/P-l PILASTER CONDITION AND I 032 07-27-05 (CMU PLACED FULL-HEIGHT) SUBMIT FOR 2 #5xl0' BARS PLACED (5' IN BEAM, 5' IN ENGINEER SLAB) TO PROVIDE DEVELOPMENT APPROVAL BOTTOM REINFORCING STEEL PLACED APPROVED AS-BUILT @ 12" OC WITHIN COL LINE R TO U-90 TO BY ENGINEER OF N/A 033 07-27-05 96, R TO U-96 TO 98 (DETAII,ED @ 10" OC RECORD VIA N/A (COMPLETE) WITHIN THESE AREAS) CORRESPONDENCE (AREA C - 4TH FLOOR) DATE:D 11-10-05 BOTTOM REINFORCING STEEL APPROVED AS-BUILT PLACED @ 10" OC WITHIN BY ENGINEER OF N/A 034 07-27-05 COL LINE M TO Q-82 TO 86 RECORD VIA N/A (COMPLETE) (DETAILED @ 9" OC WITHIN THIS AREA) CORRESPONDENCE (AREA C - 4TH FLOOR) DATED 11-10-05 f&1 7 Q,Sl.: REPORT OF NON-COMPLIANCE (PUNCHLIST) ITEMS PROJECT NAME: RESIDENCE INN PROJECT NO.: 761-50044 CLIENT: WELBRO CONSTRUCTION DESCRIPTION OF WORK: SPECIAL INSPECTIONS TECHNICIAN: STEVE CORRIGAN, MATT ODOM DATE OF REPORT: 11-16-05 DATE DESCRIPTION OF DEFICIENCY I ACTION REQUIRED ] REINSPECTION I REI~~i~TEDJ INSPECTED CB-6 BEAM CONTAINS NO BANDS @3" OC @ N END (COL LINE N-85) APPROVED AS-BUILT 7 BANDS @ 6" OC AND MID-BEAM BANDS BY ENGINEER OF N/A 035 07-27-05 @ 12" OC IN-PLACE (S END OF BEAM RECORD VIA N/A (COMI)LETE) CONSTRUCTED AS PER PROJECT CORRESPONDENCE DOCUMENTS) DATED 11-10-05 (AREA C - 4TH FLOOR) 5000 PSI CONCRETE (MIX CODE 1156016) APPROVED AS-BUILT PLACED WITHIN CMU CELLS @ COL BY ENGINEER OF N/A 036 07-27-05 LINE H.5-66 TO 68, H.5 TO S.2-66, RECORD VIA N/A (COMPLETE) N-66 TO 68 DURING PLACEMENT OF CORRESPONDENCE FLOOR SLAB (AREA C - 3RD FLOOR) DATlm 11-10-05 APPROVED AS-BUILT 2 #6 REINFORCING PRECAST LINTEL @COLLINER.2-16 BY ENGINEER OF BARS PLACED INTO FOUND TO BE CRACKED ON BOTTOM RECORD VIA LINTEL FOR 07-28-05 037 07-28-05 (CENTER, EAST TO WEST END) AND SIDE CORRESPONDENCE ADDITIONAL (COMPLETE) (NE CORNER, TOP, APPR 24" IN LENGTH) DATED 11-10-05 (AREA A, 3RD FLOOR) (MONITOR STRENGTH (RATHER CONDITION) THAN #5 BARS) 2 #5 BARS SUBSTITUED FOR 1 #6 BAR APPROVED AS-BUILT WITHIN EACH CELL IN P-1 LOCATIONS BY ENGINEER OF N/A 038 07-28-05 @COLLINE R.6-7, Q.1-8, N.3-13.5 RECORD VIA N/A (COMPLETE) (AREA A, 3RD FLOOR) CORRESPONDENCE DATED 11-10-05 CMU DOWN CELLS FOUND TO NOT BE COMPLETELY FILLED WITH GROUT REMEDIATE AS PER WITHIN AREA C: COL LINE Q.1-93,F- ST CORRESPONDENCE 039 08-08-05 96.9,A-91,H.2-79 (1 FLOOR); FROM ENGINEER COL LINE B-89.2,J-82 (2ND FLOOR); OF RECORD COL LINE E-97.5,B.8-98,B-89.2,L.9-85,J-85, DATED 11-01-05 H.2-84,H -84,J-68,N-67 ,H.4-66.5,H.4-67.5, N-66.2 P-66 S.1-66 (3RD l<~LOOR) [~Jil 8 REPORT OF NON-COMPLIANCE (PUNCHLIST) ITEMS PROJECT NAME: RESIDENCE INN PROJECT NO.: 761-50044 CLIENT: WELBRO CONSTRUCTION DESCRIPTION OF WORK: SPECIAL INSPECTIONS TECHNICIAN : STEVE CORRIGAN, MATT ODOM DATE OF REPORT: 11-16-05 DATE DESCRIPTION OF DEFICIENCY I ACTION REQUIRED J REINSPECTION I REI~~i~TED I INSPECTED VERTICAL #6 REINFORCING BARS NOT GROUT TWO ADJ PRESENT WITHIN P-1 LOCATION @ COL CELLS SOLID AS PER 040 08-08-05 LINE L.5-66 (3RD FLOOR), 1 #5 BAR CORRESPONDENCE PLACED INTO 4TH FLOOR SLAB (WITHIN FROM ENGINEER EAST HALF OF P-1 LOCATION) AS OF RECORD EXTENSION/SPLICE FOR LEVEL ABOVE DATED 11-10-05 VERIFY SILL AREA HORIZONTAL REINFORCING BARS NOT HAS BEEN GROUTED PRESENT WITHIN SILL AREA OF CMU SOLID AS PER 041 08-08-05 OPENING @ COL LINE HA-67 (2ND FLOOR) CORRESPONDENCE FROM ENGINEER AND HA-40 (3RD FLOOR) OF RECORD DATED 11-10-05 CONCRETE NOT YET PLACED WITHIN GROUT AREAS SOLID SILL AREAS (CMU) @ COL LINE HA-67, ASPER 042 08-08-05 N.5-66 (3RD FLOOR), N.1-66 (4TH FLOOR), AS CORRESPONDENCE FROM ENGINEER WELL AS ALL AIR HANDLER OPENING OF RECORD AREAS DATED 11-10-05 APPROVED AS-BUlL l' IMPROPER GROUT MIX BY ENGINEER OF (1289966 - 4000 ACGRT) RECORD VIA 043 08-11-05 CORRESPONDENCE PLACED WITHIN CMU DOWN CELLS @ DATED 11-10-05 COL LINE C-8 TO 13.7 (4TH FLOOR) (VERIFY CONSOLIDATION) #5x5' STRAIGHT BAR ADDITIONAL REINFORCING BARS NOT PLACED @ 24" OC PLACED WITHIN ROOF SLAB REMEDIATE AS PER WITHIN AREA A 044 08-16-05 (AREA A OR AREA C) RFI #102 ONLY (AS PER 08-17-05 CONVERSATION AS PER SHEET S251, S252 NOTE 14 WITH ENGINEER OF RECORD) lllJiil 9 REPORT OF NON-COMPLIANCE (PUNCHLIST) ITE1\1S PROJECT NAME: RESIDENCE INN PROJECT NO.: 761-50044 CLIENT: WELBRO CONSTRUCTION DESCRIPTION OF WORK: SPECIAL INSPECTIONS TECHNICIAN: STEVE CORRIGAN, MATT ODOM DATE OF REPORT: 11-16-05 DATE DESCRIPTION OF DEFICIENCY -, ACTION REQUIRED] REINSPECTION I REI~~i~TEDJ INSPECTED CMU DOWN CELLS :FOUND TO NOT BE REMEDIATE AS PER COMPLETEL Y FILLED WITH GROUT CORID;SPONDENCE 045 08-16-05 WITHIN AREA C: FROM ENGINEER COL LINE F-96.6, H.9-82, H.7-75, M.7-73, L.5- OF RECORD 66, N-66 (4TH FL~OR) DATED 11-10-05 I MASONRY GROUT NOT CONSOLIDATED IDENTIFY AND DURING PLACEMENT INTO CMU: REMEDIA TE ANY 08-12-05/ COL LINE G TO V-I TO 16,J TO N-17, VOIDED AREAS AS 046 08-15-05/ P TO T-22 (4TH FLOOR); PER 08-16-05/ COL LINE A.3 TO N-22, H.3 TO T-26 TO 41 CORRESPONDENCE 08-23-05 (4TH FLOOR); FROM ENGINEER ELEVATOR C (ROOF); OF RECORD I ELEV A TOR A (ROOF) DATED 11-10-05 ADDRESS AS PER CONCRETE PLACED WITHIN ROOF SLAB CORRESPONDENCE 047 08-23-05 OF ELEVATOR C WAS NOT vmRATED OR FROM ENGINEER FINISHED (TROWEL/FLOAT) OF RECORD DATED 11-10-05 IDENTIFY AREAS INSUFFICIENT SPACING OF CMU FILLED (FOR REVIEW) AS PER I CELLS IN SEVERAL LOCATIONS WITHIN CORRESPONDENCE 048 08-23-05 AREA A-I ST FLOOR (32" OC REQUIRED FROM ENGINEER I @ INTERIOR, 24" OC @ EXTERIOR) OF RECORD DATED 11-10-05 REMEDIATE AS PER NO CLEAR COVER TO BOTTOM GRADE CORRESPONDENCE 049 08-25-05 BEAM STEEL @ COL LINE U.5-50, U.5-56, FROM ENGINEER V.9-56 (AREA B) OF RECORD DATED 11-10-05 INSUFFICIENT CLEAR COVER TO REMEDIATE AS PER BOTTOM GRADE BEAM STEEL @ COL CORRESPONDENCE 050 08-25-05 LINE X-66 - AREA B (1" IN-PLACE), FROM ENGINEER SEVERAL LOCATIONS EXHmIT 2" OF RECORD (3" REOUlRED TO SOIL) DATED 11-10-05 [Qli1: 10 REPORT OF NON-COMPLIANCE (PUNCHLIST) ITEMS PROJECT NAME: RESIDENCE INN PROJECT NO.: 761-50044 CLIENT: WELBRO CONSTRUCTION DESCRIPTION OF WORK: SPECIAL INSPECTIONS TECHNICIAN : STEVE CORRIGAN, MATT ODOM DATE OF REPORT: 11-16-05 lITEM ~ATE I DESCRIPTION OF DEFICIENCY I ACTION REQUIRED ] REINSPECTION I DATE I NO. INSPECTED REINSPECTED ADDITIONAL REINFORCING DETAIL AS-BUILT CONDITION AS PER STEEL/KEYW A Y NOT PLACED WITHIN CORRESPONDENCE 051 08-25-05 GRADE BEAM @ COL LINE S.7-41, U-66- FROM ENGINEER AREA B (CONSTRUCTION JOINTS) OF RECORD AS PER S104, DETAIL 2 DATEn 11-10-05 PILE PROJECTION INTO GRADE BEAMS APPROVEn AS-BUILT (COL LINE S.7 TO U-41, U TO Z-41 TO 66- BY ENGINEER OF N/A 052 08-25-05 AREA B) WAS FOUNn TO RANGE FROM 0- RECORn VIA N/A (COMPLETE) 3" IN-PLACE (4" MIN REQUlREn AS PER CORRESPONnENCE S102} DATEn 11-10-05 NO ACTION POSSIBLE PILE TOPS NOT SUFFICIENTL YI (CONCRETE PLACED) COMPLETELY CLEANED OF nEBRIS SEE 053 08-25-05 CORRESPONnENCE WITHIN GRAnE BEAM AREAS COL LINE FROM ENGINEER S.7 TO U-41, U TO Z-41 TO 66 - AREA B OF RECORD DATEn 11-10-05 ELEVATION OF GRADE BEAMS WITHIN REF SK-23,SK-24,SK-25 COL LINE U.5 TO Z-50, Z-50 TO 56, ASPER CORRESPONnENCE 054 08-25-05 U.5 TO Z-56, X-50 TO 56 (AREA B) WAS FROM ENGINEER LOWEREn 16" DUE TO CONFLICT WITH OF RECORn ELEVATION OF PAVEMENT AREAS nATEn 11-10-05 REMEDIATE AS PER 08-23-051 CMU CELLS NOT COMPLETEL YFILLEn CORRESPONnENCE 055 08-29-05 W/GROUT: COL LINE P-5, P-4.5, 1'-12, U-12, FROM ENGINEER U.5-12, V-26, B-11.9, L-2.5, U-4 (2ND FLOOR) OFRECORn DATED 11-10-05 HORIZONTAL SILL REINFORCEMENT REMEDlA TE AS PER NOT EXTENnEn INTO JAMB CELL @ COL CORRESPONnENCE 056 08-29-05 LINE H.3-39.5 (3RD FLOOR), FROM ENGINEER (ALSO,INSUFFICIENT SPLICE LENGTH OF OFRECORn HORIZONTAL REINFORCEMENT) DATED 11-10-05 IIill1 11 REPORT OF NON-COMPLIANCE (PUNCHLIST) ITEMS PROJECT NAME: RESIDENCE INN PROJE:CT NO.: 761-50044 CLIENT: WELBRO CONSTRUCTION DESCRIPTION OF WORK: SPECIAL INSPECTIONS TECHNICIAN: STEVE CORRIGAN, MATT ODOM DATE OF REPORT: 11-16-05 DATE DESCRIPTION OF DEFICIENCY I ACTION REQUIRED ] REINSPECTION I REI~~i~TED I INSPECTED CMU CELLS NOT COMPLETELY FILLED W/GROUT: COL LINE H.3-40.5, B-12.9, B-12, REMEnIATE AS PER A.8-13, A-10, F-5, F-5.5, F-3, L-5, R.2-12 CORRESPONDENCE 057 08-30-05 (3RD FLOOR); FROM ENGINEER COL LINE L-39, N.3-10, J-13, B.5-13, A-11, OF RECORD A-10.5, A-10, A.8-13, R.5-26, S-35 DATED 11-10-05 (4TH FLOOR). APPROVED AS-BUILT BY ENGINEER OF HORIZONTAL REINFORCEMENT NOT RECORD VIA 058 08-30-05 PRESENT WITHIN SILL AREA @ CORID=SPONDENCE COL LINE A.5-13 (2ND FLOOR) DATED 11-10-05 (PROVIDED SILL AREA HAS BEEN GROUTED SOLID) GROUT AREAS SOLID CMU REMAINS UNFILLED WITH ASPER 059 08-30-05 GROUT WITHIN SILl, AREAS CORID:SPONDENCE @ COL LINE A.5-13 (3RD FLOOR); FROM ENGINEER AND N.5-41, H.3-40 (4TH FLOOR) OF RECORD DATED 11-10-05 INSUFFICIENT EMBEDMENT OF ANCHOR IDENTIFY AS-BUILT BOL TS WITHIN CONCRETE GRADE CONDITION AND BEAMS @ COL LINE: SUBMIT FOR ENGINEER 060 08-30-05 X-58 (NE-8.75,SE-8.75,NW-8.75,SW-8.5"); APPROVAL AS PER X-61 (NE-7.75,SE-7.75,NW-8.25,SW-8"); CORRE:SPONDENCE X-64 (NE-7,SE-7,NW-7,SW-7.5"); FROM ENGINEER X-66 (NE-8,SE-7 ,NW - 7 .5,SW -7 .5"); OF RECORD G-44.6 (NE-7.5,SE-7.5,NW-7.75,SW-8") DATED 11-10-05 112-Si1: 12 REPORT OF NON-COMPLIANCE (PUNCHLIST) ITEMS PROJECT NAME: RESIDENCE INN PROJECT NO.: 761-50044 CLIENT: WELBRO CONSTRUCTION DESCRIPTION OF WORK: SPECIAL INSPECTIONS TECHNICIAN : STEVE CORRIGAN, MATT ODOM DATE OF REPORT: 11-16-05 DATE DESCRIPTION OF DEFICIENCY ACTION REQUIRED ] REINSPECTION I RJ<~I~~~~TED I INSPECTED #5 VERTICAL CMU REINFORCING BARS REMEHlATE AS PER PLACED LOOSE WITHIN CMU, RATHER CORRESPONDENCE 061 08-31-05 THAN ANCHORED INTO GRADE BEAM @ FROM ENGINEER COL LINE V-44.8, R.3-41, 1'.5-41, U.5-49, OF RECORD H-61, G-45.2 DATED 11-10-05 i (TO REMEHlATE INSUFF. SPACING) #4 SLAB DOWELS (20" SPLICE) WERE STRAIGHTENED AND ARRANGED REMEDlA TE AS PER WITHIN CMU @ CORRESPONDENCE 062 08-31-05 COL LINE G-52 TO 53, V-44 TO 45 FROM ENGINEER (#5 BARS SPECIFIED @ 24" OC) OF RECORD #5 BAR PLACED LOOSE ALONGSIDE #4 DATED 11-10-05 BAR IN EACH LOCATION (AREA B - GROUND ELEVATION) IDENTIFY SEVERAL CONNECTION PLATES EXIST CONHlTIONS/ LOCATIONS AS PER 063 09-20-05 WHICH HAVE SEPARATED FROM CHORD CORRESPONDENCE AND/OR WEB MEMBERS WITHIN FROM ENGINEER ROOF TRUSSES (AREA C) OF RECORD DATED 11-10-05 TRUSS H13A, HI4A, HI5A, HI6A, H17A REME:HlATE PER , WERE FIELD-MOHlFIED TO EXTEND CANTILEVER AREA OVER BALCONY CORRESPONDENCE 064 09-20-05 BENEATH - APPEAR TO HAVE BEEN FROM E:NGINEER OF SHOP-FABRICATED AS HB, H14, HIS, RECORD DATED H16, H17 (AREA C) 08-29-05 FOUR J7 TRUSSES FIELD-MOHlFIED FOR REQUIRES APPROVAL 065 09-20-05 FIELD CONHlTION @ RIDGE AREA OF ENGINEER OF (COL LINE J-67, AREA C) RECORD TWO J4 TRUSSES MISSING @ REQUlRF~S APPROVAL TRUSSES NOW 09-26-05 066 09-20-05 OF ENGINEER OF COL LINE H.3-66 (AREA C) RECORD IN-PLACE (COMPLETE) l&1 13 . ............~.. ... ~QfI' , ,. REPORT OF NON-COMPLIANCE (PUNCHLIST) ITEMS PROJECT NAME: RESIDENCE INN PROJECT NO.: 761-50044 CLIENT: WELBRO CONSTRUCTION DESCRIPTION OF WORK: SPECIAL INSPECTIONS TECHNICIAN : STEVE CORRIGAN, MATT ODOM DATE OF REPORT: 11-16-05 DATE ] DESCRIPTION OF DEFICIENCY I ACTION REQUIRED ] REINSPECTION I REI~~i~TED j INSPECTED INTERIOR END OF TRUSS H13A, HI4A, HI5A, HI6A, HI7A, H18, HI9, H20 FALL APPR 1-1.5" SHORT OF SIDE OF WOOD REQUIRES APPROV AI, 067 09..20-05 BEARING PLATES (2x4x36" PLACED OF ENGINEER OF VERTICALLY AT BOTTOM/END WEB OF RECORD EACH TRUSS TO ALLOW PLACEMENT OF H2.5 CLIP - BOARD NAILED Cii! 4-6" OC) MANY FASTENERS OBSERVED TO BE INSTALL FASTENERS; MISSING FROM EXTERIOR SHEATHING SUPPORT AND 068 09-23-05 (DENSGLASS); OTHER AREAS FOUND TO ATTACH EXTENDED EXTEND OVER CMU APPR 8" WITH NO AREAS VIA ATTACHMENT (AREA C) APPROVED METHOD NUMEROUS FASTENERS MISSING FROM 069 09-23-05 EXTERIOR FRAMING INST AI,L MISSING (TOP AND BOTTOM TRACK LOCATIONS FASTENERS NOTED WITHIN AREA C) SEVERAL FASTENERS (NAILS, H-CLIPS) INSTALL MISSING ALL FASTENERS 09-30-05 070 09-23-05 MISSING FROM PLYWOOD ROOF FASTENERS NOTED AS MISSING (COMPLETE) DECKING (AREA C) HAVE BEEN PLACED LIGHT GAUGE METAL FRAMING WITHIN HEAD AND SILL LOCATIONS OF REMEDIATE ALL 071 09-27-05 EXTERIOR WINDOWS WITHIN ALL DEFICIENT AREAS LEVELS OF AREA C WAS CONSTRUCTED ENCOUNTERED AS PER HI DETAIL (H2 DETAIL SPECIFIED AS PER S506, DETAIL 4) NUMEROUS LOCATIONS WITHIN EXTERIOR LIGHT GAUGE METAL REMEDIATE AS PER 072 09-27-05 FRAMING (AREA C - VARIOUS LEVELS) SKETCH SK-30, WERE FOUND TO EXTEND MORE THAN 1" PAST EDGE OF CONCRETE SLAB (I" SK-31,SK-32 MAX EXTENSION AS PER S505, DETAIL 6) 19ji~ 14 REPORT OF NON-COMPLIANCE (PUNCHLIST) ITEMS PROJECT NAME: RESIDENCE INN PROJECT NO.: 761-50044 CLIENT: WELBRO CONSTRUCTION DESCRIPTION OF 'WORK: SPECIAL INSPECTIONS TECHNICIAN: STEVE CORRIGAN, MATT ODOM DATE OF REPORT: 11-16-05 DATE DESCRIPTION OF DEFICIENCY ACTION REQUIRED ] REINSPECTION ~EI~~~~TED I INSPECTED NUMEROUS LIGHT GAUGE METAL TRACK LOCATIONS WITHIN AREA C REMEDIATE ALL 073 09--27-05 (ALL LEVELS) WERE FOUND TO NOT BE DEFICIENT AREAS FASTENED TO CONCRETE SLAB AS PER ENCOUNTERED S505, DETAIL 2,4,5 P AF I<'ASTENERS UTILIZED IN JAMB DETAIL AS-BUILT STUD CLIP- TO-CONCRETE SLAB CONDITION AND LOCATIONS (AREA C - ALL LOCATIONS) SUBMIT FOR ENGINEER 074 09-27-05 ARE 0.145x1.25" PINS, APPROVAL AS PER RATHER THAN 0.177x1.25" PINS CORRESPONDENCE (REF S507, DETAIl" 4, 5) FROM ENGINEER TYPICALLY, 3 TO 5 FASTENERS OF RECORD FOUND IN-PLACE DATED 11-10-05 NAILS TYPICALLY UTILIZED FOR PROVIDE FASTENER ATTACHMENT OF PLYWOOD ROOF DATA FOR ENGINEER DECKING ARE HITACHI 2 Y. x 0.099" WIRE APPROVAL AS PER 075 09-30-05 COIL ROUND HEAD SCREW SHANK CORRESPONDENCE (#12210D) OR 8d COOLER- FROM ENGINEER 8d COMMON ARE SPECIFIED OF RECORD (NAILS SPACED @ 4-6" OC IN-PLACE) DATED 11-10-05 -- -- ~ 15 ...~.. i.~..,......'..' , 1;-.1 Build On Engineering. Consulting. Testing REPORT OF IN-PLACE DENSITY TESTS TESTED FOR: A1A Acquisition Group, L TO., LLP DATE: 1017105 3425 Atlantic Avenue REPORT NO: 7 Cocoa Beach, FL 32931 PROJECT NO: 761-50044 Attn: Roger Dobson PROJECT: Residence Inn - Cape Canaveral, FL TECHNICIAN: K. Farrell! J. Kilderrv MAXIMUM IN-PLACE ELEV. OPTIMUM LAB DRY DRY COMPACTION OF DATE MOISTURE DENSITY MOISTURE DENSITY COMPACTION REQUIREMENT TEST (2005) LOCATION (%) (PCF) (%) (PCF) (%) (%) (ft) CHILLER PAD FOOTING Reference: 0 = top of excavated grade 9/29 West side, center 12.8 107.9 5.6 103.2 95.6 95 0-1 9/29 East side, center 12.8 107.9 4.2 105.3 97.5 95 0-1 LEAVE OUT SLAB ON GRADE I Reference: 0 = top of grade 9!22 F.2-9 12.8 107.9 10.5 103.8 96.7 95 0-1 9/22 E.5-11.7 12.8 107.9 6.9 103.1 95.5 95 0-1 9/22 8.8-9.2 12.8 107.9 7.8 103.4 95.8 95 0-1 9/22 8.8-3.8 12.8 107.9 7.3 102.9 95.5 95 0-1 9/22 C.5-3.8 12.8 107.9 6.4 103.0 95.5 95 0-1 9/22 F.7-6.5 12.8 107.9 9.6 104.2 96.6 95 0-1 9/22 E .4-6 12.8 107.9 9.0 103.7 96.1 95 0-1 BUILDING PAD FILL SOILS Reference: 0 = top of fill 9/12 H-50 9.9 110.8 16.4 106.9 96.5 95 0-1 9/12 T-43 9.9 110.8 9.3 105.6 95.3 95 0-1 9!12 8-53 9.9 110.8 15.9 110.5 99.8 95 0-1 9/12 8-64 9.9 110.8 10.6 108.4 97.8 95 0-1 9/12 L-64 9.9 110.8 10.7 107.8 97.3 95 0-1 9/12 P-53 9.9 110.8 13.2 105.7 95.4 95 0-1 PAVEMENT BASE COURSE Reference: 0 = top of base course 9/23 40' W. of main entrance 11.2 120.0 14.6 118.4 98.7 98 5-10" I 9/23 " " 11.2 120.0 9.8 117.7 98.1 98 0-5" 9/23 90' W. of main entrance 11.2 120.0 12.3 118.1 98.4 98 5-10" 9/23 " " 11.2 120.0 8.5 119.0 99.2 98 0-5" THESE TEST RESUL TS APPL Y ONL Y TO THE SPECIFIC LOCATIONS NOTED AND MA Y NOT REPRESENT ANY OTHER LOCATIONS OR ELEVA TlONS. REPORTS MA Y NOT BE REPRODUCED, EXCEPT IN FULL, WITHOUT WRITTEN PERMISSION BY PROFESSIONAL SERVICE INDUSTRIES, INC. NOTES: Proctor Method: _Standard -LModified DENSITY TEST METHOD:..LDrive Sleeve LNuclear Gauge * Results do not meet project's requirement. TESTS PERFORMED PER ASTM 02922-96 & ASTM 03017-96 **Retest results do meet project's requirement DENSITIES SHOWN: Lbs. per cubic foot Respectfully Submitted, MOISTURE CONTENT: Percent of dry weight Professional Service Industries, Inc. PERCENT COMPACTION: Base on maximum dry density obtained on a representative sample 1 Jeffrey H.M. Begovlch. PE. Vice PresidenUConstruction Services Florida Registration No. 51869 ~--- --~-~~ ~-~--~-~-~ - -- ~~ -- --~--- -'-'_.~""""-,-,-~,~""'''''''' - ---~-~ ---- Professional Service Industries, Inc.' 1748 33rd Street. Orlando. FL 32839' Phone 407i304-5560' Fax 407i304-5561 FL Engineering Business 3684 REPORT OF GROUT COMPRESSION TEST Tested For: A 1A Acquisition Group LTD., LLP Project: RESIDENCE INN Attn: Roger Dobson CAPE CANAVERAL, FL 3425 Atlantic Avenue Cocoa Beach, FL 32931 Project No: 761-50044 LOCATION: Area B cell fill, col. Line G to Y and 44 to 66 Date Placed: 10/7/2005 Technician: K. Farrell Time Batched: 1030 AM Supplier: Rinker Time Sampled: 11:20 AM Delivery TicketlTruck No.: 92769401 Slump (in) (ASTM C143): 9 Mix No. & Proportions: 1162918 Air Temp. (F): 88 Concrete Temp. (F) (ASTM C1064): 90 Date Received in lab: 10/8/2005 Air Content IASTM C173/C231): N/A COMPRESSIVE TEST RESULTS Test Date Total Prism Prism Compressive Type Set Prism Age of Load Sides Area Strength of No. 10 (Days) Test (Ibs) (in) (sq. in.) (psi) Break 137 A 7 10/14/2005 37500 3.60x3.50 12.60 2980 Tvpe 2 B 28 11/4/2005 58000 3.40x3.60 12.24 4740 Tvpe 1 C 28 11/4/2005 59500 3.50x3.50 12.25 4860 Tvpe 2 Specifications: 3000 28 days REMARKS: X Prisms made by PSI Prisms made by Contractor X Prisms picked up by PSI Prisms picked up by Contractor X Test Results Comply with Test Results do not Comply with applicable specifications applicable specifications Concrete sampled in accordance with ASTM C172 and ASTM C31. Compressive Strength tests performed in accordance with ASTM C39. Respectfully Submitted Professional Service Industries, Inc. -'-'-'~..'--'-'~'- .- Professional Service Industries. Inc.. 1748 33rd Street. Orlando, FL 32839 . Phone 407/304-5560 . Fax 407/304-5561 Engineering" Consulting.. Testing October 14, 2005 Mr. Todd Morley - Chief Bldg. Official City of Cape Canaveral Building Department 105 Polk Avenue Cape Canaveral, Florida 32920 Re: Summary of Special (Threshold) Inspection Services Residence Inn - Cape Canaveral, Florida PSI Project No. 761-50044, Report #7, (Progress Report # 4) Dear Mr. Morley: Professional Service Industries, Inc (PSI) is performing special inspection services for the Residence Inn project located in Cape Canaveral, Florida. This report is intended to summarize the status of our inspection services performed between September 1, 2005 and September 30, 2005. As construction has progressed within the structure PSI representatives have performed a series of inspections in accordance with the project's Special Inspection Plan. As deficiencies are discovered within the course of our inspections and observations, the contractor will be immediately notified so that corrective action may be performed. Any deficiencies not immediately corrected are entered into a running "punch-list" of non-conforming items. A current punch-list is attached for your review. PSI will maintain and update this punch-list as deficiencies are discovered, corrective actions are taken and re-inspections are performed. As of this date, fifty-six (56) items need to be addressed. We trust that this summary of our services during this time period is complete and sufficient for your needs. If you have any questions, please do not hesitate to call. Respectfully submitted, PROFESSIONAL INDUSTRIES, INC. ? c~ ~"/ Rod P.E. Senior Engineer Construction Services Florida Registration #27667 Special Inspector Reg. #86 Attach ments: Inspection reports Punch-list Xc: A1A Acquisition Group, Roger Dobson WELBRO Building Corp., Chris Cortellini R. L. Plowfield & Associates, Chris Scroggins Powell Design Group, Ron Brown BB & T, Ron Barley -"-~-~~",~- --~"""'~~~~""-"""""""""""'-~- Professional Service Industries. Inc.' 1748 33rd Street. Orlando. FL 32839 . Phone 407/304-5560' Fax 407/304-5561 FL Engineering Business 3684 Build On Engineering.. Consulting" Testing REPORT OF REINFORCED CONCRETE INSPECTION TESTED FOR: A1A Acquisition Group, LTD., LLP PROJECT: Residence Inn - Cape Canaveral, FL 3425 Atlantic Avenue REPORT NO: 7 Cocoa Beach, Fl 32931 PROJECT NO: 761-50044 Attn: Roger Dobson DATE: 9/14/2005 TECHNICIAN: S. Corrigan REINFORCING STEEL PLACEMENT STRUCTURAL ELEMENT ELEVATION: top of grade beam Foundation PLAN LOCATION: Section "B", canopy pedestals Wall Column Floor Slab Stair X Other CRITERIA UTILIZED AS !NSPECTION REFERENCE: Structural Plans: Sheet(s): 5212 Detail(s): 2 RFI: PDE RFI: Dated: 3/23/05 RFI: CONDITIONS / CONSTRUCTIONS OBSERVED: No exceptions Deficiencies X Proper sizing X X Proper grade of bars X X Proper quantity, spacing, & layout X X Proper splice lengths & splice locations X X Proper chairing and concrete cover X X Proper securement of reinforcing X Proper layout of post tensioning cables Proper drape of post tensioning tendons Proper sheathing and anchor reinforcing X Concrete strength verified X X Concrete consolidated during placement X Other: DEFICIENCIES: REINSPECTION REQUIRED: No REMARKS: NOTES: Contractor is responsible for scheduling any necessary reinspection after remedial work is performed. Tests may not be reproduced, except in full, without written permission from Professional Service Industries, Inc. Page 1 of 7 ----""~""""-,-"'--~"~""'~"~,- ------,,- -- -----~,-,-,--"._,._-- ----- Professional Service Industries, Inc.' 1748 33rd Street. Orlando, FL 32839' Phone 407/304-5560' Fax 407/304-5561 FL Engineering Business 3684 Engineering e Consulting e Testing REPORT OF REINFORCED CONCRETE INSPECTION TESTED FOR: A1A Acquisition Group, LTD., LLP PROJECT: Residence Inn - Cape Canaveral, FL 3425 Atlantic Avenue REPORT NO: 7 Cocoa Beach, FL 32931 PROJECT NO: 761-50044 Attn: Roger Dobson DATE: 9/20/2005 TECHNICIAN: M. Odom REINFORCING STEEL PLACEMENT STRUCTURAL ELEMENT Foundation PLAN LOCATION: Section "C" roof trusses and attachments Wall Column Floor Slab Stair X Other CRITERIA UTILIZED AS INSPECTION REFERENCE: Structural Plans: Sheet(s): Detail(s): RFI: Reese Bldg Components RFI: Dated: 8/11/05 RFI: Revised: 9/8/05 CONDITIONS / CONSTRUCTIONS OBSERVED: No exceptions Deficiencies Proper sizing Proper grade of bars Proper quantity, spacing, & layout Proper splice lengths & splice locations Proper chairing and concrete cover Proper securement of reinforcing Proper layout of post tensioning cables Proper drape of post tensioning tendons Proper sheathing and anchor reinforcing Concrete strength verified Concrete consolidated during placement X Other: See below X DEFICIENCIES: Several connection plates exist which have separated from chord and/or web members. Truss H 13A, H 14A, H 15A, H 16A and H 17 A modified to extend cantilever area over balcony beneath (requires approval of engineer). Four J7 trusses modified for fieid condition at ridge area (J-67). Two J4 trusses are missing at H.3-66. REINSPECTION REQUIRED: Yes REMARKS: Various attaching clips not yet placed, nails are missing from holes in various attaching clips (all attaching holes must be utilized in order to attain design strength), and many nails are found to be uncoated (clips are galvanized). NOTES: Contractor is responsible for scheduling any necessary reinspection after remedial work is performed. Tests may not be reproduced, except in full, without written permission from Professional Service Industries, Inc. Page 2 of 7 ---~~""""-~-~""""""-"-~"'~"~ -~,---~'""-" ^ -~---,-"'-"--^,.,-_._--,-,---,---- -"--- Professional Service Industries. Inc.. 1748 33rd Street. Orlando, FL32839 . Phone 407/304-5560. Fax 407/304-5561 FL Engineering Business 3684 Build On Engineering" Consulting.. Testing REPORT OF REINFORCED CONCRETE INSPECTION TESTED FOR: A 1A Acquisition Group, LTD., LLP PROJECT: Residence Inn - Cape Canaveral, FL 3425 Atlantic Avenue REPORT NO: 7 Cocoa Beach, FL 32931 PROJECT NO: 761-50044 Attn: Roger Dobson DATE: 9/23/2005 TECHNICIAN: M. Odom REINFORCING STEEL PLACEMENT STRUCTURAL ELEMENT ELEVATION: 1 st to 4th floor Foundation PLAN LOCATION: Section "C" exterior sheathing at G.9 & 70 - 75, H.9 & 75 - 79, G.9 & 79 - 84, H.9 & 84 - 85, Wall Column Floor Slab Stair X Other CRITERiA UTiliZED AS INSPECTiON REFERENCE: Structural Plans: Sheet(s): Detail(s): RFI: RFI: Dated: 3/23/05 RFI: CONDITIONS 1 CONSTRUCTIONS OBSERVED: No exceptions Deficiencies Proper sizing Proper grade of bars Proper quantity, spacing, & layout Proper splice lengths & splice locations Proper chairing and concrete cover Proper securement of reinforcing Proper layout of post tensioning cables Proper drape of post tensioning tendons Proper sheathing and anchor reinforcing Concrete strength verified Concrete consolidated during placement X Other: see below X DEFICIENCIES: Many fasteners (screws) observed to be missing from sheathing at various locations within above-referenced areas. Also sheathing was found to extend approximately 8" over CMU at edges or corners with no attachments in extended area. These locations should be furred or otherwise supported by an approved method and attached to supporting member. REINSPECTION REQUIRED: Yes REMARKS: NOTES: Contractor is responsible for scheduling any necessary reinspection after remedial work is performed. Tests may not be reproduced, except in full, without written permiSSion from Professional Service Industries, Inc. Page 3 of 7 --~"~~-"'--~~- ~~-"~""-~-"-"~ ~ ~ ---.-.--.-,--"'-^'^'^'-..----- ------ Professional Service Industries, Inc, . 1748 33rd Street. Orlando, FL 32839 . Phone 407/304-5560. Fax 407/304.5561 FL Engineering Business 3684 /Engineering" Consulting" Testing REPORT OF REINFORCED CONCRETE INSPECTION TESTED FOR: A1A Acquisition Group, LTD., LLP PROJECT: Residence Inn - Cape Canaveral, FL 3425 Atlantic Avenue REPORT NO: 7 Cocoa Beach, FL 32931 PROJECT NO: 761-50044 Attn: Roger Dobson DATE: 9/23/2005 TECHNICIAN: M. Odom REINFORCING STEEL PLACEMENT STRUCTURAL ELEMENT Foundation PLAN LOCATION: Section "cn roof decking (plywood) at S - J & 66 - 85 (excluding E & W ridge areas) Wall Column Floor Slab Stair X Other CRITERIA UTIUZED AS INSPECTION REFERENCE: Structural Plans: Sheet(s): $101 Detail{s): RFI: RFI: Dated; 3/23105 RFI: CONDITIONS I CONSTRUCTIONS OBSERVED: No exceptions Deficiencies Proper sizing Proper grade of bars Proper quantity, spacing, & layout Proper splice lengths & splice locations Proper chairing and concrete cover Proper securement of reinforcing Proper layout of post tensioning cables Proper drape of post tensioning tendons Proper sheathing and anchor reinforcing Concrete strength verified Concrete consolidated during placement X Other: X DEFICIENCIES: Several fasteners (nails, H-c1ips) are missing from plywood roof decking within above-referenced locations. REINSPECTION REQUIRED: REMARKS: Areas found to be deficient were painted for ease of remediation and reinspection. NOTES: Contractor is responsible for scheduling any necessary reinspection after remedial work is performed. Tests may not be reproduced, except in full, without written permission from Professional Service Industries, Inc. Page 4 of 7 ~---~-,--"-----"--,-,~,-- -~._-,~ -""-,~,_ ~_"_"'_''''''__,_._..___,,_,~.,, _'~"'~'__~"_'m"___'~_"~____,,,,,_ Professional Service Industries. Inc. " 1748 33rd Street" Orlando, FL 32839" Phone 407/304-5560 " Fax 407/304-5561 FL Engineering Business 3684 Build On Engineering .. Consulting.. Testing REPORT OF REINFORCED CONCRETE INSPECTION TESTED FOR: A 1A Acquisition Group, LTD., LLP PROJECT: Residence Inn - Cape Canaveral, FL 3425 Atlantic Avenue REPORT NO: 7 Cocoa Beach, FL 32931 PROJECT NO: 761-50044 Attn: Roger Dobson DATE: 9/2312005 TECHNICIAN: M. Odom REINFORCING STEEL PLACEMENT STRUCTURAL ELEMENT Foundation PLAN LOCATION: Section "C" exterior framing (metal studs) at G.9 & 70 - 75, H.9 & 75 - 79, G.9 & 79 - 84, X Wall Column Floor Slab Stair Other CRITERIA UTILIZED AS INSPECTION REFERENCE: Structural Plans: Sheet(s): 5101 Detail(s): RFI: S402 RFI: Dated: 3/23105 S501, S502,S503, S504, S505, S506, S507 RFI: CONDITIONS 1 CONSTRUCTIONS OBSERVED: No exceptions Deficiencies Proper sizing Proper grade of bars Proper quantity, spacing, & layout Proper splice lengths & splice locations Proper chairing and concrete cover Proper securement of reinforcing Proper layout of post tensioning cables Proper drape of post tensioning tendons Proper sheathing and anchor reinforcing Concrete strength verified Concrete consolidated during placement Other: DEFICIENCIES: Top and bottom track found not to be attached as per S505 and S506 (additional fasteners required per S505, detail 2 and S506, detail 1 ). Please verify embedment depth with engineer. 0.145x1" PAF fasteners being utilized at track attachment locations. Head and sill attachments are not as per S507, detail 1 and 2 at air handler opening locations. REINSPECTION REQUIRED: REMARKS: NOTES: Contractor is responsible for scheduling any necessary reinspection after remedial work is performed. Tests may not be reproduced, except in full, without written permission from Professional Service Industries, Inc. Page 5 of 7 -'~-,."~--~--,-"~-~----,-~-~~"""~ ~~"~-"~,- ~ ..._....__,,_.^_____ _"" _."'''.m.''_'_'_.__._____,____,__" ----------- Professional Service Industries, Inc.. 1748 33rd Street. Orlando, FL 32839 . Phone 4071304-5560. Fax 407/304-5561 FL Engineering Business 3684 Build On Engineering .. Consulting.. Testing REPORT OF REINFORCED CONCRETE INSPECTION TESTED FOR: A 1A Acquisition Group, LTD., LLP PROJECT: Residence Inn - Cape Canaveral, FL 3425 Atlantic Avenue REPORT NO: 7 Cocoa Beach, FL 32931 PROJECT NO: 761-50044 Attn: Roger Dobson DATE: 912712005 TECHNICIAN: M. Odom REINFORCING STEEL PLACEMENT STRUCTURAL ELEMENT ELEVATION: roof Foundation PLAN LOCATION: Section "C" roof decking (plywood) at line 66 - 85 Wall Column Floor Slab Stair X Other CRITERIA UTiliZED AS INSPECTION REFERENCE: Structural Plans: Sheet(s): 5101 Detail(s): RFI: S262 RFI: Dated: 3123105 RFI: CONDITIONS 1 CONSTRUCTIONS OBSERVED: No exceptions Deficiencies Proper sizing Proper grade of bars Proper quantity, spacing, & layout Proper splice lengths & sprice locations Proper chairing and concrete cover Proper securement of reinforcing Proper layout of post tensioning cables Proper drape of post tensionin9 tendons Proper sheathing and anchor reinforcing Concrete strength verified Concrete consolidated during placement X Other: see below X DEFICIENCIES: REINSPECTION REQUIRED: No REMARKS: Plywood decking within north area of Section "C" was was inspected for compliance with project specifications. Contractor should verify nails being utilized meet project specification of 8d common (Hitachi 2 114 x 0.099" wire coil round head screw shank #12210D area being utilized). In areas where H-c1ips were missed in placement, 214" blocking placed beneath plywood at joint and nailed at 6" OC along each side of joint. NOTES: Contractor is responsible for scheduling any necessary reinspection after remedial work is perfonmed. Tests may not be reproduced, except in full, without written permission from Professional Service Industries, Inc. Page 6 of 7 Professional Service Industries. Inc.' 1748 33rd Street. Orlando, FL 32839 . Phone 407/304-5560' Fax 407/304-5561 FL Engineering Business 3684 Engineering" Consulting.. Testing REPORT OF REINFORCED CONCRETE INSPECTION TESTED FOR: A 1A Acquisition Group, L TO" LLP PROJECT: Residence Inn - Cape Canaveral, FL 3425 Atlantic Avenue REPORT NO: 7 Cocoa Beach, FL 32931 PROJECT NO: 761-50044 Attn: Roger Dobson DATE: 9/30/2005 TECHNICIAN: M, Odom REINFORCING STEEL PLACEMENT STRUCTURAL ELEMENT Foundation PLAN LOCATION: Section "C" roof decking (plywood) at line 85 - 99 Wall Column Floor Slab Stair X Other CRiTERIA UTiLIZED AS INSPECTION REFERENCE: Structural Plans: Sheet(s): 3101 Detail(s): RFI: S262 RFI: Dated: 3/23/05 RFI: CONDITIONS / CONSTRUCTIONS OBSERVED: No exceptions Deficiencies Proper sizing Proper grade of bars Proper quantity, spacing, & layout Proper splice lengths & spllce locations Proper chairing and concrete cover Proper securement of reinforcing Proper layout of post tensioning cables Proper drape of post tensioning tendons Proper sheathing and anchor reinforcing Concrete strength verified Concrete consolidated during placement X Other: X DEFICIENCIES: REINSPECTION REQUIRED: No REMARKS: Plywood decking withinremainder of Section "C" was was inspected for compliance with project specifications, Contractor should verify nails being utilized meet project specification of 8d common (Hitachi 21/4 x 0,099" wire coil round head screw shank #122100 area being utilized), In areas where H-c1ips were missed in placement, 2/4" biocking placad beneath plywood at joint and nailed at 6" OC along each side of joint NOTES: Contractor is responsible for scheduling any necessary reinspection after remedial work is performed, Tests may not be reproduced, except in full, without written permission from Professional Service Industries, Inc. Page 7 of 7 Professional Service Industries, Inc.. 1748 33rd Street. Orlando, FL 32839. Phone 407/304-5560. Fax 407/304-5561 FL Engineering Business 3684 REPORT OF NON-COMPLIANCE (PUNCHLIST) ITEMS PROJECT NAME: RESIDENCE INN PROJECT NO.: 761-50044 CLIENT: WELBRO CONSTRUCTION DESCRIPTION OF WORK: SPECIAL INSPECTIONS TECHNICIAN: STEVE CORRIGAN, MATT ODOM DATE OF REPORT: 09-30-05 I ITEM I DATE I DESCRIPTION OF DEFICIENCY I ACTION REQUIRED [ ~ DATE REINSPECTION REINSPECTED NO. INSPECTED TOP GRADE BEAM REINFORCING STEEL REMEDlATE PER ADDITIONAL 04-26-05/ 001 04-19-05 BARS DO NOT MATCH WITIDN GB-3/GB-7 DIRECTION OF REINFORCING STEEL 04-29-05 TRAt~SITION AREAS @ COL LINE E, R, ENGINEER OF ADDED PER (COMPLETE) AND P(BOTHENDS OFBLDG) RECORD (RFI #034) REFERENCED RFI SEVERAL AUGE:RCAST PILES LIE REMEDlATE PER AREAS REFERENCED 04-26-05/ 002 04-19-05 OUTSIDE TOLERANCES STATED FOR DIRECTION OF REMEDlA TED PER 05-16-05 ENGINEER OF LOCATION (#1244,1248,1258,1414) RECORD (RFI #035) REFERENCED RFI (COMPLETE) REMEDlATE PER AREAS REFERENCED 003 05-02-05 PILE FOUND TO BE MISSING (NO SURVEY DIRECTION OF REMEDlATED n:R 05-16-05 MARKER IN-PLACE) - PILE #1264 ENGINEER OF (COMPLETE) RECORD (RFI #045) REFERENCED RFI HOOK BARS DETAILED @ BALCONY AREAS ARE APPR 5' LONG IN-PLACE, REQUIRES APPROVAL RATHER THAN 10' IN LENGTH -- SEE 004 06-17-05 RINKER SHOP DRAWINGS, BAR MARK OF ENGINEER OF MK507 (COL LINE A TO L-88 TO 99- RECORD AREA C - 2ND FLOOR) SEVERAL CMU/PILASTER REINFORCING P-l REMOVED TO STEEL BARS NOT CENTERED WITHIN REQUIRES APPROVAL ELEV 4 COURSES 005 06-22-05 CELLS UPON COMPLETION OF GROUT OF ENGINEER OF ABOVE SLAB AND 06-27-05 PLACEMENT - RESTING ON CMU WEB RECORD REPLACED @ COL (AREA C - 2ND FLOOR) LINE L-89 ADDITIONAL #4 - 4' VERTICAL CMU RInNFORCING STEEL BAR PLACED LOOSEL Y WITHIN BARS EXHIBIT INSUFFICIENT SPLICE REMEDlATE PER BOTTOM OF CELL IN 006 06-22-05 LENGTH FROM LEVEL BELOW DIRECTION OF AREAS NOTED AS 06-22-05 (RANGE IN-PLACE 11 TO 30"- ENGINEER OF DEFICIENT (<26") 30" MIN REQUIRED AS PER S-101) RECORD (AREA C - 2ND FLOOR) (COL LINE C TO P-88 TO 99, Q TO U-95 TO 99 ---- ONLY) lRsi1: 1 REPORT OF NON-COMPLIANCE (PUNCHLIST) ITEIVIS PROJECT NAME: RESIDENCE INN PROJECT NO.: 761-50044 CLIENT: WELBRO CONSTRUCTION DESCRIPTION OF WORK: SPECIAL INSPECTIONS TECHNICIAN: STEVE CORRIGAN, MATT ODOM DATE OF REPORT: 09-30-05 I I~~~ I INS~~~~ED I DESCRIPTION OF DEFICIENCY I ACTION REQUIRED l ~ DATE REINSPECTION REINSPECTED ADDITIONAL FULL- VERTICAL P-l REINFORCING STEEL LENGTH #5 BAR BARS EXHIBIT INSUFFICIENT SPLICE REMEDlATE PER PLACED WITHIN CELL IN AREAS 007 06-22-05 LENGTH FROM LEVEL BELOW DIRECTION OF NOTED AS DEFICIENT 06-22-05 (RANGE IN-PLACE 27 TO 36" - ENGINEER OF (<35") 36" MIN REQUIRED AS PER S-101) RECORD (AREA C - 2ND FLOOR) (COL LINE C TO P-88 TO 99, Q TO U-95 TO 99 ONLY) VERTICAL CMU REINFORCING STEEL DOWEL NOT PRESENT FROM LEVEL REMEDlATE PER 008 06-22-05 BELOW @ COL LINE E-96.5, E-97.8, E-98 DIRECTION OF (CELL ADJ TO E-98 POURED SOLID ENGINEER OF WITH REINFORCEMENT) RECORD (AREA C - 2ND FLOOR) IN-PLACE CONDITION VERTICAL P-1 REINFORCING STEEL ACCEPTABLE@COL DOWEL (#6 BAR) NOT PRESENT Ii'ROM LINE A-93, B-93 LEVEL BELOW @ COL LINE A-93 & B-93 REMEDlATE PER (AWAITING (#5 BARS IN PLACE: FROM 1 ST FLOOR), DIRECTION OF CORRESPONDENCE 009 06-22-05 FROM ENGINEER OF 06-27-05 AND Q.1-95 (NO BAR OF ANY SIZE ENGINEER OF RECORD); #6 BAR PRESENT WITHIN W CELL OF RECORD PLACED INTO 2ND PILASTER, #6 BAR IN E CELL) FLOOR SLAB @ COL (AREA C - 2ND FLOOR) LINE Q.1-95 VIA DRILL/EPOXY fiiRU 2 ...,. e- " . ~.,. .: REPORT OF NON-COMPLIANCE (PUNCHLIST) ITEMS PROJECT NAME: RESIDENCE INN PROJECT NO.: 761-50044 CLIENT: WELBRO CONSTRUCTION DESCRIPTION OF WORK: SPECIAL INSPECTIONS TECHNICIAN: STEVE CORRIGAN, MATT ODOM DATE OF REPORT: 09-30-05 I ITEM I DATE I DESCRIPTION OF DEFICIENCY I ACTION REQUIRED I ~ DATE , NO. INSPECTED REINSPECTION REINSPECTED MASONRY GROUT PLACED IN SINGLE FULL-HEIGHT LIFT (8'-8"), AND GROUT WAS VIBRATlW ONLY ONCE FOLLOWING INITIAL PLACEMENT REQUIRES APPROVAL 010 06-22-05 (REFERENCE ACI 530.1-02, PART 3.5- OF ENGINEER OF RECONSOLIDATION OF GROUT RECORD REQUIRED AFTER INITIAL WATER LOSS AND SETTLEMENT HAS OCCURRED) (AREA C - 2ND FLOOR) ADDITIONAL "B" P-l PILASTER MISPLACED APPR 24" TO REMEDIATE PER BARS WITHIN 2ND THE NORTH OF PLAN POSITION DIRECTION OF FLOOR SLAB 011 06-23-05 EXTENDED TO 06-27-05 (ORIGINAL LOCATION COL LINE E-7) ENGINEER OF DEVELOP INTO (AREA A-I ST FLOOR) RECORD CURRENT P-l POSITION PILASTER DESIGNATION @ COL LINE #6 BARS PLACED Q-77 & M-77 CHANGES FROM P-l ON 1ST REMEDIATE PER INTO 2ND FLOOR SLAB 012 06-23-05 FLOOR TO P-2 DESIGNATION ON DIRECTION OF VIA DRILLIEPOXY 06-27-05 2ND FLOOR (BARS IN-PLACE FROM 1 ST ENGINEER OF WITHIN MISSING P-2 FLOOR ARE 2-#5 IN EACH LOCATION, RECORD REINFORCEMENT RATHER THAN 4-#6) (AREA C - 2ND FLR) AREAS PILASTER VERTICAL REINFORCING STEEL WITHIN P-l @ COL LINE N.I-89 REQUIRES APPRO V AL 013 06-24-05 CONSISTS OF 2-#5 BARS OF ENGINEER OF (RATHER THAN 2-#6 BARS) RECORD (AREA C - 1 ST & 2ND FLOOR) ADDITIONAL HORIZONTAL REINFORCEMENT NOT BEING PLACED REQUIRES APPROVAL 014 06-24-05 ABOVE AND BELOW CMU OPENINGS AS OF ENGINEER OF PER PROJECT SPECIFICATIONS RECORD SECTION 04220, PART 3.03.C Ipji~ 3 REPORT OF NON-COMPLIANCE (PUNCHLIST) ITEMS PROJECT NAME: RESIDENCE INN PROJECT NO.: 761-50044 CLIENT: WELBRO CONSTRUCTION DESCRIPTION OF WORK: SPECIAL INSPECTIONS TECHNICIAN: STEVE CORRIGAN, MATT ODOM DATE OF REPORT: 09-30-05 ! ITEM I DATE I DESCRIPTION OF DEFICIENCY I ACTION REQUIRED f- ~ DATE REINSPECTION REINSPECTED NO. INSPECTED LOCATION OF P-l PILASTER REMEDlA TE PER 2-#6 BARS INSTALLED 015 06-25-05 MISPLACED FROM PLAN LOCATION DIRECTION OF INTO FOUNDATION @ 06-25-05 (APPR 8" S @ COL LINE A-10 & B-I0) ENGINEER OF L.5-39 (NOW CIP COL (APPR 16" W ~ COL LINE L.5-39 & L.5-41) RECORD @ PLAN LOCATION) #5 BARS PRESENT F'ROM LEVEL BELOW FULL-LENGTH #5 BAR IN P-l PILASTER LOCATIONS (#6 BARS REQUIRES APPROVAL PLACED ALONG WITH #6 BAR ABOVE 016 06-25-05 DETAILED) @ COL LINE Q.1-86, N-85, N-82, OF ENGINEER OF 2ND FLOOR SLAB 06-27-05 P-82, N-73, P-73, N.2-13.8, Q.I-16, R.6-7 RECORD ELEV ATION (2ND FLOOR) (AREA CONLY) 1-#5 BAR ONLY PID:SENT FROM LEVEL REMEDlATE PER #6 BARS INSTALLED BELOW @ P-l PILASTER LOCATIONS DIRECTION OF VIA DlULLIEPOXY 017 06-25-05 INTO FLOOR SLAB IN 07-06-05 (2-#6 BARS DETAILED) ENGINEER OF BOTH REFERENCED @COLLINE N-39, Q.I-8 (2ND FLOOR) RECORD LOCATIONS NO CLEAR COVER TO REINFORCING REQUIRES APPROVAL 018 06-25-05 STEEL BANDS WITHIN CIP COLUMN (C-4) OF ENGINEER OF @ LINE S-26 (SW CORNER) & S-28 (NE RECORD CORNER) (1 ST FLOOR) STD HOOK BARS HAVE NOT BEEN MK412 BARS PLACED DETAILED IN SHOP DRAWINGS WITHIN REQUIRES APPROVAL WITHIN 2ND FLOOR 019 06-27-05 SLAB EDGE @ TWO SIDES OF ELEVATOR OF ENGINEER OF SLAB @ 18" OC 06-27-05 AREAS, AS WELL AS CB-I, CB-3, CB-4 RECORD ALONG REVERSE (PARTIAL), CB-5, AND CB-6 (PARTIAL) SIDE OF ELEVATOR CONCRETE BEAM AREAS (AREA A) COI" CUT FROM BASE TS COLUMN @LINE F-95 APPR 4" OUT- REQUIRES APPROVAL PLATE AND REPOSI- 020 06-27-05 OF-PLUMB (LEANING TO WEST) OF ENGINEER OF TIONED UTILIZING 08-17-05 (1 ST FLOOR) RECORD 'I." ANGLE AS SUPPORT ON 3 SIDES IMPROPER ELECTRODES BEING USED REQUIRES APPROVAL E70I8 ELECTRODES 021 06-27-05 TO WELD TS COLUMNS TOGETHER (6011 OF ENGINEER OF USED TO WELD TS 07-28-05 BEING UTILIZED,E70XX SERIES RECORD COLUMNS WITHIN SPECIFIED - SEE SHEET S-IO]) AREA A, 3RD FLOOR fiiBl 4 1t!..,1I ,: REPORT OF NON-COMPLIANCE (PUNCHl.JST) ITEMS PROJECT NAME: RESIDENCE INN PROJECT NO.: 761-50044 CLIENT: WELBRO CONSTRUCTION DESCRIPTION OF WORK: SPECIAL INSPECTIONS TECHNICIAN: STEVE CORRIGAN, MATT ODOM DATE OF REPORT: 09-30-05 I I~~~ I INS~~~~ED I DESCRIPTION OF DEFICIENCY I ACTION REQUIRED I~ ~ DATE REINSPECTION REINSPECTED MANY CMU CELLS NOT COMPLETELY FILLED WITH MASONRY GROUT: COL LINE B-13,H-3,N.9-4,N.9-5,Q.I-8,R-13.1, REMEDIATE PER Q.9-16, T -12, T.5-12,U-12,U.5-12,H.5-22,J-22, DIRECTION OF 022 07-05-05 K-22,P .1-22,Q-26,HA-40,S.2-40.8,N-67 ,HA-67, ENGINEER OF HA-68,P-68,S- 77 ,R.2-89,J -88,F -96.5,A.8-89, RECORD A-96 (1 ST FLOOR); Al'\'D COL LINE AJ-98,G-92,U-97.3,R.5-82,R.8-82, S.5-82,T-82,K-77,N-67 (2ND FLOOR) MANY CMU WALLS REINFORCED @ REQUIRES APPROVAL 023 07-05-05 48" OC, RATHER THAN 32" OC AS PER OF ENGINEER OF S-212, DETAIL 3 (W-l DESIGNATION FOR RECORD INTERIOR 1 ST FLOOR AREAS) (AREA C) TYPICAL CMU SILL REINFORCEMENT REQUIRES APPROVAL 024 07-05-05 (2-#5 BARS) NOT PLACED BENEATH AIR OF ENGINEER OF HANDLER OPENINGS IN ANY LOCATION RECORD CIP COLUMN @LlNES.2-84APPR2" OUT- REQUIRES APPROVAL 025 07-06-05 OF-PLUMB (LEANING TO NORTH) OF ENGINEER OF (1 ST FLOOR) RECORD CIP COLUMN APPR 1" OUT-OF-PLUMB@ LINE S.2-28 (LEANING TO NORTH), S.2-33 (LEANING TO SOUTH), REQUIRES APPROVAL 026 07-08-05 S.2-70 (LEANING TO NORTH); OF ENGINEER OF APPR 1.25" OUT-OF-PLUMB@ RECORD LINE S.2-37 (LEANING TO NORTH) (1 ST FLOOR) KO-l BOND BEAM REINFORCING STEEL REQUIRES APPRO V AL 027 07-11-05 NOT PRESENT @ COL LINE A TO C-89, OF ENGINEER OF C-88 TO 89, U-96.2 TO 99 RECORD (3RD FLOOR SLAB EI~EV ATION) ADDITIONAL "A" BARS NOT PRESENT REQUIRES APPROVAL 028 07-11-05 WITHIN FLOOR SLAB @ OF ENGINEER OF COL LINE N TO Q-96 (3RD FLOOR) RECORD fiiBl 5 .. ......~." .... tt:..."II,: REPORT OF NON-COMPLIANCE (PUNCHLIST) ITEMS PROJECT NAME: RESIDENCE INN PROJECT NO.: 761-50044 CLIENT: WELBRO CONSTRUCTION DESCRIPTION OF WORK: SPECIAL INSPECTIONS TECHNICIAN: STEVE CORRIGAN, MATT ODOM DATE OF REPORT: 09-30-05 I I~~~ I INS~~~~ED I DESCRIPTION OF DEFICIENCY I ACTION REQUIRED I ~ DATE REINSPECTION ro:INSPECTED BANDS PLACED @ 6" OC TYPICAL REQUIRES APPROVAL 029 07-11-05 WITHIN CB-2 BEAMS @ COL LINE: S.2-68 OF ENGINEER OF TO 70, U.I-94 TO 96.2, RATHER THAN AS RECORD PER S-301, DETAIL 2 (3RD FLOOR) CIP COLUMN @ LINE S.2-19 OFFSET APPR REQUIRES APPRO V AL 030 07-13-05 2" S OF PLAN LOCATION OF ENGINEER OF (1ST AND 2ND FLOOR~ RECORD SEVERAL CMU WALLS ON 2 D FLOOR OFFSET FROM 1 ST FLOOR LOCATIONS (APPR OFFSET AND DIRECTION LISTED): COL LINE 1'-31 (1.625" TO NORTH), COL LINE 1'-22 (0.875" TO NORTH), COL LINE F-2 (0.625" TO EAST), REQUIRES APPROVAL 031 07-14-05 COL LINE H-l (0.625" TO EAST), OF ENGINEER OF COL LINE L-2 (0.75" TO EAST), RECORD COL LINE V -90 (0.50" TO NORTH), COL LINE 1'-82 (0.625 TO SOUTH), COL LINE 1'-73 (1.0" TO SOUTH), COL LINE G.8-82 (0.50" TO NORTH), COL LINE H-99 (1.0" TO WEST), COL LINE U-35 (1.125" TO SOUTH) END OF CB-l BEAM @ COL LINE L.5-68 NOT BEARING ON CMU/P-l PILASTER REQUIRES APPRO V AL 032 07-27-05 (CMU PLACED FULL-HEIGHT) OF ENGINEER OF 2 #5xl0' BARS PLACED (5' IN BEAM,S' IN RECORD SLAB) TO PROVIDE DEVELOPMENT BOTTOM REINFORCING STEEL PLACED @ 12" OC WITHIN COL LINE R TO U-90 TO REQUIRES APPROVAL 033 07-27-05 96, R TO U-96 TO 98 (DETAILED @ 10" OC OF ENGINEER OF WITHIN THESE AREAS) RECORD (AREA C - 4TH FLOOR) mii' 6 REPORT OF NON-COMPLIANCE (PUNCHLIST) ITEMS PROJECT NAME: RESIDENCE INN PROJECT NO.: 761-50044 CLIENT: WELBRO CONSTRUCTION DESCRIPTION OF WORK: SPECIAL INSPECTIONS TECHNICIAN: STEVE CORRIGAN, MATT ODOM DATE OF REPORT: 09-30-05 I I~~~ I INS~~~~ED I DESCRIPTION OF DEFICIENCY I ACTION REQUIRED 1_ REINSPECTION I REI~~i~TED I BOTTOM REINFORCING STE.EL PLACED @ 10" OC WITHIN REQUIRES APPROVAL 034 07-27-05 COL LINE M TO Q-82 TO 86 OF ENGINEER OF (DETAILED @ 9" OC WITHIN THIS AREA) RECORD (AREA C - 4TH FLOOR) CB-6 BEAM CONTAINS NO BANDS @ 3" OC @ N END (COL LINE N-85) 7 BANDS @ 6" OC AND MID-BEAM BANDS REQUIRES APPROVAL 035 07-27-05 @ 12" OC IN-PLACE (S END OF Bl~AM OF ENGINEER OF CONSTRUCTED AS PER PROJECT RECORD DOCUMENTS) (AREA C - 4TH FLOOR) 5000 PSI CONCRETE (MIX CODE 1156016) PLACED WITHIN CMU CELLS @ COL REQUIRES APPROVAL 036 07-27-05 LINE H.5-66 TO 68, H.5 TO S.2-66, OF ENGINEER OF N-66 TO 68 DURING PLACEMENT OF RECORD FLOOR SLAB (AREA C - 3RD FLOOR) PRECAST LINTEL @COLLINER.2-16 2 #6 REINFORCING BARS PLACED INTO FOUND TO BE CRACKED ON BOTTOM REQUIRES APPROVAL LINTEL FOR 037 07-28-05 (CENTER, EAST TO WEST END) AND SIDE OF ENGINEER OF ADDITIONAL 07-28-05 (NE CORNER, TOP, APPR 24" IN LENGTH) RECORD STRENGTH (RATHER (AREA A, 3RD FLOOR) THAN #5 BARS) 2 #5 BARS SUBSTITUED FOR 1 #6 BAR REQUIRES APPROVAL WITHIN EACH CELL IN P-l LOCATIONS 038 07-28-05 @ COL LINE R.6-7, Q.1-8, N.3-13.5 OF ENGINEER OF (AREA A. 3RJ) FLOOR) RECORD D1 7 It!. 'IIiillI JI .: REPORT OF NON-COMPLIANCE (PUNCHLIST) ITEMS PROJECT NAME: RESIDENCE INN PROJECT NO.: 761-50044 CLIENT: WELBRO CONSTRUCTION DESCRIPTION OF WORK: SPECIAL INSPECTIONS TECHNICIAN: STEVE CORRIGAN, MATT ODOM DATE OF REPORT: 09-30-05 I I~~~ I-1NS~~~~ED I DESCRIPTION OF DEFICIENCY IACTION REQUIRED 1- REINSPECTION =1 REI~~i~TED I CMU DOWN CELLS FOUND TO NOT BE COMPLETELY FILLED WITH GROUT WITHIN AREA C: COL LINE Q.1-93,F- REMEDIATE PER 039 08-08-05 96.9,A-91,H.2-79 (1 ST FLOOR); DIRECTION OF COL LINE B-89.2,J-82 (2ND FLOOR); ENGINEER OF COL LINE E-97.5,B.8-.98,B-89.2,L.9-85,J-85, RECORD H.2-84,H -84,J-68,N -67 ,H.4-66.5,H.4-67 .5, N-66.2,P-66,S.1-66 (3RD FLOOR) VERTICAL #6 REINFORCING BARS NOT PRESENT WITHIN P-1 LOCATION @ COL REQUIRES APPROVAL LINE L.5-66 (3RD FIJOOR), 1 #5 BAR 040 08-08-05 PLACED INTO 4TH FLOOR SLAB (WITHIN OF ENGINEER OF EAST HALF OF P-l LOCATION) AS RECORD EXTENSION/SPLICE FOR LEVEL ABOVE HORIZONTAL REINJi'ORCING BARS NOT REMEDIATE PER 041 08-08-05 PRESENT WITHIN SILL AREA OF CMU DIRECTION OF OPENING @ COL LINE H.4-67 (2ND FLOOR) ENGINEER OF AND H.4-40 (3RD FLOOR) RECORD CONCRETE NOT YET PLACED WITHIN SILL AREAS (CMU) @COLLINE H.4-67, REQUIRES APPROVAL 042 08-08-05 N.5-66 (3RD FLOOR), N..I-66 (4TH FLOOR), AS OF ENGINEER OF WELL AS ALL AIR HANDLER OPENING RECORD AREAS IMPROPER GROUT MIX REQUIRES APPROVAL 043 08-11-05 (1289966 - 4000 ACGRT) OF ENGINEER OF PLACED WITHIN CMU DOWN CELLS @ RECORD COL LINE C-8 TO 13.7 (4TH FLOOR) #5x5' STRAIGHT BAR ADDITIONAL REINFORCING BARS NOT llLACED @ 24" OC REQUIRES APPROVAL WITHIN AREA A 044 08-16-05 PLACED WITHIN ROOF SLAB OF ENGINEER OF ONLY (AS PER 08-17-05 (AREA A OR AREA C) RECORD CONVERSATION AS PER SHEET S251, S252 - NOTE 14 WITH ENGINEER OF RECORD) tg, 8 REPORT OF NON-COMPLIANCE (PUNCHLIST) ITEMS PROJECT NAME: RESIDENCE INN PROJECT NO.: 761-50044 CLIENT: WELBRO CONSTRUCTION DESCRIPTION OF WORK: SPECIAL INSPECTIONS TECHNICIAN: STEVE CORRIGAN, MATT ODOM DATE OF REPORT: 09-30-05 I ITEM ~ DATE [ DESCRIPTION OF DEFICIENCY I ACTION REQUIRED 1= REINSPECTION [; DATE NO. INSPECTED REINSPECTED CMU DOWN CELLS I<'OUND TO NOT BE REMEDIATE PER COMPLETEL Y FILLED WITH GROUT DIRECTION OF 045 08-16-05 WITHIN AREAC: ENGINEER OF COL LINE F-96.6, H.9-82, H.7-75, M.7-73, L.5- RECORD 66, N-66 (4TH FLOOR) MASONRY GROUT NOT CONSOLIDATED DURING PLACEMENT INTO CMU: 08-12-05/ COL LINE G TO V-I TO 16,J TO N-17, REQUIRES APPROVAL 046 08-15-05/ P TO 1'-22 (4TH FLOOR); OF ENGINEER OF 08-16-05/ COL LINE A.3 TO N-22, H.3 TO 1'-26 TO 41 RECORD 08-23-05 (4TH FLOOR); ELEVATOR C (ROOF); ELEVATOR A (ROOF) CONCRETE PLACED WITHIN ROOF SLAB REQUIRES APPROVAL 047 08-23-05 OF ELEVATOR C WAS NOT VIBRATED OR OF ENGINEER OF FINISHED (TROWEL/FLOAT) RECORD INSUFFICIENT SPACING OF CMU FILLED REQUIRES APPROVAL CELLS IN SEVERAL LOCATIONS WITHIN 048 08-23-05 AREA A-I ST FLOOR (32" OC REQUIRED OF ENGINEER OF em INTERIOR, 24" OC @ EXTERIOR) RECORD NO CLEAR COVER TO BOTTOM GRADE REQUIRES APPROVAL 049 08-25-05 BEAM STEEL @ COL LINE U.5-50, U.S-56, OF ENGINEER OF V.9-56 (AREA B) RECORD INSUFFICIENT CLEAR COVER TO BOTTOM GRADE BEAM STEEL @ COL REQUIRES APPROVAL 050 08-25-05 LINE X-66 - AREA B (I" IN-PLACE), OF ENGINEER OF SEVERAL LOCATIONS EXHIBIT 2" RECORD (3" REQUIRED TO SOIL) ADDITIONAL REINFORCING STEEL/KEYWAY NOT PLACED WITHIN REQUIRES APPRO V AL 051 08-25-05 GRADE BEAM @ COL LINE S.7-41, U-66- OF ENGINEER OF AREA B (CONSTRUCTION JOINTS) RECORD AS PER S104, DETAIL 2 teil 9 ..~. " ...~"'>,: REPORT OF NON-COMPLIANCE (PUNCHLIST) ITEMS PROJECT NAME: RESID.ENCE INN PROJECT NO.: 761-50044 CLIENT: WELBRO CONSTRUCTION DESCRIPTION OF WORK: SPECIAL INSPECTIONS TECHNICIAN: STEVE CORRIGAN, MATT ODOM DATE OF REPORT: 09-30-05 I ITEM I DATE I DESCRIPTION OF DEFICIENCY I ACTION REQUIRED L ,. ~ DATE NO. INSPECTED REINSPECTION REINSPECTED .- PILE PROJECTION INTO GRADE BEAMS (COL LINE S.7 TO U-41, U TO Z-41 TO 66- REQUIRES APPRO V AL 052 08-25-05 AREA B) WAS FOUND TO RANGE :FROM 0- OF ENGINEER OF 3" IN-PLACE (4" MIN REQUIRED AS PER RECORD S102) PILE TOPS NOT SUFFICIENTLY/ REQUIRES APPROVAL COMPLETELY CLEANED OF DEBRIS 053 08-Z5-05 WITHIN GRADE BEAM AREAS COL LINE OF ENGINEER OF S.7 TO U-41, U TO Z,...41 TO 66 - AREA B RECORD ELEVATION OF GRADE BEAMS WITHIN COL LINE U.5 TO Z-50, Z-50 TO 56, REQUIRES APPROVAL 054 08-Z5-05 U.5 TO Z-56, X-50 TO 56 (AREA B) WAS OF ENGINEER OF LOWERED 16" DUE TO CONFLICT WITH RECORD ELEVATION OF PAVEMENT AREAS CMU CELLS NOT COMPLETELY FILLED REMEDIATE PER 055 08...Z3-05/ W/GROUT: COL LINE P-5, P-4.5, T-1Z, U-12, DIRECTION OF 08-29-05 U.5-12, V-Z6, B-ll.9, L-Z.5, U-4 (ZND FLOOR) ENGINEER OF RECORD HORIZONTAL SILL REINFORCEMENT REMEDIATE PER NOT EXTENDED INTO JAMB CELL @ COL DIRECTION OF 056 08-Z9-05 LINE H.3-39.5 (3RD FLOOR), ENGINEER OF (ALSO,INSUFFICIENT SPLICE LENGTH OF RECORD HORIZONTAL REINFORCEMENT) CMU CELLS NOT COMPLETELY FILLED W/GROUT: COL LIN]i~ H.3-40.5, B-12.9, B-12, REMEDIATE PER A.8-13, A-10, F-5, F-5.5, F-3, L-5, R.2-12 DIRECTION Ol<~ 057 08-30-05 (3RD FLOOR); ENGINEER OF COL LINE L-39, N.3-10, J-13, B.5-13, A-ll, RECORD A-IO.5, A-10, A.8-13, R.5-Z6, S-35 (4TH FLOOR) HORIZONTAL REINFORCEMENT NOT REQUIRES APPRO V AL 058 08-30-05 PRESENT WITHIN SILL AREA @ OF ENGINEER OF COL LINE A.5-13 (ZND FLOOR) RECORD lrJ.si~ 10 REPORT OF NON-COMPLIANCE (PUNCHLIST) ITEMS PROJECT NAME: RESIDENCE INN PROJECT NO.: 761-50044 CLIENT: WELBRO CONSTRUCTION DESCRIPTION OF WORK: SPECIAL INSPECTIONS TECHNICIAN: STEVE CORRIGAN, MATT ODOM DATE OF REPORT: 09-30-05 I ITEM I DATE I DESCRIPTION OF DEFICIENCY I ACTION REQUIRED [REINSPECTION I REI~~i~TED NO. INSPECTED CMU REMAINS UNFILLED WITH REMEDIATE PER 059 08-30-05 GROUT WITHIN SILL AREAS DIRECTION OF @COLLINEA.5-13 (3RD FLOOR); ENGINEER OF AND N.5-41, H.3..40 (4TH FLOOR) RECORD INSUFFICIENT EMBEDMENT OF ANCHOR BOLTS WITHIN CONCRETE GRADE BEAMS @ COL LINE: REQUIRES APPROVAL 060 08-30-05 X-58 (NE-8. 75,SE-8. 75,NW-8. 75,SW -8.5"); OF ENGINEER OF X-61 (NE-7.75,SE-7.75,NW-8.25,SW-8"); RECORD X-64 (NE-7,SE-7,NW-7,SW-7.5"); X-66 (NE-8,SE-7 ,NW - 7 .5,SW -7 .5"); G-44.6 (NE-7.5,SE-7.5,NW-7.75,SW-8") #5 VERTICAL CMU REINFORCING BARS PLACED LOOSE WITHIN CMU, RATHER REQUIRES APPROVAL 061 08-31-05 THAN ANCHORED INTO GRADE BE:AM @ OF ENGINEER OF COL LINE V-44.8, R.3-41, 1'.5-41, U.5-49, RECORD H-61, G-45.2 (TO REMEDIATE INSUFF. SPACING) #4 SLAB DOWELS (20" SPLICE) WERE STRAIGHTENED AND ARRANGED WITHIN CMU @ REQUIRES APPRO V AL 062 08-31-05 COL LINE G-52 TO 53, V -44 TO 45 OF ENGINEER OF (#5 BARS SPECIFIED @ 24" OC) RECORD #5 BAR PLACED LOOSE ALONGSIDE #4 BAR IN EACH LOCATION (AREA B - GROUND ELEVATION) SEVERAL CONNECTION PLATES EXIST })ROVIDE REMEDIAL 063 09-20-05 WHICH HAVE SEP ARA TED FROM CHORD GUSSET AS PER AND/OR WEB ME:MBERS WITHIN ENGINEER OF ROOF TRUSSES (AREA C) RECORD fliil 11 RE)>ORT OF NON-COMPLIANCE (PUNCHLIST) ITEMS PROJECT NAME: RESIDENCE INN PROJECT NO.: 761-50044 CLIENT: WELBRO CONSTRUCTION DESCRIPTION OF WORK: SPECIAL INSPECTIONS TECHNICIAN: STEVE CORRIGAN, MATT ODOM DATE OF RE]>ORT: 09-30-05 I ITEM I DATE I DESCRIPTION OF DEFICIENCY , ACTION REQUIRED ,- REINSPECTION ~:I~~i~TED NO. INSPECTED TRUSS H13A, HI4A, HI5A, HI6A, H17A REMEDIATE PER WERE FIELD-MODIFIED TO EXTEND CORRESPONDENCE 064 09-20-05 CANTILEVER AREA OVER BALCONY FROM ENGINEER OF BENEATH - APPEAR TO HAVE BEEN RECORD DATED SHOP-FABRICATED AS H13, H14, H15, 08-29-05 H16, HI7 (AREA C) FOUR J7 TRUSSES FIELD-MODIFIED FOR REQUIRES APPROVAL 065 09-20-05 FIELD CONDITION @ RIDGE AREA OF ENGINEER OF (COL LINE J-67, AREA C) RECORD TWO J4 TRUSSES MISSING @ REQUIRES APPRO V AL TRUSSES NOW 066 09-20-05 OF ENGINEER OF 09-26-05 COL LINE H.3-66 (AREA C) RECORD IN-PLACE INTERIOR END OF TRUSS H13A, HI4A, HI5A, HI6A, HI7A, H18, H19, H20 F'ALL APPR 1-1.5" SHORT OF SIDE OF WOOD REQUIRES APPROVAL 067 09-20-05 BEARING PLATES (2x4x36" PLACED OF ENGINEER OF VERTICALL Y AT BOTTOM/END WEB OF RECORD EACH TRUSS TO ALLOW PLACEMENT OF H2.5 CLIP - BOARD _NAILED (iiJ 4-6" OC) MANY FASTENERS OBSERVED TO BE INSTALL FASTENERS; MISSING FROM EXTERIOR SHEATHING SUPPORT AND 068 09-23-05 (DENSGLASS); OTHER AREAS FOUND TO ATTACH EXTENDED EXTEND OVER CMU APPR 8" WITH NO AREAS VIA ATTACHMENT (AREA C) APPROVED METHOD NUMEROUS FASTENERS MISSING FROM 069 09-23-05 EXTERIOR FRAMING INSTALL MISSING (TOP AND BOTTOM TRACK LOCATIONS FASTENERS NOTED WITHIN AREA C) SEVERAL FASTENERS (NAILS, H-CLIPS) INSTALL MISSING ALL FASTENERS 09-30-05 070 09-23-05 MISSING FROM PLYWOOD ROOF FASTENERS NOTED AS MISSING I (COMPLETE) DECKING (AREA C) HAVE BEEN PLACED 111:11( 12 REPORT OF NON-COMPLIANCE (PUNCHLIST) ITEMS PROJECT NAME: RESIDENCE INN PROJECT NO.: 761-50044 CLIENT: WELBRO CONSTRUCTION DESCRIPTION OF WORK: SPECIAL INSPECTIONS TECHNICIAN: STEVE CORRIGAN, MATT ODOM DATE OF REPORT: 09-30-05 l1~ DATE I DESCRIPTION OF DEFICIENCY I ACTION REQUIRED [ REINSPECTION =C;IN~~~~TED NO. INSPECTED LIGHT GAUGE METAL FRAMING WITHIN HEAD AND SILL LOCATIONS OF REMEDIATE ALL 071 09-27-05 EXTERIOR WINDOWS WITHIN ALL DEFICIENT AREAS LEVELS OF AREA C WAS CONSTRUCTED ENCOUNTERED AS PER HI DETAIL (H2 DETAIL SPECIFIED AS PER S506, DETAIL 4) NUMEROUS LOCATIONS WITHIN EXTERIOR LIGHT GAUGE METAL REMEDIATE AS PER 072 09-27-05 FRAMING (AREA C -- VARIOUS LEVELS) DIRECTION OF WERE FOUND TO EXTEND MORE THAN ENGINEER OF I" PAST EDGE OF CONCRETE SLAB (I" RECORD MAX EXTENSION AS PER S505, DETAIL 6) NUMEROUS LIGHT GAUGE METAL TRACK LOCATIONS WITHIN ARl~A C REMEDIATE ALL 073 09-27-05 (ALL LEVELS) WERE FOUND TO NOT BE DEFICIENT AREAS FASTENED TO CONCRETE SLAB AS PER ENCOUNTERED S505, DETAIL 2, 4, 5 PAF FASTENERS UTILIZED IN JAMB STUD CLlP-TO-CONCRETE SLAB LOCATIONS (AREA C - ALL LOCATIONS) REQUIRES APPRO V AL 074 09-27-05 ARE 0.I45x1.25" PINS, O:FENGINEER OF RATHER THAN 0.177x1.25" PINS RECORD (REF S507, DETAIL 4, 5) TYPICALLY, 3 TO 5 FASTENERS FOUND IN-PLACE NAILS TYPICALLY UTILIZED FOR ATTACHMENT OF PLYWOOD ROOF I DECKING ARE HITACHI 2 % x 0.099" WIRE REQUIRES APPROVAL 075 09-30-05 COIL ROUND HEAD SCREW SHANK OF ENGINEER OF (#12210D) OR 8d COOLER- RECORD 8d COMMON ARE SPECIFIED (NAILS SPACED @4-6" OC IN-PLACE) filB} 13 It!"". . ,. Engineering" Consulting" Testing September 26, 2005 Mr. Todd Morley - Chief Bldg. Official City of Cape Canaveral Building Department 105 Polk Avenue Cape Canaveral, Florida 32920 Re: Summary of Special (Threshold) Inspection Services Residence Inn - Cape Canaveral, Florida PSI Project No. 761-50044, Report #6, (Progress Report # 3) Dear Mr. Morley: Professional Service Industries, Inc (PSI) is performing special inspection services for the Residence Inn project located in Cape Canaveral, Florida. This report is intended to summarize the status of our inspection services performed between August 1, 2005 and August 31,2005. As construction has progressed within the structure PSI representatives have performed a series of inspections in accordance with the project's Special Inspection Plan. As deficiencies are discovered within the course of our inspections and observations, the contractor will be immediately notified so that corrective action may be performed. Any deficiencies not immediately corrected are entered into a running "punch-list" of non-conforming items. A current punch-list is attached for your review. PSI will maintain and update this punch-list as deficiencies are discovered, corrective actions are taken and re-inspections are performed. As of this date, fifty-one (51) items need to be addressed. We trust that this summary' of our services during this time period is complete and sufficient for your needs. If you have any questions, please do not hesitate to call. Respectfully submitted, PROFESSIONAL SERVICE IlYDUSTRIES, INC. <7 .<y. __~, .?/ ....~ { ;:;ze;/ /' /' ~< .' L/""c,*_w,," " 72 Rod Fruland, Senior Engineer Constructioil Services Florida Registration #27667 Special inspector Reg. #85 Attachments: Inspection reports Punch-list Xc: A 1 A Acquisition Group, Roger Dobson WELBRO Building Corp., Chris Cortellini R. L. Plowfield & Associates, Chris Scroggins Powell Design Group, Ron Brown BB & T, Ron Barley Professional Service Industries, Inc. . 1748 33rd Street. Orlando, FL 32839 . Phone 407/304-5560 . Fax 407/304-5561 Engineering" Consulting" Testing REPORT OF REINFORCED CONCRETE INSPECTION TESTED FOR: A1A Acquisition Group, LTD., LLP PROJECT: Residence Inn - Cape Canaveral, FL 3425 Atlantic Avenue REPORT NO: 6 Cocoa Beach, FL 32931 PROJECT NO: 761-50044 Altn: Roger Dobson DATE: 8/1/2005 TECHNICIAN: M. Odom REINFORCING STEEL PLACEMENT STRUCTURAL ELEMENT Foundation PLAN LOCATION: Area A. CMU walls (including pilasters) line H.3 to U and 13 to 41 X Wall Column Floor Slab Stair Other CRITERIA UTILIZED AS INSPECTION REFERENCE: Structural Plans: Sheet(s): S-101, S-212 Detail(s): RFI: structural drawings S-231, S-301 n/a,3 RFI: Dated: 1/12/05 S-302 RFI: Revised: 3/23/05 CONDITIONS I CONSTRUCTIONS OBSERVED: No exceptions Deficiencies X Proper sizing X X Proper grade of bars X X Proper quantity, spacing, & layout X X Proper splice lengths & splice iocations X X Proper chairing and concrete cover X X Proper securement of reinforcing X Proper layout of post tensioning cables Proper drape of post tensioning tendons Proper sheathing and anchor reinforcing Concrete strength verified Concrete consolidated during placement Other: DEFICIENCIES: REINSPECTION REQUIRED: REMARKS: NOTES: Contractor is responsible for scheduling any necessary reinspection after remedial work is performed. Tests may not be reproduced, except in full, without written permisSion from Professional Service Industries, Inc. Page 1 of 18 Professional Service Industries, Inc. . 1748 33rd Street. Orlando, FL 32839 . Phone 407/304-5560 . Fax 407/304-5561 Engineering. Consulting. Testing REPORT OF REINFORCED CONCRETE INSPECTION TESTED FOR: A1A Acquisition Group, LTD., LLP PROJECT: Residence Inn - Cape Canaveral, FL 3425 Atlantic Avenue REPORT NO: 6 Cocoa Beach, FL 32931 PROJECT NO: 761-50044 Attn: Roger Dobson DATE: 8/3/2005 TECHNICIAN: M. Odom REINFORCING STEEL PLACEMENT STRUCTURAL ELEMENT ELEVATION: 4th floor Foundation PLAN LOCATION: Area A floor slab Wall Column X Floor Slab Stair Other CRITERIA UTILIZED AS INSPECTION REFERENCE: Structural Plans: Sheet(s): $-101, $-241 Detail(s): RFI: structural drawinqs RFI: Dated: 1/12/05 S-302, S-303 9, 10; 4,5,6,7,8,9, 10, 12 RFI: Revised: 3/23/05 S-304 1A, 8,11 CONDITIONS I CONSTRUCTIONS OBSERVED: No exceptions Deficiencies X Proper sizing X X Proper grade of bars X X Proper quantity, spacing, & layout X X Proper splice lengths & splice locations X X Proper chairing and concrete cover X X Proper securement of reinforcing X Proper layout of post tensioning cables Proper drape of post tensioning tendons Proper sheathing and anchor reinforcing Concrete strength verified Concrete consolidated during placement Other: DEFICIENCIES: REINSPECTION REQUIRED: No REMARKS: NOTES: Contractor is responsible for scheduling any necessary reinspection after remedial work is performed. Tests may not be reproduced, except in full, without written permission from Professional Service Industries, Inc. Page 2 of 18 Professional Service Industries. Inc. . 1748 33rd Street. Orlando. FL 32839 . Phone 407/304-5560 . Fax 407/304-5561 Engineering.. Consulting.. Testing REPORT OF REINFORCED CONCRETE INSPECTION TESTED FOR: A1AAcquisition Group, LTD., LLP PROJECT: Residence Inn - Cape Canaveral, FL 3425 Atlantic Avenue REPORT NO: 6 Cocoa Beach, FL 32931 PROJECT NO: 761-50044 Attn: Roger Dobson DATE: 8/4/2005 TECHNICIAN: M. Odom REINFORCING STEEL PLACEMENT STRUCTURAL ELEMENT ELEVATION: 4th floor Foundation PLAN LOCATION: Area C, CMU walls (including pilasters) at line A to J and 88 to 99 X Wall Column Floor Slab Stair Other CRITERIA UTILIZED AS INSPECTION REFERENCE: Structural Plans: Sheet(s): 8-101,8-212 Detail(s): RFI: structural drawings S-242, S-301 RFI: Dated: 1/12/05 RFI: Revised: 3/23/05 CONDITIONS / CONSTRUCTIONS OBSERVED: No exceptions Deficiencies X Proper sizing X X Proper grade of bars X X Proper quantity, spacing, & layout X X Proper splice lengths & splice locations X X Proper chairing and concrete cover X X Proper securement of reinforcing X Proper layout of post tensioning cables Proper drape of post tensioning tendons Proper sheathing and anchor reinforcing Concrete strength verified Concrete consolidated during placement Other: DEFICIENCIES: REINSPECTION REQUIRED: No REMARKS: NOTES: Contractor is responsible for scheduling any necessary reinspection after remedial work is performed. Tests may not be reproduced, except in full, without written permission from Professional Service Industries, Inc. Page 3 of 18 Professional Service Industries. Inc.' 1748 33rd Street. Orlando, FL 32839' Phone 407/304-5560' Fax 407/304-5561 Engineering.. Consulting.. Testing REPORT OF REINFORCED CONCRETE INSPECTION TESTED FOR: A 1A Acquisition Group, LTD., LLP PROJECT: Residence Inn - Cape Canaveral, FL 3425 Atlantic Avenue REPORT NO: 6 Cocoa Beach, FL 32931 PROJECT NO: 761-50044 Altn: Roger Dobson DATE: 8/4/2005 TECHNICIAN: M. Odom REINFORCING STEEL PLACEMENT STRUCTURAL ELEMENT ELEVATION: 4th floor Foundation PLAN LOCATION: Area C columns, line S.1-68, 5.2-70, 5.2-75, 5.1-77, 5.2-79, 5.2-84, 5.1-86, U.1-94, U-96 Wall X Column Floor Slab 5tair Other CRITERIA UTILIZED AS INSPECTION REFERENCE: Structural Plans: Sheet(s): 5-101 Detail(s): RFI: structural drawinQs 5-212 RFI: Dated: 1/12/05 RFI: Revised: 3/23/05 CONDITIONS I CONSTRUCTIONS OBSERVED: No exceptions Deficiencies Proper sizing X X Proper grade of bars X X Proper quantity, spacing, & layout X X Proper splice lengths & splice iocations X X Proper chairing and concrete cover X X Proper securement of reinforcing X Proper layout of post tensioning cables Proper drape of post tensioning tendons Proper sheathing and anchor reinforcing Concrete strength verified Concrete consolidated during placement Other: DEFICIENCIES: REINSPECTION REQUIRED: No REMARKS: NOTES: Contractor is responsible for scheduling any necessary reinspection after remedial work is performed. Tests may not be reproduced, except in full, without written permission from Professional Service Industries, Inc. Page 4 of 18 Professional Service Industries. Inc. . 1748 33rd Street. Orlando, FL 32839 . Phone 407/304-5560. Fax 407/304-5561 Engineering.. Consulting.. Testing REPORT OF REINFORCED CONCRETE INSPECTION TESTED FOR: A 1A Acquisition Group, LTD., LLP PROJECT: Residence Inn - Cape Canaveral, FL 3425 Atlantic Avenue REPORT NO: 6 Cocoa Beach, FL 32931 PROJECT NO: 761-50044 Altn: Roger Dobson DATE: 8/5/2005 TECHNICIAN: M. Odom REINFORCING STEEL PLACEMENT STRUCTURAL ELEMENT ELEVATION: 4th floor - Foundation PLAN LOCATION: Area C CMU walls X Wall Column ~- ~ - Floor Slab Stair = ~ Other CRITERIA UTILIZED AS INSPECTION REFERENCE: ~trUctural Plans: ~heet(s): S-101, S-212 ..Qetail( s ): RF/: structural drawinQs S-242, S-301 - n/a.3 - BFI: Dated: 1/12/05 - S-302 - 1,3,5 - BFI: Revised: 3/23/05 CONDITIONS I CONSTRUCTIONS OBSERVED: No exceptions Deficiencies X Proper sizing X - X - Proper grade of bars X - - - X Proper quantity, spacing, & layout X - - X Proper splice lengths & splice locations - X - - X Proper chairing and concrete cover - X - - X Proper securement af reinforcing - X - - - Proper layout of post tensioning cables - - - Proper drape of post tensioning tendons - ~ - Proper sheathing and anchor reinforcing - - _. - Concrete strength verified - - - Concrete consolidated during placement - - - Other: - - DEFICIENCIES: - ~ REINSPECTION REQUIRED: No REMARKS: ~ = = NOTES: Contractor is respcnsible for scheduling any necessary reinspection after remedial work is performed. Tests may not be reprOduced, except in full, without written permission from Professional Service Industries, Inc. Page 5 of 18 Professional Service Industries, Inc. . 1748 33rd Street. Orlando, FL 32839. Phone 407/304-5560, F"y A()7/'OA' ~~~. Build On Engineering.. Consulting.. Testing REPORT OF REINFORCED CONCRETE INSPECTION TESTED FOR: A1A Acquisition Group, lTD., llP PROJECT: Residence Inn - Cape Canaveral, Fl 3425 Atlantic Avenue REPORT NO: 6 Cocoa Beach, Fl32931 PROJECT NO: 761-50044 Attn: Roger Dobson DATE: 8/8/2005 TECHNICIAN: M. Odom REINFORCING STEEL PLACEMENT STRUCTURAL ELEMENT ELEVATION: 4th floor Foundation ~LAN LOCATION: Area C CMU walls Wall Column Floor Slab Stair Other CRITERIA UTILIZED AS INSPECTION REFERENCE: Structural Plans: Sheet(s): S-101, S-212 Detai/(s): RFI: structural drawings S-242, S-301 nla, 3 RFI: Dated: 1/12/05 S-302 1,3,5 RFI: Revised: 3/23/05 CONDITIONS / CONSTRUCTIONS OBSERVED: No exceptions Deficiencies X Proper sizing X X Proper grade of bars X Proper quantity, spacing, & layout X X Proper splice lengths & splice locations X X Proper chairing and concrete cover X X Proper securement of reinforcing X Proper layout of post tensioning cables Proper drape of post tensioning tendons Proper sheathing and anchor reinforcing Concrete strength verified Concrete consolidated during placement Other: DEFICIENCIES: #6 bars found to be missing from level below at P-1 location (L5-66). One #5 bar was placed into 4th floor slab via drill/epoxy east half of P-1 location : REINSPECTION REQUIRED: Yes REMARKS: - = NOTES: Contractor is responsible for scheduling any necessary reinspection after remedial work is performed. Tests may not be reproduced, except in full, without written permission from Professional Service Industries, Inc. Page 6 of 18 Professional Service Industries, Inc. . 1748 33rd Street. Orlando. Fl 32839. Phone 407/304-5560. Fax 407/304-5561 On Engineering.. Consulting.. Testing REPORT OF REINFORCED CONCRETE INSPECTION TESTED FOR: A1AAcquisition Group, LTD., LLP PROJECT: Residence Inn - Cape Canaveral, FL 3425 Atlantic Avenue REPORT NO: 6 Cocoa Beach, FL 32931 PROJECT NO: 761-50044 Attn: Roger Dobson DATE: 8/10/2005 TECHNICIAN: M. Odom REINFORCING STEEL PLACEMENT STRUCTURAL ElEMENT ELEVATION: roof Foundation PLAN LOCATION: Area C roof slab = Wall Column = X Slab Stair ~ Other CRITERIA UTILIZED AS INSPECTION REFERENCE: Structural Plans: Sheet(s): S-101, S-252 Detail(s): RFI: structural drawinQs S-301 1,2 RFI: Dated: 1/12/05 S-303 4,5,6, 7, 8, 10, 12 RFI: Revised: 3-23-05 S-304 1,5,6 CONDITIONS I CONSTRUCTIONS OBSERVED: No exceptions Deficiencies X Proper sizing X X Proper grade of bars X X Proper quantity, spacing, & layout v ^ X Proper splice lengths & splice locations X X Proper chairing and concrete cover X X Proper securement of reinforcing X Proper layout of post tensioning cables - Proper drape of post tensioning tendons - Proper sheathing and anchor reinforcing - Concrete strength verified Concrete consolidated during placement Other: DEFICIENCIES: = ~ = ~ REINSPECTION REQUIRED: No REMARKS: : ~ ~ NOTES: Contractor is responsible for scheduling any necessary reinspection after remedial work is performed. Tests may not be reproduced, except in full, without written permiSSion from Professional Service Industries, Inc. Page 7 of 18 Professional Service Industries, Inc. . 1748 33rd Street. Orlando, FL 32839 . Phone 407/304-5560 . Fax 407/304-5561 REPORT OF REINFORCED CONCRETE INSPECTION TESTED FOR: A 1A Acquisition Group, LTD., LLP PROJECT: Residence Inn Cape Canaverai, FL 3425 Atlantic Avenue REPORT NO: 6 Cocoa Beach, FL 32931 PROJECT NO: 761-50044 Attn: Roger Dobson STRUCTURAL ELEMENT ELEVATION: 4th floor Foundation PLAN LOCATION: Area A columns, U-7, U.1-9. S.1-16, S.2-19, S2-24, S.1-26, 8.2-28, S.2-33, S.1-35, S.2-37 Wall Column Floor Slab Stair Other CRITERIA UTILIZED AS INSPECTION REFERENCE: Structural Plans: Sheet(s): S-101 Oetai/(s): RFI: structural drawinQs RFI: Dated: 1/12/05 RFI Revised: 3/23/05 CONDITIONS I CONSTRUCTIONS OBSERVED: No exceptions Deficiencies X Proper sizing X X Proper grade of bars X X Proper quantity, spacing, & layout X X Proper splice lengths & splice locations X X Proper chairing and concrete cover X X Proper securement of reinforcing Proper layout of post tensioning cables Proper drape of post tensioning tendons Proper sheathing and anchor reinforcing Concrete strength verified Concrete consolidated during placement Other: DEFICIENCIES: No REMARKS: Excessive water was added to concrete placed within above-referenced column area (25 gallons added to 4 yards). Samples were taken fOllowinQ addition of water. NOTES: Contractor is responsible for scheduling any necessary reinspection after remedial work is performed. Tests may not be reproduced, except in full, without written permission from Professional Service Industries, Inc. Page 8 of 18 Professional Service Industries. Inc.' 1748 33rd Street. Orlando. FL 32839' Phone 407/304-5560' Fax 407/304-5561 Engineering.. Consulting.. Testing REPORT OF REINFORCED CONCRETE INSPECTION TESTED FOR: A 1 A Acquisition Group, LTD., LLP PROJECT: Residence Inn - Cape Canaveral, FL 3425 Atlantic Avenue REPORT NO: 6 Cocoa Beach, FL 32931 PROJECT NO: 761-50044 Attn; Roger Dobson DATE: 8/11/2005 TECHNICIAN: M. Odom REINFORCING STEEL PLACEMENT STRUCTURAL ELEMENT ELEVATION; 4th floor Foundation PLAN LOCATION; Area A CMU walls Wall Column Fioor Slab Stair Other CRITERIA UTILIZED AS INSPECTION REFERENCE: Structural Plans; Sheet(s); S-101, S-212 Detail(s); RFI; structural drawinQS S-241, S-301 n/a, 3 RFI; Dated; 1/12/05 S-302 1,3,5 RFI; Revised; 3/23/05 CONDITIONS I CONSTRUCTIONS OBSERVED: No exceptions Deficiencies Proper sizing X Proper grade of bars X Proper quantity, spacing, & layout X Proper splice lengths & splice locations X X Proper chairing and concrete cover X X Proper securement of reinforcing X Proper layout of post tensioning cables Proper drape of post tensioning tendons Proper sheathing and anchor reinforcing Concrete strength verified Concrete consolidated during placement Other; DEFICIENCIES: REINSPECTION REQUIRED: Approval from EaR REMARKS: Improper grout mix (1289966-4000 ACGRT) placed within CMU wall at line C and 8 to 13.7. Samples were taken from improper mix. Pro er mix 1162918 - 3000 CMG was laced within remainder of above-referenced area. NOTES; Contractor is responsible for scheduling any necessary reinspection after remedial work is performed. Tests may not be reproduced, except in full, without written permission from Professional Service Industries, Inc. Page 9 of 18 Professional Service Industries, Inc. . 1748 33rd Street. Orlando. FL 32839 . Phone 407/304-5560 . Fax 407/304-5561 Engineering" Consulting" Testing REPORT OF REINFORCED CONCRETE INSPECTION TESTED FOR: A 1A Acquisition Group, LTD., LLP PROJECT: Residence Inn - Cape Canaveral, FL 3425 Atlantic Avenue REPORT NO: 6 Cocoa Beach, FL 32931 PROJECT NO: 761-50044 Attn: Roger Dobson DATE: 8i12i2005 TECHNICIAN: M. Odom REINFORCING STEEL PLACEMENT STRUCTURAL ELEMENT Foundation PLAN LOCATION: Area A CMU walls (including pilasters) at line G to V and 1 to 16, J to Nand 17, P to T and 22 Wall Column Floor Slab Stair Other CRITERIA UTILIZED AS INSPECTION REFERENCE: Structural Plans: Sheet(s): S-101, S-212 Detail(s): RFI: structural drawings S-241 , S-301 nla, 3 RFI: Dated: 1i12/05 S-302 RFI: Revised: 3/23105 CONDITIONS 1 CONSTRUCTIONS OBSERVED: No exceptions Deficiencies X Proper sizing X X Proper grade of bars X X Proper quantity, spacing, & layout X X Proper splice lengths & splice locations X X Proper Chairing and concrete cover X X Proper securement of reinforcing X Proper layout of post tensioning cables Proper drape of post tensioning tendons Proper sheathing and anchor reinforcing Concrete strength verified Concrete consolidated during placement Other: DEFICIENCIES: REINSPECTION REQUIRED: Approval of EOR REMARKS: Vibrator stopped functioning at approx. 75% completion of grout placement Reinforcing bars were then shaken to promote NOTES: Contractor is responsible for scheduling any necessary reinspection after remedial work is performed. Tests may not be reproduced, except in full, without written permiSSion from Professional Service Industries, Inc. Page 10 of 18 Professional Service Industries, Inc.' 1748 33rd Street. Orlando, FL 32839' Phone 407/304-5560' Fax 407i304-5561 . Engineering .. Consulting" Testing REPORT OF REINFORCED CONCRETE INSPECTION TESTED FOR: AlA Acquisition Group, LTD., LLP PROJECT: Residence Inn - Cape Canaveral, FL 3425 Atlantic Avenue REPORT NO: 6 Cocoa Beach, FL 32931 PROJECT NO: 761-50044 Attn: Roger Dobson DATE: 8/15/2005 TECHNICIAN: M. Odom REINFORCING STEEL PLACEMENT STRUCTURAL ELEMENT Foundation PLAN LOCATION: Area A CMU walls at A.3 to Nand 22, H.3 to T and 26 to 41 X Wall Column Floor Slab Stair Other CRITERIA UTILIZED AS INSPECTION REFERENCE: Structural Plans: Sheet(s): 5-101,5-212 Detail(s): RFI: structural drawinqs 5-241, S-301 n/a, 3 RFI: Dated: 1/12/05 RFI: Revised: 3/23/05 CONDITIONS f CONSTRUCTIONS OBSERVED: No exceptions Deficiencies X Proper sizing X X Proper grade of bars X X Proper quantity, spacing, & layout X X Proper splice lengths & splice locations X X Proper chairing and concrete cover X X Proper securement of reinforcing X Proper layout of post tensioning cables Proper drape of post tensioning tendons Proper sheathing and anchor reinforcing Concrete strength verified Concrete consolidated during placement Other: DEFICIENCIES: Grout not consolidated via vibrator (minimally puddled). One #5 horizontal bar only placed within sill area beneath CMU opening at line H.3-40 (bar does not extend into both jambs). REINSPECTION REQUIRED: Approval of EaR REMARKS: NOTES: Contractor is responsible for scheduling any necessary reinspection after remedial work is performed. Tests may not be reproduced, except in full, without written permiSSion from Professional Service Industries, Inc. Page 11 of 18 Professional Service Industries, Inc. . 1748 33rd Street. Orlando, FL 32839 . Phone 407/304-5560' Fax 407/304-5561 Engineering.. Consulting.. Testing REPORT OF REINFORCED CONCRETE INSPECTION TESTED FOR: A1A Acquisition Group, LTD., LLP PROJECT: Residence Inn - Cape Canaveral, FL 3425 Atlantic Avenue REPORT NO: 6 Cocoa Beach, FL 32931 PROJECT NO: 761-50044 Attn: Roger Dobson REINFORCING STEEL PLACEMENT STRUCTURAL ELEMENT Foundation PLAN LOCATION: Area C elevator CMU walls X Wall Column Floor Slab Stair Other CRITERIA UTILIZED AS INSPECTION REFERENCE: Structural Plans: 8heet(s): 8-101,8-212 Detail(s): RFI: structural drawings 8-252, 8-301 n/a, 3 RFI: Dated: 1/12/05 8-302 1,3,5 RFI: Revised: 3/23/05 CONDITIONS / CONSTRUCTIONS OBSERVED: No exceptions Deficiencies X Proper sizing X X Proper grade of bars X X Proper quantity, spacing, & layout X X Proper splice lengths & splice locations X X Proper chairing and concrete cover X X Proper securement of reinforcing X Proper layout of post tensioning cables Proper drape of post tensioning tendons Proper sheathing and anchor reinforcing Concrete strength verified Concrete consolidated during placement Other: DEFICIENCIES: Grout not consolidated via vibrator (minimally puddled). REINSPECTION REQUIRED: Approval of EaR REMARKS: NOTE8: Contractor is responsible for scheduling any necessary reinspection after remedial work is performed. Tests may not be reproduced, except in full, without written permission from Professional Service Industries, Inc. Page 12 of 18 ----"""--------- _"~__~~e_____'___~_________,_,_____,_,___,_,_,~"""___,~"______~____""~_ Professional Service Industries. Inc.. 1748 33rd Street. Orlando, FL 32839. Phone 407/304-5560. Fax 407/304-5561 /Engineering. Consulting.. Testing REPORT OF REINFORCED CONCRETE INSPECTION TESTED FOR: A 1A Acquisition Group, LTD., LLP PROJECT: Residence Inn - Cape Canaveral, FL 3425 Atlantic Avenue REPORT NO: 6 Cocoa Beach, FL 32931 PROJECT NO: 761-50044 Attn: Roger Dobson DATE: 8/17/2005 TECHNICIAN: M. Odom REINFORCING STEEL PLACEMENT STRUCTURAL ELEMENT Foundation PLAN LOCATION: Area A roof slab Wall Column X Slab Stair Other CRITERIA UTILIZED AS INSPECTION REFERENCE: Structural Plans: Sheet(s): S-101, S-251 Detaii(s): RFI: structural drawings S-301 RFI: Dated: 1/12/05 4,5,6,7,8,10,12 RFI: Revised: 3/23/05 S-304 1,5,6 CONDITIONS I CONSTRUCTIONS OBSERVED: No exceptions Deficiencies X Proper sizing X X Proper grade of bars X X Proper quantity, spacing, & layout X X Proper splice lengths & splice locations X X Proper chairing and concrete cover X X Proper securement of reinforcing X Proper layout of post tensioning cables Proper drape of post tensioning tendons Proper sheathing and anchor reinforcing Concrete strength verified Concrete consolidated during placement Other: DEFICIENCIES: Additional bars not placed within above-referenced slab area as per sheet S251 note 14. #5x5' straight bars placed at 24" OC as per conversation with engineer of record. CB-1 concrete beams located at column line M-13.6 and N-15 were formed as 8x18" beams, rather than 8x16" (reference S-301 detail 2). REINSPECTION REQUIRED: Yes REMARKS: NOTES: Contractor is responsible for scheduling any necessary reinspection after remedial work is performed. Tests may not be reproduced, except in full, without written permission from Professional Service Industries, Inc. Page 13 of 18 Professional Service Industries, Inc. . 1748 33rd Street. Orlando, FL 32839. Phone 4071304-5560 . Fax 4071304-5561 Engineering.. Consulting" Testing REPORT OF REINFORCED CONCRETE INSPECTION TESTED FOR: A 1 A Acquisition Group, LTD., LLP PROJECT: Residence Inn - Cape Canaveral, FL 3425 Atlantic Avenue REPORT NO: 6 Cocoa Beach, FL 32931 PROJECT NO: 761-50044 Attn: Roger Dobson DATE: 8/23/2005 TECHNICIAN: M. Odom REINFORCING STEEL PLACEMENT STRUCTURAL ELEMENT Foundation PLAN LOCATION: Area A elevator CMU walls X Wall Column Floor Slab Stair Other CRITERIA UTILIZED AS INSPECTION REFERENCE: Structural Plans: Sheet(s): S-101, S-212 Detail(s): RFI: structural drawings S-251 , S-301 RFI: Dated: 1/12/05 RFI: Revised: 3/23/05 CONDITIONS / CONSTRUCTIONS OBSERVED: No exceptions Deficiencies X Proper sizing X X Proper grade of bars X X Proper quantity, spacing, & layout X X Proper spiice lengths & splice locations X X Proper chairing and concrete cover X X Proper securement of reinforcing X Proper layout of post tensioning cables Proper drape of post tensioning tendons Proper sheathing and anchor reinforcing Concrete strength verified Concrete consolidated during placement X Other: consolidation X DEFICIENCIES: Grout not consolidated via vibrator (minimally puddled). REINSPECTlON REQUIRED: Approval of EaR REMARKS: NOTES: Contractor is responsible for scheduling any necessary reinspection after remedial work is perfomred. Tests may not be reproduced, except in full, without written permission from Professional Service Industries, Inc. Page 14 of 18 Professional Service Industries, inc. . 1748 33rd Street. Orlando, FL 32839 . Phone 407/304-5560. Fax 407/304-5561 . Engineering.. Consulting" Testing REPORT OF REINFORCED CONCRETE INSPECTION TESTED FOR: A 1 A Acquisition Group, LTD., LLP PROJECT: Residence Inn - Cape Canaveral, FL 3425 Atlantic Avenue REPORT NO: 6 Cocoa Beach, FL 32931 PROJECT NO: 761-50044 Attn: Roger Dobson DATE: 8/23/2005 TECHNICIAN: M. Odom REINFORCING STEEL PLACEMENT STRUCTURAL ELEMENT ELEVATION: roof Foundation PLAN LOCATION: Section C elevator roof slab Wall Column X Slab Stair Other CRITERIA UTILIZED AS INSPECTION REFERENCE: Structural Plans: Sheet(s): S-101. S-252 Detail(s): RFI: structural drawings 1 RFI: Dated: 1/12/05 RFI: Revised: 3/23/05 CONDITIONS / CONSTRUCTIONS OBSERVED: No exceptions Deficiencies X Proper sizing X X Proper grade of bars X X Proper quantity, spacing, & layout X X Proper splice lengths & splice locations X X Proper chairing and concrete cover X X Proper securement of reinforcing X Proper layout of post tensioning cables Proper drape of post tensioning tendons Proper sheathing and anchor reinforcing Concrete strength verified Concrete consolidated during placement X Other: consolidation X DEFICIENCIES: Reinforcing steel placed according to S-8 designation found on S-252 and S-301, detail 1. Concrete was not consolidated by any means, nor was top of concrete finished via float or trowel. REINSPECTlON REQUIRED: Approval of EaR REMARKS: NOTES: Contractor is responsible for scheduling any necessary reinspection after remedial work is performed. Tests may not be reproduced, except in full, without written permiSSion from Professional Service Industries, Inc. Page 15 of 18 Professional Service Industries, Inc. . 1748 33rd Street. Orlando, FL 32839. Phone 407/304-5560. Fax 407/304-5561 Engineering.. Consulting. Testing REPORT OF REINFORCED CONCRETE INSPECTION TESTED FOR: A 1A Acquisition Group, L TO" LLP PROJECT: Residence Inn - Cape Canaveral, FL 3425 Atlantic Avenue REPORT NO: 6 Cocoa Beach, FL 32931 PROJECT NO: 761-50044 Attn: Roger Dobson DATE: 8/25/2005 TECHNICIAN: M, Odom REINFORCING STEEL PLACEMENT STRUCTURAL ELEMENT Foundation PLAN LOCATION: Area B grade beams, S,7 to U and 41, U to Z and 41 to 66 X Wall Column Floor Slab Stair Other CRITERIA UTILIZED AS INSPECTION REFERENCE: Structural Plans: Sheet(s): S-101, S-212 Detail(s): RFI: structural drawinQs S-102 RFI: Dated: 1/12/05 S-104 RFI: Revised: 3/23/05 CONDITIONS I CONSTRUCTIONS OBSERVED: No exceptions Deficiencies X Proper sizing X X Proper grade of bars X X Proper quantity, spacing, & layout X X Proper splice lengths & splice locations X X Proper chairing and concrete cover X X Proper securement of reinforcing X Proper layout of post tensioning cables Proper drape of post tensioning tendons Proper sheathing and anchor reinforcing Concrete strength verified Concrete consolidated during placement X Other: anchor bolts X DEFICIENCIES: No clear cover to bottom reinforcing steel @ column line U,5-50, U,5-56, V,9-56, Insufficient clear cover to bottom reinforcing steel at line X-66 (1" in-place), and several other locations measute only 2" (3" clear required to soil), Additional reinforcing steellkeyway not placed at line S,7-41 and U-66 (construction joints) as per 8-104 detail 2, Pile projection into grade beam ranges from 0-3" in-place (4" minimum per 8-102), Pile tops not sufficiently/completely cleaned of debris, REINSPECTION REQUIRED: Yes REMARKS: NOTES: Contractor is responsible for scheduling any necessary reinspection after remedial work is performed, Tests may not be reproduced, except in full, without written permission from Professional Service Industries, Inc, Page 16 of 18 Professional Service Industries, Inc,. 1748 33rd Street. Orlando, FL 32839. Phone 407/304-5560. Fax 407/304-5561 Engineering.. Consulting.. Testing REPORT OF REINFORCED CONCRETE INSPECTION TESTED FOR: A 1 A Acquisition Group, LTD., LLP PROJECT: Residence Inn - Cape Canaveral, FL 3425 Atlantic Avenue REPORT NO: 6 Cocoa Beach, FL 32931 PROJECT NO: 761-50044 Attn: Roger Dobson DATE: 8/29/2005 TECHNICIAN: M. Odom REINFORCING STEEL PLACEMENT STRUCTURAL ELEMENT ELEVATION: rocf Foundation PLAN LOCATION: Area A elevator roof slab Wall Column X Slab Stair Other CRITERIA UTILIZED AS INSPECTION REFERENCE: Structural Plans: Sheet(s): S-101, S-251 Detail(s): RFI: structural drawinQs 5-301 1 RFI: Dated: 1/12/05 RFI: Revised: 3/23/05 CONDITIONS I CONSTRUCTIONS OBSERVED: No exceptions Deficiencies X Proper sizing X X Proper grade of bars X X Proper quantity, spacing, & layout X X Proper splice lengths & splice locations X X Proper chairing and concrete cover X X Proper securement of reinforcing X Proper layout of post tensioning cables Proper drape of post tensioning tendons Proper sheathing and anchor reinforcing Concrete strength verified Concrete consolidated during placement Other: DEFICIENCIES: REINSPECTION REQUIRED: no REMARKS: Reinforcing steel placed according to 5-8 designation found on S-252 and 5-301 detail 1. NOTES: Contractor is responsible for scheduling any necessary reinspection after remedial work is performed. Tests may not be reproduced, except in full, without written permission from Professional Service Industries, Inc. Page 17 of 18 Professional Service Industries, Inc. 1748 33rd Street. Orlando, FL 32839. Phone 407/304-5560. Fax 407/304-5561 /Engineering.. Consulting" Testing REPORT OF REINFORCED CONCRETE INSPECTION TESTED FOR: A 1A Acquisition Group, LTD., LLP PROJECT: Residence Inn - Cape Canaveral, FL 3425 Atlantic Avenue REPORT NO: 6 Cocoa Beach, FL 32931 PROJECT NO: 761-50044 Attn: Roger Dobson DATE: 8/31/2005 TECHNICIAN: M. Odom REINFORCING STEEL PLACEMENT STRUCTURAL ELEMENT ELEVATION: ground Foundation PLAN LOCATION: Area B CMU stem walls X Wall Column Floor Slab Stair Other CRITERIA UTILIZED AS INSPECTION REFERENCE: Structural Plans: Sheet(s): S-101 Detail(s): RFI: structural drawings S-212 3 RFI: Dated: 1/12/05 RFI: Revised: 3/23/05 CONDITIONS / CONSTRUCTIONS OBSERVED: No exceptions Deficiencies X Proper sizing X X Proper grade of bars X X Proper quantity, spacing, & layout X X Proper splice lengths & splice locations X X Proper chairing and concrete cover X X Proper securement of reinforcing X Proper layout of post tensioning cables Proper drape of post tensioning tendons Proper sheathing and anchor reinforcing Concrete strength verified Concrete consolidated during placement Other: DEFICIENCIES: Six #4 slab dowels installed into grade beam at door openings (5-6" embed, allied epoxy). 22 #5 vertical CMU reinforcing bars installed into existing stemwall fill (6" embed, allied epoxy) where spacing found to be insufficient (line K to S.5 and 41, H.5 to Sand 66). Six #5 vertical CMU reinforCing bars placed loose in CMU (not anchored into grade beam) at V-44.8, R.3-41, T.5-41, U.5-49, H-61, G-45.2. Eleven #5 vertical CMU reinforcing bars placed with #4 slab dowels (20" splice) bent vertical into CMU at line G-52 to 53, V-44 to 45. REINSPECTION REQUIRED: Yes REMARKS: NOTES: Contractor is responsible for scheduling any necessary reinspection after remedial work is performed. Tests may not be reproduced, except in full, without written permission from Professional Service Industries, Inc. Page 18 of 18 Professional Service Industries, Inc.. 1748 33rd Street. Orlando, FL 32839 . Phone 407/304-5560. Fax 407/304-5561 REPORT OF NON-COMPLIANCE (lPUNCHLIST) ITEMS --~ PROJECT NAME: RESIDENCE INrN PROJECT NO.: 761-50044 CLIENT: WELBRO CONSTRUCTION DESCIUPTION OF WORK: SPECIAL INSPECTIONS TECHNICIAN: STEVE CORRIGAN, MATT ODOM DATE OF REPORT: 08-25-05 I ITEM I DATE DESCRIPTION OF DEFICIENCY I ACTION REQUIRED ] REINSPECTION I REI~~i~TED I NO. INSPECTED TOP GRADE BEAM REINFORCING STEEL REMEDIATE PER ADDITIONAL 04~26~05/ 001 04-19-05 BARS DO NOT MATCH WITHIN GB-3/GB-7 DIRECTION OF REINFORCING STEEL 04-29-05 TRANSITION AREAS @ COL LINE E, R, ENGINEER OF ADDED PER (COMPLETE) AND P (BOTH ENDS OF BLDG) RECORD (RFI #034) REFERENCED RFI SEVERAL AUGERCAST PILES LIE REMEDlATE PER AREAS REFERENCED 04-26-05/ 002 04-19-05 OUTSIDE TOLERANCES STATED FOR DIRECTION OF REMEDIA TED PER 05-16-05 LOCATION (#1244, 1248, 1258, 1414) ENGINEER OF REFERENCED RFI (COMPLETE) RECOllD (RFI #035) REMEDIATE PER AREAS REFERENCED 003 05-02-05 PILE FOUND TO lJE MISSING (NO SURVEY DIRECTION OF REMEDIA TED PER 05-16-05 MARKER IN-PLACE) - PILE #1264 ENGINEER OF REFERENCED RFI (COMPLETE) RECORD (RFI #045) HOOK BARS DETAILED @ BALCONY AREAS ARE APPR 5' LONG IN-PLACE, REQUIRI~S APPROVAL RATHER THAN 10' IN LENGTH - SEE 004 06-17-05 RINKER SHOP BRA WINGS, BAR MARK OF ENGINEER OF MK507 (COL LINE A TO L-88 TO 99 - RECORD AREA C - 2ND FLOOR) SEVERAL CMU/PILASTER REINFORCING P-l REMOVED TO STEEL BARS NOT CENTERED WITHIN REQUlRI~S APPROV AL ELEV 4 COURSES 005 06-22-05 CELLS UPON COMPLETION OF GROUT OF ENGINEER OF ABOVE SLAB AND 06-27-05 PLACEMENT - RESTING ON CMU WEB RECORD REPLACED @ COL (AREA C - 2ND FLOOR) LINE L-89 I ADDITIONAL #4 - 4' VERTICAL CMU REINFORCING STEEL BAR PLACED BARS EXHffiIT INSUFFICIENT SPLICE REMEDIATE PER LOOSELY WITHIN LENGTH FROM LEVEL BELOW DIRECTION OF BOTTOM OF CELL IN 006 06-22-05 (RANGE IN..PLACE 11 TO 30" - ENGINEER OF AREAS NOTED AS 06-22-05 30" MIN REQUIRED AS PER S-(01) RECORD DEFICIENT (<26") (AREA C - 2ND FLOOR) (COL LINE C TO P-88 TO 99, Q TO U-95 TO 99 ONLY) 1 REPORT OF NON-COMPLIANCE (PUNCHLIST) ITEMS PROJECT NAME: RESIDENCE INN PROJECT NO.: 761-50044 CLIENT: WELBRO CONSTRUCTION DESCRlPTION OF WORK: SPECIAL INSPECTIONS TECHNICIAN: STEVE CORRIGAN, MATT ODOM DATE OF REPORT: 08-25-05 D~ DESCRIPTION OF DEFICIENCY I ACTION REQUIRED J REINSPECTION I DA~ INSPECTED REINSPECTED -- ADDITIONAL FULL- VERTICAL P-1 REINFORCING STEEL LENGTH #5 BAR PLACED WITHIN BARS EXHIBIT INSUFFICIENT SPLICE REME:DIATE PER CELL IN AREAS 007 06-22-05 LENGTH FROM LEVEL BELOW DIRE:CTION OF NOTED AS DEFICIENT 06-22-05 (RANGE IN-PLACE 27 TO 36" - ENGINEER OF (<35") 36" MIN REQUIRED AS PER S-101) RECORD (AREA C - 2ND FLOOR) (COL LINE C TO P-88 TO 99, Q TO U-95 TO 99 ONLY) VERTICAL CMU REINFORCING STEEL DOWEL NOT PRESENT FROM LEVEL REME:DIATE PER 008 06-22-05 BELOW @ COL LINE E-96.5, E-97.8, E-98 DIRE:CTION OF (CELL ADJ TO E-98 POURED SOLID ENGINEER OF WITH REINFORCEMENT) RECORD (AREA C - 2ND FLOOR) IN-PLACE CONDITION VERTICAL P-l REINFORCING STEEL ACCEPT ABLE @ COL DOWEL (#6 BAR) NOT PRESENT FROM LINE A-93, B-93 (AWAITING LEVEL BELOW @ COL LINE A-93 & B-93 REME:DIATE PER CORRESPONDENCE 009 06-22-05 (#5 BARS IN PLACE FROM 1sT FLOOR), DIRE:CTION OF FROM ENGINEER OF 06-27-05 AND Q.1-95 (NO BAR OF ANY SIZE ENGINEER OF RECORD); #6 BAR PRESENT WITHIN W CELL OF RECORD PLACED INTO 2ND PILASTER, #6 BAR IN E CELL) FLOOR SLAB @ COL (AREA C - 2ND FLOOR) LINE Q.1-95 VIA I DRILUEPOXY 2 REPORT OF NON-COMPLIANCE (PUNCHLIST) ITEMS PROJECT NAME: RESIDENCE INN PROJECT NO.: 761-50044 CLIENT: WELBRO CONSTRUCTION DESCRIPTION OF WORK: SPECIAL INSPECTIONS TECHNICIAN: STEVE CORRIGAN, MATT ODOM DATE OF REPORT: 08-25-05 I ITEM I D~ DESCRIPTION OF DEFICIENCY I ACTION REQUIRED J REINSPECTION I REI~~~~TED l NO. INSPECTED MASONRY GROUT PLACED IN SINGLE FULL-HEIGHT UFT (8'-8"), AND GROUT WAS VIBRATED ONLY ONCE FOLLOWING INITIAL PLACEMENT REQUIRES APPROVAL 010 06-22-05 (REFERENCE ACI 530.1-02, PART 3.5- OF ENGINEER OF RECONSOLIDATION OF GROUT RECORD REQUmED AFTJi:R INITIAL WATER LOSS AND SETTLEMENT HAS OCCURRED) (AREA C - 2ND FLOOR) ADDITIONAL "B" P-l PILASTER MISPLACED APPR 24" TO REM1WIATE PER BARS WITHIN 2ND THE NORTH OF PLAN POSITION DIRE:CTION OF FLOOR SLAB 011 06-23-05 EXTENDED TO 06-27-05 (ORIGINAL LOCATION COL LINE E-7) ENGINEER OF DEVELOP INTO (AREA A-I ST FLOOR) RECORD CURRENT P-l POSITION PILASTER DESIGNATION @ COL LINE #6 BARS PLACED Q-77 & M-77 CHANGES FROM P-l ON 1ST REME:DIA TEPER INTO 2ND FLOOR SLAB 012 06-23-05 FLOOR TO P-2 DESIGNATION ON DIRE:CTION OF VIA DRILLIEPOXY 06-27-05 2ND FLOOR (BARS IN-PLACE FROM 1 ST ENGINEER OF WITHIN MISSING P-2 FLOOR ARE 2-#5 IN EACH LOCATION, RECORD REINFORCEMENT RATHER THAN 4-#6) (AREA C - 2ND FLR) AREAS PILASTER VERTICAL REINFORCING STEEL WITHIN P-l @ COL LINE N.I-89 REQUmESAPPROVAL 013 06-24-05 CONSISTS OF 2-#5 BARS OF ENGINEER OF (RATHER THAN 2-#6 BARS) RECORD (AREA C -- 1ST & 2ND FLOOR) ADDITIONAL HORIZONTAL REINFORCEMENT NOT BEING PLACED REQUm:ESAPPROVAL 014 06-24-05 ABOVE AND BELOW CMU OPENINGS AS OF ENGINEER OF PER PROJECT SPECIFICATIONS RECORD SECTION 04220. PART 3.03.C 3 REPORT OF NON-COMPLIANCE (PUNCHLIST) ITEMS PROJECT NAME: RESIDENCE INN PROJECT NO.: 761-50044 CLIENT: WELBRO CONSTRUCTION DESCRlPTION OF WORK: SPECIAL INSPECTIONS TECHNICIAN: STEVE CORRlGAN, MATT ODOM DATE OF REPORT: 08-25-05 ~~ D~ DESCRIPTION OF DEFICIENCY -r ACTION REQUIRED ] REINSPECTION I RE~~i~TED I NO. INSPECTED LOCATION OF P-1 PILASTER REMEDIATE PER 2-#6 BARS INSTALLED 015 06-25-05 MISPLACED FROM PLAN LOCA nON DIRECTION OF INTO FOUNDATION @ 06-25-05 (APPR 8" S@COLLINE A-10 & B-10) ENGINEER OF L.5-39 (NOW CIP COL (APPR 16" W @COLLINE L.5-39 & L.5-41) RECORD @ PLAN LOCATION) #5 BARS PRESENT FROM LEVEL BELOW FULL-LENGTH #5 BAR PLACED ALONG IN P-1 PILASTER LOCATIONS (#6 BARS REQUIRES APPROVAL WITH #6 BAR ABOVE 016 06-25-05 DETAILED) @ COL LINE Q.1-86, N-85, N-82, OF ENGINEER OF 2ND FLOOR SLAB 06-27-05 P-82, N-73, P-7J, N.2-13.8, Q.1-16, R,6-7 RECORD ELEVATION (2ND FLOOR) (AREA CONLY) 1-#5 BAR ONLY PRESENT FROM LEVEL REMEDIATE PER #6 BARS INSTALLED VIA DRILLIEPOXY 017 06-25-05 BELOW @ P-1 PILASTER LOCATIONS DIRE:CTION OF INTO FLOOR SLAB IN 07-06-05 (2-#6 BARS DETAILED) ENGINEER OF BOTH REFERENCED @COLLINEN-39,Q.1-8(2NDFLOOR) RECORD LOCA nONS NO CLEAR COVER TO REINFORCING REQUIRES APPROVAL 018 06-25-05 STEEL BANDS WITHIN CIP COLUMN (C-4) OF ENGINEER OF @ LINE S-26 (SW CORNER) & S-28 (NE RECORD CORNER) (1 ST FLOOR) STD HOOK BARS HAVE NOT BEEN MK412 BARS PLACED DETAILED IN SHOP DRAWINGS WITHIN REQUIRES APPROVAL WITHIN 2ND FLOOR 019 06-27-05 SLAB EDGE @ TWO SIDES OF ELEVATOR OF ENGINEER OF SLAB @ 18" OC 06-27-05 AREAS, AS WELL AS CB-1, CB-3, CB-4 RECORD ALONG REVERSE (PARTIAL), CB..5, AND CB-6 (pARTIAL) SIDE OF ELEVATOR CONCRETE BEAM AREAS (AREA A) COL CUT FROM BASE TS COLUMN @ LINE F-95 APPR 4" OUT- REQUIRES APPROVAL PLATE AND REPOSI- 020 06-27-05 OF-PLUMB (LEANING TO WEST) OF ENGINEER OF TIONED UTILIZING 08-17-05 (1 ST FLOOR) RECORD W' ANGLE AS SUPPORT ON 3 SIDES IMPROPER ELECTRODES BEING USED REQUIRES APPROVAL E7018 ELECTRODES 021 06-27-05 TO WELD TS COLUMNS TOGETHER (6011 OF ENGINEER OF USED TO WELD TS 07-28-05 BEING UTILIZED, E70XX SERIES RECORD COLUMNS WITIDN SPECIFIED - SEE SHEET S-10n AREA A. 3RD FLOOR 4 REPORT OF NON-COMPLIANCE (PUNCHLIST) ITEMS PROJECT NAME: RESIDENCE INN PROJECT NO.: 761-50044 CLIENT: WELBRO CONSTRUCTION DESCRIPTION OF WORK: SPECIAL INSPECTIONS TECHNICIAN: STEVE CORRIGAN, MATT ODOM DATE OF REPORT: 08-25-05 ~~ D~ DESCRIPTION OF DEFICIENCY I ACTION REQUIRED J REINSPECTION I REI~~~~TED l NO. INSPECTED MANY CMU CKLLS NOT COMPLETELY FILLED WITH MASONRY GROUT: COL LINE B-13,H-3,N.9-4,N.9-5,Q.I-8,R-13.1, REMlmIATE PER Q.9-16, T -12,T.5-12,U-12,U.5-12,H.5-22,J-22, DIRECTION OF 022 07 -05-05 K-22,P.1-22,Q-26,H.4-40,S.2-40.8,N-67 ,H.4-67, ENGINEER OF H.4-68,P-68,S-77,R.2-89 ,J-88,F -96.5,A.8-89, RECORD A-96 (1 ST FLOOR); AND COL LINE A.I-98,G-92,U-97.3,R.5-82,R.8-82, S.5-82,T-82,K-77,N-67 (2ND FLOOR) MANY CMU WALLS REINFORCED @ REQUIRES APPROVAL 023 07-05-05 48" OC, RATHER THAN 32" OC AS PER OF ENGINEER OF S-212, DETAIL 3 (\V-I DESIGNATION FOR RECORD INTERIOR 1 ST FLOOR AREAS) (AREA C) TYPICAL CMU SILL REINFORCEMENT REQUIRES APPROVAL 024 07-05-05 (2-#5 BARS) NOT PLACED BENEATH AIR OF ENGINEER OF HANDLER OPENINGS IN ANY LOCATION RECORD CIP COLUMN @ LINE 8.2-84 APPR 2" OUT- REQUIRES APPROVAL 025 07-06-05 OF-PLUMB (I~EANING TO NORTH) OF ENGINEER OF (1 ST FLOOR) RECORD CIP COLUMN APPR 1" OUT-OF-PLUMB @ LINE S.2-28 (LEANING TO NORTH), S.2-33 (LEANING TO SOUTH), REQUIRES APPROVAL 026 07 -08-05 S.2-70 (LEANING TO NORTH); OF ENGINEER OF APPR 1.25" OUT-OF-PLUMB@ RECORD LINE 8.2-37 (LEANING TO NORTH) (1ST FLOOR) KO-l BOND BEAM REINFORCING STEEL REQUIRES APPROVAL NOT PRESENT @ COL LINE A TO C-89, 027 07-11-05 C-88 TO 89, U-96.2 TO 99 OF ENGINEER OF (3RD FLOOR SLAB ELEVATION) RECORD ADDITIONAL "A" BARS NOT PRESENT REQUIRES APPROVAL 028 07-11-05 WITHIN FLOOR SLAB @ OF ENGINEER OF COL LINE N TO 0-96 (3RD FLOOR) RECORD 5 REPORT OF NON-COMPLIANCE (PUNCHLIST) ITEMS PROJECT NAME: RESIDENCE INN PROJECT NO.: 761-50044 CLIENT: WELBRO CONSTRUCTION DESCRIPTION OF WORK: SPECIAL INSPECTIONS TECHNICIAN: STEVE CORRIGAN, MATT ODOM DATE OF REPORT: 08-25-05 [ ITEM I DATE ] DESCRIPTION OF DEFICIENCY I ACTION REQUIRED J REINSPECTION I REI~~i~TEDl NO. INSPECTED BANDS PLACED @ 6" OC TYPICAL REQUIRES APPROVAL 029 07..11-05 WITHIN CB-2 BEAMS @ COL LINE S.2-68 OF ENGINEER OF TO 70, U.1-94 TO 96.2, RATHER THAN AS RECORD PER S-301, DETAIL 2 (3RD FLOOR) CIP COLUMN @ LINE S.2-19 OFFSET APPR REQUm.ES APPROVAL 030 07..13-05 2" S OF lPLAN LOCATION OF ENGINEER OF (1 ST AND 2ND FLOOR) RECORD SEVERAL CMU WALLS ON 2ND FLOOR OFFSET FROM 1ST FLOOR LOCATIONS (APPR OFFSET AND DIRECTION LISTED): COL LINE T-31 (1.625" TO NORTH), COL LINE T-22 (0.875" TO NORTH), COL LINE F-2 (0.625" TO EAST), REQUm.ES APPROVAL 031 07..14-05 COL LINE H-l (0.625" TO EAST), OF ENGINEER OF COL LINE 1.-2 (0.75" TO EAST), RECORD COL LINE Y.-90 (0.50" TO NORTH), COL LINE T -82 (0.625 TO SOUTH), COL LINE T-73 (1.0" TO SOUTH), COL LINE G.8-82 (0.50" TO NORTH), COL LINE H-99 (1.0" TO WEST), COL LINE U.35 (1.125" TO SOUTH) END OF CB-l BEAM @ COL LINE 1..5-68 NOT BEARING ON CMUIP-l PILASTER REQUIRES APPROVAL 032 07..27-05 (CMU PLACED FULL-HEIGHT) OF ENGINEER OF 2 #5xl0' BARS PJLACED (5' IN BEAM, 5' IN RECORD SLAm TO PROVIDE DEVELOPMENT BOTTOM REINF'ORCING STEEL PLACED @ 12" OC WITHIN COL LINE R TO U-90 TO REQUIRES APPROVAL 033 07..27-05 96, R TO U-96 TO 98 (DETAILED@ 10" OC OF ENGINEER OF WITHIN THESE AREAS) .RECORD (AREA C - 4TH FLOOR) 6 REPORT OF NON-COMPLIANCE (PUNCHLIST) ITEMS PROJECT NAME: RESIDENCE INN PROJECT NO.: 761-50044 CLIENT: WELBRO CONSTRUCTION DESCRIPTION OF WORK: SPECIAL INSPECTIONS TECHNICIAN: STEVE CORRIGAN, MATT ODOM DATE OF REPORT: 08-25-05 I ITEM ~ATE L I ACTION REQUIRED ] REINSPECTION I REI~~i~TED l NO. INSPECTED DESCRIPTION OF DEFICIENCY , BOTTOM REINFORCING STEEL PLACED @ 10" OC WITHIN REQUIRES APPROVAL, 034 07-27-05 COL LINE M TO Q-82 TO 86 OF ENGINEER OF (DETAILED @ 9" OC WITHIN THIS AREA) RECORD (AREA C - 4TH FLOOR) CB-6 BEAM CONTAINS NO BANDS@ 3" OC @ N END (COL LINE N-85) 7 BANDS @ 6" OC AND MID-BEAM BANDS REQUIRES APPROVAL 035 07-27-05 @ 12" OC IN-PLACE (S END OF BEAM OF ENGINEER OF CONSTRUCTED AS PER PROJECT RECORD DOCUMENTS) (AREA C - 4TH FLOOR) 5000 PSI CONCRETE (MIX CODE 1156016) PLACED WITHIN CMU CELLS @ COL REQUIRES APPROVAL 036 07-27-05 LINE H.5-66 TO 68, H.5 TO S.2-66, OF ENGINEER OF 1'1-66 TO 68 DURING PLACEMENT OF RECORD -+----!'LOOR SLAB LAREA C - 3RD FLOOR) 2 #6 REINFORCING I PRECAST LINTEL @ COL LINE R.2-16 BARS PLACED INTO I FOUND TO BE CRACKED ON BOTTOM REQUIRES APPROVAL LINTEL FOR 037 07-28-05 I (CENTER, EAST TO WEST END) AND SIDE OF ENGINEER OF ADDITIONAL 07-28-05 I (NE CORNER, TOP, APPR 24" IN LENGTH) RECORD STRENGTH (RATHER i (AREA A, 3RD FLOOR) THAN #5 BARS) I I 2 #5 BARS SUBSTITUED FOR 1 #6 BAR I WITHIN EACH CELL IN P-l LOCATIONS REQUIRES APPROVAL 038 07-28-05 OF ENGINEER OF I @ COL LIN]~ R.6-7, Q.I-8, N.3-13.5 RECORD I (AREA A, 3RD FLOOR) " 7 REPORT OF NON-COMPLIANCE (PUNCHLIST) ITEMS PROJECT NAME: RESIDENCE INN PROJECT NO.: 761-50044 CLIENT: WELBRO CONSTRUCTION DESCRIPTION OF WORK: SPECIAL INSPECTIONS TECHNICIAN: STEVE CORRIGAN, MATT ODOM DATE OF REPORT: 08-25-05 [ITEM I DATE C I ACTION REQUIRED ] REINSPECTION I DA TE J NO. INSPECTED DESCRIPTION OF DEFICIENCY REINSPECTED CMU DOWN CELLS FOUND TO NOT BE COMPLETELY FILLED WITH GROUT WITHIN AREA C: COL LINE Q.1-93,F- REMl~DIA TE PER 039 08..08-05 96.9,A-91,H.2-79 (l ST FLOOR); DIRECTION OF COL LINE B-89.2,J-82 (2ND FLOOR); ENGINEER OF COL LINE E-97.5,B.8-98,B-89.2,L.9-85,J-85, RECORD H.2-84,H-84,J-68,N-67 ,H.4-66.5,H.4-67 .5, N-66.2,P-66,S.1-66 (3RD FLOOR) VERTICAL #6 REINFORCING BARS NOT PRESENT WITHIN P-l LOCATION @ COL REQUIRES APPROVAL LINE L.5-66 (3RD FLOOR), 1 #5 BAR 040 08-08-05 PLACED INTO 4TH FLOOR SLAB (WITHIN OF ENGINEER OF EAST HALF OF P-l LOCATION) AS RECORD EXTENSION/SPI..ICE FOR LEVEL ABOVE HORIZONTAL REINFORCING BARS NOT REMlmIATE PER 041 08-08-05 PRESENT WITHIN SILL AREA OF CMU DIRECTION OF OPENING @ COl. LINE H.4-67 (2ND FLOOR) ENGINEER OF AND HA-40 (3RD FLOOR) RECORD CONCRETE NOT YET PLACED WITHIN SILL AREAS (CMU) @ COL LINE H.4-67, REQUIRES APPROVAL 042 08-08-05 N.5-66 (3RD FLOOR), N.1-66 (4TH FLOOR), AS OF ENGINEER OF WELL AS ALL AIR HANDLER OPENING RECORD AREAS IMPROPER GROUT MIX REQUIRES APPROVAL 043 08..11-05 (1289966 - 4000 ACGRT) OF ENGINEER OF PLACED WITIDN CMU DOWN CELLS @ RECORD COL LINE C-8 TO 13.7 (4TH FLOOR) #5x5' STRAIGHT BAR ADDITIONAL REINFORCING BARS NOT PLACED @ 24" OC PLACED WITmN ROOF SLAB REQUIRES APPROVAL WITHIN AREA A I 044 08..16-05 (AREA A OR AREA C) OF ENGINEER OF ONLY (AS PER 08-17-05 L RECORD CONVERSATION AS PER SHEET S251, S252 - NOTE 14 WITH ENGINEER OF RECOROl 8 REPORT OF NON-COMPLIANCE (PUNCHLIST) ITEMS PROJECT NAME: RESIDENCE INN PROJECT NO.: 761-50044 CLIENT: WELBRO CONSTRUCTION DESCRIPTION OF WORK: SPECIAL INSPECTIONS TECHNICIAN : STEVE CORRIGAN, MATT ODOM DATE OF REPORT: 08-25-05 DATE I DESCRIPTION OF DEFICIENCY I ACTION REQUIRED J REINSPECTION I RE~~i~TED I INSPECTED CMU DOWN CELLS .FOUND TO NOT BE REMEDIATE PER COMPLETELY FILLED WITH GROUT DIID:CTION OF 045 08-16-05 WITHIN AREA C: COL LINE F-96.6, H.9-82, H.7-75, M.7-73, L.5- ENGINEER OF 66. N-66 (4TH FLOOR) RECORD MASONRY GROUT NOT CONSOLIDATED DURING PLACEMENT INTO CMU: 08-12-05/ COL LINE G TO V-I TO 16,J TO N-17, REQUIRES AFPROV AL 046 08-15-05/ P TO T-22 (4TH FLOOR); OF ENGINEER OF 08-16-05/ COL LINE A.3 TO N-22, H.3 TO T-26 TO 41 RECORD 08-23-05 (4TH FLOOR); ELEVATOR C (ROOF); ELEVATOR A (ROOF) CONCRETE PLACED WITHIN ROOF SLAB REQUIRES APPROV AI, 047 08-23-05 OF ELEVATOR C WAS NOT VIBRATED OR OF ENGINEER OF FINISHED (TROWELIFLOAT) RECORD INSUFFICIENT SPACING OF CMU FILLED REQUIRES AFPROV AI, CELLS IN SEVERAL LOCATIONS WITHIN 048 08-23-05 AREA A_1sT FLOOR (32" OC REQUIRED OF ENGINEER OF (ii) INTERIOR, 24" OC (ii) EXTERIOR) RECORD NO CLEAR COVER TO BOTTOM GRADE REQUIRES AFPROV AL 049 08-25-05 BEAM STEEL @ COL LINE U.5-50, U.5-56, OF ENGINEER OF V.9..56 (AREA B) RECORD INSUFFICIENT CLEAR COVER TO BOTTOM GRADE BEAM STEEL @ COL REQUIRES APPROVAL 050 08-25-05 LINE X-66 - AREA B (I" IN-PLACE), OF ENGINEER OF SEVERAL LOCATIONS EXIDBIT 2" RECORD (3" REQUIRED TO SOIL) ADDITIONAL REINFORCING STEELlKEYW AY NOT PLACED WITHIN REQUIRES AFPROV AL 051 08-25-05 GRADE BEAM@COLLINES.7-41, U-66- OF ENGINEER OF AREA .B (CONSTRUCTION JOINTS) RECORD AS PER S104 DETAIL 2 9 REPORT OF NON-COMPLIANCE (PUNCHLIST) ITEMS PROJECT NAME: RESIDENCE INN PROJECT NO.: 761-50044 CLIENT: WELBRO CONSTRUCTION DESCRIPTION OF WORK: SPECIAL INSPECTIONS TECHNICIAN: STJ;~VE CORRIGAN, MATT ODOM DATE OF REPORT: 08-25-05 I ITEM ~ATE I DESCRIPTION OF DEI<'ICIENCY I ACTION REQUIRED -' REINSPECTION I REI~~i~TED I NO. INSPECTED PILE PROJECTION INTO GRADE BEAMS (COL LINE S.7 TO U-41, U TO Z-41 TO 66- REQUIRES APPROVAL, 052 08..25-05 AREA B) WAS FOUND TO RANGE FROM 0- OF ENGINEER OF 3" IN-PLACE (4" MIN REQUIRED AS PER RECORD S102) PILE TOPS NOT SUFFICIENTLY; REQUIRES APPROVAL COMPLETELY CLEANED OF DEBRIS 053 08..25-05 WITHIN GRADE BEAM AREAS COL LINE OF ENGINEER OF S.7 TO U-41, V TO Z-41 TO 66-AREA B RECORD ELEVATION OF GRADE BEAMS WITHIN COL LINE U.5 TO Z-50, Z-50 TO 56, REQUIRES APPROVAL 054 08-25-05 V.5 TO Z-56, X-50 TO 56 (AREA B) WAS OF ENGINEER OF LOWERED 16" DUE TO CONFLICT WITH RECORD ELEVATION OF PAVEMENT AREAS 10 Engineering. Consulting. Testing REPORT OF IN-PLACE DENSITY TESTS TESTED FOR: A1A Acquisition Group, LTD., LLP DATE: 9/26/05 3425 Atlantic Avenue REPORT NO: 6 Cocoa Beach, FL 32931 PROJECT NO: 761-50044 Attn: Roger Dobson PROJECT: Residence Inn - Cape Canaveral, FL TECHNICIAN: S. Corrigan MAXIMUM IN-PLACE ELEV. OPTIMUM LAB DRY DRY COMPACTION OF DATE MOISTURE DENSITY MOISTURE DENSITY COMPACTION REQUIREMENT TEST (2005) I LOCATION (%) (PCF) (%) (PC F) (%) (%) (ft) A1A DECELERATION LANE Reference: 0 = top of stabilized subbase STABILIZED SUBBASE 8/15 15' S. of N. end 9.6 116.3 10.9 114.6 98.5 98 6-12" 8/15 10' S. of N. end 9.6 116.3 10.1 114.0 98.0 98 0-6" 8/15 15' N. of S. end 9.6 116.3 11.4 115.3 99.1 98 6-12" 8/15 10' N. of S. end 9.6 116.3 9.9 114.2 98.2 98 0-6" THESE TEST RESUL TS APPL Y ONL Y TO THE SPECIFIC LOCA nONS NOTED AND MA Y NOT REPRESENT ANY OTHER LOCA nONS OR ELEVA nONS. REPORTS MA Y NOT BE REPRODUCED, EXCEPT IN FULL, WITHOUT WRITTEN PERMISSION BY PROFESSIONAL SERVICE INDUSTRIES, INC. NOTES: Proctor Method: _Standard ....x..Modified DENSITY TEST METHOD:LDrive Sleeve .1LNuclear Gauge . Results do not meet project's requirement. TESTS PERFORMED PER ASTM 02922-96 & ASTM 03017-96 "Retest results do meet project's requirement DENSITIES SHOWN: Lbs. per cubic foot Respectfully Submitted, MOISTURE CONTENT Percent of dry weight Professional Service Industries, Inc. PERCENT COMPACTION: Base on maximum dry density obtained on a representative sample 1 Jeffrey H.M. Begovich, PE. Vice PresidenVConstruction Services Florida Registration No. 51869 Professional Service Industries, Inc.. 1748 33rd Street. Orlando, FL 32839. Phone 407/304-5560. Fax 407/304-5561 Engineering · Consulting · Testing lIMEROCK BEARING RATIO TEST RESULTS (FM 5-515) TESTED FOR: A 1 A Acquistion Group L TO, LLP 3425 Atlantic Ave. PROJECT: RESIDENCE INN Cocoa Beach, FL 32931 REPORT NO: o PROJECT NO: 761-50044 DATE TESTED: Auqust 29. 2005 SAMPLE LOCATION: BASE COURSE BENEATH PARKING & ROADWAY SOiL DESCRiPTiON: L1MEROCK 1000 -+ ,__ , c w ~ I ~_ -I 100 .". - . ~ :; ~ ,- ~ all I -I , 1'1 i! - ~ I , I . ! II 10 I I 6.00 7.00 8.00 9.00 10.00 11.00 12.00 13.00 14.00 15.00 MOISTURE CONTENT (%) PROJECT LBR REQUIREMENT: 100 LBR VALUE: 140 121.00 I I I 120.50 I 120.00 I tfI"" ~ 119 50 ~. i -~ . ~~, 13 119.00 , ~ .e: 118.50 , i 118.00 J ..... .......... ",,- Q 117.50 .... w " s: 117.00 II '- ' !:: 116.50 , ,-I I ~ 116.00 I~.' I >- 115.50 II I ~ o 115.001 114.50 'I 114.00 . I 113.50 ~ i I . 113.00 I 6.00 7.00 8.00 9.00 10.00 11.00 12.00 13.00 14.00 15.00 MOISTURE CONTENT ('Yo) OPT MOISTURE: 11.2 MAX DENSITY 120.0 NOTES: 1 TEST MEETS PROJECT REQUIREMENTS 2 761-50044 3 Professional Service Industries, Inc. . 1748 33rd Street. Orlando, FL 32839 . Phone 407/304.5560 . Fax 407/304-5561 FL Engineering Business 3684 Engineering .. Consulting .. Testing REPORT OF CONCRETE COMPRESSION TEST Tested For: A 1 A Acquisition Group L TO., LLP Project: RESIDENCE INN Attn: Roger Dobson CAPE CANAVERAL, FL 3425 Atlantic Avenue Cocoa Beach, FL 32931 Project No: 761-50044 LOCATION: Section B slab on grade, approx. K-64 Date Placed: 9/14/2005 Technician: J. Kilderry Time Batched: 11:25 AM Supplier: Rinker Time Sampled: 12:04 PM Delivery TicketlTruck No.: 92693260 Slump (in) (ASTM C143): 5.75 Mix No. & Proportions: 1176299 Air Temp. (F): 87 Concrete Temp. (F) (ASTM C1064): 90 Date Received in lab: 9/15/2005 Air Content (ASTM C173/C231): N/A COMPRESSIVE TEST RESULTS Test Date Total Cylinder Cylinder Compressive Type Set Cylinder Age of Load Diameter Area Strength of No. 10 (Days) Test (Ibs) (in) (sq. in.) (psi) Break 134 A 7 9/21/2005 95500 6.00 28.27 3380 Type 1 B 28 10/12/2005 140000 6.00 28.27 4950 Type 1 C 28 10/12/2005 141500 6.00 28.27 5010 Type 2 0 Hold Specifications: 3000 28 days REMARKS: X Cylinders made by PSI Cylinders made by Contractor X Cylinders picked up by PSI Cylinders picked up by Contractor X Test Results Comply with Test Results do not Comply with applicable specifications applicable specifications Concrete sampled in accordance with ASTM C172 and ASTM C31. Compressive Strength tests performed in accordance with ASTM C39. Respectfully Submitted Professional Service Industries, Inc. Professional Service Industries, Inc.. 1748 33rd Street. Orlando, FL 32839. Phone 407/304-5560 . Fax 407/304-5561 FL Engineering Business 3684 Engineering. Consulting. Testing REPORT OF CONCRETE COMPRESSION TEST Tested For: A1A Acquisition Group LTD., LLP Project: RESIDENCE INN Attn: Roger Dobson CAPE CANAVERAL, FL 3425 Atlantic Avenue Cocoa Beach, FL 32931 Project No: 761-50044 LOCATION: Section B slab on grade, approx. H-56 Date Placed: 9/14/2005 Technician: J. Kilderry Time Batched: 12:06 PM Supplier: Rinker Time Sampled: 12:45 PM Delivery Ticket/Truck No.: 40499948 Slump (in) (ASTM C143): 3.75 Mix No. & Proportions: 1176299 Air Temp. (F): 90 Concrete Temp. (F) (ASTM C1064): 92 Date Received in lab: 9/15/2005 Air Content (ASTM C173/C231): N/A COMPRESSIVE TEST RESULTS Test Date Total Cylinder Cylinder Compressive Type Set Cylinder Age of Load Diameter Area Strength of No. 10 (Days) Test (Ibs) (in) (sq. in.) (psi) Break 135 A 7 9/21/2005 93500 6.00 28.27 3310 Type 1 B 28 10/12/2005 143500 6.00 28.27 5080 Tvee 2 C 28 10/12/2005 145000 6.00 28.27 5130 Type 2 D Hold Specifications: 3000 28 days REMARKS: X Cylinders made by PSI Cylinders made by Contractor X Cylinders picked up by PSI Cylinders picked up by Contractor X Test Results Comply with Test Results do not Comply with applicable specifications applicable specifications 10 gallons water added to concrete Concrete sampled in accordance with ASTM C172 and ASTM C31. Compressive Strength tests performed in accordance with ASTM C39. Respectfully Submitted Professional Service Industries, Inc. Professional Service Industries. Inc.' 1748 33rd Street. Orlando, FL 32839' Phone 407/304-5560' Fax 407/304-5561 FL Engineering Business 3684 Build On Engineering. Consulting. Testing REPORT OF CONCRETE COMPRESSION TEST Tested For: A 1A Acquisition Group LTD., LLP Project: RESIDENCE INN Alln: Roger Dobson CAPE CANAVERAL, FL 3425 Atlantic Avenue Cocoa Beach, FL 32931 Project No: 761-50044 LOCATION: Section B slab on grade, approx. L-47 Date Placed: 9/14/2005 Technician: J. Kilderry Time Batched: 1 :46 PM Supplier: Rinker Time Sampled: 2:15 PM Delivery Tickel/Truck No.: 92694576 Slump (in) (ASTM C143): 5.5 Mix No. & Proportions: 1176299 Air Temp. (F): 91 Concrete Temp. (F) (ASTM C1064): 92 Date Received in lab: 9/15/2005 Air Content (ASTM C173/C231): N/A COMPRESSIVE TEST RESULTS Test Date Total Cylinder Cylinder Compressive Type Set Cylinder Age of Load Diameter Area Strength of No. 10 (Days) Test (Ibs) (in) (sq. in.) (psi) Break 136 A 7 9/21/2005 93500 6.00 28.27 3310 Tvoe 1 B 28 10/12/2005 140000 6.00 28.27 4950 Tvoe 1 C 28 10/12/2005 141000 6.00 28.27 4990 Type 2 D Hold Specifications: 3000 28 days REMARKS: X Cylinders made by PSI Cylinders made by Contractor X Cylinders picked up by PSI Cylinders picked up by Contractor X Test Results Comply with Test Results do not Comply with applicable specifications applicable specifications 10 gallons water added to concrete Concrete sampled in accordance with ASTM C172 and ASTM C31. Compressive Strength tests performed in accordance with ASTM C39. Respectfully Submitted Professional Service Industries, Inc. Professional Service Industries, Inc.. 1748 33rd Street. Orlando, FL 32839. Phone 407/304-5560. Fax 407/304-5561 FL Engineering Business 3684 Engineering .. Consulting.. Testing REPORT OF GROUT COMPRESSION TEST Tested For: A1A Acquisition Group LTD., LLP Project: RESIDENCE INN Attn: Roger Dobson CAPE CANAVER.A.L, FL 3425 Atlantic Avenue Cocoa Beach, FL 32931 Project No: 761-50044 LOCATION: Area B, coL Une G to Y and 44 to 66 Date Placed: 1 0/7/2005 Technician: K Farrell Time Batched: 10:30 AM Supplier: Rinker Time Sampled: 11:20 AM Delivery Tickel/Truck No.: 92769401 Slump (in) (ASTM C143): 90 Mix No. & Proportions: 1162918 Air Temp. (F): 88 Concrete Temp. (F) (ASTM C1064): 90 Date Received in lab: 10/8/2005 Air Content IASTM C173/C231): N/A COMPRESSIVE TEST RESULTS Test Date Total Prism Prism Compressive Type Set Prism Age of Load Sides Area Strength of No. 10 (Days) Test (Ibs) (in) (sq. in.) (psi) Break 137 A 7 10/14/2005 37500 3.60x3.50 12.60 2980 TVDe 2 B 28 11/4/2005 C 28 11/4/2005 Specifications: 3000 28 days REMARKS: X Prisms made by PSI Prisms made by Contractor X Prisms picked up by PSI Prisms picked up by Contractor Test Results Comply with Test Results do not Comply with applicable specifications applicable specifications Concrete sampled in accordance with ASTM C172 and ASTM C31. Compressive Strength tests performed in accordance with ASTM C39. Respectfully Submitted Professional Service Industries, Inc. Professional Service Industries. Inc.. 1748 33rd Street. Orlando, FL 32839 . Phone 407/304-5560. Fax 407/304-5561 FL Engineering Business 3684 Engineering · Consulting.. Testing REPORT OF CONCRETE COMPRESSION TEST Tested For: A 1A Acquisition Group LTD., LLP Project: RESIDENCE INN Alln: Roger Dobson CAPE CANAVERAL, FL 3425 Atlantic Avenue Cocoa Beach, FL 32931 Project No: 761-50044 LOCATION: grade beams: col. Lines S.7to U-41, U to Z-41 to 66 (area B) sampled approx. col. Line X-56 Date Placed: 8/25/2005 Technician: M. Odom Time Batched: 11:55 AM Supplier: Rinker Time Sampled: 1233 PM Delivery TicketlTruck No.: 92637579 Slump (in) (ASTM C143): 5.5 Mix No. & Proportions: 1176299 Air Temp. (F): 83 Concrete Temp. (F) (ASTM C1064): 80 Date Received in lab: 8/26/2005 Air Content IASTM C173/C231): N/A COMPRESSIVE TEST RESULTS Test Date Total Cylinder Cylinder Compressive Type Set Cylinder Age of Load Diameter Area Strength of No. 10 (Days) Test (Ibs) (in) (sq. in.) (psi) Break 131 A 7 9/1/2005 74500 6.00 28.27 2640 Tvpe 1 B 28 9/22/2005 117500 6.00 28.27 4160 Tvpe 1 C 28 9/22/2005 118500 6.00 28.27 4190 Tvpe 1 0 Hold Specifications: 3000 28 days t I REMARKS: X Cylinders made by PSI Cylinders made by Contractor I X Cylinders picked up by PSI Cylinders picked up by Contractor X Test Results Comply with Test Results do not Comply with applicable specifications applicable specifications Concrete sampled in accordance with ASTM Ci72 and ASTM C3i. Compressive Strength tests performed in accordance with ASTM C39. Respectfully Submitted Professional Service Industries, Inc. Professional Service Industries, Inc.' 1748 33rd Street. Orlando, FL 32839 . Phone 407/304-5560. Fax 407/304-5561 FL Engineering Business 3684 Build On Engineering.. Consulting.. Testing REPORT OF CONCRETE COMPRESSION TEST Tested For: A 1 A Acquisition Group L TD., LLP Project: RESIDENCE INN Attn: Roger Dobson CAPE CANAVERAL, FL 3425 Atlantic Avenue Cocoa Beach, FL 32931 Project No: 761-50044 LOCATION: Grade beams: col. Lines S.7 to U-41, U to 2-41 to 66 (area B) sampled approx. col. Line U.7-61 Date Placed: 8/25/2005 Technician: M. Odom Time Batched: 1:14PM Supplier: Rinker Time Sampled: 1 :50 PM Delivery TickeVTruck No.: 92637956 Slump (in) (ASTM C143): 6.25 Mix No. & Proportions: 1176299 Air Temp. (F): 84 Concrete Temp. (F) (ASTM C1064): 80 Date Received in lab: 8/26/2005 Air Content (ASTM C173/C231): N/A COMPRESSIVE TEST RESULTS Test Date Total Cylinder Cylinder Compressive Type Set Cylinder Age of Load Diameter Area Strength of No. 10 (Days) Test (Ibs) (in) (sq. in.) (psi) Break 132 A 7 9/1/2005 75500 6.00 28.27 2670 Tvoe 1 B 28 9/22/2005 125000 6.00 28.27 4420 Tvoe 1 C 28 9/22/2005 123000 6.00 28.27 4350 Tvoe 2 D Hold Specifications: 3000 28 days REMARKS: X Cylinders made by PSI Cylinders made by Contractor X Cylinders picked up by PSI Cylinders picked up by Contractor X Test Results Comply with Test Results do not Comply with applicable specifications applicable specifications Concrete sampled in accordance with ASTM C172 and ASTM C31. Compressive Strength tests performed in accordance with ASTM C39. Respectfully Submitted Professional Service Industries, Inc. -,~~"'~---~--~-~~-"~--,- ~-_._,--"""""'~ ._._,~"""""- -- -~------~---- Professional Service Industries. Inc.. 1748 33rd Street. Orlando. FL 32839. Phone 407/304-5560. Fax 407/304-5561 FL Engineering Business 3684 Engineering.. Consulting.. Testing REPORT OF CONCRETE COMPRESSION TEST Tested For: A 1A Acquisition Group LTD., LLP Project: RESIDENCE INN Attn: Roger Dobson CAPE CANAVERAL, FL 3425 Atlantic Avenue Cocoa Beach, FL 32931 Project No: 761-50044 LOCATION: Roof slab: elevator A, sampled approx. center of slab Date Placed: 8/29/2005 Technician: M. Odom Time Batched: 952 AM Supplier: Rinker Time Sampled: 10:45 AM Delivery TicketlTruck No.: 92642641 Slump (in) (ASTM C143): 2 Mix No. & Proportions: 117634 Air Temp. (F): 84 Concrete Temp. (F) (ASTM C1064): 90 Date Received in lab: 8/30/2005 Air Content (ASTM C173/C231): N/A COMPRESSIVE TEST RESULTS Test Date Total Cylinder Cylinder Compress ive Type Set Cylinder Age of Load Diameter Area Strength of No. 10 (Days) Test (Ibs) (in) (sq. in.) (psi) Break 133 A 3 9/1/2005 124500 6.00 28.27 4400 Type 1 B 7 9/5/2005 160000 6.00 28.27 5660 Type 2 C 28 9/26/2005 210000 6.00 28.27 7430 Type 1 0 28 9/26/2005 213000 6.00 28.27 7530 Type 1 Specifications: 3000 28 days I I REMARKS: X Cylinders made by PSI Cylinders made by Contractor X Cylinders picked up by PSI Cylinders picked up by Contractor X Test Results Comply with Test Results do not Comply with applicable specifications applicable specifications Concrete sampled in accordance with ASTM Ci72 and ASTM C3i. Compressive Strength tests performed in accordance with ASTM C39. Respectfully Submitted Professional Service Industries, Inc. Professional Service Industries, Inc.' 1748 33rd Street. Orlando. FL 32839' Phone 407/304-5560' Fax 407/304-5561 FL Engineering Business 3684 Build On Engineering.. Consulting.. Testing REPORT OF CONCRETE COMPRESSION TEST Tested For: A1A Acquisition Group LTD., LLP Project: RESIDENCE INN Attn: Roger Dobson CAPE CANAVERAL, FL 3425 Atlantic Avenue Cocoa Beach, FL 32931 Project No: 761-50044 LOCATION: Section B slab on grade, approx. K-64 Date Placed: 9/14/2005 Technician: J. Kiiderry Time Batched: 11:25 AM Supplier: Rinker Time Sampled: 12:04 PM Delivery Ticket/Truck No.: 92693260 Slump (in) (ASTM C143): 5.75 Mix No. & Proportions: 1176299 Air Temp. (F): 87 Concrete Temp. (F) (ASTM C1064): 90 Date Received in lab: 9/15/2005 Air Content IASTM C173/C231): N/A COMPRESSIVE TEST RESULTS Test Date Total Cylinder Cylinder Compressive Type Set Cylinder Age of Load Diameter Area Strength of No. 10 (Days) Test (Ibs) (in) (sq. in.) (psi) Break 134 A 7 9/21/2005 95500 6.00 28.27 3380 Tvoe 1 B 28 10/12/2005 C 28 10/12/2005 0 Hold Specifications: 3000 28 days I I REMARKS: X Cylinders made by PSI Cylinders made by Contractor X Cylinders picked up by PSI Cylinders picked up by Contractor X Test Results Comply with Test Results do not Comply with applicable specifications applicable specifications Concrete sampled in accordance with ASTM Ci72 and ASTM C3i. Compressive Strength tests performed in accordance with ASTM C39. Respectfully Submitted Professional Service Industries, Inc. Professional Service Industries, Inc.. 1748 33rd Street. Orlando, FL 32839. Phone 407/304-5560. Fax 407/304-5561 FL Engineering Business 3684 Engineering" Consulting" Testing REPORT OF CONCRETE COMPRESSION TEST Tested For: A 1A Acquisition Group LTD., LLP Project: RESIDENCE INN Attn: Roger Dobson CAPE CANAVERAL, FL 3425 Atlantic Avenue Cocoa Beach, FL 32931 Project No: 761-50044 LOCATION: Section B slab on grade, approx. H-56 Date Piaced: 9/14/2005 Technician: J. Kilderry Time Balched: 12:06 PM Supplier: Rinker Time Sampled: 12:45 PM Delivery TickeUTruck No.: 40499948 Slump (in) (ASTM C143): 3.75 Mix No. & Proportions: 1176299 Air Temp. (F): 90 Concrete Temp. (F) (ASTM C1064): 92 Date Received in lab: 9/15/2005 Air Content IASTM C173/C231l: N/A COMPRESSIVE TEST RESULTS Test Date Total Cylinder Cylinder Compressive Type Set Cylinder Age of Load Diameter Area Strength of No. 10 (Days) Test (Ibs) (in) (sq. in.) (psi) Break 135 A 7 9/21/2005 93500 6.00 28.27 3310 TVDe 1 B 28 10/12/2005 C 28 10/12/2005 D Hold Specifications: 3000 28 days I I REMARKS: X Cylinders made by PSI Cylinders made by Contractor X Cylinders picked up by PSI Cylinders picked up by Contractor X Test Results Comply with Test Results do not Comply with applicable specifications applicable specifications 10 gallons water added to concrete Concrete sampled in accordance with ASTM C172 and ASTM C31. Compressive Strength tests performed in accordance with ASTM C39. Respectfully Submitted Professional Service Industries, Inc. Professional Service Industries, Inc. . 1748 33rd Street. Orlando. FL 32839 . Phone 407/304-5560. Fax 407/304-5561 FL Engineering Business 3684 Build On Engineering . Consulting. Testing REPORT OF CONCRETE COMPRESSION TEST Tested For: A1A Acquisition Group LTD., LLP Project: RESIDENCE INN Attn: Roger Dobson CAPE CANAVERAL, FL 3425 Atlantic Avenue Cocoa Beach, FL 32931 Project No: 761-50044 LOCATION: Section B slab on grade, approx. L-47 Date Placed: 9/14/2005 Technician: J. Kilderry Time Batched: 1 46 PM Supplier: Rinker Time Sampled: 2:15 PM Delivery TicketlTruck No.: 92694576 Slump (in) (ASTM C143): 5.5 Mix No. & Proportions: 1176299 Air Temp. (F): 91 Concrete Temp. (F) (ASTM C1064): 92 Date Received in lab: 9/15/2005 Air Content IASTM C173/C231): NIA COMPRESSIVE TEST RESULTS Test Date Total Cylinder Cylinder Compressive Type Set Cylinder Age of Load Diameter Area Strength of No. 10 (Days) Test (Ibs) (in) (sq. in.) (psi) Break 136 A 7 9/21/2005 93500 6.00 28.27 3310 Tv De 1 B 28 10/1212005 C 28 10/1212005 I I 0 I I Hold I I Is~~"ti,">1 I I 3000 28 days I I REMARKS: X Cylinders made by PSI Cylinders made by Contractor X Cylinders picked up by PSI Cylinders picked up by Contractor X Test Results Comply with Test Results do not Comply with applicable specifications applicable specifications 10 gallons water added to concrete Concrete sampled in accordance with ASTM C172 and ASTM C31. Compressive Strength tests performed in accordance with ASTM C39. Respectfully Submitted Professional Service Industries, Inc. Professional Service Industries, Inc.. 1748 33rd Street. Orlanda, FL 32839 . Phone 407/304-5560 . Fax 407/304-5561 FL Engineering Business 3684 Build On Engineering. Consulting. Testing August 24, 2005 Mr. Todd Morley - Chief Bldg. Official City of Cape Canaveral Building Department 105 Polk Avenue Cape Canaveral, Florida 32920 Re: Summary of Special (Threshold) Inspection Services Residence Inn - Cape Canaveral, Florida PSI Project No. 761-50044, Report #4 and #5, (Progress Report # 2) Dear Mr. Morley: Professional Service Industries, Inc (PSI) is performing special inspection services for the Residence Inn project located in Cape Canaveral, Florida. This report is intended to summarize the status of our inspection services performed between June 3, 2005 and July 28, 2005. As construction has progressed within the structure PSI representatives have performed a series of inspections in accordance with the project's Special Inspection Plan. These services through the above referenced dates have included Section A wall (1S\ 2nd and 3rd floors), Section C wall (2nd and 3rd floors), Section A columns (1st and 2nd floor), Section C columns (1st, 2nd and 3rd floors), Section A slab (2nd and 3rd floors) and Section C slab (3rd and 4th floors). As deficiencies are discovered within the course of our inspections and observations, the contractor will be immediately notified so that corrective action may be performed. Any deficiencies not immediately corrected are entered into a running "punch-list" of non-conforming items. A current punch-list is attached for your review. PSI will maintain and update this punch-list as deficiencies are discovered, corrective actions are taken and re-inspections are performed. As of this date, forty-five (45) items need to be addressed. We trust that this summary of our services during this time period is complete and sufficient for your needs. If you have any questions, please do not hesitate to call. Respectfully submitted, PROFESSIONAL SERVICE If'iDUSTRIES, INC. ~? C/ ~~/7 y~_.,/v// ji''' . ,..,.' /... ,.k/..... . . .& 50$' Rod Ffuland, P.E. Senior Engineer ConstructionServir,es Florida Registration #27'967 Special inspector Reg. #/35 Attachments: Inspection reports Punch-list Xc: A 1 A Acquisition Group, Roger Dobson WELBRO Building Corp., Chris Cortellini R. L. Plowfield & Associates, Chris Scroggins Powell Design Group, Ron Brown BB & T, Ron Barley Professional Service Industries, Inc.. 1748 33rd Street. Orlando, FL 32839 . Phone 407/304-5560. Fax 407/304-5561 FL Engineering Business 3684 Build On Engineering .. Consulting" Testing REPORT OF REINFORCED CONCRETE INSPECTION TESTED FOR: A 1 A Acquisition Group. L TD. LLP PROJECT: Residence Inn - Cape Canaveral. FL 3425 Atlantic Avenue REPORT NO: 5 Cocoa Beach. FL 32931 PROJECT NO: 761-50044 Attn: Roger Dobson DATE: 7/1/2005 TECHNICIAN: M adorn REINFORCING STEEL PLACEMENT STRUCTURAL ELEMENT ELEVATION: 2nd floor Foundation PLAN LOCATION: Section "A" CMU walls (including pilasters), column line A - P & 1 - 14 X Wall Column Floor Slab Stair Other CRITERIA UTILIZED AS INSPECTION REFERENCE: Structural Plans: Sheet(s): S-101, S-212 Detail(s) RFI: structural drawings S-223. S-301 n/a, 1,3,5 RFI: Dated: 3/23/05 S-302 RFI: CONDITIONS I CONSTRUCTIONS OBSERVED: No exceptions Deficiencies X Proper sizing X X Proper grade of bars X X Proper quantity, spacing. & layout X X Proper splice lengths & splice locations X X Proper chairing and concrete cover X X Proper securement of reinforcing X Proper layout of post tensioning cables Proper drape of post tensioning tendons Proper sheathing and anchor reinforcing Concrete strength verified Concrete consolidated during placement Other: DEFICIENCIES: Many CMU vertical reinforcing steel bars exhibit insufficient splice length (18 - 30" In-place; 30" minimum required). #4-4" bars placed @ bottom of cell where splice noted as less than 26". Several P-l vertical reinforcing steel bars exhibit insufficient splice length (33 - 35" in-place; 36" minimum required). Full-length #5 bars placed within cells where splice noted as less than 35" REINSPECTION REQUIRED: REMARKS: NOTES Contractor is responsible for scheduling any necessary re!nspecticn after ,..!medial work is performed. Tests may not be reproduced, except In full, Without written penmission from Profes","Jnal Service Industnes, Inc. -----------~.-.-_.------.--.---__~_J..J!g!UJ>L14..~ ~~^ -,----,-,-" Professional Service Industries. Inc. . 1748 33rd Street. Orlando. FL 32839 . Phone 407!3~4-~56~-=-~~~-~~;;04-~~~~-'-- FL Engineering Business 3684 Build On Engineering " Consulting" Testing REPORT OF REINFORCED CONCRETE INSPECTION TESTED FOR: A 1A Acquisition Group, L TO" LLP PROJECT: Residence Inn - Cape Canaveral, FL 3425 Atlantic Avenue REPORT NO: 5 Cocoa Beach, FL 32931 PROJECT NO: 761-50044 Atln: Roger Dobson DATE: 7/6/2005 TECHNICIAN: M, Odom REINFORCING STEEL PLACEMENT STRUCTURAL ELEMENT ELEV A TION: 2nd floor Foundation PLAN LOCATION: Section .C", Columns line S, 1-68, S,2-70, S,2-75, S 1-77, S2-79, S.2-84, S,1-86, U,1-94, U-96 Wall X Column Floor Slab Stair Other CRITERIA UTILIZED AS INSPECTION REFERENCE: Structural Plans: Sheet(s): S-101 Detail(s): RFI: structural drawings S-212 2 RFI: Dated: 3/23/05 S-223 RFI: CONDITIONS I CONSTRUCTIONS OBSERVED: X Proper sizing X X Proper grade of bars X X Proper quantity; spacing, & layout X X Proper splice lengths & splice locations X X Proper chairing and concrete cover X X Proper securement of reinforcing X Proper layout of post tensioning cables Proper drape of post tensioning tendons Proper sheathing and anchor reinforcing Concrete strength verified Concrete consolidated during placement Other. DEFICIENCIES: Approximately 1/2" clear cover to bottom two bands, approximate 1" clear cover to third band and sufficient clear cover noted to remainder of bands (E side) within column S,2-84, REINSPECTION REQUIRED: Yes REMARKS: Remainder of above-referenced columns were field-adjusted to allow substantial accordance with the project specification for clear cover (1 S') NOTES: Contractor IS responsible for scheduling any necessary reinspection after r",medial "ork IS performed, Tests may not be repro(juced, except in full, without written permission from ProfeSSional Ser.lce Industries, Inc, ~~-,-~-",----,-~-~~_""",~_______,,_~ge2_ol1~ -~ ~-- ~~ ~- -- -- ~",""- -"" -"^~.._----.-,,- Professional Service Industries, Inc.. 1748 33rd Street. Orlando, FL 32839 . Phone 407/304-5560 . Fax 407/304-5561 FL Engineering Business 3684 Build On Engineering. Consulting. Testing REPORT OF REINFORCED CONCRETE INSPECTION TESTED FOR: A 1 A Acquisition Group, L TO., LLP PROJECT: Residence Inn - Cape Canaveral, FL 3425 Atlantic Avenue REPORT NO: 5 Cocoa Beach, FL 32931 PROJECT NO: 761-50044 Attn. Roger Dobson REINFORCING STEEL PLACEMENT STRUCTURAL ELEMENT ELEVATION: 2nd floor Foundation PLAN LOCATION Section "A", CMU walls (including pilasters), column line Q - V & 1 - 16 and H.3 - T & 17 - 41 X Wall Column Floor Slab Stair Other CRITERIA UTILIZED AS INSPECTION REFERENCE: Structural Plans: Sheet(s): S-101, S-212 Oetail(s): RFI: structural drawings S-223, S-301 n/a, 3 RFI: Dated: 3/23/05 5-302 1,3,5 RFI: CONDITIONS I CONSTRUCTIONS OBSERVED: No exceptions Deficiencies X Proper sizing X X Proper grade of bars X X Proper quantity, spacing, & layout X X Proper splice lengths & splice locations X X Proper chairing and concrete cover X X Proper securement of reinforcing X Proper layout of post tensioning cables Proper drape of post tensioning tendons Proper sheathing and anchor reinforcing Concrete strength verified Concrete consolidated during placement Other DEFICIENCIES: Many CMU vertical reinforcing steel bars exhibit insufficient splice length (26 to 30" in-place; minimum 30" required). No additional bars were added (no splice found to be less than 26"). Some P-1 vertical reinforcing steel bars exhibit insufficient splice length (33 to 36" in-place: minimum 36" required). Full-length #5 bars placed within cells where splice noted as less than 35". Additionally three (3) cells were not filled due to insufficient grout quantity (approximately column line L-41 ). REINSPECTION REQUIRED: Yes REMARKS: -. NOT ES: Contractor is responsible for SCheduling any necessary reinspection after remedial work is performed Tests may not be reproduced, except In full, without written permiSSion from Professional Service Industries, Inc --_._..._~~~.~.__..~_....__.......~-~........~_~.E5!g~f.~..._~...__ . .._~....... . ......_...... ..... ............ ....~..._.._. Professional Service Industries, Inc.. 1748 33rd Street. Orlando, FL 32839. Phone 407/304-5560. Fax 407/304.5561 FL Engineering Business 3684 Build On Engineering. Consulting. Testing REPORT OF REINFORCED CONCRETE INSPECTION TESTED FOR: A 1A Acquisition Group, LTD., LLP PROJECT: Residence Inn - Cape Canaveral, FL 3425 Atlantic Avenue REPORT NO: 5 Cocoa Beach, FL 32931 PROJECT NO: 761-50044 Attn: Roger Dobson DATE: 7/11/2005 TECHNICIAN: M. Odom REINFORCING STEEL PLACEMENT STRUCTURAL ELEMENT ELEVATION: 3rd floor Foundation PLAN LOCATION: Section "C" floor slab Wall Column X Floor Slab Stair Other CRITERIA UTILIZED AS INSPECTION REFERENCE: Structural Plans: Sheet(s): 5-101,5-233 Detail(s): RFI: structural drawings 5-301 1,2 RFI: Dated: 3/23/05 5-302, 5-303 9,10;4,5,6.7,8,910,12 RFI: 5-304 1A,11 CONDITIONS I CONSTRUCTIONS OBSERVED: No exceptions Deficiencies X Proper siZin9 X X Proper grade of bars X X Proper quantity, spacing, & layout X X Proper splice lengths & splice locations X X Proper chairing and concrete cover X X Proper securement of reinforcing X Proper layout of post tensioning cables Proper drape of post tensioning tendons Proper sheathing and anchor reinforcing Concrete strength verified Concrete consolidated during placement Other. DEFICIENCIES: 3'8" candy cane bars (MK412) placed @ approx. 18" OC into beam areas @ column line L3 & 66 - 68, A - B & 93, N & 85 - 86. and two side of elevator (R & 86 - 89 and Q - R & 89). KO-1 reinforcinq steel not present at line A - C & 89, C & 88 - 89 and U & 96.2 - 99 (3rd floor slab elev.) Additional "A" bars not present within floor slab at line N - Q & 96. Bands placed at 6" OC typical within CB-2 beams at line 5.2 & 68 - 70, U.1 & 94 - 96,2, rather than as per 5-301, detail 2. REINSPECTlON REQUIRED: Yes REMARKS: NOTES: Contractor is responsible for scheduling any necessary reinspection after remell!al Nark is performed Tests may not lle reproduced, except in full, without wntten permission from Professional S,", "ce Industries, Inc ~~'~---'-'~-~-"~---'~'----'-"--"~_"_'__~""_"'___ p ~<'l~O~~_~__~___~ . _.___~ _ . . _~~_~_ Professional Service Induslries, Inc.. 1748 33rd Street. Orlando, FL 32839 . Phone 407/304-5560 . Fax 407/304~5561 FL Engineering Business 3684 Engineering. Consulting. Testing REPORT OF REINFORCED CONCRETE INSPECTION TESTED FOR: .A.1A Acquisition Group, LTD. LLP PROJECT: Residence Inn - Cape Canaveral. FL 3425 Atlantic Avenue REPORT NO: 5 Cocoa Beach, FL 32931 PROJECT NO 761-50044 Attn: Roger Dobson REINFORCING STEEL PLACEMENT STRUCTURAL ELEMENT ELEVATION: 2nd floor Foundation PLAN LOCATION Section "A", Columns, line U.7. U.1-9, S.1-16, S.2-19, S.2-24, S.1-26. S2-28, S.2-33, S.1-35, S.2-37 Wall X Column Floor Slab Stair Other CRITERIA UTILIZED AS INSPECTION REFERENCE: Structural Plans: Sheet(s): S-101 Detail(s): RFI: structural drawinqs S-212 RFI: Dated: 3/23/05 RFI: CONDITIONS / CONSTRUCTIONS OBSERVED: No exceptions Deficiencies X Proper sizing X X Proper grade of bars X X Proper quantity, spacing, & layout X X Proper splice lengths & splice locations X X Proper chairing and concrete cover X X Proper securement of reinforcing X Proper layout of post tensioning cables Proper drape of post tensioning tendons Proper sheathing and anchor reinforcing Concrete strength verified Concrete consolidated during placement Other: DEFICIENCIES: REINSPECTION REQUIRED: REMARKS: Column S.2-19 offset approximately 2" south of plan location (1st and 2nd floor). ~jOTES: Contractor is responsible for scheduling any necessary reinspect", , after remedial work is performed Tests may not be reproduced. except In full, without written permission Professional Service Industries, Inc ~.~~___._..~.~.~____~_..~__~_..._._..~._~e 5 of 14 _ _~.,.._..______,,_,,_ '"'' """_M'_"'_'_,_"",,, -_._----,--,-,-,,,,-,,,,--,,-,,-,-,,--,-,- - Professional Service Industries, Inc.' 1748 33rd Street. Orlando, FL 32839' Phone 407/304-5560' Fax 407/304-5561 FL Engineering Business 3684 Build On Engineering · Consulting. Testing REPORT OF REINFORCED CONCRETE INSPECTION TESTED FOR: A1A Acquisition Group, LTD., LLP PROJECT: Residence Inn - Cape Canaveral. FL 3425 Atlantic Avenue REPORT NO: 5 Cocoa Beach, FL 32931 PROJECT NO: 761-50044 Attn: R0ger Dobson DATE: 7/19/2005 TECHNICIAN: M. Odom REINFORCING STEEL PLACEMENT STRUCTURAL ELEMENT ELEVATION 3rd floor Foundation PLAN LOCATION: Section "A", CMU walls (including pilasters) line A - J & 88 - 99 X Wall Column Floor Slab Stair Other CRITERIA UTILIZED AS INSPECTION REFERENCE: Structural Plans: Sheet(s): S-101, S-212 Detail(s) RFI: structural drawings S-233, S-301 nla, 3 RFI: Dated: 3/23/05 S-302 1,3,5 RFI: CONDITIONS 1 CONSTRUCTIONS OBSERVED: No exceptions Deficiencies X Proper sizing X X Proper grade of bars X X Proper quantity, spacing, & layout X X Proper splice lengths & splice locations X X Proper chairing and concrete cover X X Proper securement of reinforcing X Proper layout of post tensioning cables Proper drape of post tensioning tendons Proper sheathing and anchor reinforcing Concrete strength verified Concrete consolidated during placement Other: DEFICIENCIES: REINSPECTION REQUIRED: REMARKS: NOTES Contractor is responsible for scheduling any necessary reinspection after remectlal work is performed. Tests may not be reproduced, except in full. without written permission from Professional Service Industries. Inc. 14 Professional Service Industries, Inc.' 1748 33rd Street. Orlando, FL 32839' Phone 407/304-5560' Fax 407/304-5561 FL Engineering Business 3684 Build On Engineering" Consulting.. Testing REPORT OF REINFORCED CONCRETE INSPECTION TESTED FOR: A1A Acquisition Group LTD., LLP PROJECT: Residence Inn - Cape Canaveral, FL 3425 Atlantic Avenue REPORT NO: 5 Cocoa Beach FL 32931 PROJECT NO: 761-50044 Altn Roger Dobson DATE: 7/19/2005 TECHNICIAN: M. Odom REINFORCING STEEL PLACEMENT STRUCTURAL ELEMENT ELEVATION: 3rd floor Foundation PLAN LOCATION: Section "C", Columns: S.1-68, S.2-70, S.2-75, S 1-77, 5 2-79, S.2-84, 5.1-86. U.1-94, U-96 Wall X Column Slab Stair Other CRITERIA UTILIZED AS INSPECTION REFERENCE: Structural Plans: Sheet(s): S-101 Oetail(s): RFI: structural drawings S-212 2 RFI: Dated: 3/23/05 S-233 RFI: CONDITIONS I CONSTRUCTIONS OBSERVED: No X Proper sizing X X Proper grade of bars X X Proper quantity, spacIng. & layout X X Proper splice lengths & sptice locations X X Proper chairing and concrete cover X X Proper securement of reinforcing X Proper layout of post tensioning cables Proper drape of post tensioning tendons Proper sheathing and anchor reinforcing Concrete strength verified Concrete consolidated during placement Other: DEFICIENCIES: REINSPECTION REQUIRED: REMARKS: NOTES: Contractor r%ponsible for scheduling any necessary reinspection after remedIal work performed Tests may not be re,;,ro.>Juced, except in full, without wrrtten permission from Professional 5er'/lce Industries, Inc. Professional Service Industries, Inc. . 1748 33rd Street. Orlando, FL 32839 . Phone 407/304-5560 . Fax 407/304-5561 FL Engineering Business 3684 Build On Engineering. Consulting. Testing REPORT OF REINFORCED CONCRETE INSPECTION TESTED FOR: A 1A Acquisition Group, LTD., LLP PROJECT: Residence Inn - Cape Canaveral FL 3425 Atlantic Avenue REPORT NO: 5 Cocoa Beach, FL 32931 PROJECT NO: 761-50044 Attn: Roger Dobson DATE: 7/20/2005 TECHNICIAN: M. Odom REINFORCING STEEL PLACEMENT STRUCTURAL ELEMENT ELEVATION 3rd floor Foundation PLAN LOCATION Section "A" floor slab Wall Column X Floor Slab Stair Other CRITERIA UTILIZED AS INSPECTION REFERENCE: Structural Plans: Sheet(s): S-101. S-231 Detail(s): RFI: structural drawings S-301 1,2 RFI: Dated: 3/23/05 S-302. S-303 9,10; 4, 5, 6, 7, 8, 9,10,12 RFI: CONDITIONS / CONSTRUCTIONS OBSERVED: No exceptions Deficiencies X Proper sizing X X Proper grade of bars X X Proper quantity, spacing, & layout X X Proper splice lengths & splice locations X X Proper chairing and concrete cover X X Proper securement of reinforcing X Proper layout of post tensioning cables Proper drape of post tensioning tendons Proper sheathing and anchor reinforcing Concrete strength verified Concrete consolidated during placement Other: DEFICIENCIES: REINSPECTION REQUIRED: REMARKS: Standard hook reinforcing bars have not been detailed in shop drawings within slab edge at two sides of elevator area. as well as CB-1, CB-3 and CB-4 (partial) beam locations Candy cane bars (3'8" - MK412) were installed in these locations at 18" OC per Inspectors request. Balcony slab was constructed within line S2 - T & 33 - 37 as per S-241 (not detailed within structural drawings in this location until 4th floor). NOTES: Contractor is responsible for 5' heduling any necessary reinspection after remedial work is performe':J Tests may not be reproduced, except full, without written permission from Professional Service Industries ~ -~- ~-~--~ --~~~-----~--~-~ PaQeJ_2~___ _ _~_____~_ m___ __...____ Professional Service Industries, Inc.' 1748 33rd Street. Orlando, FL 32839. Phone 407/304-5560' Fax 407/304-5561 FL Engineering Business 3684 Build On Engineering. Consulting. Testing REPORT OF REINFORCED CONCRETE INSPECTION TESTED FOR: A1A AcqUisition Group, lTD., llP PROJECT: Residence Inn. Cape Canaveral, Fl 3425 Atlantic Avenue REPORT NO: 5 Cocoa Beach, Fl32931 PROJECT NO: 761-50044 Attn: Roger Dobson DATE: 7/21/2005 TECHNICIAN: M. Odom REINFORCING STEEL PLACEMENT STRUCTURAL ELEMENT ELEVATION: 3rd floor Foundation PLAN lOCATION: Section "C" CMU walls (including pilasters), line l . V & 86 - 99, G.8 - N & 84 - 86 X Wall Column Floor Slab Stair Other CRITERIA UTILIZED AS INSPECTION REFERENCE: Structural Plans: Sheet(s): 5-101,5-212 Detail(s): RFI: structural drawings 5-233, S-30 1 n/a,3 RFI: Dated: 3/23/05 S-302 1,3,5 RFI: CONDITIONS 1 CONSTRUCTIONS OBSERVED: No exceptions Deficiencies X Proper sizing X X Proper grade of bars X X Proper quantity. spacing, & layout X X Proper splice lengths & splice locations X X Proper chairing and concrete cover X X Proper securement of reinforcing X Proper layout of post tensioning cables Proper drape of post tensioning tendons Proper sheathing and anchor reinforcing Concrete strength verified Concrete consolidated during placement Other: DEFICIENCIES: REINSPECTION REQUIRED: REMARKS: #fj and full-length #5 bars placed within P.1 pilaster location at N.3-89 (#5 bars extended upward Irom previous level) NOTES. Contractor is responsible for scheduling any necessary reinspection after remedial work is performed. Tests may not be reproduced, except in full, Without wr<tten permission from ProfeSSional Ser'/lce Industries, Inc -'--~~---,---,,--,,-,-,,---'"-~-~-----,~,~~,-~""'-"""""- P;>JgP. 9 of 1!'L_~......._..___~_. Professional Service Industries, Inc.. 1748 33rd Street. Orlando, FL 32839. Phone 407/304-5560. Fax 407/304-5561 FL Engineering Business 3684 Build On Engineering. Consulting. Testing REPORT OF REINFORCED CONCRETE INSPECTION TESTED FOR: A1A Acquisition Group, L TO, LLP PROJECT: Residence Inn. Cape Canaveral, FL 3425 Atlantic Avenue REPORT NO: 5 Cocoa Beach, FL 32931 PROJECT NO: 761-50044 Altn: Roger Dobson REINFORCING STEEL PLACEMENT STRUCTURAL ELEMENT ELEVATION: 3rd floor Foundation PLAN LOCATION: Section "C", CMU walls (including pilasters), line G,B - T & 70 - B2 X Wall Column Floor Slab Stair Other CRITERIA UTILIZED AS INSPECTION REFERENCE: Structural Plans: Sheet(s): S-101, S-212 Detail(s): RFI: structural drawings S-233, S-301 n/a, 3 RFI: Dated: 3/23/05 S-302 1,3,5 RFI: CONDITIONS I CONSTRUCTIONS OBSERVED: No exceptions Deficiencies X Proper sizing X X Proper grade of bars X X Proper quantity, spacing, & layout X X Proper splice lengths & splice locations X X Proper chairing and concrete cover X X Proper securement of reinforcing X Proper layout of post tensioning cables Proper drape of post tensioning tendons Proper sheathing and anchor reinforcing Concrete strength verified Concrete consolidated during placement Other: DEFICIENCIES: REINSPECTION REQUIRED: REMARKS: Masonry contractor should be reminded to center reinforcing steel within cells following placement and consolidation of grout. NOTES: Contractor is responsible for scheduling any necessary ,c',nspection after remedial work !s performed, Tests may not be reproduced, except in full, without written perm!s" In from Professional Service In(justnes, Inc, _'__~,____'"'___~,~____,___~~_~_______~_~,,_""__,__,~__~~~~~~~? or \4 ~ ~~ -''''''-'''''',.,,_.,-,~ -----.-_..,-,_.,~,,-,..."""'-"" Professional Service Industries, Inc.. 1748 33rd Street. Orlando, FL 32839. Phone 407/304-5560. Fax 407/304.5561 FL Engineering Business 3684 Build On Engineering · Consulting. Testing REPORT OF REINFORCED CONCRETE INSPECTION TESTED FOR: A 1 A Acquisition Group, L TO LLP PROJECT: Residence Inn - Cape Canaveral, FL 3425 Atlantic Avenue REPORT NO: 5 Cocoa Beach, FL 32931 PROJECT NO: 761-50044 Attn R0ger Dobson DATE: 7/2712005 TECHNICIAN: M. Odom REINFORCING STEEL PLACEMENT STRUCTURAL ELEMENT ELEVATION: 3rd floor Foundation PLAN LOCATION: Section "A", CMU walls (including pilasters), line A - G & 1 - 14 X Wall Column Floor Slab Stair Other CRITERIA UTILIZED AS INSPECTION REFERENCE: Structural Plans: Sheet(s): S-101, S-212 Detail(s): RFI structural drawings S-231 , 5-301 nla, 3 RFI Dated: 3/23/05 1,3,5 RFI CONDITIONS 1 CONSTRUCTIONS OBSERVED: No exceptions Deficiencies X Proper sizing X X Proper grade of bars X X Proper quantity, spacing, & layout X X Proper splice lengths & splice locations X X Proper chairing and concrete cover X X Proper securement of reinforcing X Proper layout of post tensioning cables Proper drape of post tensioning tendons Proper sheathing and anchor reinforcing Concrete strength verified Concrete consolidated during placement Other: DEFICIENCIES: REINSPECTION REQUIRED: REMARKS: NOTES: Contractor is responsible for sChedulinq any necessary reinspection after remedial work is performed. Tests may not be reproduced. except In lull Without written permiSSion from Professional Service Industries, Inc. ~""''''''''''--'~---'''-"'~'''''--,--~-'''-''''--'''-,,-,--,~--'''''''~.._,-- f'flilll~~_~.._ -'" '" "'''''''''' "" "'''''''-.'''.-.--.-- -,--_._"'~..,~,-"''''''' Professional Service Industries, Inc.. 1748 33rd Street. Orlando, FL 32839. Phone 407/304-5560. Fax 407/304-5561 FL Engineering Business 3684 Build On Engineering · Consulting. Testing REPORT OF REINFORCED CONCRETE INSPECTION TESTED FOR: AlA Acquisition Group LTD.. LLP PROJECT: Residence Inn - Cape Canaveral. FL 3425 Atlantic Avenue REPORT NO: 5 Cocoa Beach. FL 32931 PROJECT NO: 761-50044 Attn: Roger Dobson DATE: 7/27/2005 TECHNICIAN: M. Odom REINFORCING STEEL PLACEMENT STRUCTURAL ELEMENT ELEVATION: 4th floor Foundation PLAN LOCATION: Section "C" floor slab Wall Column X Floor Slab Stair Other CRITERIA UTILIZED AS INSPECTION REFERENCE: Structural Plans: Sheet(s): S-101. S-242 Detail(s): RFI: structural drawings S-301 1.2 RFI: Dated: 3/23/05 S-302. S-303 9, 10; 4, 5, 6, 7. 8. 9, 10. 12 RFI: CONDITIONS / CONSTRUCTIONS OBSERVED: No exceptions Deficiencies X Proper sizing X X Proper grade of bars X X Proper quantity, spacing, & layout X X Proper splice lengths & splice locations X X Proper chairing and concrete cover X X Proper securement of reinforcing X Proper layout of post tensioning cables Proper drape of post tensioning tendOnS Proper sheathing and anchor reinforcing Concrete strength verified Concrete consolidated during placement Other: DEFICIENCIES: Bottom reinfocing steel placed at 12" OC in-place within line R - U & 90 - 96 and R - U & 96 - 98 (detailed at 10" OC in these areas). Bottom reinforcing steel placed at 10" OC In-place within line M - Q & 82 - 86 (detailed at 9" OC in this area). Three bands at 3" OC not placed at N. end of CB-6 beam (line N-85); seven bands at 6" OC and mid-beam bands at 12" OC in-place (bands at S. end of beam placed as detailed). REINSPECTION REQUIRED: Yes REMARKS: NOTES: Contractor responsible for scheduling any necessary reinspection after remedial work IS performed. Tests may not be re::roduced, except in full, without wntten permission from Professional SerJ!ce Industries. Inc. ~~-""--~-~-~""-~,-~-"'---~--,-~--""-,-~- __~ilge~li~____ --~- _.._.__.._-,-,-,-,-- - ---- ---,--,--- Professional Service Industries, Inc.' 1748 33rd Street. Orlando, FL 32839' Phone 407/304-5560' Fax 407/304-5561 FL Engineering Business 3684 Build On Engineering. Consulting. Testing REPORT OF REINFORCED CONCRETE INSPECTION TESTED FOR: A 1A Acquisition Group, L TO" LLP PROJECT: Residence Inn - Cape Canaveral, FL 3425 Atlantic Avenue REPORT NO: 5 Cocoa Beach, FL 32931 PROJECT NO: 761-50044 Attn: Roger Dobson DATE: REINFORCING STEEL PLACEMENT STRUCTURAL ELEMENT ELEVATION: 3rd floor Foundation PLAN LOCATION Section "A", CMU walls (including pilasters) column line H to P & 1 - 135 and Q - V & 1 - 13 X Wall Column Floor Slab Stair Other CRITERIA UTILIZED AS INSPECTION REFERENCE: Structural Plans: Sheet(s): S-101, S-212 Detail(s): RFI: structural drawings S-231, S-301 n/a,3 RFI: Dated 3/23/05 8-302 1,3,5 RFI: CONDITIONS I CONSTRUCTIONS OBSERVED: No exceptions Deficiencies X Proper sizing X X Proper grade of bars X X Proper quantity, spacing, & layout X X Proper splice lengths & splice locations X X Proper chairing and concrete cover X X Proper securement of reinforcing X Proper layout of post tensioning cables Proper drape of post tensioning tendons Proper sheathing and anchor reinforcing Concrete strength verified Concrete consolidated during placement Other: DEFICIENCIES: Two #5 bars placed instead of one #6 bar within each cell of P-1 locations @ line R.6 & 7, Q,1 & 8, N,3 & 13,5 (bars only extend to allow approximately 30" splice for upper elevations), REINSPECTION REQUIRED: Yes REMARKS: NOTES: Contractor is responsible for scheduling any necessary reinspectlon after remedial work IS performed Tests may not be reproduced, except In full, without written permission from Professional Service Industries, Inc ~_____~_______~_____~~_____Page 13 ofJi......_.._..._._.._.__._______._.._.._._._ ___ ___ ___________ -------,------- Professional Service Industries, Inc,. 1748 33rd Street. Orlando, FL 32839 . Phone 407/304-5560 . Fax 407/304-5561 FL Engineering Business 3684 Build On Engineering.. Consulting.. Testing REPORT OF REINFORCED CONCRETE INSPECTION TESTED FOR: A 1 A Acquisition Group, L TO, LLP PROJECT: Residence Inn - Cape Canaveral, FL 3425 Atlantic Avenue REPORT NO: 5 Cocoa Beach, FL 32931 PROJECT NO: 761-50044 Attn Roger Dobson REINFORCING STEEL PLACEMENT STRUCTURAL ELEMENT ELEVATION: 2nd floor Foundation PLAN LOCATION: Section "A", Columns: U-7, U.1-9, S 1-16, S.2-19, S.2-24, S.1-26, S.2-28, S2-33. S.1-35, S,2-37 Wall X Column Floor Slab Stair Other CRITERIA UTILIZED AS INSPECTION REFERENCE: Structural Plans: Sheet(s): S-101 Detail(s): RFI: structural drawinas S-212 2 RFI: Dated: 3/23/05 RFI: CONDITIONS I CONSTRUCTIONS OBSERVED: No exceptions Deficiencies X Proper sizing X X Proper grade of bars X X Proper quantity, spacing, & layout X X Proper splice lengths & splice locations X X Proper chairing and concrete cover X X Proper securement of reinforcing X Proper layout of post tensioning cables Proper drape of post tensioning tendons Proper sheathing and anchor reinforcing Concrete strength verified Concrete consolidated during placement DEFICIENCIES: REINSPECTlON REQUIRED: REMARKS: NOTES Contractor is responsible for scheduling any necessary relnspection after remedial work is performed. Tests may not be reproduced. except in fu". w.thout written permiSSion from Profess.onal Service Industnes, Inc. ----'~"-"-'-""--~----------"'---~---~,--"'--,---~~-~-~""-""~ Paqe 14 of 14 ~'~'-"'-,._.._-'-----"'-,,-""''''''-,..._,,-,,~...,~,,_.'''_._.._-,-,-___"'''''' "'- "'''' '" ---",,-,,-,-,,'" Professional Service Industries. Inc.. 1748 33rd Street. Orlando, FL 32839 . Phone 407/304-5560 . Fax 407/304-5561 FL Engineering Business 3684 /Engineering.. Consulting.. Testing REPORT OF REINFORCED CONCRETE INSPECTION TESTED FOR: A1A Acquisition Group. LTD. LLP PROJECT: Residence Inn - Cape Canaveral. FL 3425 Atlantic Avenue REPORT NO: 4 Cocoa Beach. FL 32931 PROJECT NO: 761-50044 Attn: Roger Dobson DATE: 6/3/2005 TECHNICIAN: S. Corrigan REINFORCING STEEL PLACEMENT STRUCTURAL ELEMENT Foundation PLAN LOCATION: 1st floor walls - section "C". lines E. L - V. 85 - 99 X Wall Section "A" floor slab Column X Floor Slab Stair Other CRITERIA UTILIZED AS INSPECTION REFERENCE: Structural Plans: Sheet(s): 5213 Detail(s): RFI: PDG S302. S301 1 - 11. 2. 3 RFI: Dated: 3-23-05 3 RFI: CONDITIONS / CONSTRUCTIONS OBSERVED: No exceptions Deficiencies X Proper sizing X X Proper grade of bars X X Proper quantity. spacing. & layout X X Proper splice lengths & splice locations X X Proper chairing and concrete cover X X Proper securement of reinforcing X Proper layout of post tensioning cables Proper drape of post tensioning tendons Proper sheathing and anchor reinforcing X Concrete strength verified X X Concrete consolidated during placement X X Other: wire mesh - floor slab X DEFICIENCIES: REINSPECTION REQUIRED: No REMARKS: Line E vertical bars preViously missing on 5/27/05 have been placed NOTES: Contractor is responSible for scheduling any necessary relnspection after remedial work is p"riufflled. Tests may not be reproduced. except in full. without wntten permission from Professional Service Industries Inc '-~_.'..."""."".'_._._..'.'..._'_..""_,_"..,,,.._~_..l'.a.R'LL~.~_~..._.~.~ -""---,-,-,- Professional Service Industries, Inc.' 1748 33rd Street. Orlando, FL 32839' Phone 407/304-5560' Fax 407/304-5561 FL Engineering Business 3684 Build On Engineering. Consulting. Testing REPORT OF REINFORCED CONCRETE INSPECTION TESTED FOR: A 1 A Acquisition Group, L TO, LLP PROJECT: Residence Inn - Cape Canaveral FL 3425 Atlantic Avenue REPORT NO: 4 Cocoa Beach, FL 32931 PROJECT NO: 761-50044 Attn: Roger Dobson REINFORCING STEEL PLACEMENT STRUCTURAL ELEMENT ELEVATION: 9'4" Foundation PLAN LOCATION 1 st floor walls, Section "C", lines 66 - 85, F - V X Wall Column Floor Slab Stair Other CRITERIA UTILIZED AS INSPECTION REFERENCE: Structural Plans: Sheet(s): S213 Detail(s): RFI: PDG S302, S301 1 - 11, 2 - 3 RFI: Dated: 3/23105 S212 3 RFI: CONDITIONS / CONSTRUCTIONS OBSERVED: No exceptions Deficiencies X Proper sizing X X Proper grade of bars X X Proper quantity, spacing, & layout X X Proper splice lengths & splice locations X X Proper chairing and concrete cover X X Proper securement of reinforcing X Proper layout of post tensioning cables Proper drape of post tensioning tendons Proper sheathing and anchor reinforcing X Concrete strength verified X X Concrete consolidated during placement X Other: DEFICIENCIES: REINSPECTION REQUIRED: No REMARKS: Section "C" complete to elevation 9' 4". NOTES: Contractor IS responsible lor scheduling any necessary relnspection after remedial work IS performec Tests may not be reproduced. excepi In full, without written permiSSion from Professional Servic" Industres ~-~-_..-..~-~--.-.....-..---~_.-._......--~~.z~----....-..---..-...-...-.-....----.~...- .. ......~----.-- Professional Service Industries, Inc. . 1748 33rd Street. Orlando. FL 32839 . Phone 407/304-5560. Fax 407/304-5561 FL Engineering Business 3684 Build On Engineering" Consulting" Testing REPORT OF REINFORCED CONCRETE INSPECTION TESTED FOR: A 1A Acquisition Group, L TD" LLP PROJECT: Residence Inn - Cape Canaveral, FL 3425 Atlantic Avenue REPORT NO: 4 Cocoa Beach, FL 32931 PROJECT NO: 761-50044 Attn: Roger Dobson DATE: 6/9/2005 TECHNICIAN: S, Corrigan REINFORCING STEEL PLACEMENT SiRUCTURAL ELEMENT ELEVATION: walls 9' 4", columns 8' Foundation PLAN LOCATION: Section "A", walls, lines A - U & 1 - 14, L & 1 - 8,25, P & 1 - 7, R & 1 - 7, X Wall Section "C", 1st floor columns, line S,25 @J 68,70,75,77,79,84 & 86, also line U,2 @J 94 and 96 X Column Floor Slab Stair Other CRITERIA UTILIZED AS INSPECTION REFERENCE: Structural Plans: Sheet(s): 5211,5213 Detail(s): RFI: PDG S212 2, 3 RFI: Dated 3/23/05 S302 11 RFI CONDITIONS / CONSTRUCTIONS OBSERVED: No exceptions Deficiencies X Proper sizing X X Proper grade of bars X X Proper quantity, spacing, & layout X X Proper splice lengths & splice locations X X Proper chairing and concrete cover X X Proper securement of reinforcing X Proper layout of post tensioning cables Proper drape of post tensioning tendons Proper sheathing and anchor reinforcing X Concrete strength verified 6/10 X X Concrete consolidated during placement 6/10 X Other. DEFICIENCIES: REINSPECTION REQUIRED: No REMARKS: NOTES Contractor IS responsible for scheduling any neCeSSdly reinspection after remedial work IS performed, Tests may not be reproduced, except in full, Without written pern"ssion from ProfeSSional Service Industries, Inc, Professional Service Industries. Inc.. 1748 33rd Street. Orlando, FL 32839" Phone 407/304-5560. Fax 407/304-5561 FL Engineering Business 3684 /Engineering. Consulting. Testing REPORT OF REINFORCED CONCRETE INSPECTION TESTED FOR: AlA Acquisition Group, L TO, LLP PROJECT: Residence Inn. Cape Canaveral, FL 3425 Atlantic Avenue REPORT NO: 4 Cocoa Beach, FL 32931 PROJECT NO: 761.50044 Attn: Roger Dobson DATE: 6/14 & 6/15 TECHNICIAN: S, Corrigan REINFORCING STEEL PLACEMENT STRUCTURAL ELEMENT ELEVATION: 109'4" Foundation PLAN LOCATION: Section "A", 1st floor walls, lines 1 .41 and H - V X Wall Column Floor Slab Stair Other CRITERIA UTILIZED AS INSPECTION REFERENCE: Structural Plans: Sheet(s): 5211 Detail(s): RFI: PDG S212 3&2 RFI: Dated: 3/23/05 S302, S301 RFI: CONDITIONS / CONSTRUCTIONS OBSERVED: No exceptions Deficiencies X Proper sizing X X Proper grade of bars X X Proper quantity, spacing, & layout X X Proper splice lengths & splice locations X X Proper chairing and concrete cover X X Proper securement of reinforcing X Proper layout of post tensioning cables Proper drape of post tensioning tendons Proper sheathing and anchor reinforcing X Concrete strength verified X X Concrete consolidated during placement X Other: DEFICIENCIES: REINSPECTION REQUIRED: No REMARKS: -~~ NOTES: Contractor is responsible for scheduling any necessary reinspection after remedial work IS performed, Tests may not be reproduced, except in full, without written permission from Professional Service Industries, Inc. -~~'~"'-'-~---"~-~"-,-"-,---"--~------~,~-----~---,- Paqe ~ of 9 ~----,,--,-,-,~ - -----------,,-,,-,- Professionai Service Industries, Inc.' 1748 33rd Street. Orlando, FL 32839 . Phone 407/304-5560' Fax 407/304-5561 FL Engineering Business 3684 Build On .. Consulting" Testing REPORT OF REINFORCED CONCRETE INSPECTION :0 FOR: A 1 A Acquisition Group, LTD., LLP PROJECT: Residence Inn. Cape Canaveral, FL 3425 Atlantic Avenue REPORT NO: 4 Cocoa Beach. FL 32931 PROJECT NO: 761.50044 Attn: Roger Dot)son REINFORCING STEEL PLACEMENT :TURAL ELEMENT Foundation PLAN LOCATION: Section "C'. 2nd floor slab Wall Column X Floor Slab Stair Other RIA UTILIZED AS INSPECTION REFERENCE: Iral Plans: Sheet(s): S223 Detail(s): 1 RFI S301, S303 1, all RFI 3/23/05 S304 1,5,6.7.9. 11 RFI ITIONS I CONSTRUCTIONS OBSERVED: No exceptions Deficiencies X Proper sizing X X Proper grade of bars X X Proper quantity. spacing, & layout X X Proper splice lengths & splice locations X X Proper chairing and concrete cover X X Proper securement of reinforcing X Proper layout of post tensioning cables Proper drape of post tensioning tendons Proper sheathln9 and anchor reinforcing X Concrete strength verified X X Concrete consolidated during placement X Other: !ENCIES: Wrong length hook bars used on perimeter lines A . K & 88 - 99. PECTION REQUIRED: ~KS: Request for ,nformation on above deficiency. NOTES: Conua lor is responsible for scheduling any necessary reinspection after remedial work is performed. Tests may reproduced, except in full, withouIMltten permission from Professional SerVJI:e Industries, Inc. Professional Service Industries. Inc.. 1748 33rd Street. Orlando. FL 32839. Phone 407/304.5560. Fax 407/304.5561 FL Engineering BUSiness 3684 .. Consulting.. Testing REPORT OF REINFORCED CONCRETE INSPECTION TESTED FOR: A 1 A Acquisition Group, LTD., LLP PROJECT: Residence Inn - Cape Canaveral, FL 3425 Atlantic Avenue REPORT NO: 4 Cocoa Beach, FL 32931 PROJECT NO: 761-50044 Attn: Roger Dobson REINFORCING STEEL PLACEMENT STRUCTURAL ELEMENT Foundation PLAN LOCATION: Section "A", 1st floor columns: J7, J9. S2 @J 16 19.24.26,28,33,35 & 37 Wall X Column Floor Slab Stair Other CRITERIA UTILIZED AS INSPECTION REFERENCE: Structural Plans: Sheet(s): S211 Detai!(s): RFI: PDG 2 RFI: Dated: 3/23/05 RFI: CONDITIONS' CONSTRUCTIONS OBSERVED: No exceptions Deficiencies X Proper sizing X X Proper grade of bars X X Proper Quantity, spacing, & layout X X Proper splice lengths & splice locations X X Proper chairing and concrete cover X X Proper securement of reinforcing X Proper layout of post tensioning cables Proper drape of post tensioning tendons Proper sheathing and anchor reinforcing X Concrete strength verified 6/21/05 X X Concrete consolidated during placement 6/21/05 X Other DEFICIENCIES: REINSPECTION REQUIRED: No REMARKS: NOTES' Contractor is responsible for scneduling any necessary reinspection after remedIci' Wi)" s performed Tests may not be reproduced, except in lull, without written permission from Professional Industnes. Inc ProfeSSional Service Industries, Inc. . 1748 33rd Street. Orlando. FL 32839 . Phone 407/304-5560 Fax 407/304-5561 FL Engineering BUSiness 3684 Build On Engineering It Consulting It Testing REPORT OF REINFORCED CONCRETE INSPECTION TESTED FOR: A 1 A Acquisition Group, LTD., LLP PROJECT: Residence Inn - Cape Canaveral. FL 3425 Atlantic Avenue REPORT NO: 4 Cocoa Beach, FL 32931 PROJECT NO: 761-50044 Attn: Roger Dobson DATE: 6/22/2005 TECHNICIAN: M. Odom REINFORCING STEEL PLACEMENT STRUCTURAL ELEMENT ELEVATION: 2nd floor Foundation PLAN LOCATION: Section "C", line C - P & 88 - 99, Q - U & 95 - 99 including pilasters X Wall Column Floor Slab Stair Other CRITERIA UTILIZED AS INSPECTION REFERENCE: Structural Plans: Sheet(s): S-101, $-212. Detail(s): RFI: structural drawings S-223, S-301 n/a, 3 RFI: Dated: 3/23/05 S-302 1,3,5 RFI: CONDITIONS I CONSTRUCTIONS OBSERVED: No exceptions Deficiencies X Proper sizing X X Proper grade of bars X X Proper quantity, spacing, & layout X X Proper splice lengths & splice locations X X Proper chairing and concrete cover X X Proper securement of reinforcing X Proper layout of post tensioning cables Proper drape of post tensioning tendons Proper sheathing and anchor reinforcing Concrete strength verified Concrete consolidated during placement Other: DEFICIENCIES: Many CMU vertical reinforcing steel bars exhibit insufficient splice length (11" to 30" in-place; 30" minimum required). #4-4' bars placed @ bottom of cell where splice noted as less than 26". Several P-1 vertical reinforcing steel bars exhibit insufficient splice length (27" to 36" in-place; 36" minimum required). Full-length #5 bars placed within cells where splice noted as less than 35" Spacing of CMU vertical reinforcing steel noted to range from 16" to 56" o.C. (two locations only @ 56" o.C. - column line G-94, J-91 ). No #6 bar located from previous level @ P-1 (column line Q.1-95). REINSPECTION REQUIRED: Yes REMARKS: NOTES Contractor is responsible for schedulmg any necessary reinspection after remedial work is performed. Tests may not be reproduced, except in full. Without written permission from ProfesSional Service Industries Inc. ~'~--~---,~--,-,--,-~-------,~-- Pogo 7 of 9 ...~~.........- ~"_""_'m_"m_'m"''''''_ _ _ _.__"_________ _____.__.."_._._.___ Professional Service Industries, Inc. . 1748 33rd Street. Orlando, FL 32839 . Phone 407/304.5560. Fax 407/304-5561 FL Engineering Business 3684 Build On " Consulting" Testing REPORT OF REINFORCED CONCRETE INSPECTION TESTED FOR: A 1 A Acquisition Group, L TO., LLP PROJECT: Residence Inn - Cape Canaveral. FL 3425 Atlantic Avenue REPORT NO: 4 Cocoa Beach, FL32931 PROJECT NO: 761-50044 Attn: Roger Dobson REINFORCING STEEL PLACEMENT STRUCTURAL ELEMENT Foundation Wall Column ----- X Floor Slab Stair Other CRITERIA UTILIZED AS INSPECTION REFERENCE: Structural Plans: Sheet(s): S-101, S-221 Detail(s) RFI structural drawinqs S-301 1,2 RFI Dated: 3/23/05 S-302, S-303 9, 10,4,5,6,7,8,9 10, 12 RFI CONDITIONS 1 CONSTRUCTIONS OBSERVED: No exceptions Deficiencies X Proper sizing X X Proper grade of bars X __ )( ~ Proper quantity, spacing, & layout X X Proper splice lengths & splice locations X X Proper chairing and concrete cover X X Proper securement of reinforcing X Proper layout of post tensioning cables Proper drape of post tensioning tendons Proper sheathing and anchor reinforcing Concrete strength verified Concrete consolidated during placement DEFICIENCIES: Standard hook reinforcing bars have not been detailed in shop drawings within slab edge at two sides of elevator area, as well as CB-1, CB-3 and CB-4 (partial) beam locations, REINSPECTlON REQUIRED: Yes REMARKS: Candy cane bars (3'8" - MK412) were installed at reJerse side of elevator at 18" OC per inspectors request. Hook bars were installed via drill/eDoxy into i;rde: above elevator opening at 24" OC as per sketch SK-21 prior to placement of fie y slab, NOTES Contractor is responsible for sCheeJuJ,n, any necessary reinspection after remedial work is performed, Tests may not be reproduced, except in full wilhout written pemnisslon from Professional Service Industries, Inc, ProfeSSional Service Indusfrles, Inc,' 1748 33rd Street. Orlando, FL 32839' Phone 407/304-5560' Fax 407/304-5561 FL Engineering Business 3684 Engineering · Consulting. Testing REPORT OF REINFORCED CONCRETE INSPECTION TESTED FOR: A 1 A Acquisition Group, LTD., LLP PROJECT: Residence Inn - Cape Canaveral, FL 3425 Atlantic Avenue REPORT NO: 4 Cocoa Beach, FL32931 PROJECT NO: 761-50044 Attn: Roger Dobson REINFORCING STEEL PLACEMENT STRUCTURAL ELEMENT ELEVATION: 2nd floor Foundation PLAN LOCATION Section "C" CMU walls (including pilasters), line G.9 - T & 60 - 85, Q - V & 86 - 94.9 X Wall Column Floor Slab Stair Other CRITERIA UTILIZED AS INSPECTION REFERENCE: Structural Plans: Sheet(s) $-101. $-212 Detail(s): RFI: structural drawings 5-223, S-301 nJa, 3 RFI: Dated: 3/23/05 5-302 1,3,5 RFI: CONDITIONS / CONSTRUCTIONS OBSERVED: No exceptions Deficiencies X Proper sizing X X Proper grade of bars X X Proper quantity, spacing, & layout X X Proper splice lengths & splice locations X X Proper chairing and concrete cover X X Proper securement of reinforcing X Proper layout of post tensioning cables Proper drape of post tensioning tendons Proper sheathing and anchor reinforcing Concrete strength verified Concrete consolidated during placement Other: DEFICIENCIES: Many CMU vertical reinforcing steel bars exhibit insufficient splice length (18 to 30" in-place: minimum 30" required), #4-4' bars placed @ bottom of cell where splice noted as less than 26". Several P-l vertical reinforCing steel bars exhibit insufficient splice length (27 to 36" In-place; minimum 36" required). Full-length #5 bars placed within cells where splice noted as less than 35". REINSPECTION REQUIRED: Yes REMARKS: NOTES: Contractor is responsible for scheduling any necessary reinspectlon after remedial work is p.,'tormed Tests may not be reproduced, except In full, without written permission from Professional Service Indu,tries, Ine -_.~--,_.~-_.."-,--,~.______~~__~_~__~J:'ageJLQL9_,,,"_,~ _._._._----"-,-,,_..._""',,...~"'''''~''' Professional Service Industries. Inc.. 1748 33rd Street. Orlando, FL 32839 . Phone 407/304-5560 . Fax 407/304-5561 FL Engineering Business 3684 REPORT OF NON-COMPLIANCE (PUNCHLIST) ITEMS PROJECT NAME: RESIDENCE INN PROJECT NO.: 761-50044 CLIENT: WELBRO CONSTRUCTION DESCRIPTION OF WORK: SPECIAL INSPECTIONS TECHNICIAN: STEVE CORRIGAN, MATT ODOM DATE OF REPORT: 08-17-05 ~ C I G 1-----' ITEM DATE DATE L-.:..l\TO. I INSPECTED DESCRIPTION OF DEFICIENCY ACTION REQUIRED REINSPECTION I REI1\'SPF:CTED J TOP GRADE BEAM REINFORCING STEEL REMEDIATE PER ADDITIONAL 04-26-05/ 001 04-19-05 BARS DO NOT MATCH WITHIN GB-3/GB-7 DIRECTION OF REINFORCING STEEL 04-29-05 TRANSITION AREAS @ COL LINE E, R, ENGINEER OF ADDED PER . -" AND P (BOTH ENDS OF BLDG) RECORD (RFI #034) REFERENCED RFI (COMPLE fE) SEVERAL AUGERCAST PILES LIE REMEDIATE PER AREAS REFERENCED 04-26-05/ 002 04-19-05 OUTSIDE TOLERANCES STATED FOR DIR~CTION OF REMEDIATED PER 05.16-05 LOCATION 1#1244 1248 1258 1414) ENhINEER OF REFERENCED RFI (COM PI ETE) \ , " RECORD (RFI #035) , REMEDIATE PER AREAS'REF'E'I"ENCE'D PILE FOUND TO BE MISSING (NO SURVEY DIRECTION OF · ,,' ~ · 05-16-05 003 05-02-05 MARKER IN-I) LACE) _ PILE #1264 ENGINEER OF REMEDIATED PER (COMPLETE) RECORD (RFI #045) REFERENCED RFI HOOK BARS DETAILED @ BALCONY AREAS ARE APPR 5' LONG IN-PLACE, RATHER THAN 10' IN LENGTH _ SEE REQUIRES APPROVAL 004 06.-17-05 RINKER SHOP DRAWINGS, BAR MARK OF ENGINEER OF MK507 (COL LINE A TO L-88 TO 99 _ RECORD AREA C - 2ND FLOOR) SEVERAL CMU/PILASTER REINFORCING P-l REMOVED TO STEEL BARS NOT CENTERED WITHIN REQUIRES APPROVAL ELEV 4 COURSES 005 06-22-05 CELLS UPON COMPLETION OF GROUT OF ENGINEER OF ABOVE SLAB AND 06-27-05 PLACEMENT - RESTING ON CMU WEB RECORD REPLACED @ COL (AREA C - 2ND FLOOR) LINE L-89 ADDITIONAL #4 - 4' VERTICAL CMU REINFORCING STEEL BAR PLACED BARS EXHIBIT INSUFFICIENT SPLICE REMEDIATE PER LOOSEL Y WITHIN . , I BOTTOM OF CELL IN 006 06-22-05 LENGTH FROM LEVE~ BEL?," DIRECTION OF AREAS NOTED AS 06-22-05 \~NGE ~N-~LACE 11 fO 3? - ENGINEER OF DEFICIENT (<26") 30 MIN REQ~IR~~ AS PER S-]Ol) RECORD (COL LINE C TO 1'-88 I (AREA C - 2 FLOOR) TO 99, Q TO U-95 TO 991 I ONL Y) l.'.~..'S..~..' 1 It:. ttiiJI. .: REPORT OF NON-COMPLIANCE (PUNCHLIST) ITEMS PROJECT NAME: RESIDENCE INN PROJECT NO.: 761-50044 CLIENT: WELBRO CONSTRUCTION DESCRIPTION OF WORK: SPECIAL INSPECTIONS TECHNICIAN: STEVE CORRIGAN, MATT ODOM DATE OF REPORT: 08-17-05 DATE I DESCRIPTION OF DEFICIENCY I ACTION REQUIRED ~INSPECTION DATlD INSPECTED I REINSPECTED ADDITIONAL FULL- VERTICAL 1'-1 REINFORCING STEEL LENGTH #5 BAR PLACED WITHIN BARS EXHIBIT INSUFFICIENT SPLICE REMEDIA TE PER CELL IN AREAS I 007 06-22-05 LENGTH FROM LEVEL BELOW DIRECTION OF NOTED AS DEFICIENT 06-22-05 (RANGE IN-PLACE 27 TO 36" - ENGINEER OF 36" MIN REQUIRED AS PER S-101) RECORD (<35") (AREA C - 2ND FLOOR) (COL LINE C TO 1'-88 TO 99, Q TO U-95 TO 99 ONLY) VERTICAL CMU REINFORCING STEEL DOWEL NOT PRESENT FROM LEVEL REMEDIA TE PER 008 06-22-05 BELOW @ COL LINE E-96.5, E-97.8, E-98 DIRECTION OF (CELL ADJ TO E-98 POURED SOLID ENGINEER OF WITH REINFORCEMENT) RECORD (AREA C - 2ND FLOOR) IN-PLACE CONDITION VERTICAL 1'-1 REINFORCING STEEL ACCEPTABLE @ COL DOWEL (#6 BAR) NOT PRESENT FROM LINE A-93, B-93 LEVEL BELOW @ COL LINE A-93 & B-93 REMEDIA TE I)ER (AWAITING (#5 BARS IN PLACE FROM 1 ST FLOOR), DIRECTION OF CORRESI'ONDENCE 009 06-22-05 FROM ENGINEER OF 06-27-05 AND Q.1-95 (NO BAR OF ANY SIZE ENGINEER OF PRESENT WITHIN W CELL OF HECORD RECORD); #6 BAR PILASTER, #6 BAR IN E CELL) I)LACED INTO 2ND (AREA C - 2ND FLOOR) FLOOR SLAB @ COL L I L LINE Q.1-95 VIA I DRILL/EPOXY fils:l 2 REPORT OF NON-COMPLIANCE (PUNCHLIST) ITEMS PROJECT NAME: RESIDENCE INN PROJECT NO.: 761-50044 CLIENT: \VELBRO CONSTRUCTION DESCRIPTION OF WORK: SPECIAL INSPECTIONS TECHNICIAN: STEVE CORRIGAN, MATT ODOM DATE OF REPORT: 08-17-05 DATE DESCRIPTION OF DEFICIENCY I ACTION REQUIRED ] REINSPECTION [ DATE;] INSPECTED REINSPECTED ~'O MASONRY GROUT PLACED IN SINGLE --l FULL-HEIGHT LIFT (8'-8"), AND GROUT WAS VIBRATED ONLY ONCE FOLLOWING INITIAL PLACEMENT REQUIRES APPROVAL 06-22-05 (REFERENCE ACI 530.1-02, PART 3.5- OF ENGINEER OF RECONSOLIDATION OF GROUT RECORD REQUIRED AFTER INITIAL WATER LOSS AND SETTLEMENT HAS OCCURRED) (AREA C - 2ND FLOOR) ADDITIONAL "B" P-l PILASTER MISPLACED APPR 24" TO REMICDIA TE PER BARS WITHIN 2N() THE NORTH OF PLAN POSITION DIRECTION OF FLOOR SLAB 011 06-23-05 (ORIGINAL LOCATION COL LINE E-7) ENGINEER OF EXTENDED TO 06-27-05 (AREA A _1ST FLOOR) RECORD DEVELOP INTO CURRENT P-l POSITION PILASTER DESIGNATION @ COL LINE #6 BARS PLACED Q-77 & M-77 CHANGES FROM P-l ON 1ST REMEDIA TE PER INTO 2ND FLOOR SLAB 012 06-23-05 FLOOR TO P-2 DESIGNATION ON DIRECTION OF VIA DRILL/EPOXY 06-27-05 2N() FLOOR (BARS IN-PLACE FROM 1 ST ENGINEER OF WITHIN MISSING P-2 FLOOR ARE 2-#5 IN EACH LOCATION, RECORD REINFORCEMENT RATHER THAN 4..#6) (AREA C - 2ND FLR) AREAS PILASTER VERTICAL REINFORCING STEEL WITHIN P-l @ COL LINE N.I-89 REQUIRES APPROVAL 013 06-24-05 CONSISTS OF 2-#5 BARS OF ENGINEER OF (RATHER THAN 2-#6 BARS) RECORD (AREA C -- 1 ST & 2ND FLOOR) ADDITIONAL HORIZONTAL REINFORCEMENT NOT BEING PLACED REQUIRES APPROVAL 014 06-24-05 ABOVE AND BELOW CMU OPENINGS AS OF ENGINEER OF PER PROJECT SPECIFICATIONS RECORD SECTION 04220, PART 3.03.C liiEJ 3 tt:...,. .: REPORT OF NON-COMPLIANCE (PUNCHLIST) ITEMS PROJECT NAME: RESIDENCE INN PROJECT NO.: 761-50044 CLIENT: WELBRO CONSTRUCTION DESCRIPTION OF WORK: SPECIAL INSPECTIONS TECHNICIAN: STEVE CORRIGAN, MATT ODOM DATE OF REPORT: 08-17-05 ~EM DATE DESCRIPTION OF DEFICIENCY I ACTION REQUIRED REINSPECTION DATE I I NO. INSPECTED REINSPECTED -- I LOCATION OF P-l PILASTER REMEDIATE PER 2-#6 BARS INSTALLED 015 06-25-05 MISPLACED FROM PLAN LOCATION DIRECTION OF INTO FOUNDATION @ 06_~ (APPR 8" S @ COL LINE A-I0 & B-I0) ENGINEER OF 1..5-39 (NOW CIP COL ~PR 16" W @ COL LINE L.5-39 & L.5-41) RECORD @ PLAN LOCATION) #5 BARS PRESENT FROM LEVEL BELOW FULL-LENGTH #5 BAR PLACED ALONG IN P-l PILASTER LOCATIONS (#6 BARS REQUIRES APPROVAL WITH #6 BAR ABOVE I 016 06-25-05 DETAILED) @ COL LINE Q.I-86, N-85, N-82, OF ENGINEER OF 2ND FLOOR SLAB 06-27-05 P-82, N-73, P-73, N.2-13.8, Q.1-16, R.6-7 RECORD (2ND FLOOR) ELEVATION (AREA CONLY) 1-#5 BAR ONLY PRESENT FROM LEVEL REMEDIA TE PER #6 BARS INSTALLED VIA DRILL/EPOXY 017 06-25-05 BELOW @ P-IPILASTER LOCATIONS DIRI~CTION OF INTO FLOOR SLAB IN 07-06-05 (2-#6 BARS DETAILED) ENGINEER OF BOTH REFERENCED @ COL LINE N-39, Q.I-8 (2ND FLOOR) RECORD LOCATIONS NO CLEAR COVER TO REINFORCING REQUIRES APPROVAL 018 06-25-05 STEEL BANDS WITHIN CIP COLUMN (C-4) OF ENGINEER OF @ LINE S-26 (SW CORNER) & S-28 (NE RECORD CORNER) (1sT FLOOR) m__ STD HOOK BARS HAVE NOT BEEN MK412 BARS PLACED DETAILED IN SHOP DRAWINGS WITHIN REQUIRES APPRO V AI. WITHIN 2ND FLOOR 019 06-27-05 SLAB EDGE @ TWO SIDES OF ELEVATOR OF ENGINEER OF SLAB @ 18" OC 06-27-05 AREAS, AS WELL AS CB-I, CB-3, CB-4 RECORD ALONG REVERSE (PARTIAL), CR-5, AND CB-6 (PARTIAL) SIDE OF ELEV A TOR I CONCRETE BEAM AREAS (AREA A) 00_=1 COL CUT FROM BASE TS COLUMN @ LINE F-95 APPR 4" OUT- REQUIRES APPROVAL PLATE AND REPOSI- 020 06-27-05 OF-PLUMB (LEANING TO WEST) OF ENGINEER OF TIONED UTILIZING (1 ST FLOOR) RECORD W' ANGLE AS SUPPORT ON 3 SIDES IMPROPER ELECTRODES BEING USED REQUIRES APPROVAL E7018 ELECTRODES 021 06-27-05 I TO WELD TS COLUMNS TOGETHER (6011 OF ENGINEER OF USED TO WELD TS 07-28-05 BEING UTILIZED, E70XX SERIES RECORD COLUMNS WITHIN I SPECIFIED - SEE SHEET S-1 01 ) AREA A 3RD FLOOR ~ 4 ,.. C!" ., . t!!.~1I ,~ REPORT OF NON-COMPLIANCE (PUNCHLIST) ITEMS PROJECT NAME: RESIDENCE INN PROJECT NO.: 761-50044 CLIENT: WELBRO CONSTRUCTION DESCRIPTION OF WORK: SPECIAL INSPECTIONS TECHNICIAN: STEVE CORRIGAN, MATT ODOM DATE OF REPORT: 08-17-05 DATE DESCRIPTION OF DEFICIENCY I ACTION REQUIRED ] REINSPECTION I REIl~~~i~TED I INSPECTED I MANY CMU CELLS NOT COMPLETELY i I I FILLED WITH MASONRY GROUT: COL LINE B-13,H-3,N.9-4,N.9-5,Q.I-8,R-13.1, REMEDlATE PER Q. 9-16,T -12, T.5-12,U-12,U.5-12,H.5-22,J-22, DIRECTION OF 022 07-05-05 K-22,P .1-22,Q-26,H.4-40,S.2-40.8,N -67 ,H.4-67, ENGINEER OF H.4-68,P-68,S-77 ,R.2-89,J-88,F -96.5,A.8-89, RECORD A-96 (I ST FLOOR); AND COL LINE A.I-98,G-92,U-97.3,R.5-82,R.8-82, S.5-82,T-82,K-77,N-67 (2ND FLOOR) MANY CMU WALLS REINFORCED @ REQUIRES APPRO V AL 023 07-05-05 48" OC, RATHER THAN 32" OC AS PER OF ENGINEER OF I I S-212, DETAIL 3 (W-l DESIGNATION FOR RECORD I--- I INTERIOR 1 ST FLOOR AREAS) (AREA C) TYPICAL CMU SILL REINFORCEMENT REQUIRES APPROVAL 024 07-05-05 (2-#5 BARS) NOT PLACED BENEATH AIR OF ENGINEER OF HANDLER OPENINGS IN ANY LOCATION RECORD CIP COLUMN @ LINE S.2-84 APPR 2" OUT- REQUIRES APPROVAL 025 07-06-05 OF-PLUMB (LEANING TO NORTH) OF ENGINEER OF (1 ST FLOOR) RECORD CIP COLUMN APPR I" OUT-OF-PLUMB @ LINE S.2-28 (LEANING TO NORTH), S.2-33 (LEANING TO SOUTH), REQUIRES APPROVAL 026 07-08-05 S.2-70 (LEANING TO NORTH); OF ENGINEER OF APPR 1.25" OUT-OF-PLUMB @ RECORD LINE S.2-37 (LEANING TO NORTH) (1 ST FLOOR) KO-l BOND BEAM REINFORCING STEEL REQUIRES APPROVAL 027 07-11-05 NOT PRESENT @ COL LINE A TO C-89, OF ENGINEER OF C-88 TO 89, U-96.2 TO 99 RECORD (3RD FLOOR SLAB ELEVATION) ADDITIONAL "A" BARS NOT PRESENT REQUIRES APPROVAL , 028 07-11-05 WITHIN FLOOR SLAB @ OF ENGINEER OF I I L COL LINE 1'1 TO 0-96 (3RD FLOOR) RECORD I l1iB1 5 tt:...,. .: REPORT OF NON-COMPLIANCE (PUNCHLIST) ITEMS PROJECT NAME: RESIDENCE INN PROJECT NO.: 761-50044 CLIENT: WELBRO CONSTRUCTION DESCRIPTION OF WORK: SPECIAL INSPECTIONS TECHNICIAN: STEVE CORRIGAN, MATT ODOM DATE OF REPORT: 08-17-05 [1EM I DATE C I ACTION REQUIRED ] REINSPECTION I REI~~~~:TE~ NO. INSPECTED DESCRIPTION OF DEFICIENCY ~1I-05 BANDS PLACED @ 6" OC TYPICAL REQUIRES APPROVAL WITHIN CB-2 BEAMS @ COL LINE S.2-68 OF ENGINEER OF TO 70, U.I-94 TO 96.2, RATHER THAN AS RECORD PER S-301, DETAIL 2 (3RD FLOOR) CIP COLUMN @ LINE S.2-19 OFFSET APPR REQUIRES APPROVAL 030 07-13-05 2" S OF PLAN LOCATION OF ENGINEER OF (151 AND 2ND FLOOR) RECORD SEVERAL CMU WALLS ON 2ND FLOOR ~-- OFFSET FROM 1ST FLOOR LOCATIONS (APPR OFFSET AND DIRECTION LISTED): COL LINE T-31 (1.625" TO NORTH), COL LINE T-22 (0.875" TO NORTH), COL LINE F-2 (0.625" TO EAST), REQUIRES APPROVAL 031 07-14-05 COL LINE H-l (0.625" TO EAST), OF ENGINEER OF COL LINE L..2 (0.75" TO EAST), RECORD COL LINE V..90 (0.50" TO NORTH), COL LINE T.82 (0.625 TO SOUTH), COL LINE T-73 (1.0" TO SOUTH), COL LINE G.8-82 (0.50" TO NORTH), COL LINE H-99 (1.0" TO WEST), COL LINE U..35 (1.125" TO SOUTH) END OF CB-l BEAM @ COL LINE 1..5-68 NOT BEARING ON CMU/P-l PILASTER REQUIRES APPRO V AL 032 07-27-05 (CMU PLACED FULL-HEIGHT) OF ENGINEER OF 2 #5xI0' BARS PLACED (5' IN BEAM, 5' IN RECORD SLAB) TO PROVIDE DEVELOPMENT BOTTOM REINFORCING STEEL PLACED ~li 12" OC WITHIN COL LINE R TO U-90 TO REQUIRES APPROVAL 033 07-27-05 96, R TO U-96 TO 98 (DETAILED @ 10" OC OF ENGINEER OF WITHIN THESE AREAS) RECORD (AREA C - 4TH FLOOR) ~ 6 ...... e- " ..'It!~. .: REPORT OF NON-COMPLIANCE (PUNCHLIST) ITEMS PROJECT NAME: RESIDENCE INN PROJECT NO.: 761-50044 CLIENT: WELBRO CONSTRUCTION DESCR1PTION OF WORK: SPECIAL INSPECTIONS TECHNICIAN: STEVE CORRIGAN, MATT ODOM DATE OF REPORT: 08-17-05 DA TE C DESCRIPTION OF DEFICIENCY I ACTION REQUIRED ] I DATE I INSPECTED j REINSPECTION I REINSPI~CTED I BOTTOM REINFORCING STEEL I PLACED @ 10" OC WITHIN REQUIRES APPROV AL 034 07-27-05 COL LINE M TO Q-82 TO 86 OF ENGINEER OF (DETAILED @ 9'" OC WITHIN THIS AREA) HECORD (AREA C - 4TH FLOOR) CB-6 BEAM CONTAINS NO BANDS @3" OC @ N END (COL LINE N-85) 7 BANDS @ 6" OC AND MID-BEAM BANDS REQUIRES APPROVAL 035 07-27-05 (Ii] 12" OC IN-PLACE (S END OF BEAM OF ENGINEER OF I CONSTRUCTED AS PER PROJECT RECORD I DOCUMENTS) I (AREA C - 4TH FLOOR) 5000 PSI CONCRETE (MIX CODE 1156016) PLACED WITHIN CMU CELLS @ COL REQUIRES APPROVAL 036 07..27-05 LINE H.5-66 TO 68, H.5 TO S.2-66, OF ENGINEER OF N-66 TO 68 DURING PLACEMENT OF RECORD FLOOR SLAB {AREA C - 3RD FLOOR) PRECAST LINTEL @ COL LINE R.2-16 2 #6 REINFORCING BARS PLACED INTO FOUND TO BE CRACKED ON BOTTOM REQUIRES APPROVAL LINTEL FOR 037 07-28-05 (CENTER, EAST TO WEST END) AND SIDE OF ENGINEER OF ADDITIONAL 07..28-05 I (NE CORNER, TOP, APPR 24" IN LENGTH) RECORD STRENGTH(RATHER I t38 ~ (AREA A, 3'" FLOOR) THAN #5 BARS) 2 #5 BARS SUBSTITUED FOR 1 #6 BAR REQUIRES APPROVAL WITHIN EACH CELL IN P-l LOCATIONS 07-28-05 @ COL LINE R.6-7, Q.I-8, N.3-13.5 OF ENGINEER OF (AREA A, 3RD FLOOR) RECORD ~ 7 ...~. . ~W1.,~ REPORT OF NON-COMPLIANCE (PUNCHLIST) ITEMS PROJECT NAME: RESIDENCE INN PROJECT NO.: 761-50044 CLIENT: WELBRO CONSTRUCTION DESCRIPTION OF WORK: SPECIAL INSPECTIONS TECHNICIAN: STEVE CORRIGAN, MATT ODOM DATE OF REPORT: 08-17-05 DATE DESCRIPTION OF DEFICIENCY I ACTION REQUIRED ] REINSPECTION I DATE INSPECTED REINSPECTED I I CMU DOWN CELLS FOUND TO NOT BE COMPLETEL Y FILLED WITH GROUT WITHIN AREA C: COL LINE Q.I-93,F- REMEDIA TE PER 039 OS-OS-OS 96.9,A-91,H.2-79 (I ST FLOOR); DIRECTION OF COL LINE B-89.2,J-S2 (2ND FLOOR); ENGINEER OF COL LINE E-97.5,B.8-9S,B-S9.2,L.9-S5,J-S5, RECORD H.2-S4,H -84,J-68,N -67 ,HA-66.5,HA-67 .5, N-66.2,P-66,S.I-66 (3RD FLOOR) VERTICAL #6 REINFORCING BARS NOT PRESENT WITHIN P-I LOCATION @ COL REQUIRES API)ROV AL LINE L.5-66 (31w FLOOR), 1 #5 BAR I 040 OS-08-05 PLACED INTO 4111 FLOOR SLAB (WITHIN OF ENGINEER OF EAST HALF OF P-I LOCATION) AS RECORD EXTENSION/SPLICE FOR LEVEL ABOVE HORIZONTAL REINFORCING BARS NOT REMEDIATE PER 041 OS-OS-OS PRESENT WITHIN SILL AREA OF CMU DIRF:CTION OF OPENING @ COL LINE HA-67 (2ND FLOOR) ENGINEER OF AND HA-40 (3RD FLOOR) RECORD CONCRETE NOT YET PLACED WITHIN SILL AREAS (CMU) @ COL LINE HA-67, REQUIRES APPROVAL 042 08-08-05 N.5-66 (3RD FLOOR), N.1-66 (4TH FLOOR), AS OF ENGINEER OF WELL AS ALL AIR HANDLER OPENING UECORD AREAS ""- IMPROI'EU GUOUT MIX REQUIRES APPROVAL 043 08-11-05 (1289966 -- 4000 ACGUT) OF ENGINEEU OF PLACED WITHIN eMU DOWN CELLS @ UECORD COL LINE C-8 TO 13.7 (4TH FLOOR) #5x5' STRAIGHT BAR ADDITIONAL REINFORCING BARS NOT PLACED @ 24" OC PLACED WITHIN ROOF SLAB REQUIRES APPROVAL WITHIN AREA A I 044 I 08-16-05 (AREA A OR AREA C) OF ENGINEER OF ONLY (AS PER 08-17-05 RECOUD CONVERSATION I AS PER SHEET S251, S252 - NOTE 14 WITH ENGINEER OF I I I I i RECORD) ~ 8 ... ~ II . " tt:.~.,: REPORT OF NON-COMPLIANCE (PUNCHLIST) ITEMS PROJECT NAME: RESIDENCE INN PROJECT NO.: 761-50044 CLIENT: 'VELBRO CONSTRUCTION DESCRIPTION OF WORK: SPECIAL INSPECTIONS TECHNICIAN: STEVE CORRIGAN, MATT ODOM DATE OF REPORT: 08-17-05 I IT~ DATE C I ACTION REQUIRED J REINSPECTION I REI~~~~TED I NO. INSPECTED DESCRIPTION OF DEFICIENCY ----~-_.."_._- CMU DOWN CELLS FOUND TO NOT BE REMEDlATE PER COMPLETELY FILLED WITH GROUT 045 08-16-05 WITHIN AREA C: DlRE:CTION OF COL LINE F-96.6, H.9-82, H.7-75, M.7-73, L.5- ENGINEER OF 66, N-66 (4TH FLOOR) RECORD , ---------- ~ 9 ftl!.!A.1 11!.~. .,: Build On Engineering 0> Consulting 0> Testing August24,2005 Mr. Todd Morley - Chief Bldg. Official City of Cape Canaveral Building Department 105 Polk Avenue Cape Canaveral, Florida 32920 Re: Summary of Special (Threshold) Inspection Services Residence Inn - Cape Canaveral, Florida PSI Project No. 761-50044, Report #4 and #5, (Progress Report # 2) Dear Mr. Morley: Professional Service Industries, Inc (PSI) is performing special inspection services for the Residence Inn project located in Cape Canaveral, Florida. This report is intended to summarize the status of our inspection services performed between June 3, 2005 and July 28, 2005. As construction has progressed within the structure PSI representatives have performed a series of inspections in accordance with the project's Special Inspection Plan. These services through the above referenced dates have included Section A wall (15\ 2nd and 3rd floors), Section C wall (2nd and 3rd floors), Section A columns (1st and 2nd floor), Section C columns (15\ 2nd and 3rd floors), Section A slab (2nd and 3rd floors) and Section C slab (3rd and 4th floors). As deficiencies are discovered within the course of our inspections and observations, the contractor will be immediately notified so that corrective action may be performed. Any deficiencies not immediately corrected are entered into a running "punch-list" of non-conforming items. A current punch-list is attached for your review. PSI will maintain and update this punch-list as deficiencies are discovered, corrective actions are taken and re-inspections are performed. As of this date, forty-five (45) items need to be addressed. We trust that this summary of our services during this time period is complete and sufficient for your needs. If you have any questions, please do not hesitate to call. Respectfully submitted, PROFESSIONAL SERVICE INDUSTRIES, INC. /::;? pi? ~ J:;? 7:/ ;/ K...-/ ~. v....-/~. o 5"'- c:> '.2. c...":' Rod Fruland, P.E. Senior Engineer Constn:ction Services Florida Registration #27667 Special Inspector Reg. #85 Attacnments: Inspection reports Punch-list Xc: A 1 A Acquisition Group, Roger Dobson WELBRO Building Corp, Chris Cortellini R L. Plowfield & Associates, Chris Scroggins Powell Design Group, Ron Brown BB & T, Ron Barley Professional Service Industries, Inc.. 1748 33rd Street. Orlando, FL 32839. Phone 407/304-5560. Fax 407/304-5561 FL Engineering Business 3684 Build On Engineering.. Consulting.. Testing REPORT OF REINFORCED CONCRETE INSPECTION TESTED FOR: A1A Acquisition Group, lTD., llP PROJECT: Residence Inn - Cape Canaveral, Fl 3425 Atlantic Avenue REPORT NO: 5 Cocoa Beach, Fl32931 PROJECT NO: 761-50044 Attn: Roger Dobson DATE: 7/1/2005 TECHNICIAN: M Odom REINFORCING STEEL PLACEMENT STRUCTURAL ELEMENT ELEVATION: 2nd floor Foundation PLAN lOCATION: Section "A" CMU walls (including pilasters). column line A - P & 1 - 14 X Wall Column Floor Slab Stair Other CRITERIA UTILIZED AS INSPECTION REFERENCE: Structural Plans: Sheet(s): S-101, S-212 Detail(s) RFI: structural drawings S-223, S-30 1 nla, 1,3,5 RFI: Dated: 3/23/05 S-302 RFI: CONDITIONS I CONSTRUCTIONS OBSERVED: No exceptions Deficiencies X Proper sizing X X Proper grade of bars X X Proper quantity, spacing, & layout X X Proper splice lengths & splice locations X X Proper chairing and concrete cover X X Proper securement of reinforcing X Proper layout of post tensioning cables Proper drape of post tensioning tendons Proper sheathing and anchor reinforcing Concrete strength verified Concrete consolidated during placement Other: DEFICIENCIES: Many CMU vertical reinforcing steel bars exhibit insufficient splice length (18 - 30" in-place; 30" minimum required). #4-4" bars placed @ bottom of cell where splice noted as less than 26". Several P-1 vertical reinforcing steel bars exhibit insufficient splice length (33 - 35" in-place: 36" minimum required). Full-length #5 bars placed within cells where splice noted as less than 35" REINSPECTION REQUIRED: REMARKS: NOTES Contractor is responsible for scheduling any necessary re1nspection after ".,pledial work is performed. Tests may not be reproduced, exceplln full, without written penmission from Profes,.unal Service Industres, Inc. ----,~--~,-"-- -,---"~-,-,--"'-""'~ ~.9.elof14 -""~'" ~ - ~~ ~ Professional Service Industries, Inc.. 1748 33rd Street. Orlando, Fl32839 . Phone 407/304-5560 . Fax 407/304-5561 FL Engineering Business 3684 Build On Engineering. Consulting. Testing REPORT OF REINFORCED CONCRETE INSPECTION TESTED FOR: A 1A Acquisition Group. LTD., LLP PROJECT: Residence Inn - Cape Canaveral, FL 3425 Atlantic Avenue REPORT NO: 5 Cocoa Beach, FL 32931 PROJECT NO: 761-50044 Attn: Roger Dobson DATE: 7/6/2005 TECHNICIAN: M. Odom REINFORCING STEEL PLACEMENT STRUCTURAL ELEMENT ELEV A TION: 2nd floor Foundation PLAN LOCATION: Section "C", Columns line S.1-68, S.2-70. S.2-75, S 1-77, S2-79, S2-84, S.1-86, U.1-94, U-96 Wall X Column Floor Slab Stair Other CRITERIA UTILIZED AS INSPECTION REFERENCE: Structural Plans: Sheet(s): S-101 Detail(s): RFI: structural drawings S-212 2 RFI: Dated: 3/23/05 S-223 RFI: CONDITIONS / CONSTRUCTIONS OBSERVED: No exceptions Deficiencies X Proper sizing X X Proper grade of bars X X Proper quantity, spacing, & layout X X Proper splice lengths & splice locations X X Proper chairing and concrete cover X X Proper securement of reinforcing X Proper layout of post tensioning cables Proper drape of post tensioning tendons Proper sheathing and anchor reinforcing Concrete strength verified Concrete consolidated during placement Other: DEFICIENCIES: Approximately 112" clear cover to bottom two bands, approximate 1" clear cover to third band and sufficient clear cover noted to remainder of bands (E side) within column S2-84. REINSPECTION REQUIRED: Yes REMARKS: Remainder of above-referenced columns were field-adjusted to allow substantial accordance with the project specification for clear cover (1.5") NOTES: Contractor IS responsible for scheduling any necessary reinspection after re,medial work IS performed. Tests may not be reproduced, except in full. without written permission from Professional Ser,'ce Industries, Inc. ________~_____ __ _____~~__ _____~__p_iIg_e..1Jl..f.1..:l~ Professional Service Industries, Inc.. 1748 33rd Street. Orlando. FL 32839. Phone 407/304-5560. Fax :;;;7/304-5~~;- ~ ~ ~-,~,~ FL Engineering Business 3684 Build On Engineering" Consulting.. Testing REPORT OF REINFORCED CONCRETE INSPECTION TESTED FOR: A 1 A Acquisition Group, LTD., LLP PROJECT: Residence Inn - Cape Canaveral, FL 3425 Atlantic Avenue REPORT NO: 5 Cocoa Beach, FL 32931 PROJECT NO: 761-50044 Attn Roger Dobson DATE: 71712005 TECHNICIAN: M. Odom REINFORCING STEEL PLACEMENT STRUCTURAL ELEMENT ELEVATION: 2nd floor Foundation PLAN LOCATION Section "A", CMU walls (including pilasters), column line Q - V & 1 - 16 and H.3 - T & 17 - 41 X Wall Column Floor Slab Stair Other CRITERIA UTILIZED AS INSPECTION REFERENCE: Structural Plans: Sheet(s): S-101, S-212 Detail(s): RFI: structural drawings S-223, S-301 n/a.3 RFI: Dated: 3/23/05 S-302 1,3,5 RFI: CONDITIONS 1 CONSTRUCTIONS OBSERVED: X Proper sizing X X Proper grade of bars X X Proper quantity, spacing, & layout X X Proper splice lengths & splice locations X X Proper chairing and concrete cover X X Proper securement of reinforcing X Proper layout of post tensioning cables Proper drape of post tensioning tendons Proper sheathing and anchor reinforcing Concrete strength verified Concrete consolidated during placement Other DEFICIENCIES: Many CMU vertical reinforcing steel bars exhibit insufficient splice length (26 to 30" in-place: minimum 30" required) No additional bars were added (no splice found to be less than 26"). Some P-1 vertical reinforcing steel bars exhibit Insufficient splice length (33 to 36" in-place: minimum 36" required). Full-length #5 bars placed within cells where splice noted as less than 35". Additionally three (3) cells were not filled due to insufficient grout quantity (approximately column line L-41 ). REINSPECTION REQUIRED: Yes REMARKS: NOTES: Contractor is responsible for SCheduling any necessary reinspectlon afoer remedial work is performed Test,; may not be reproduced, except In full, without written permission from Professional Service Industries. Inc ~________~.~.__.._.._..___..__~.~__......__~.._................_......._~e 3 of 1~_ ......_ ___ ....___.____ Professional Service Industries, Inc.' 1748 33rd Street. Orlando, FL 32839 . Phone 407/304-5560' Fax 407/304-5561 FL Engineering Business 3684 Build On Engineering OJ Consulting OJ Testing REPORT OF REINFORCED CONCRETE INSPECTION TESTED FOR: A 1 A AcqUisition Group. LTD.. LLP PROJECT: Residence Inn - Cape Canaveral. FL 3425 Atlantic Avenue REPORT NO: 5 Cocoa Beach. FL 32931 PROJECT NO: 761-50044 Attn: Roger Dobson DATE: 7/11/2005 TECHNICIAN: M. Odom REINFORCING STEEL PLACEMENT STRUCTURAL ELEMENT ELEVATION: 3rd floor Foundation PLAN LOCATION: Section "C" floor slab Wall Column X Floor Slab Stair Other CRITERIA UTILIZED AS INSPECTION REFERENCE: Structural Plans: Sheet(s): S-101. S-233 Detail(s): RFI: structural drawings S-30 1 1,2 RFI: Dated: 3/23/05 S-302. S-303 9. 10: 4. 5. 6. 7. 8. 9 10. 12 RFI: CONDITIONS I CONSTRUCTIONS OBSERVED: No exceptions Deficiencies X Proper sizing X X Proper gnade of bars X X Proper quantity. spacing. & layout X X Proper splice lengths & splice locations X X Proper chairing and concrete cover X X Proper securement of reinforcing X Proper layout of post tensioning cables Proper drape of post tensioning tendons Proper sheathing and anchor reinforcing Concrete strength verified Concrete consolidated during placement Other: DEFICIENCIES: 3'8" candy cane bars (MK412) placed @ approx. 18" OC into beam areas @ column line L3 & 66 - 68. A - B & 93. N & 85 - 86, and two side of elevator (R & 86 - 89 and Q - R & 89). KO-1 reinforcing steel not present at line A - C & 89. C & 88 - 89 and U & 96.2 - 99 (3rd floor slab elev.) Additional "A" bars not present within floor slab at line N - Q & 96. Bands placed at 6" OC typical within CB-2 beams at line S.2 & 68 - 70. U.1 & 94 - 962, rather than as per S-301. detail 2. REINSPECTION REQUIRED: REMARKS: NOTES: Contractor is responsible for schedullOg any necessary reinspection after remedial work is performed. Tests may not be reproduced. except in full, without wntten permission from ProfeSSional Ser "ce Industries, Inc 4 of 14 Professional Service Industries. Inc.' 1748 33rd Street. Orlando. FL 32839' Phone 407/304-5560' Fax 407/304-5561 FL Engineering Business 3684 Build On Engineering" Consulting.. Testing REPORT OF REINFORCED CONCRETE INSPECTION TESTED FOR: A 1 A Acquisition Group, L TD. LLP PROJECT: Residence Inn - Cape Canaveral. FL 3425 Atlantic Avenue REPORT NO: 5 Cocoa Beach, FL 32931 PROJECT NO: 761-50044 A/tn: Roger Dobson REINFORCING STEEL PLACEMENT STRUCTURAL ELEMENT Foundation PLAN LOCATION Section "A", Columns, line U-7. U 1-9, S.1-16, S.2-19, S.2-24, S.1-26, S.2-28, S.2-33, S.1-35, S.2-37 Wall X Column Floor Slab Stair Other CRITERIA UTILIZED AS INSPECTION REFERENCE: Structural Plans: Sheet(s): S-101 Detail(s): RFI: structural drawings S-212 2 RFI: Dated: 3/23/05 S-221 RFI: CONDITIONS / CONSTRUCTIONS OBSERVED: No exceptions Deficiencies X Proper sizing X X Proper grade of bars X X Proper quantity, spacing, & layout X X Proper splice lengths & splice locations X X Proper chairing and concrete cover X X Proper securement of reinforcing X Proper layout of post tensioning cables Proper drape of post tensioning tendons Proper sheathing and anchor reinforcing Concrete strength verified Concrete consolidated during placement Other: DEFICIENCIES: REINSPECTION REQUIRED: REMARKS: Column S.2-19 offset approximately 2" south of plan location (1 st and 2nd fj()Or). NOTES: Contractor is responSible for scheduling any necessary reinspectlun 3fter remedial work is performed. Tests may not be reproduced. except In full, without written permiSSion frum Professional Service Industries, Inc ~-~,--,-"'~"'~- --------"'~""-,,-,-- _._.~,- Page 5 _o~~____ .. .__________ ___~______ ~-,,-,---,----- Professional Service Industries. Inc.. 1748 33rd Street. Orlando. FL 32839 . Phone 407/304-5560. Fax 407/304.5561 FL Engineering Business 3684 Build On Engineering.. Consulting.. Testing REPORT OF REINFORCED CONCRETE INSPECTION TESTED FOR: A 1A AcquIsition Group, LTD., LLP PROJECT: Residence Inn - Cape Canaveral. FL 3425 Atlantic Avenue REPORT NO: 5 Cocoa Beach, FL 32931 PROJECT NO: 761-50044 Attn Roger Dobson REINFORCING STEEL PLACEMENT STRUCTURAL ELEMENT ELEVATION 3rd floor Foundation PLAN LOCATION: Section "A", CMU walls (including pilasters) line A - J & 88 - 99 X Wall Column Floor Slab Stair Other CRITERIA UTILIZED AS INSPECTION REFERENCE: Structural Plans: Sheet(s): S-101, S-212 Detail(s) RFI: structural drawings S-233, S-301 nla, 3 RFI: Dated: 3/23/05 S-302 1,3,5 RFI: CONDITIONS I CONSTRUCTIONS OBSERVED: No exceptions Deficiencies X Proper sizing X X Proper grade of bars X X Proper quantity, spacing, & layout X X Proper splice lengths & splice locations X X Proper chairing and concrete cover X X Proper securement of reinforcing X Proper layout of post tensioning cables Proper drape of post tensioning tendons Proper sheathing and anchor reinforcing Concrete strength verified Concrete consolidated during placement Other: DEFICIENCIES: REINSPECTION REQUIRED: REMARKS: NOTES Contractor is responsible for scheduling any necessary reinspection after remedial work is performed. Tests may not be reproduced, except in full. without written permission from Professional Service Industries. Inc. 14 Professional Service Industries, Inc.. 1748 33rd Street. Orlando, FL 32839. Phone 407/304-5560. Fax 407/304-5561 FL Engineering Business 3684 Build On Engineering .. Consulting" Testing REPORT OF REINFORCED CONCRETE INSPECTION TESTED FOR: A1A AcquiSilion Group LTD., LLP PROJECT: Residence Inn - Cape Canaveral, FL 3425 Atlanlic Avenue REPORT NO: 5 Cocoa Beach. FL 32931 PROJECT NO: 761-50044 Attn: Roger Dobson DATE: 7/19/2005 TECHNICIAN: M. Odom REINFORCING STEEL PLACEMENT STRUCTURAL ELEMENT ELEVATION: 3rd floor Foundation PLAN LOCATION: Section "C". Columns: S.1-68, S.2-70, S.2-75, S 1-77. S 2-79, S.2-84, S.1-86. U.1-94, U-96 Wall X Column Slab Stair Other CRITERIA UTILIZED AS INSPECTION REFERENCE: Structural Plans: Sheet(s): S-101 Detail(s): RFI: structural drawinqs S-212 2 RFI: Dated: 3/23/05 S-233 RFI: CONDITIONS / CONSTRUCTIONS OBSERVED: X Proper sizing X X Proper grade of bars X X Proper quantity, spacing, & layout X X Proper splice lengths & splice locations X X Proper chairing and concrete cover X X Proper securement of reinforcing X Proper layout of post tensioning cables Proper drape of post tensioning tendons Proper sheathing and anchor reinforcing Concrete strength venfled Concrete consolidated during placement Other: DEFICIENCIES: REINSPECT10N REQUIRED: REMARKS: NOTES: Contractor responsible for scheduling any necessary reinspection after remedial work oerformed Tests may not be r,'r' '1uced, except in full, without 'Mitten permission from Professional Ser/ice Industries, Inc, -~,---"-~----~-"-"""""-,~--,- Pa"g.e 7 of 14 _"""m_"_'_'''~'''''~,_.__,_,~",,_ """""""" m....._.___,_,___ "_"",,,,_ _,_,_,___ Professional Service Industries, Inc. . 1748 33rd Street. Orlando, FL 32839 . Phone 407/304-5560 . Fax 407/304-5561 FL Engineering Business 3684 Build On · Consulting. Testing REPORT OF REINFORCED CONCRETE INSPECTION TESTED FOR: A lA Acquisition Group, LTD., LLP PROJECT: Residence Inn - Cape Canaveral FL 3425 Atlantic Avenue REPORT NO: 5 Cocoa Beach, FL 32931 PROJECT NO: 761-50044 Attn: Roger Dobson DATE: 7/20/2005 TECHNICIAN: M. Odom REINFORCING STEEL PLACEMENT STRUCTURAL ELEMENT ELEVATION 3rd floor Foundation PLAN LOCA TION' Section "A" floor slab Wall Column X Floor Slab 5tair Other CRITERIA UTILIZED A5 INSPECTION REFERENCE: Structural Plans: 5heet(s): 5-101,5-231 Detail(s): RFI: structural drawings 5-301 1,2 RFI: Dated: 3/23/05 5-302, 5-303 9,10; 4,5,6, 7,8,9,10,12 RFI: CONDITIONS / CONSTRUCTIONS OBSERVED: No exceptions Deficiencies X Proper sizing X X Proper grade of bars X X Proper quantity, spacing, & layout X X Proper splice lengths & splice locations X X Proper chairing and concrete cover X X Proper securement of reinforcing X Proper layout of post tensioning cables Proper drape of post tensioning tendons Proper sheathing and anchor reinforcing Concrete strength verified Concrete consolidated during placement Other: DEFICIENCIES: REINSPECTION REQUIRED: REMARKS: Standard hook reinforcing bars have not been detailed in shop drawings within slab edge at two sides of elevator ar'Oa. as well as CB-1, CB-3 and CB-4 (partial) beam locations Candy cane bars (3'8" - MK412) were installed 10 these locations at 18" OC p'O' insp'Octors request. Balcony slab was constructed within line 52 - T & 33 - 37 as per 5-241 (not detailed within structural drawings in this location unit! 4th floor). NOTES: Contractor is responsible for scheduling any necessary reinspection after remedial work is performej Tests may not be reproduced, except full, without written permission from Professional Service Industries ---,-,~""""-,-~~---"'--~--"- ~!L!j_'2LH~__. ...._~_~.. ... ._.__..__.____ ______._____ Professional Service Industries, Inc. . 1748 33rd Street. Orlando, FL 32839 . Phone 407/304-5560. Fax 407/304-5561 FL Engineering Business 3684 Build On Engineering" Consulting" Testing REPORT OF REINFORCED CONCRETE INSPECTION TESTED FOR: A1A Acquisition Group, LTD., LLP PROJECT: Residence Inn - Cape Canaveral, FL 3425 Atlantic Avenue REPORT NO: 5 Cocoa Beach, FL 32931 PROJECT NO: 761-50044 Attn: Roger Dobson DATE: 7/21/2005 TECHNICIAN: M. Odom REINFORCING STEEL PLACEMENT STRUCTURAL ELEMENT ELEVATION: 3rd floor Foundation PLAN LOCATION: Section "C" CMU walls (including pilasters). line L - V & 86 - 99, G.8 - N & 84 - 86 X Wall Column Floor Siab Stair Other CRITERIA UTILIZED AS INSPECTION REFERENCE: Structural Plans: Sheet(s): 5-101, S-212 Detail(s): RFI: structural drawings 5-233,5-301 nla, 3 RFI: Dated: 3/23/05 5-302 1.3,5 RFI: CONDITIONS 1 CONSTRUCTIONS OBSERVED: No exceptions Deficiencies X Proper sizing X X Proper grade of bars X X Proper quantity, spacing, & layout X X Proper splice lengths & splice locations X X Proper chairing and concrete cover X X Proper securement of reinforcing X Proper layout of post tensioning cables Proper drape of post tensioning tendons Proper sheathing and anchor reinforcing Concrete strength verified Concrete consolidated during placement Other: DEFICIENCIES: REINSPECTION REQUIRED: REMARKS: #6 and full-length #5 bars placed within P-1 pilaster location at N.3-89 (#5 bars extended upward from previous level) NOTES. Contractor is responsible for scheduling any necessary reinspeCtlon after remedial w-:;rk is performed. Tests may not be reproduced, except in full, without wfltten permission from Professional Ser".ce Industries, Inc --~--,",--~,---,~,---~~-~,--,-,-,-",-",~ ...__.__.~ilge 9 of 14 --~"''''-,-''''''''-,- "'''''''''.'''''--.'''.'''''''''.-.'''.- '" _._._-,----,-,~,-,_...,,-,,-"'-,-''''''''' Professional Service Industries. Inc.. 1748 33rd Street. Orlando, FL 32839 . Phone 407/304-5560. Fax 407/304-5561 FL Engineering Business 3684 Build On Engineering" Consulting" Testing REPORT OF REINFORCED CONCRETE INSPECTION TESTED FOR: A 1A Acquisition Group, L TO, LLP PROJECT: Residence Inn - Cape Canaveral, FL 3425 Atlantic Avenue REPORT NO: 5 Cocoa Beach, FL 32931 PROJECT NO: 761-50044 Attn: Roger Dobson DATE: 7/22/2005 TECHNICIAN: M. Odom REINFORCING STEEL PLACEMENT STRUCTURAL ELEMENT ELEVATION 3rd floor Foundation PLAN LOCATION: Section "cn, CMU walls (Including pilasters), line G.8 - T & 70 - 82 X Wall Column Floor Slab Stair Other CRITERIA UTILIZED AS INSPECTION REFERENCE: Structural Plans: Sheet(s): S-101, S-212 Detail(s): RFI: structural drawings S-233, S-301 nla, 3 RFI: Dated 3/23/05 S-302 1,3,5 RFI: CONDITIONS 1 CONSTRUCTIONS OBSERVED: No exceptions Deficiencies X Proper sizing X X Proper grade of bars X X Proper quantity, spacing, & layout X X Proper splice lengths & splice locations X X Proper chairing and concrete cover X X Proper securement of reinforcing X Proper layout of post tensioning cables Proper drape of post tensioning tendons Proper sheathing and anchor reinforcing Concrete strength verified Concrete consolidated during placement Other: DEFICIENCIES: REINSPECTION REQUIRED: REMARKS: Masonry contractor should be reminded to center reinforcing steel within cells following placement and consolidation of grout. NOTES: Contractor is responsible for scheduling any necessary"," spection after remedial work IS periormed. Tests may not be reproduced. except in full, without written perm:s,.."n from Professional Service IniJustnes, Inc. ___~___ .__._____...._._..._....._........~__.._................~.~.....1001 : 4 ~~""""~,,-"'-,,~''''''~'''-,,~'''-,-'''''''-,~,-,,_..,_..._,------,- ---,---_.- Professional Service Industries, Inc.' 1748 33rd Street. Orlando, FL 32839' Phone 407/304-5560' Fax 407/304.5561 FL Engineering Business 3684 Build On Engineering" Consulting" Testing REPORT OF REINFORCED CONCRETE INSPECTION TESTED FOR: A 1 A Acquisition Group, LTD.. LLP PROJECT: Residence Inn - Cape Canaveral, FL 3425 Atlantic Avenue REPORT NO: 5 Cocoa Beach, FL 32931 PROJECT NO: 761-50044 Attn: Roger Dobson DATE: 7/27/2005 TECHNICIAN: M. Odom REINFORCING STEEL PLACEMENT STRUCTURAL ELEMENT ELEVATION: 3rd floor Foundation PLAN LOCATION: Section "A", CMU walls (including pilasters), line A - G & 1 - 14 X Wall Column Floor Slab Stair Other CRITERIA UTILIZED AS INSPECTION REFERENCE: Structural Plans: Sheet(s): S-101, S-212 Detail(s): RFI structural drawings S-231, S-301 n/a, 3 RFI Dated: 3/23/05 S-302 1,3,5 RFI CONDITIONS I CONSTRUCTIONS OBSERVED: No exceptions Deficiencies X Proper sizing X X Proper grade of bars X X Proper quantity, spacing, & layout X X Proper splice lengths & splice locations X X Proper chairing and concrete cover X X Proper securement of reinforcing X Proper layout of post tensioning cables Proper drape of post tensioning tendons Proper sheathing and anchor reinforcing Concrete strength verified Concrete consolidated during placement Other: DEFICIENCIES: REINSPECTION REQUIRED: REMARKS: NOTES: Contractor is responsible for sche(juling any necessary relnspection after remedial work is performed. Tests may not be reproduced. except In full. without written permiSSion from Professional Service Industries, Inc. ~"'~ "___'_"""~~_____~_~,__""_~_____~__,~,~""""'_"_ ~Y~.M.1.1 of 14 "mw_,^,_... ~"_w,,w'm_'_'_~,~..,_ ~'m"" ".m.." """ """ """"''''''._." Professional Service Industries, Inc. . 1748 33rd Street. Orlando, FL 32839 . Phone 407/304-5560 . Fax 407/304-5561 FL Engineering Business 3684 Build On .. Consulting .. Testing REPORT OF REINFORCED CONCRETE INSPECTION TESTED FOR: A 1 A Acquisition Group L TO" LLP PROJECT: Residence Inn - Cape Canaveral, FL 3425 Atlantic Avenue REPORT NO: 5 Cocoa Beach. FL 32931 PROJECT NO: 761-50044 Attn Roger Dobson REINFORCING STEEL PLACEMENT STRUCTURAL ELEMENT ELEVATION: 4th floor Foundation PLAN LOCATION: Section "C" floor slab Wall Column v Floor Slab ^ -, Stair Other CRITERiA UTiliZED AS iNSPECTION REFERENCE: Structural Plans: Sheet(s): S-101, S-242 Detail(s): RFI: structural drawings S-301 1,2 RFI: Dated: 3/23/05 S-302, S-303 9, 10; 4, 5, 6, 7, 8, 9, 10, 12 RFI: CONDITIONS / CONSTRUCTIONS OBSERVED: No exceptions Deficiencies X Proper sizing X X Proper grade of bars X X Proper quantity, spacing, & layout X X Proper splice lengths & splice locations X X Proper chairing and concrete cover X X Proper securement of reinforcing X Proper layout of post tensioning cables Proper drape of post tensioning tendons Proper sheathing and anchor reinforcing Concrete strength venfled Concrete consolidated during placement Other: DEFICIENCIES: Bottom reinfocing steel placed at 12" OC in-place within line R" U & 90 - 96 and R - U & 96 - 98 (detailed at 10" OC in these areas), Bottom reinforcing steel placed at 10" OC In-place within line M - Q & 82 - 86 (detailed at 9" OC in this area), Three bands at 3" OC not placed at N. end of CB-6 beam (line N-85); seven bands at 6" OC and mid-beam bands at 12" OC in-place (bands at S, end of beam placed as detailed), REINSPECTION REQUIRED: Yes REMARKS: NOTES: Contractor responsible for scheduling any necessary reinspection after remedial work IS performed. Tests may not ()e re:cclduced, except in full, without wntten permission from Professional Serllce Industries, Inc Professional Service Industries, Inc,' 1748 33rd Street- Orlando, FL 32839 - Phone 407/304-5560 - Fax 407/304-5561 FL Engineenng BUSiness 3684 Build On " Consulting.. Testing REPORT OF REINFORCED CONCRETE INSPECTION TESTED FOR: A 1A Acquisition Group, L TO" LLP PROJECT Residence Inn - Cape Canaveral, FL 3425 Atlantic Avenue REPORT NO 5 Cocoa Beach, FL 32931 PROJECT NO 761-50044 Attn: Roger Dobson REINFORCING STEEL PLACEMENT STRUCTURAL ELEMENT Foundation PLAN LOCATION Section "A", CMU walls (includinCj pilasters) column line H to P & 1 - 135 and Q - V & 1 - 13 X Wall Column Floor Slab Stair Other CRITERIA UTILIZED AS INSPECTION REFERENCE: Structural Plans: Sheet(s): S-101, S-212 Detail(s): RFI: structural drawinqs S-231. S-301 nla, 3 RFI Dated 3/23/05 S-302 1,3,5 RFI: CONDITIONS I CONSTRUCTIONS OBSERVED: No exceptions Deficiencies X Proper sizing X X Proper grade of bars X X Proper quantity, spacing, & layout X X Proper splice lengths & splice locations X X Proper chairing and concrete cover X X Proper securement of reinforcing X Proper layout of post tensioning cables Proper drape of post tensioning tendons Proper sheathing and anchor reinforcing Concrete strength verified Concrete consolidated during placement Other: DEFICIENCIES: Two #5 bars placed instead of one #6 bar within each cell of P-110cations @ line R6 & 7, Q,1 & 8, N,3 & 13,5 (bars only extend to allow approximately 30" splice for upper elevations), REINSPECTION REQUIRED: REMARKS: - NOTES: Contractor is responsible for SCheduling any necessary reinspect!on after remedial work IS performed Tests may not be reproduced, except !n full, without written permission from Professional Service Industries, Inc Professional Service Industnes, Inc,. 1748 33rd Street. Orlando, FL 32839. Phone 407/304-5560' Fax 407/304-5561 FL Engineering BUSiness 3684 Build On " Consulting.. Testing REPORT OF REINFORCED CONCRETE INSPECTION TESTED FOR: A 1 A Acquisition Group, L TO, LLP PROJECT: ReSidence Inn - Cape Canaveral, FL 3425 Atlantic Avenue REPORT NO: 5 Cocoa Beach, FL 32931 PROJECT NO: 761-50044 Attn Roger Dobson DATE: M REINFORCING STEEL PLACEMENT STRUCTURAL ELEMENT Foundation PLAN LOCATION: Section "A", Columns: U-7, U.1-9, S 1-16, S.2-19, S2-24, S.1-26, S.2-28, S2-33. S 1-35, S.2-37 Wall X Column Floor Slab Stair Other CRITERIA UTILIZED AS INSPECTION REFERENCE: Structural Plans: Sheet(s): S-101 Detail(s): RFI: structural drawings S-212 2 RFI: Dated: 3/23105 S-231 RFI: CONDITIONS / CONSTRUCTIONS OBSERVED: No exceptions Deficiencies X Proper sizing X X Proper grade of bars X X Proper quantity, spacing, & layout X X Proper splice lengths & splice locations X X Proper chairing and concrete cover X X Proper securement of reinforcing X Proper layout of post tensioning cables Proper drape of post tensioning tendons Proper sheathing and anchor reinforcing Concrete strength verified Concrete consolidated during placement Other: DEFICIENCIES: REINSPECTION REQUIRED: REMARKS: NOTES Contractor is responsible for Scheduling any necessary re!nspection alter remedial work IS performed. Tests may not be reproduced, except In lull. without written permiSSion from Prolesslonal Service Industries, Inc. Professional Service Industries, Ine. 1748 33rd Street. Orlando, FL 32839' Phone 407/304-5560 Fax 407/304-5561 FL Engineering Business 3684 Engineering. Consulting. Testing REPORT OF REINFORCED CONCRETE INSPECTION TESTED FOR: A1AAcquisition Group, LTD. LLP PROJECT: Residence Inn - Cape Canaveral. FL 3425 Atlantic Avenue REPORT NO: 4 Cocoa Beach, FL 32931 PROJECT NO: 761-50044 Attn: Roger Dobson DATE: 6/3/2005 TECHNICIAN: S. Corrigan REINFORCING STEEL PLACEMENT STRUCTURAL ELEMENT ELEVATION 9'4" Foundation PLAN LOCATION: 1st floor walls - section "C", lines E, L - V, 85 - 99 X Wall Section "A" floor slab Column X Floor Slab Stair Other CRITERIA UTILIZED AS INSPECTION REFERENCE: Structural Plans: Sheet(s) 5213 Detail(s): RFI: PDG S302, 5301 1 - 11, 2. 3 RFI: Dated: 3-23-05 S212 RFI: CONDITIONS / CONSTRUCTIONS OBSERVED: No exceptions Deficiencies X Proper sizing X X Proper grade of bars X X Proper quantity, spacing, & layout X ='"..~~." X Proper splice lengths & splice locations X X Proper chairing and concrete cover X X Proper securement of reinforcing X Proper layout of post tensioning cables Proper drape of post tensioning tendons Proper sheathing and anchor reinforcing X Concrete strength verified X X Concrete consolidated during placement X X Other: wire mesh - floor slab X DEFICIENCIES: REINSPECTION REQUIRED: No REMARKS: Line E vertical bars previously missing on 5/27/05 have been placed NOTES: Contractor is responsible for scheduling any necessary relnspection after remedial work is p"riUfin.,d Tests may not be reproduced. except in full, without written permission from Professional Service IndlJSlfib Inc ~~~-"'-~--~~-----,-"-"~--,---,~-,._"--,--"--~-,- .e.<lile 1 of 9~__ .. _~_______ .... ..-.. -. .-.--------,---,--.-"'-.-. ,.... Professional Service Industries. Inc.' 1748 33rd Street. Orlando, FL 32839 . Phone 407/304-5560' Fax 407/304-5561 FL Engineering Business 3684 Build On /Engineering · Consulting. Testing REPORT OF REINFORCED CONCRETE INSPECTION TESTED FOR: A 1 A Acquisition Group, LTD., LLP PROJECT: Residence Inn - Cape Canaveral. FL 3425 Atlantic Avenue REPORT NO: 4 Cocoa Beach, FL 32931 PROJECT NO: 761-50044 Altn: Roger Dobson REINFORCING STEEL PLACEMENT STRUCTURAL ELEMENT ELEVATION: 9' 4" Foundation PLAN LOCATION 1 st floor walls, Section "C", lines 66 - 85, F - V X Wall Column Floor Slab Stair Other CRITERIA UTILIZED AS INSPECTION REFERENCE: Structural Plans: Sheet(s): 5213 Detail(s): RFI: PDG S302, S301 1 - 11, 2 - 3 RFI: Dated: 3/23/05 S212 3 RFI: CONDITIONS / CONSTRUCTIONS OBSERVED: No exceptions Deficiencies X Proper sizing X X Proper grade of bars X X Proper quantity, spacing, & layout X X Proper splice lengths & splice locations X X Proper chairing and concrete cover X X Proper securement of reinforcing X Proper layout of post tensioning cables Proper drape of post tensioning tendons Proper sheathing and anchor reinforcing X Concrete strength verified X X Concrete consolidated during placement X Other: DEFICIENCIES: REINSPECTION REQUIRED: No REMARKS: Section "C" complete to elevation 9' 4". NOTES: Contractor IS responsible for scheduling any necessary relnspectlon after remedial work IS performed Tests may not be reproduced, except ,n full, without written permiSSion from Professional Servic"'C Industnes Ine ~--~-~_._--,_.~~~,_._~____._._..~..._~,_..eaga2.0L9_~_", ^^-^~_._.~"'~ ~"''''-''''''''''''''''---,-,--,-,- Professional Service Industries. Ine.. 1748 33rd Street. Orlando, FL 32839. Phone 407/304-5560. Fax 407/304-5561 FL Engineering Business 3684 .. Consulting" Testing REPORT OF REINFORCED CONCRETE INSPECTiON TESTED FOR: A 1A Acquisition Group, L TO,. LLP PROJECT: Residence Inn - Cape Canaveral, FL 3425 Atlantic Avenue REPORT NO: 4 Cocoa Beach. FL 32931 PROJECT NO: 761-50044 Attn: Roger Dobson STEEL PLACEMENT STRUCTURAL ELEMENT Foundation PLAN LOCATION: Section "A". walls, lines A - U & 1 - 14. L & 1 - 8.25. P & 1 - 7. R & 1 - 7, X Wall Section "C". 1st floor columns. line S,25 @! 68. 70. 75, 77, 79,84 & 86. also line U2 @ 94 and 96 X Column Floor Slab Stair Other CRITERIA UTILIZED AS INSPECTION REFERENCE: Structural Plans: Sheet(s) S211.8213 Detail(s): RFI PDG 2. 3 RFI Dated 3/23/05 RFI CONDITIONS I CONSTRUCTIONS OBSERVED: No exceptions Deficiencies X Proper sizing X X Proper grade of bars X X Proper quantity. spacing. & layout __ X .. X Proper splice lengths & splice locations X X Proper chairing and concrete cover X X Proper securement of reinforcing X Proper layout of post tensioning cables Proper drape of post tensioning tendons Proper sheathing and anchor reinforcing X Concrete strength verified 6/10 X X Concrete consolidated during placement 6/10 X Other: DEFICIENCIES: REINSPECTION REQUIRED: No REMARKS: NOTES Contractor IS responsible for scheduling any neCbSdr, '8inspection after remedial work '5 performed, Tests mdy not be reproduced, except in full, without wrrtt8n P8C'riSSIOn from ProfeSSional Service Inrlustries, Inc, ProfeSSional Service Industries, Inc' 1748 33rd Street. Orlando, FL 32839" Phone 407/304-5560' Fax 407/304-6561 FL Engineerrng BUSiness 3684 Engineering" Consulting" Testing REPORT OF REINFORCED CONCRETE INSPECTION TESTED FOR: A lA Acquisition Group, L TD, LLP PROJECT: Residence Inn. Cape Canaveral, FL 3425 Atlantic Avenue REPORT NO: 4 Cocoa Beach, FL 32931 PROJECT NO: 761.50044 Alln: Roger Dobson DATE: 6/14 & 6/15 TECHNICIAN: S. Corrigan REINFORCING STEEL PLACEMENT STRUCTURAL ELEMENT ELEVATION: 109' 4" Foundation PLAN LOCATION: Section "A", 1st floor walls, lines 1 ,,41 and H - V X Wall Column Floor Slab Stair Other CRITERIA UTILIZED AS INSPECTION REFERENCE: Structural Plans: Sheet(s): S211 Detail(s): RFI: POG S212 3&2 RFI: Dated: 3/23/05 S302, S301 1,2,3" 3 RFI: CONDITIONS / CONSTRUCTIONS OBSERVED: No exceptions Deficiencies X Proper sizing X X Proper grade of bars X X Proper quantity, spacing, & layout X X Proper splice lengths & splice locations X X Proper chairing and concrete cover X X Proper securement of reinforcing X Proper layout of post tensioning cables Proper drape of post tensioning tendons Proper sheathing and anchor reinforcing -- X Concrete strength verified X X Concrete consolidated during placement X Other: DEFICIENCIES: .- REINSPECTION REQUIRED: No REMARKS: -- ~~ ~- NOTES: Contractor is responsible for scheduling any necessary reinspection after remedial work is performed. Tests may not be reproduced, except in full, without written permission from Professional Service Industnes, Inc. _.~--~~_...__.____~.~_..__.._~~_._.___._~_.~__~f 9 ~ -^~,-,. _~'_'^'~'~"_'___'__"m" Professional Service Industries, Inc.. 1748 33rd Street. Orlando, FL 32839 . Phone 407/304-5560. Fax 407/304-5561 FL Engineering Business 3684 On .. Consulting" Testing REPORT OF REINFORCED CONCRETE INSPECTION :DFOR: AlA AcqUlsltlcn Group, L TO., LLP PROJECT: Residence Inn - Cape Canaveral, FL 3425 AtlantlcJ\venue REPORT NO: 4 Cocoa Beach. FL 32931 PROJECT NO: 761-50044 Attn: Roger Dctrson REINFORCING STEEL PLACEMENT ::;TURAL ELEMENT Foundation PLAN LOCATION: Section ..C', 2nd floor slab Wall Column X Floor Slab Stair Other RIA UTILIZED AS INSPECTION REFERENCE: lral Plans: Sheet(s): 5223 Oetail(s): 1 RFI S301, S303 1. all RFI 3/23/05 S304 1,5,6.7.9. 11 RFI OBSERVED: No exceptions Deficiencies X Proper sizing X X Proper grade of bars X X Proper quantity. spacing, & layout X X Proper splice lengths & splice locations X X Proper chairing and concrete cover X X Proper securement of reinforcing X Proper layout of post tensioning cables Proper drape of post tensioning tendons Proper sheathing and anchor reinforcing X Concrete strength verified X X Concrete consolidated during placement X Other: IENCIES: Wrong length hook bars used on perimeter lines A - K & 88 - 99. PECTION REQUIRED: Yes ::tKS: Request for rnforrnation on above deficiency. NOTES: ConU d' 'Dr is responsible for scheduling any necessary reinspection after reme,jlai work is performed. Tests may reproduced, except in full, without 'Mitten permission from Professional Sef'/Ice Industries, Inc. Professional Service Industries. Inc -1748 33rd Street- Orlando. FL 32839. Phone 407/304-5560' 407/304-5561 FL Engineering Business 3684 .. Consulting" Testing REPORT OF REINFORCED CONCRETE INSPECTION TESTED FOR: A 1 A Acquisition Group, LTD., LLP PROJECT: Residence Inn - Cape Canaveral, FL 3425 AtlantiC Avenue REPORT NO: 4 Cocoa Beach, FL 32931 PROJECT NO: 761-50044 Attn Roger Dobson REINFORCING STEEL PLACEMENT STRUCTURAL ELEMENT Foundation PLAN LOCATION: Section "A", 1st floor columns: J7, J9, S.2 @ 16 19.24.26,28,33,35 & 37 Wall X Column Floor Slab Stair Other CRITERIA UTILIZED AS INSPECTION REFERENCE: Structural Plans: Sheet(s): 5211 Detail(s): RFI: PDG S212 2 RFI: Dated: 3/23/05 RFI: CONDITIONS I CONSTRUCTIONS OBSERVED: No exceptions DefiCiencies X Proper sizing X X Proper grade of bars X X Proper quantity, spacing, & layout X X Proper splice lengths & splice locations X X Proper chairing and concrete cover X X Proper securement of reinforcing X Proper layout of post tensioning cables Proper drape of post tensioning tendons Proper sheathing and anchor reinforcing X Concrete strength verified 6/21/05 X X Concrete consolidated during placement 6/21/05 X Other DEFICIENCIES: REINSPECTION REQUIRED: No REMARKS: NOTES' Contractor is responsible for scheduling any necessary reinspection after remedia' 's performed Tests may not be reproduced, except in fuil, without written permission from Professional Sc'rf"le Industries, Inc. ProfeSSional Service Industries, Inc.. 1748 33rd Street. Orlando. FL 32839' Phone 407/304-5560' Fax 407/304-5561 FL Engineering Business 3684 Build On . Consulting" Testing REPORT OF REINFORCED CONCRETE INSPECTION "TESTED FOR A 1 A Acquisition Group, LTD., LLP PROJECT: Residence Inn - Cape Canaveral, FL 3425 AtlantiC Avenue REPORT NO: 4 Cocoa Beach, FL 32931 PROJECT NO: 761-50044 Attn Roger Dobson REINFORCING STEEL PLACEMENT STRUCTURAL ELEMENT ELEVATION: 2nd floor Foundation PLAN LOCATION Section "C", line C - P & 88 - 99, Q - U & 95 - 99 including pilasters X Wall Column Floor Slab Stair Other CRITERIA UTILIZED AS INSPECTION REFERENCE: Structural Plans: Sheet(s): 5-101, $-212, Detail(s): RFI: structural drawings S-223, S-301 n/a, 3 RFI Dated: 3/23/05 S-302 1,3,5 RFI CONDITIONS I CONSTRUCTIONS OBSERVED: No exceptions Deficiencies X Proper sizing X X Proper grade of bans X X Proper quantity, spacing, & layout X X Proper splice lengths & splice locations X X Proper chairing and concrete cover X X Proper securement of reinforcing X Proper layout of post tensioning cables Proper drape of post tensioning tendons Proper sheathing and anchor reinforcing Concrete strength verified Concrete consolidated during placement Other: DEFICIENCIES: Many CMU vertical reinforcing steel bars exhibit insufficient splice length (11" to 30" in-place; 30" minimum required). #4-4' bars placed @ bottom of cell where splice noted as less than 26". Several P-1 vertical reinforcing steel bars exhibit insufficient splice length (27" to 36" in-place; 36" minimum required). Full-length #5 bars placed within cells where splice noted as less than 35". Spacing of CMU vertical reinforcing steel noted to range from 16" to 56" oc. (two locations only @ 56" oc .. column line G-94, J-91 ). No #6 bar located from previous level @ P-1 (column line Q.1-95). REINSPECTION REQUIRED: REMARKS: NOTES. Contractor is responsible for scheduling any necessary reinspection aile' remedial work is performed. Tests may not be reproduced, except in full. Wllhcut written permission from ProfsSSlonal Service Industries Inc. Professional Service Industries. Inc.' 1748 33rd Street. Orlando, FL 32839' Phone 407/304-5560' Fax 407/304-5561 FL Englneerrng Business 3684 .. Consulting.. Testing REPORT OF REINFORCED CONCRETE INSPECTION TESTED FOR: A lA Acquisition Group, LTD., LLP PROJECT: Residence Inn - Cape Canaveral, FL 3425 Atlantic Avenue REPORT NO: 4 Cocoa Beach, FL 32931 PROJECT NO: 761-50044 Atln Roger Dobson REINFORCING STEEL PLACEMENT STRUCTURAL ELEMENT Foundation Wall Column X Fioor Slab Stair Other CRITERIA UTILIZED AS INSPECTION REFERENCE: Structural Plans: Sheet(s): S-101. S-221 Detail(s): RFI structural drawings S-301 1,2 RFI Dated: 3/23/05 S-302, S-303 9. 10,4,5,6,7,8,910, 12 RFI I CONSTRUCTIONS OBSERVED: No exceptions Deficiencies X Proper sizing X X Proper grade of bars X X Proper quantity, spacing, & layout X X Proper splice lengths & splice locations X X Proper chairing and concrete cover X X Proper securement of reinforcing X Proper layout of post tensioning cables Proper drape of post tensioning tendons Proper sheathing and anchor reinforcing Concrete strength verified Concrete consolidated during placement DEFICIENCIES: Standard hook reinforcing bars have not been detailed in shop drawings within slab edge at two sides of elevator area, as well as CB-l, CB-3 and CB-4 (partial) beam locations. REINSPECTION REQUIRED: Yes REMARKS: Candy cane bars (3'8" - MK412) were installed at re'Jerse side of elevator at 18" OC per Inspectors request. Hook bars were installed via drill/epoxy into iwriei 3t)(lVe elevator opening at 24" OC as per sketch SK-21 prior to placement of flou slab. NOTES. Contractor is responsible for any necessary reinspection after remedial work is performed. Tests may not be reproduced. except in wdhout written penmlsslon from ProfeSSional Service Industries. Inc. ProfeSSional Service Industries. Inc. . 1748 33rd Street. Orlando. FL 32839 . Phone 407/304-5560 . Fax 407/304-5561 FL Engineering BUSiness 3684 Build On Engineering · Consulting. Testing REPORT OF REINFORCED CONCRETE INSPECTION TESTED FOR: A 1 A Acquisition Group, LTD., LLP PROJECT: Residence Inn - Cape Canaveral, FL 3425 Atlantic Avenue REPORT NO: 4 Cocoa Beach, FL 32931 PROJECT NO: 761-50044 Attn: Roger Dobson REINFORCING STEEL PLACEMENT STRUCTURAL ELEMENT ELEVATION: 2nd floor Foundation PLAN LOCATION Section "C" CMU walls (including pilasters), line G.9 - T & 66 - 85, Q - V & 86 - 94.9 X Wall Column Floor Slab Stair Other CRITERIA UTILIZED AS INSPECTION REFERENCE: Structural Plans: Sheet(s) 5-101.5-212 Detail(s): RFI: structural drawings S-223, S-301 n/a, 3 RFI: Dated: 3/23/05 S-302 1,3,5 RFI: CONDITIONS / CONSTRUCTIONS OBSERVED: No exceptions DeficienCies X Proper sizing X X Proper grade of bars X X Proper quantity, spacing, & layout X X Proper splice lengths & splice locations X X Proper chairing and concrete cover X X Proper securement of reinforcing X Proper layout of post tensioning cables Proper drape of post tensioning tendons Proper sheathing and anchor reinforcing Concrete strength verified Concrete consolidated during placement Other: DEFICIENCIES: Many CMU vertical reinforcing steel bars exhibit insufficient splice length (18 to 30" in-place; minimum 30" required), #4-4' bars placed @ bottom of cell where splice noted as less than 26". Several P-1 vertical reinforcing steel bars exhibit insufficient splice length (27 to 36" in-place; minimum 36" required). Full-length #5 bars placed within cells where splice noted as less than 35". REINSPECTION REQUIRED: Yes REMARKS: NOTES: Contractor is responsible for scheduling any necessary reinspectlon after remedial work is pH'ormed Tests may not be reproduced, except In full, without written permission from Professional Service Indv,tries, Inc ---~._.__._---------~._-------~~_.._~____..h9.tlJ2Lil~__~.____,"""'_""'_,_,__~~"_,.,_"_"'_""",..,__ """^ ^~ ^^^^^- Professional Service Industries, Inc. . 1748 33rd Street. Orlando, FL 32839 . Phone 407/304-5560 . Fax 407/304-5561 FL Engineering Business 3684 REPORT OF NON-COMPLIANCE (PUNCHLIST) ITEMS PROJECT NAME: RESIDENCE INN PROJECT NO.: 761-50044 CLIENT: WELBRO CONSTRUCTION DESCRIPTION OF WORK: SPECIAL INSPECTIONS TECHNICIAN: STEVE CORRIGAN, MATT ODOM DATE OF REPORT: 08-17-05 ~ ] ,------1 ITEM DATE , DATE i NO. ! INSPECTED 1= DESCRIPTION OF DEFICIENCY I AC nON REQUIRED REINSPECTION I RFINSPFC~ TOI' GRADE BEAM REINFORCING STEEL REMEDIATE PER ADDITIONAL 04-26-05/ 001 04-19-05 BARS DO NOT MATCH WITHIN GB-3/GB-7 DIRJ~CTION OF REINFORCING STEEL 04-29-05 TRANSITION AREAS @ COL LINE E, R, ENGINEER OF ADDED PER .':' , AND P (BOTH ENDS OF BLDG) RECORD (RFI #034) REFERENCIW RFI (COMPLli, I Ii,) SEVERAL AUGERCAST PILES LIE REMEDIA TE PER AREAS REFERENCED 04-26-05/ 002 04-19-05 OUTSIDE TOLERANCES STATED FOR DIRl~CTION OF REMEDIATED PER 05-16-0'i ENGINEER OF ,- LOCATION (#1244, 1248, 1258, 1414) RECORD (RFI #035) REFERENCED RFI (COMPLETE) PILE FOUND TO BE MISSING (NO SURVEY R~~~~~~~~~ ~~R AREAS RI<~FERENCED 05-16-05 003 05-02-05 MARKER IN-PLACE) _ PILE #1264 ENGINEER OF REMEDIA TEp PER (COMPLETE) RECORD (RFI #045) REFERENCED RFI HOOK BARS DETAILED @ BALCONY AREAS ARE Al)I'R ~' LONG IN-PLAC~, REQUIRES APPROV At. 004 06-17-05 RATHER THAN 10 IN LENGTH - SEE OF ENGINEER OF RINKER SHOP ORA WINGS, BAR MARK IlECORD MK507 (COL LINE A TO L-88 TO 99- AREA C - 2ND FLOOR) SEVERAL CMu/PILASTER REINJi'ORCING P-l REMOVED TO STEEL BARS NOT CENTERED WITHIN REQUIRES APPROVAL ELEV 4 COURSES i 005 06-22-05 CELLS UPON COMPLETION OF GROUT OF ENGINEER OF ABOVE SLAB AND 06-27-05 PLACEMENT - RESTING ON CMU WEB IlECORD REPLACED @ COL (AREA C - 2ND FLOOR) LINE L-89 ADDITIONAL #4 - 4' , BAR PLACED VF..RTICAL CMU REINFORCING STEEL LOOSEL Y WITHIN BARS EXHIBIT INSUFFICIENT SPLICE REMEDIA TE PER BOTTOM OF CELL IN 006 06-22-05 LENGTH FROM LEVEl: BEL?,W n.IR~CTION OF AREAS NOTED AS 06-22-05 I \~NGE IN-PLACE 11 fO 30 - EN(.INEER OF DEFICIENT (<26") ': 30 l\HN REQI!IR~~ AS PER S-101) RECORD (COL LINE C TO P-88 I . i I (AREA C - 2 FLOOR) TO 99, Q TO U-95 TO 991 L~ ONLY) I l.......~~;l I It!.". . .: REPORT OF NON-COMPLIANCE (PUNCHLIST) ITEMS PROJECT NAME: RESIDENCE INN PROJECT NO.: 761-50044 CLIENT: WELBRO CONSTRUCTION DESCRIPTION OF WORK: SPECIAL INSPECTIONS TECHNICIAN: STEVE CORRIGAN, MATT ODOM DATE OF REPORT: 08-17-05 DATE ~ ' I ACTION REQUIRED ] REINSPECTION [ DATE I INSPECTED DESCRIPTION OF DEFICIENCY REINSPECTED I ADDITIONAL FULL- VERTICAL P-l REINFORCING STEEL LENGTH #5 BAR BARS EXHIBIT INSUFFICIENT SPLICE REMEDlA TE PER PLACED WITHIN LENGTH FROM LEVEL BELOW DIRECTION OF CELL IN AREAS 007 06-22-05 (RANGE IN-PLACE 27 TO 36" - ENGINEER OF NOTED AS DEFICIENT 06-22-05 36" MIN REQUIRED AS PER S-101) RECORD (<35") (AREA C - 2ND FLOOR) (COL LINE C TO P-88 TO 99, Q TO U-95 TO 99 ONLY) VERTICAL CMU REINFORCING STEEL DOWEL NOT I)RESENT FROM LEVEL REMEDIA TE PER 008 06-22-05 BELOW @ COL LINE E-96.5, E-97.8, E-98 DIRECTION OF (CELL ADJ TO E-98 POURED SOLID ENGINEER OF WITH REINFORCEMENT) RECORD I (AREA C - 2ND FLOOR) IN-PLACE CONDITION VERTICAL P-I REINFORCING STEEL ACCEPT ABLE @ COL DOWEL (#6 BAR) NOT PRESENT FROM LINE A-93, B-93 LEVEL BELOW @ COL LINE A-93 & B-93 REMEDIATE PER (AWAITING (#5 BARS IN PLACE FROM 1ST FLOOR), DIRECTION OF CORRESPONDENCE 009 06-22-05 FROM ENGINEER OF 06-27-05 AND Q.I-95 (NO BAR OF ANY SIZE ENGINEER OF RECORD); #6 BAR PRESENT WITHIN W CELL OF RECORD PILASTER, #6 BAR IN E CELL) PLACED INTO 2ND (AREA C - 2ND FLOOR) FLOOR SLAB @ COL L_I LINE Q.1-95 VIA I DRILL/EPOXY l:fiii} 2 ~ 'fIiiIlI. . .: REPORT OF NON-COMPLIANCE (PUNCHLIST) ITEMS PROJECT NAME: RESIDENCE INN PROJECT NO.: 761-50044 CLIENT: WELBRO CONSTRUCTION DESCRIPTION OF WORK: SPECIAL INSI>ECTIONS TECHNICIAN: STEVE CORRIGAN, MATT ODOM DATE OF REPORT: 08-17-05 DATE DESCRIPTION OF DEFICIENCY I ACTION REQUIRED ] REINSPECTION I DATE I INSPECTED REINSPECTED MASONRY GROUT PLACED IN SINGLE FULL-HEIGHT LIFT (8'-8"), AND GROUT WAS VIBRATED ONLY ONCE FOLLOWING INITIAL PLACEMENT REQUIRES APPROVAL 010 06-22-05 (REFERENCE ACI 530.1-02, PART 3.5- OF ENGINEER OF RECONSOLIDATION OF GROUT RECORD REQUIRED AFTER INITIAL WATER LOSS AND SETTLEMENT HAS OCCURRED) (AREA C - 2ND FLOOR) ADDITIONAL "B" P-l PILASTER MISPLACED APPR 24" TO REMEDIA TE PER BARS WITHIN 2ND FLOOR SLAB 011 06-23-05 THE NORTH OF PLAN POSITION DIRECTION OF EXTENDED TO 06-27-05 (ORIGINAL LOCATION COL LINE E-7) ENGINEER OF DEVELOP INTO (AREA A-I ST FLOOR) RECORD I CURRENT P-I POSITION PILASTER DESIGNATION @ COL LINE #6 BARS PLACED Q-77 & M-77 CHANGES FROM P-l ON 1ST REMlmIA TE PER INTO 2ND FLOOR SLAB 012 06-23-05 FLOOR TO P-2 DESIGNATION ON DIRECTION OF VIA DRILLIEPOXY 06-27-05 2ND FLOOR (BARS IN-PLACE FROM 1 ST ENGINEER OF WITHIN MISSING P-2 FLOOR ARE 2-#5 IN EACH LOCATION, RECORD REINFORCEMENT RATHER THAN 4..#6) (AREA C - 2ND FLR) AREAS PILASTER VERTICAL REINFORCING STEEL WITHIN P-l @ COL LINE N.I-89 REQUIRES APPROVAL 013 06-24-05 CONSISTS OF 2-#5 BARS OF ENGINEER OF , (RA THEn THAN 2-#6 BARS) RECORD (AREA C __1ST & 2ND FLOOR) ADDITIONAL HORIZONTAL REINFORCEMENT NOT BEING PLACED REQUIRES APPRO V AL 014 06-24-05 ABOVE AND BELOW CMU OPENINGS AS OF ENGINEER OF PEn PROJECT SPECIFICATIONS RECORD SECTION 04220, PART 3.03.C l~~:l 3 REPORT OF NON-COMPLIANCE (PUNCHLIST) ITEMS PROJECT NAME: RESIDENCE INN PROJECT NO.: 761-50044 CLIENT: \VELBRO CONSTRUCTION DESCRIPTION OF WORK: SPECIAL INSPECTIONS TECHNICIAN: STEVE CORRIGAN, MATT ODOM DA TE OF REPORT: 08-17-05 INS~~~~ED [_ DESCRIPTION OF DEFICIENCY I ACTION REQUIRED REINSPECTION DATE REINSPECTED LOCATION OF 1'-1 PILASTER REMEDIATE PER 2-#6 BARS INSTALLED 015 06-25-05 MISPLACED FROM PLAN LOCATION DIRECTION OF INTO FOUNDATION @ 06-25-05 (APPR 8" S @ COL LINE A-I0 & B-I0) ENGINEER OF L.5-39 (NOW CIP COL ~PR 16" W @COLLINEL.5-39& L.5-4l) RECORD (il) PLAN LOCATION) #5 BARS PRESENT FROM LEVEL BELOW FULL-LENGTH #5 BAR PLACED ALONG IN 1'-1 PILASTER LOCATIONS (#6 BARS REQUIRES APPROVAL WITH #6 BAR ABOVE 016 06-25-05 DETAILED) @ COL LINE Q.I-86, N-85, N-82, OF ENGINEER OF 2ND FLOOR SLAB 06-27-05 I 1'-82, N-73, 1'-73, N.2-13.8, Q.I-16, R,6-7 RECORD ELEV ATlON (2ND FLOOR) (AREA CONLY) 1-#5 BAR ONLY PRESENT FROM LEVEL REMlmIATE PER #6 BARS INSTALLED VIA DRILL/EPOXY 017 06-25..05 BELOW @ 1'-1 PILASTER LOCATIONS DIRECTION OF INTO FLOOR SLAB IN 07-06-05 I (2-#6 BARS DETAILED) ENGINEER OF BOTH REFERENCED @ COL LINE N-39, Q.I-8 (2Nn FLOOR) RECORD LOCATIONS NO CLEAR COVER TO REINFORCING REQUIRES APPROVAL 018 06-25-05 STEEL BANDS WlTHIN CIP COLUMN (C-4) OF ENGINEER OF @ LINE S-26 (SW CORNER) & S-28 (NE RECORD CORNER) (1 ST FLOOR) . -1 STD HOOK BARS HAVE NOT BEEN MK412 BARS PLACED DETAILED IN SHOP DRAWINGS WITHIN REQUIRES APPROVAL WITHIN 2ND FLOOR 019 06-27..05 SLAB EDGE @ TWO SIDES OF ELEVATOR OF ENGINEER OF SLAB @ 18" OC 06-27-05 AREAS, AS WELL AS CB-I, CB-3, CB-4 RECORD ALONG REVERSE (PARTIAL), CB-.5, AND CB-6 (PARTIAL) SIDE OF ELEVATOR CONCRETE BEAM AREAS (AREA A) COL CUT FROM BASE TS COLUMN @ LINE .F-95 APPR 4" OUT- REQUIRES APPROVAL PLATE AND REPOSI- 020 06-27..05 OF-PLUMB (LEANING TO WEST) OF ENGINEER OF TIONED UTILIZING 08-17-05 (1 ST FLOOR) RECORD ';." ANGLE AS i SUPPORT ON 3 SIDES 07-::= IMPROPER ELECTRODES BEING USED REQUIRES APPROVAL E7018 ELECTRODES 021 06-27-05 TO WELD TS COLUMNS TOGETHER (6011 OF ENGINEER OF USED TO WELD TS BEING UTILIZED, E70XX SERIES RECORD COLUMNS WITHIN SPECIFIED - SEE SHEET S-IOl) AREA A 3RD FLOOR ~ 4 n~1 .~~.' REPORT OF NON-COMPLIANCE (PUNCHLIST) ITEMS PROJECT NAME: RESIDENCE INN PROJECT NO.: 761-50044 CLIENT: WELBRO CONSTRUCTION DESCRIPTION OF WORK: SPECIAL INSPECTIONS TECHNICIAN: STEVE CORRIGAN, MATT ODOM DATE OF REPORT: 08-17-05 I ITEM I DATE C I ACTION REQUIRED -] REINSPECTION I REI~s^ri~TED I NO. INSPECTED DESCRIPTION OF DEFICIENCY I I MANY CMU CELLS NOT COMPLETELY I I I FILLED WITH MASONRY GROUT: COL LINE B-13,H-3,N.9-4,N.9-5,Q.I-8,R-13.1, REMEDIA TE PER Q.9-16, T -12,T.5-12, U-12, U.5-12,H.5-22,J-22, DIRECTION OF 022 07-05-05 K-22,P .1-22,Q-26,H..4-40,S.2-40.8,N-6 7 ,HA-67, ENGINEER OF HA-68,P-68,S- n,R.2-89,J-88,F -96.5,A.8-89, RECORD A-96 (I ST FLOOR); AND COL LINE A.I-98,G-92,U-97.3,R.5-82,R.8-82, S.5-82,T-82,K-77,N-67 (2ND FLOOR) MANY CMU WALLS REINFORCED @ REQUIRES APPRO V AL 023 07-05-05 48" OC, RATHER THAN 32" OC AS PER OF ENGINEER OF S-212, DETAIL 3 (W-I DESIGNATION FOR RECORD INTERIOR 1 ST FLOOR AREAS) (AREA C) --~_.^_.^._-~- TYPICAL CMU SILL REINFORCEMENT REQUIRES APPROVAL 024 07-05-05 (2-#5 BARS) NOT PLACED BENEATH AIR OF ENGINEER OF HANDLER OPENINGS IN ANY LOCATION RECORD CIP COLUMN @ LINE S.2-84 APPR 2" OUT- REQUIRES APPRO V AL 025 07-06-05 OF-PLUMB (LEANING TO NORTH) OF ENGINEER OF (1ST FLOOR) RECORD CIP COLUMN APPR I" OUT-OF-PLUMB @ LINE S.2-28 (LEANING TO NORTH), S.2-33 (LEANING TO SOUTH), REQUIRES APPROV AL 026 07-08-05 S.2-70 (LEANING TO NORTH); OF ENGINEER OF AI)PR 1.25" OUT-OF-PLUMB @ RECORD LINE S.2-37 (LI':ANING TO NORTH) (1ST FLOOR) KO..I BOND BEAM REINFORCING STEEL REQUIRES APPROV AL 027 07-11-05 NOT PRESENT @ COL LINE A TO C-89, OF ENGINEER OF C-88 TO 89, U-96.2 TO 99 RECORD (3RD FLOOR SLAB ELEVATION) ADDITIONAL "A" BARS NOT PRESENT REQUIRES APPROVAL I 028 I 07-11-05 WITHIN FLOOR SLAB @ OF ENGINEER OF I COL LINE N TO 0-96 (3RD FLOOR) RECORD fejJ 5 ..~. It'...". .: REPORT OF NON-COMPLIANCE (PUNCHLIST) ITEMS PROJECT NAME: RESIDENCE INN PROJECT NO.: 761-50044 CLIENT: WELBRO CONSTRUCTION DESCRIPTION OF WORK: SPECIAL INSPECTIONS TECHNICIAN: STEVE CORRIGAN, MATT ODOM DATE OF REPORT: 08-17-05 DATE DESCRIPTION OF DEFICIENCY I ACTION REQUIRED ] REINSPECTION [ DATE INSPECTED REINSPECTED BANDS PLACED @ 6" OC TYPICAL REQUIRES APPRO V AL 029 07-11..05 WITHIN CB-2 BEAMS @ COL LINE S.2-68 OF ENGINEER OF TO 70, U.1-94 TO 96.2, RATHER THAN AS RECORD PER S-301, DETAIL 2 (3RlJ FLOOR) CIP COLUMN @ LINE S.2-19 OFFSET APPR REQUIRES APPROVAL 030 07-13-05 2" S OF I'LAN LOCATION OF ENGINEER OF i (1ST AND 2ND FLOOR) IU~CORD I SEVERAL CMU WALLS ON 2NU FLOOR --~-",_.,~.,.,-- OFFSET FROM 1ST FLOOR LOCATIONS (APPR OFFSET AND DIRECTION LISTED): COL LINE 1'-31 (1.625" TO NORTH), COL LINE 1'-22 (0.875" TO NORTH), COL LINE F-2 (0.625" TO EAST), REQUIRES APPROVAL 031 07-14..05 COL LINE H-l (0.625" TO EAST), OF ENGINEER OF COL LINE L.2 (0.75" TO EAST), RECORD COL LINE V-90 (0.50" TO NORTH), COL LINE 1'-82 (0.625 TO SOUTH), COL LINE 1'-73 (1.0" TO SOUTH), COL LINE G.8-82 (0.50" TO NORTH), COL LINE H-99 (1.0" TO WEST), COL LINE U-35 (1.125" TO sounD END OF CB-l BEAM @ COL LINE L.5-68 NOT BEARING ON CMU/P-l PILASTER REQUIRES APPROVAL 032 07-27-05 (CMU PLACED FULL-HEIGHT) OF ENGINEER OF 2 #5xl0' BARS PLACED (5' IN BEAM, 5' IN RECORD SLAB) TO PROVIDE DEVELOPMENT BOTTOM REINFORCING STEEL PLACED D-=::J (a, 12" OC WITIIIN COL UN': R TO 0.90 TO REQUIRES APPROV AL 033 07-27-05 96, R TO U-96 TO 98 (DETAILED @ 10" OC OF ENGINEER OF WITHIN THESE AREAS) RECORD (AREA C - 4TH FLOOR) IiiEJ 6 ~e-Ii , ' t!!.~IJ,' . ~ REPORT OF NON-COMPLIANCE (PUNCHLIST) ITEMS PROJECT NAME: RESIDENCE INN PROJECT NO.: 761-50044 CLIENT: WELBRO CONSTRUCTION DESCRIPTION OF WORK: SPECIAL INSPECTIONS TECHNICIAN: STEVE CORRIGAN, MATT ODOM DATE OF REPORT: 08-17-05 DA1~ DESCRIPTION OF DEFICIENCY I ACTION REQUIRED ] REINSPECTION I DATE I INSPECTED REINSPECTED I ! BOTTOM REINFORCING STEEL I I PLACED @ 10" OC WITHIN REQUIRES APPROVAL 034 07-27-05 COL LINF: M TO Q-82 TO 86 OF ENGINEER OF (DEl' AILED @ 9" OC WITHIN THIS AREA) RECORD (AREA C - 4TH FLOOR) CB-6 BEAM CONTAINS NO BANDS @ 3" OC @ 1'1 END (COL LINE N-85) 7 BANDS @ 6" OC AND MID-BEAM BANDS REQUIRES APPROV AL 035 07-27-05 @ 12" OC IN-PLACE (S END OF BEAM OF ENGINEER OF I CONSTRUCTED AS PER PROJECT RECORD DOCUMENTS) i (AREA C - 4TH FLOOR) 5000 PSI CONCRETE (MIX CODE 1156016) PLACED WITHIN CMU CELLS @ COL REQUIRES APPROVAL 036 07-27-05 LINE H.5-66 TO 68, H.5 TO S.2-66, OF ENGINEER OF N-66 TO 68 DURING PLACEMENT OF RECORD FLOOR SLAB 0REA C - 3RD FLOOR) PRECAST LINTEL @ COL LINE R.2-16 2 #6 REINFORCING BARS PLACED INTO FOUND TO BE CRACKED ON BOTTOM REQUIRES APPROVAL LINTEL FOR 037 07-28-05 (CENTER, EAST TO WEST END) AND SIDE OF ENGINEER OF ADDITIONAL 07-28-05 ! (NE CORNER, TOP, APPR 24" IN LENGTH) RECORD STRENGTH(RATHER i (AREA A, 3RD FLOOR) THAN #5 BARS) 2 #5 BARS SUBSTITUED FOR 1 #6 BAR REQUIRES APPROVAL WITHIN EACH CELL IN 1'-1 LOCATIONS 038 07-28-05 @ COL LINE R.6-7, Q.I-8, N.3-13.5 OF ENGINEER OF (AREA A, 3RD FLOOR) RECORD fJ[ij} 7 "~I ... tt:...,,, ,~ REPORT OF NON-COMPLIANCE (PUNCHLIST) ITEMS PROJECT NAME: RESIDENCE INN PROJECT NO.: 761-50044 CLIENT: WELBRO CONSTRUCTION DESCRIPTION OF WORK: SPECIAL INSPECTIONS TECHNICIAN: STEVE CORRIGAN, MATT ODOM DATE OF REPORT: 08-17-05 I ITEM I DATE C I ACTION REQUIRED ] REINSPECTION I DATE NO. INSPECTED DESCRIPTION OF DEFICIENCY REINSPECTED CMU DOWN CELLS FOUND TO NOT BE COMPLETEL Y FILLED WITH GROUT WITHIN AREA C: COL LINE Q.I-93,F- REMIWIA TE l'ER 039 08-08-05 96.9,A-91,H.2-79 (1ST FLOOR); DIro:CTION OF COL LINE B-89.2,J-82 (2ND FLOOR); ENGINEER OF COL LINE E-97.5,B.8-98,B-89.2,L.9-85,J-85, RECORD H.2-84,H -84,J-68,N -67 ,HA-66.5,HA-67.5, N-66.2,P-66,S.I-66 (3RD FLOOR) VERTICAL #6 REINFORCING BARS NOT PRESENT WITHIN 1'-1 LOCATION@COL REQUIRES APPROVAL LINE L.5-66 (31m FLOOR), 1 #5 BAR 040 08-08-05 PLACED INTO 4TII FLOOR SLAB (WITHIN OF ENGINEER OF EAST HALF OF 1'-1 LOCATION) AS RECORD EXTENSION/SPLICE FOR LEVEL ABOVE HORIZONTAL REINFORCING BARS NOT REME:DIA TE PER 041 08-08-05 PRESENT WITHIN SILL AREA OF CMU DIRECTION OF OPENING @ COL LINE HA-67 (2ND FLOOR) ENGINEER OF AND HA-40 (3RO FLOOR) RECORD CONCRETE NOT YET PLACED WITHIN SILL AREAS (CMU) @COLLINE HA-67, REQUIRES APPROVAL 042 08-08-05 N.5-66 (3RO FLOOR), N.I-66 (4TH FLOOR), AS OF ENGINEER OF WELL AS ALL AIR HANDLER OPENING RECORD AREAS IMPROPER GROUT MIX REQUIRES APPROVAL 043 08-11-.05 (1289966 -- 4000 ACGRT) OF ENGINEER OF PLACED WITHIN CMU DOWN CELLS @ RECORD COL LINE C-8 TO 13.7 (4TH FLOOR) #5x5' STRAIGHT BAR ADDITIONAL REINFORCING BARS NOT PLACED@ 24" OC PLACED WITHIN ROOF SLAB REQUIRES APPROVAL WITHIN AREA A 044 08-16-05 (AREA A OR AREA C) OF ENGINEER OF ONLY (AS PER 08-17-05 RECORD CONVERSATION AS PER SHEET S251, S252 - NOTE 14 WITH ENGINEER OF , RECORD) ! ffiii1 8 .. t/!.!1" . .~~..: REPORT OF NON-COMPLIANCE (PUNCHLIST) ITEMS PROJECT NAME: RESIDENCE INN PROJECT NO.: 761-50044 CLIENT: WELBRO CONSTRUCTION DESCRIPTION OF WORK: SPECIAL INSPECTIONS TECHNICIAN: STEVE CORRIGAN, MATT ODOM DATE OF REPORT: 08-17-05 DATE DESCRIPTION OF DEFICIENCY I ACTION REQUIRED -' REINSPECTION I REIl~~~~~TED 1 INSPECTED CMU DOWN CELLS FOUND TO NOT BE REMEDIA TE PER COMPLETEL Y FILLED WITH GROUT 045 08-16-05 WITHIN AREA C: DIRECTION OF COL LINE F-96.6, H.9-82, H.7-75, M.7-73, L.5- ENGINEER OF (4TH l) RECOIID 66, N-66 4 FLOOR ---,...~....~--- "-----~~._- l.:~i} 9 I:t;:~ II .~ J. 2 ~--~""'~"""'-'-'.. '~"'''''''+--"_._-_.<._----_.------~.,^",,-',--_.....,~_.~-,._-------'-'~.~~~~-.~--"..._._-"",,--------_.- YOU 1)0 ALL C4LL A.S.A.P. --_._---~--~-_.~~-~".^._~-~^,.~,._._-_.-----..-_.._.,,~~,,_..~_._~-_...-->--"._--~_.__. -,,"""""___IRu____ - --.~--"_ ._"""=--=~"~~..~;a;--.----- Ii_-. ~.. for the Resideot;f; "-',-, _._~'~""^'-_..'''-,...-~-,.~.''''''''_..;-~.~,_.,,'''''...,.,..~--''....'''".".-_.........-._._,-....,_."....-...._-~-_..~y------_.._..~,--,-"._._._""'---.-----......-_............~_-............_,,,,.....~,...---^- '__,_,__"w",_,__~,-"-_""""""__,___"___,,,_,_,,__,,_,__,-_,~._,.__,.__"...,.~_.,.k_'~~"""''''""'-''''-''''''~''~_~''-'-__'__'~_''''_~<___.__^,.~.__"..,_...."_. .. ~'___'~___""4'___~__''''''''''''''__'___"",,"''''''~'__' .---,._"_'_..______~".~.'M._'_...__,,_~,._^..,"~____,._'_.____._____.__._._~_,_______."__""""'''..,..",,..,.,.-_~~~,._,.__;,~_,.._ ...._..,__.___....~,...._ ----_.-.....~_----.-...._,-"....,-" --_. '_'__'<>--.,__..~____.._~_h_.,.. _....-....__~___.''''._._.__._.._~.,'__*'_~_..,___~~____~_~__...............;c._...,"...'<.."...._.._<...,.,..,..._,._.___.__~.,,__..__,_,,__,,__."""'~___'...'~----.-_ ----~ ,-,-,-,-"~--~-,,--'"_...~._..--,,---_..,,,----,.~~~--_...............,.--------_.._-~.'''-....----------_._---~--,_._--~_..--.........,-''''--_.~-~-~".-..--<.- ^--,."-.,._"'"..~....,....".,..."--..._.._,,,.'"._~-~-'<_.~---_..__.._-,,,.--'--"..._-_.."-_.._--_..------......--.-...............~~~,..,,..,,~......-..-.-...._-,----~-~--,,~_.~--...........,.,'--..---,............--.." "'""'.'..'...-"',.,.~-"'-..,..-..,~.,...,.,~.".-.,.'-.--,-..-.-.--.-,---~.,--'-_..,_."__M__,'.._._.__........_,._.._.r,~.....................,..'_~..,,,_.._,....,.."__._*____.______ ".. '" -~--'--...-".~~-.....-.._-....-,_.-...."""""...._,_,.__~""'........,_.~__~._..__.....~,+_~__.__"_'",.._..,____o~.__.__u.,_......,_.!."___"'."'_",.'o~.._..~_,_,_.,_....,__.,___,__~,_..__,__,.~..~_,_ ----.,,--.--"-.--~-.. ....---~_~_"_"~,__.._".~.___....'_._._=~_.,_______., __..___"_____._'_.____.___.M._.........--._.__...........~,_________~.__"_,_.._.______~.~_____. PSl HAS OVER l:SO .oFFICES NA'DONWIDE w <cm,snu.:('TION nsnl'lG ..\..ND Q\;AIJ", ('I)I'H'ROL ~ R('.iO~' .~ 'ID PAV1:ME.'Jf CONSUL TiJ'll(; . DIEDI:C" lTJ) f'ROJEcrn:SnNGAi"JD INSPE\.,...HON . GtOO"E(HNICAL iNGJNEERJN(; . ~~!"fvm.ONI\ii:N"U AND ASBES'fl!S MA"lAGJ:ME~~r ~ ANAL YllC...r.. SERVIC'tS ~- -_,_"".,~_ _..'__'_'~"_"^__'__ ,______._______,___.____ ~", _u_,. ,"'-' (~ Street'"' on:sncrj FL 328;39 'II Pnorv:: 4ti7/304..55.f';;C i> r=a.x 407:'304-556'f [ r(}f and 08/21/05 Resll:telThte'L.'m PSlI # 161.-50044 COnlmLi;',lir: Welbr!) Date St~N~1 ;} f ooe oithe # WalI:n't f"Jlml;Vork and eMU Walls, 1. set of 3 !;;lOin tu obtron the mil:;unum ad IT was CI:U.'1 fill cellt;. 5 bm- ""'as placed via drill and ep\ll'\} method at thl'J! location CoJ. Line L5-66.Gmut met ilOt Sllili fiUID {l$/O8/05 of con.crete on Steel Sl~<:tj on .\~,., project Wfl3 '1 st'",~$ of concrete.' ~podflcati(ln$. Concrete complied wnil prqject floo!' !il<'lj;. 1/05 CrC'llerete and Grout l'J'),et Partial and Colw:.nns. Cast I se1 of grout pn!lm$ fur specificatlomL cdl filllIDd I 1;ci of COflcrete cylinders representing {;i)hlffilJ.l!, pro aud 1nIn.'j~d l:Mt from , C~'t 1 5ct Kj 1.5/0:J Sediof! CMlJ walls Reio,fon.:ing Steel and placement met Cast 1 &:'it prifuilll, Pcrtormed. fu-?!ace p!'Oje~t specification. ln~place Denl>itie!i ll'l'd the dtmiWHies an Stabilized Suhgrade betneath Deoel Lane lllinimU,'11 98% compaction rtqui,ttment l)t:f DOl !? ill s.l*iJn~n froM 8/12/0$ , Mid 'Nalls @ Elevator and iectjoH "A" f'l)~)f "}\" RQ\'tf iS$ues wett'! I!lS per completed, 7 :,;;.1$ (Jf concrete cylinder!'> were cast with of re<<1rd, flom 'Sleb. and eMU WftH!8 4'" floor Steel complied Wittl proj<<K:t sets of COl:\crew we:.~ !;.as( :representing; specifications. C.or,ctete complied ',V'im project floor 51.au llUd 1 S~ of grout prisms cast repr~senting specificatiomJ, ai',d CMUwalls. Cast 1 set of coucrete for cohJfl')no: ~!ld ~~ 1 :>ot ofgwut prisms fur eMU. te.\1,1 --~--'_.._---_._--_.~---~--_._--~-,--_._-~,-_._~~---;~--~~,,_.._.._...__...._,..._-_.- .-,-,.....'., '.-,-_. .-..,-.--.-.--.- ~)roh:-5:,;,t\,n';:.\1 SerVice ~ 17if.8 :~:1ra ~3trB€'t 'JI O;"!~tn(k'. FL 3283B 'f Pr~Qrd~ 4,07l304'55t.:~0. F&;'( 4{J7/304-5~t;1 Build On Engineering.. Consulting" Testing REPORT OF GROUT COMPRESSION TEST Tested For: A1A Acquisition Group LTD., LLP Project: RESIDENCE INN Attn: Roger Dobson CAPE CANAVERAL, FL 3425 Atlantic Avenue Cocoa Beach, FL 32931 Project No: 761-50044 LOCATION: Down cells: CMU walls and pilasters, col. Line C-8 to 13.7 (4th floor) Sampled: approx. Co!. Line C-9 Date Placed: 8/11/2005 Technician: M. Odom Time Batched: 2:46 PM Supplier: Rinker Time Sampled: 3:45 PM Delivery Ticket'Truck No.: 92590726 Slump (in) (ASTM C143): 11.25 Mix No. & Proportions: 1289966 ~ Air Temp. (F): 85 Concrete Temp. (F) (ASTM C1064): 82 Date Received in lab: 8/12/2005 Air Content IASTM C173/C231): N/A COMPRESSIVE TEST RESULTS Test Date Total Prism Prism Compressive Type Set Pri",m No. 10 (Days) Test (Ibs) (in) (sq. in.) (psi) Break 120 A 7 8/18/2005 35000 3.50x3.70 12.95 2700 TVDe 3 B 28 9/8/2005 68000 3.60x3.60 12.96 5250 Tvpe 3 ,.... 28 9/8/2005 67000 3.50x3.70 12.95 5170 Tvpe 2 v Specifications: 3000 28 days REMARKS: X Prisms made by PSI Prisms made by Contractor X Prisms picked up by PSI Prisms picked up by Contractor X Test Results Comply with Test Results do not Comply with applicable specifications applicable specifications Concrete sampled in accordance with ASTM C172 and ASTM C31. Compressive Strength tests performed in accordance with ASTM C39. Respectfully Submitted Professional Service Industries, Inc. ,I Service Industries, Inc.. 1748 33rd Street. Orlando. FL 32839. Phone 407/304-5560. Fax 407/304-5561 FL Engineering Business 3684 " Consulting II Testing REPORT OF CONCRETE COMPRESSION TEST Tested For: AlA Acquisition Group LTD., LLP Project: RESIDENCE INN Alln: Roger Dobson CAPE CANAVERAL, FL 3425 Atlantic Avenue Cocoa Beach, FL 32931 Project No: 761-50044 lOCATION: Columns: line U-7, U.I-9, S.I-16, S.2-19, S.2-24, S.I-26, S.2-28, S2-33, S.I-35, S.2-37 (4th floor) Sampled: column 8.2-19 Date Placed: 8/11/2005 Technician: M. Odom Time Batched: 2:28 PM Supplier: Rinker Time Sampled: 400 PM Delivery TicketlTruck No.: 92590748 Slump (in) (ASTM CI43): 4.5 Mix No. & Proportions: 1176347 ~ Air Temp. (F): 85 Concrete Temp. (F) (ASTM Cl064): 90 Date Received in lab: 8/12/2005 Air Content (ASTM C173/C231): N/A COMPRESSIVE TEST RESULTS Test Date Total Cylinder Cylinder Compress ive Type I Set _JIl:imnm!r~ :~::::...Area::::._ No. 10 (Days) Test (Ibs) (in) (sq. in.) (psi) Break 121 A 4 8/15/2005 113000 6.00 28.27 4000 Tvpe 2 B 7 8/18/2005 139500 6.00 28.27 4930 Tvpe 1 C ')0 9/8/2005 .olI""7r:""" 6.00 28.27 6190 Tvpe i "U I/;;JVVV 0 28 9/8/2005 173500 6.00 28.27 6140 Tvpe 2 Specifications: 5000 28 days REMARKS: X Cylinders made by PSI Cylinders made by Contractor X Cylinders picked up by PSI Cylinders picked up by Contractor X Test Results Comply with Test Results do not Comply with applicable specifications applicable specifications Concrete sampled in accordance with ASTM C172 and ASTM C31. Compressive Strength tests performed in accordance with ASTM C39. Respectfully Submitted Professional Service Industries, Inc. ProfeSSional Service Industries. Inc.' 1748 33rd Street. Orlando. FL 32839 . Phone 407/304-5560 Fax 407/304-5561 FL Engineering Business 3684 Build On Engineering. Consulting. Testing REPORT OF CONCRETE COMPRESSION TEST Tested For: A1A Acquisition Group LTD., LLP Project: RESIDENCE INN Altn: Roger Dobson CAPE CANAVERAL, FL 3425 Atlantic Avenue Cocoa Beach, FL 32931 Project No: 761-50044 LOCATION: Section A Roof slab, sampled at approx. 8-4 Dale Placed: 8/17/2005 Technician: J Kilderry Time Batched: 9:15 AM Supplier: Rinker Time Sampled: 10:16 AM Delivery TickelfTruck No.: 92607686 Slump (in) (ASTM C143): 6.5 Mix No. & Proportions: 1156016 ~ Air Temp. (F): 85 Concrele Temp. (F) (ASTM C1064): 93 Dale Received in lab: 8/18/2005 Air Content (ASTM C173/C231): N/A COMPRESSIVE TEST RESULTS . Test Date Total Cylinder Cylinder Compressive Type - No. 10 (Days) Test (Ibs) (in) (sq. in.) (psi) Break 122 A 3 8/20/2005 122500 6.00 28.27 4330 Type 1 B 7 8/24/2005 148000 6.00 28.27 5240 Type 2 C 28 9/14/2005 181000 6.00 28.27 6400 Type 1 0 28 9/14/2005 183000 6.00 28.27 6470 Type 2 Specifications: 4000 28 days REMARKS: X Cylinders made by PSI Cylinders made by Contractor X Cylinders picked up by PSI Cylinders picked up by Contractor X Test Results Comply with Test Results do not Comply with applicable specifications applicable specifications 5 gallons water added to concrete Concrete sampled in accordance with ASTM C172 and ASTM C31. Compressive Strength tests performed in accordance with ASTM C39. Respectfully Submilted Professional Service Industries, Inc. Professional Service Industries, Inc.' 1748 33rd Street. Orlando, FL 32839. Phone 407/304-5560' Fax 407/304-5561 FL Engineering Business 3684 Build On Engineering · Consulting. Testing REPORT OF CONCRETE COMPRESSION TEST Tested For: A1A Acquisition Group LTD., LLP Project: RESIDENCE INN Attn: Roger Dobson CAPE CAN A VERAL, FL 3425 Atlantic Avenue Cocoa Beach, FL 32931 Project No: 761-50044 LOCATION: Section A Roof slab, sampled at approx. E-10 Date Placed: 8/17/2005 Technician: J Kilderry Time Batched: 10:00 AM Supplier: Rinker Time Sampled: 10:40 AM Delivery TicketlTruck No.: 92607852 Slump (in) (ASTM C143): 7 Mix No. & Proportions: 1156016 Air Temp. (F): 86 Concrete Temp. (F) (ASTM C1064): 94 Date Received in lab: 8/18/2005 Air Content IASTM C173/C231): N/A COMPRESSIVE TEST RESULTS . Test Date Total Cylinder Cylinder Compressive Type -- No. 10 (Days) Test (Ibs) (in) (sq. in.) (psi) Break 123 A 3 8/20/2005 120000 6.00 28.27 4240 Tvoe 2 B 7 8/24/2005 147500 6.00 28.27 5220 Tvoe 1 C 28 9/14/2005 181000 6.00 28.27 6400 Type 1 0 28 9/14/2005 179500 6.00 28.27 6350 Type 1 Specifications: 4000 28 days REMARKS: X Cylinders made by PSI Cylinders made by Contractor X Cylinders picked up by PSI Cylinders picked up by Contractor X Test Results Comply with Test Results do not Comply with applicable specifications applicable specifications Concrete sampled in accordance with ASTM C172 and ASTM C31. Compressive Strength tests performed in accordance with ASTM C39. Respectfully Submitted Professional Service Industries, Inc. Professional Service Industries, Ine' 1748 33rd Street. Orlando, FL 32839' Phone 407/304-5560' Fax 407/304-5561 FL Engineering Business 3684 Build On Engineering" Consulting" Testing REPORT OF CONCRETE COMPRESSION TEST Tested For: A 1A Acquisition Group LTD., LLP Project: RESIDENCE INN Alln: Roger Dobson CAPE CANAVERAL, FL 3425 Atlantic Avenue Cocoa Beach, FL 32931 Project No: 761-50044 lOCATION: Section A Roof slab, sampled at approx. R.5-10 Date Placed: 8/17/2005 Technician: J Kilderry Time Batched: 11:19 AM Supplier: Rinker Time Sampled: 11:55 AM Delivery TicketlTruck No.: 92608575 Slump (in) (ASTM C143): 6.5 Mix No. & Proportions: 1156016 ~ Air Temp. (F): 90 Concrete Temp. (F) (ASTM C1064): 94 Date Received in lab: 8/18/2005 Air Content (ASTM C173/C231): N/A COMPRESSIVE TEST RESULTS Test Date Total Cylinder Cylinder Compressive Type ,n.. ""s.. v. ",,"Ie,,'" "'..... ."" No. 10 (Days) Test (Ibs) (in) (sq. in.) (psi) Break 125 A 3 8/20/2005 115500 6.00 28.27 4090 Type 1 B 7 8/24/2005 136000 6.00 28.27 4810 Type 2 C 28 9/14/2005 173500 6.00 28.27 6140 Type 1 0 28 9/14/2005 174000 6.00 28.27 6150 Type 2 Specifications: 4000 28 days REMARKS: X Cylinders made by PSI Cylinders made by Contractor X Cylinders picked up by PSI Cylinders picked up by Contractor X Test Results Comply with Test Results do not Comply with applicable specifications applicable specifications Concrete sampled in accordance with ASTM C172 and ASTM C31. Compressive Strength tests performed in accordance with ASTM C39. Respectfully Submilled Professional Service Industries, Inc. Professional Service Industries, Inc. . 1748 33rd Street. Orlando, FL 32839 . Phone 407/304-5560 . Fax 407/304-5561 FL Engineering Business 3684 Build On Engineering.. Consulting" Testing REPORT OF CONCRETE COMPRESSION TEST Tested For: A 1A Acquisition Group LTD., LLP Project: RESIDENCE INN Alln: Roger Dobson CAPE CANAVERAL, FL 3425 Atlantic Avenue Cocoa Beach, FL 32931 Project No: 761-50044 LOCATION: Section A Roof slab, sampled at approx. J-6 Date Placed: 8/17/2005 Technician: J Kilderry Time Batched: 10:46 AM Supplier: Rinker Time Sampled: 11:34 AM Delivery Tickel/Truck No.: 92608364 Slump (in) (ASTM C143): 8 Mix No. & Proportions: 1156016 ~ Air Temp. (F): 88 Concrete Temp. (F) (ASTM C1064): 93 Date Received in lab: 8/18/2005 Air Content (ASTM C173/C231): N/A COMPRESSIVE TEST RESULTS Test Date Total Cylinder Cylinder Compressive Type ,..n -.I "l:f~ "" "''''..... No. 10 (Days) Test (Ibs) (in) (sq. in.) (psi) Break 124 A 3 8/20/2005 110000 6.00 28.27 3890 Type 1 B 7 8/24/2005 141000 6.00 28.27 4990 Type 1 C 28 9/14/2005 173500 6.00 28.27 6140 Type 2 0 28 9/14/2005 175000 6.00 28.27 6190 Type 1 Specifications: 4000 28 days REMARKS: X Cylinders made by PSI Cyiinders made by Contractor X Cylinders picked up by PSI Cylinders picked up by Contractor X Test Results Comply with Test Results do not Comply with applicable specifications applicable specifications 5 gallons water added to concrete Concrete sampled in accordance with ASTM Ci72 and ASTM C31. Compressive Strength tests performed in accordance with ASTM C39. Respectfully Submitted Professional Service Industries, Inc. Professional Service Industries, Inc.' 1748 33rd Street. Orlando, FL 32839' Phone 407/304-5560' Fax 407/304-5561 FL Engineering Business 3684 Build On .. Consulting" Testing REPORT OF CONCRETE COMPRESSION TEST Tested For: A1A Acquisition Group LTD., LLP Project: RESIDENCE INN Attn: Roger Dobson CAPE CANAVERAL, FL 3425 Atlantic Avenue Cocoa Beach, FL 32931 Project No: 761-50044 LOCATION: Section A Roof slab, sampled at approx. Q-19 Date Placed: 8/17/2005 Technician: .1 Kilr!",rrv - . ,.,-_." J Time Batched: N/A Supplier: Rinker Time Sampled: 12:36 PM Delivery TicketlTruck No.: 92608908 . Slump (in) (ASTM C143): 6 Mix No. & Proportions: 1156016 , Air Temp. (F): 90 Concrete Temp. (F) (ASTM C1064): 94 Date Received in lab: 8/18/2005 Air Content IASTM C173/C231): N/A COMPRESSIVE TEST RESULTS . Test Date Total Cylinder Cylinder Compressive Type ,-~,~ "Set.- . "Cy1tntt"er .. ...Agtf....... . ... 'or.' .-. ..- tnmr.-. .. 'Dtarrreter" .... Area- .... ~..Strengttr- ....""Of-. No. 10 (Days) Test (Ibs) (in) (sq. in.) (psi) Break 126 A 3 8/20/2005 117500 6.00 28.27 4160 Type 2 B 7 8/24/2005 141500 6.00 28.27 5010 Type 1 C 28 9/14/2005 175000 6.00 28.27 6190 Type 1 D 28 9/14/2005 177000 6.00 28.27 6260 Type 1 Specifications: 4000 28 days REMARKS: X Cylinders made by PSI Cylinders made by Contractor X Cylinders picked up by PSI Cylinders picked up by Contractor X Test Results Comply with Test Results do not Comply with applicable specifications applicable specifications Concrete sampled in accordance with ASTM C172 and ASTM C31. Compressive Strength tests performed in accordance with ASTM C39. Respectfully Submitted Professional Service Industries, Inc. Professional Service Industnes, Inc.. 1748 33rd Street. Orlando, FL 32839. Phone 407/304.5560. Fax 407/304.5561 FL Engineering Business 3684 Build On " Consulting" Testing REPORT OF CONCRETE COMPRESSION TEST Tested For: A 1A Acquisition Group L TO, LLP Project: RESIDENCE INN Alln: Roger Dobson CAPE CANAVERAL, FL 3425 Atlantic Avenue Cocoa Beach, FL 32931 Project No: 761-50044 LOCA nON: Section A Roof slab, sampled at approx. T-31 Date Placed: 8/17/2005 Technician: j Kiiderry Time Batched: 12:29 PM Supplier: Rinker Time Sampled: 1 :01 PM Delivery TickeUTruck No.: 92609110 Slump (in) (ASTM C143): 6.5 Mix No. & Proportions: 1156016 ~ Air Temp. (F): 90 Concrete Temp. (F) (ASTM C1064): 94 Date Received in lab: 8/18/2005 Air Content (ASTM C173/C231): N/A COMPRESSIVE TEST RESULTS Test Date Total Cylinder Cylinder Compressive Type V 0 ea....... ...._..0. No. 10 (Days) Test (Ibs) (in) (sq. in.) (psi) Break 127 A 3 8/20/2005 115000 6.00 28.27 4070 Type 1 B 7 8/24/2005 136500 6.00 28.27 4830 Type 1 C 28 9/14/2005 171000 6.00 28.27 6050 Type 2 0 28 9/14/2005 172500 6.00 28.27 6100 Type 1 Specifications: 4000 28 days REMARKS: X Cylinders made by PSI Cylinders made by Contractor X Cylinders picked up by PSI Cylinders picked up by Contractor X Test Results Comply with Test Results do not Comply with applicable specifications applicable specifications Concrete sampled in accordance with ASTM C172 and ASTM C31. Compressive Strength tests performed in accordance with ASTM C39. Respectfully Submitted Professional Service Industries, Inc. Professional Service Industries. Inc.' 1748 33rd Street. Orlando, FL 32839' Phone 407/304.5560 Fax 407/304.5561 FL Engineenng Business 3684 Build On Engineering.. Consulting" Testing REPORT OF CONCRETE COMPRESSION TEST Tested For: A 1A Acquisition Group LTD., LLP Project: RESIDENCE INN Attn: Roger Dobson CAPE CANAVERAL, FL 3425 Atlantic Avenue Cocoa Beach, FL 32931 Project No: 761-50044 LOCATION: Section A Roof slab, sampled at approx. K-37 Daie Piaced: 8i17/2005 Technician: j Kiiderry Time Batched: 12:55 PM Supplier: Rinker Time Sampled: 1 :28 PM Delivery TicketfTruck No.: 92609306 Slump (in) (ASTM C143): 6.5 Mix No. & Proportions: 1156016 ~ Air Temp. (F): 91 Concrete Temp. (F) (ASTM C1064): 95 Date Received in lab: 8/18/2005 Air Content (ASTM C173/C231): N/A COMPRESSIVE TEST RESULTS . Test Date Total Cylinder Cylinder Compressive Type No. 10 (Days) Test (Ibs) (in) (sq. in.) (psi) Break 128 A 3 8/20/2005 120000 6.00 28.27 4240 Type 2 B 7 8/24/2005 144500 6.00 28.27 5110 Type 1 C 28 9/14/2005 177500 6.00 28.27 6280 Type 2 0 28 9/14/2005 176000 6.00 28.27 6230 Type 2 Specifications: 4000 28 days REMARKS: X Cylinders made by PSI Cylinders made by Contractor X Cylinders picked up by PSI Cylinders picked up by Contractor X Test Results Comply with Test Results do not Comply with applicable specifications applicable specifications Concrete sampled in accordance with ASTM C172 and ASTM C31. Compressive Strength tests performed in accordance with ASTM C39. Respectfully Submitted Professional Service Industries, Inc. Professional Service Industries. Inc.. 1748 33rd Street. Orlando, FL 32839 . Phone 407/304-5560. Fax 407/304-5561 FL Engineering Business 3684 REPORT OF GROUT COMPRESSION TEST Tested For: A1A Acquisition Group LTD., LLP Project: RESIDENCE INN Altn: Roger Dobson CAPE CANAVERAL, FL 3425 Atlantic Avenue Cocoa Beach, FL 32931 Project No: 761-50044 LOCATION: Down cells: CMU walls and pilasters, coL Line A.3 to N-22, H.3 to T-26 to 41 (4th floor) Sampled: approx. Col. Line R-31 Date Placed: 8/15/2005 Technician: M.Odom Time Batched: 10:50 AM Supplier: Rinker Time Sampled: 11:45 AM Delivery TickeUTruck No.: 92599270 . Slump (in) (ASTM C143): 9 Mix No. & Proportions: 1162918 . Air Temp. (F): 89 Concrete Temp. (F) (ASTM C1064): 85 Date Received in lab: 8/16/2005 Air Content (ASTM C173/C231): N/A COMPRESSIVE TEST RESULTS Test Date Total Prism Prism Compressive Type .:tJSm. s. No. 10 (Days) Test (Ibs) (in) (sq. in.) (psi) Break 129 A 7 8/22/2005 41000 3.50x3.60 12.60 3250 Type 2 B 28 9/12/2005 49000 3.50x3.60 12.60 3890 Type 2 C 28 9/12/2005 47500 3.40x3.50 11.90 3990 Tvpe 2 Specifications: 3000 28 days REMARKS: X Prisms made by PSI Prisms made by Contractor X Prisms picked up by PSI Prisms picked up by Contractor X Test Results Comply with Test Results do not Comply with applicable specifications applicable specifications Concrete sampled in accordance with ASTM C172 and ASTM C31. Compressive Strength tests performed in accordance with ASTM C39. Respectfully Submitted Professional Service Industries, Inc. Professional Service Industries. Inc. . 1748 33rd Street. Orlando. FL 32839 Phone 407/304-5560 Fax 407/304-5561 FL Engineenng Business 3684 Build On Engineering" Consulting.. Testing REPORT OF CONCRETE COMPRESSION TEST Tested For: A 1A Acquisition Group LTD., LLP Project: RESIDENCE INN Attn: Roger Dobson CAPE CANAVERAL, FL 3425 Atlantic Avenue Cocoa Beach, FL 32931 Project No: 761-50044 LOCATION: Roof Slab: elevator C, sampled approx. center of slab Date Placed: 8/23/2005 Technician: M.Odom Time Batched: 12:25 PM Supplier: Rinker Time Sampled: 1:16 PM Delivery TicketiTruck No.: 92628493 . Slump (in) (ASTM C143): 8 Mix No. & Proportions: 1176347 . Air Temp. (F): 95 Concrete Temp. (F) (ASTM C1064): 90 Date Received in lab: 8/24/2005 Air Content IASTM C173/C231): N/A COMPRESSIVE TEST RESULTS . Test Date Total Cylinder Cylinder Compressive Type No. 10 (Days) Test (Ibs) (in) (sq. in.) (psi) Break 130 A 3 8/26/2005 101000 6.00 28.27 3570 Tvpe 2 B 7 8/30/2005 124500 6.00 28.27 4400 Tvpe 1 r- 28 9/20/2005 185500 6.00 28.27 6560 Tvee 1 I.J 0 28 9/20/2005 187000 6.00 28.27 6610 Type 2 Specifications: 5000 28 days REMARKS: X Cylinders made by PSI Cylinders made by Contractor X Cylinders picked up by PSI Cylinders picked up by Contractor X Test Results Comply with Test Results do not Comply with applicable specifications applicable specifications Concrete sampled in accordance with ASTM C172 and ASTM C31. Compressive Strength tests performed in accordance with ASTM C39. Respectfully Submitted Professional Service Industries, Inc. Professional Service Industries. Inc.' 1748 33rd Street. Orlando, FL 32839' Phone 407/304.5560' Fax 407/304.5561 FL Engineering Business 3684 09/20[15 l~J: 1 3:'143:3[1171 F'SI Pt~GE Ell ., - JR~~;llnfOrmaJion -'--.........--.-.,-'-'.-.- '*-"--~....-..__"_..,._A"_.~__"_"",,,, ".-*"" ,.,.,---...-.,.-".,.....-.. . .... .1bBuildOn ~~;\\~,,~ FAX OOV'ER PAGE ADDRE~EP!lO~i~~~: .-. ~ :=._~ : I I'AK~EU 2845 WEST KING ST SUITE 1" ~. l COCOA OFFICE (321)~1711 I COCOA, l11~ :l2i1)16 ORLA.1'lIDO OFFICE (.1) 304-5561 I {32114J~~L , . .... -' DATE: 3f91t5 rtM::E;' . 4:10 EM ~-. -~----- - ~ TOTAL NtMBER OJ' PAGES ~_ INCLiJDINGCOVDPAGI:; TO: .Mr. Bob HoIor~ . NAME: .- ---- FIRi\f: ,,-t;tiy of CB~ Cnaven) CITY: .-.-- ~NUMBER: :~1~lU7 ~~ . .- -.- - -- ---...-~ mOM: ,~ Iii' YOU DO /+lIlT RECEIVE ALL PAGES, PLEAlJ;CAl.L A.SA.P. \,,,J" OPERATOR: sc ". "'t'..... '" . - m'1l T 'Re: S~nmary for Res_ace. IDU holed' 7fJ5 to _ .' ~"L -.. --'-----....."..-,.,,"- . --.... ......-..- -rr..,-.-- J"$I HASOVD 153 Omcr.sNATIONWmB . CO?ll1/TlUJenoN 'J'UTING ANDQU..um' CONTROL . lIOOJl' ANn PAl'DuNT CONSULTING G PDICA"m PRo..mcTn:sn\Il'C Am) ~ . ~lC.IlL~ .. ~"MINTALAND ~'OS MANAGIlMtN'r .. A.l>lAL\"Y1ICAL SE'l.VIOl:$ . NONDl!:8T1WC'nVl:. ~A'nON AND~G .. MA"TEIUALS ~ AND CDTIFICATiOH . ~I1WGMMS ----.-.--...-..-.--...-.-- "-'-"-'---'-.'--"- ,- ..-. -- .,....-,-....-.---..-..--- ..--,.----,.-. Prt>fasslon.,1 Service Irrd\lstrJe;>, Inc. . 1748 ssm Slre8t . Oriando, FL 32839 . Phone 407f3!)4..5560 . Fax 4071304~1 OS,/ D9/ 2l1D!5 1 . HJ :3214~33t:1171 PSI PAGE 02 L Fisfl b1fbnnntion _~__",,,,,,__.,,--_,___,\,,,,,,,,,,,,_~__',"r-_._""~_._"'---''''-,.'- I:t!s /I .ToBuild ()n Ilng~ · CommIttJDfI .. ~ BiwWeekly S~ fur Te:iting andlr.ispectiol1 Swices througb 08/6/05 Project: Residence Inn PSI Project # 761w50044 Contmctor: Welbro f ~. .. Descri~~on -~-- .~] ~. Remarks I Date I 7/25/05 Reinforcing Steel lm~tlon Section, ""1\" 4 . Floor I Not aU Colwnns were ready. Bottom mat of Colwrms, Preliminary Md Section "C" 4dt floor reinfoTcins steel for floor slab complete, I Slab PreliIDjn!!i1'Y I 7/26/05 Reinto:rcmg Steel wpedion Section "C' 41ll Floor Reinforcing Steel is not. complete will he Slab Preliminary inspected prior to placement of concrete f,}Il. 7/27/0$, -~......,-- ~forcing Steel ~ctj()n Sectioo "'C" 4m. Floor Reinforcing Steel complied with project I 7/27/05 Slab Now Complete and eMU wills 3m floor.?' sets ! ropecifi.catioiU. Minor spacing de6ciimdes of (;oncrete cylinders ~ cast rept'etle1Iting floor Request RFI fot these. C~ complied with slab m:l.d I set of grom prisms emit repmsming Cen project specifications. fiU 7/28/05 I Reinforcing Steel SeCtion "A" J'" floor, C~..1U walls, ReInforcing Steel mtrt proj<<1t specifi<:ation. .1 Partial and Columns. I i I 7/JO/I}:5 1 R<inJ'"",... St..1 S<di.. "A' ," fl"",: eMU _11>, Earty break... from concrete placement Oil 8/27 preliminary, met IDmimum 3000pl!li requirement to strip 1 forms., I I , r--- Reintb~~-n1g St~ei Section "A" 3AAl floor, CMlj wa.l.l.s. Reinforcing Steel Wid grout placement met I 8/1/05 I ('ast 1 set of grout prisms. project ,pecificatioo. I I I 8/2/05 Reinfotcins Steel lIDipe<.'iion411O Floor secti~r} "A'" Rel'lforcing Steel Willi incomplete atld win I prelimina!.)' continue during placement of ooncrete 18I3!05 i Reinforcl!l& Stfel1nspectlon ~tion. .. ^" 4ill Floof . '"f Reinforcing Steel complied wimprojeCt Slab Now Complete amd eMU walls 4111 floor.? kt5 specifications. C~T~tfl complied with project of concrete C)'!inders VI'e1"e cut representing floor specificaw':IJ\S. :51ab and 1 set of gtoU[ prisms C!ll$t repr;~lJti:l:'lg cell fill 8/4/05 Reinforcing SteellnllpOCtioo-Section "e" 4m floor Reinfurcing Steel complied with project columns and eMU walls. Cast 1 set of COJ)(:J'ef.t f(if specificatioos. Concrete complied with project col\lmns and C$! 1 set of grollt prisms fur eMU. I specif!Ct\tioos. I Picked-up and transp<.>rled ~t specimens from ! 8/3/05 I i/5105 Reinforcmg S'.cellnspoction Section "e" 4111 CMt.! t ReInforcing Stllel complied willi project w~lls. Pickoo~1lp Md ~ported leSt specimens from f specificatlollil. L ISnlO5 ~_ 1 -1 '.-'....,'. ~""-,'" __'.,....".___.__H__.. .___.,.__._ ._',m_ P'()l;)s{;\(,nal Servi(le Inctu6trle~. Inc. . F45 $;J,<;l St-ee! > Orlando, FL 325;)9 . PI-.c:r.e 407/304.5560' fax 407:304-5561 -------------,,-,,--'"''---,-''-~---------'''-,~---,-''''_.,,''',--,.","'-",--,-,--------------- --, ~-,-,-,,-,,-,-,-,,-,~" Build On Engineering .. Consulting.. Testing REPORT OF GROUT COMPRESSION TEST Tested For: A 1A Acquisition Group LTD., LLP Project: RESIDENCE INN Attn: Roger Dobson CAPE CAN A VERAL, FL 3425 Atlantic Avenue Cocoa Beach, FL 32931 Project No: 761-50044 LOCATION: Down cells: CMU walls and pilasters, col. Une H.3 to U and 13 to 41-3rd floor Sampled column L-17 Date Placed: 8/1/2005 Technician: M. Odom Time Batched: 7:05 AM Supplier: Rinker Time Sampled: 7:45 AM Delivery TicketlTruck No.: 92549669 Slump (in) (ASTM C143): 9.5 Mix No. & Proportions: 1162918 Air Temp. (F): 78 Concrete Temp. (F) (ASTM C1064): 83 Date Received in lab: 8/212005 Air Content (ASTM C173/C231): N/A COMPRESSIVE TEST RESULTS Test Date Total Prism Prism Compressive Type ... No. 10 (Days) Test (Ibs) (in) (sq. in.) (psi) Break 102 A 7 8/8/2005 45000 3.65x3.70 13.51 3330 Type 1 B 28 8/29/2005 63000 3.70x3.80 14.06 4480 Type 1 C 28 8/29/2005 65000 3.80x3.80 14.44 4500 Type 1 Specifications: 3000 28 days REMARKS: X Prisms made by PSI Prisms made by Contractor X Prisms picked up by PSI Prisms picked up by Contractor X Test Results Comply with Test Results do not Comply with applicable specifications applicable specifications Concrete sampled in accordance with ASTM C172 and ASTM C31. Compressive Strength tests performed in accordance with ASTM C39. Respectfully Submitted Professional Service Industries, Inc. Professional Service Industries, Inc.. 1748 33rd Street. Orlando, FL 32839. Phone 407/304-5560. Fax 407/304-5561 FL Engineering Business 3684 . Build On Engineering.. Consulting.. Testing REPORT OF CONCRETE COMPRESSION TEST Tested For: A 1A Acquisition Group LTD., LLP Project: RESIDENCE INN Attn: Roger Dobson CAPE CANAVERAL, FL 3425 Atlantic Avenue Cocoa Beach, FL 32931 Project No: 761-50044 LOCATION: Section A, 4th floor slab, approx B-3 Date Placed: 8/3/2005 Technician: J. Kilderry Time Batched: 6:24 AM Supplier: Rinker Time Sampled: 7:15 AM Delivery TicketlTruck No.: 40499948 Slump (in) (ASTM C143): 6 Mix No. & Proportions: 1156016 Air Temp. (F): 86 Concrete Temp. (F) (ASTM C1064): 91 Date Received in lab: 8/4/2005 Air Content (ASTM C173/C231): N/A COMPRESSIVE TEST RESULTS Test Date Total Cylinder Cylinder Compressive Type ..,. -~ No. 10 (Days) Test (Ibs) (in) (sq. in.) (psi) Break 103 A 3 8/6/2005 121000 6.00 28.27 4280 Tvoe 1 B 7 8/10/2005 146000 6.00 28.27 5160 Tvoe 1 C 28 8/31/2005 187500 6.00 28.27 6630 Type 1 D 28 8/31/2005 189000 6.00 28.27 6690 Type 2 Specifications: 4000 28 days REMARKS: X Cylinders made by PSI Cylinders made by Contractor X Cylinders picked up by PSI Cylinders picked up by Contractor X Test Results Comply with Test Results do not Comply with applicable specifications applicable specifications 5 gallons water added to concrete Concrete sampled in accordance with ASTM C172 and ASTM C31. Compressive Strength tests performed in accordance with ASTM C39. Respectfully Submitted Professional Service Industries, Inc. Professional Service Industries, Inc.. 1748 33rd Street. Orlando, FL 32839. Phone 407/304-5560. Fax 407/304-5561 FL Engineering Business 3684 _"___~,,,~_,_w"~'_m"_"""'_""_''''_,,_'''_____~.,,_,.______.~_,_.._,_,_,~___,_,_,_.___,_._,_""_,_,_.,_",,_,,,_,_,_,,_,,_,,_"'_''''_,,~ Build On Engineering .. Consulting.. Testing REPORT OF CONCRETE COMPRESSION TEST Tested For: A1A Acquisition Group LTD., LLP Project: RESIDENCE INN AUn: Roger Dobson CAPE CANAVERAL, FL 3425 Atlantic Avenue Cocoa Beach, FL 32931 Project No: 761-50044 LOCATION: Section A, 4th floor slab, approx E-7 Date Placed: 8/3/2005 Technician: J. Kilderry Time Batched: 7:20 AM Supplier: Rinker Time Sampled: 7:52 AM Delivery TicketlTruck No.: 92558555 Slump (in) (ASTM C143): 6 Mix No. & Proportions: 1156016 Air Temp. (F): 86 Concrete Temp. (F) (ASTM C1064): 92 Date Received in lab: 8/4/2005 Air Content (ASTM C173/C231): N/A COMPRESSIVE TEST RESULTS Test Date Total Cylinder Cylinder Compressive Type ,..'" 'J '"'\:I" v -. .",. No. 10 (Days) Test (Ibs) (in) (sq. in.) (psi) Break 104 A 3 8/6/2005 108000 6.00 28.27 3820 Type 1 B 7 8/10/2005 132500 6.00 28.27 4690 Type 1 C 28 8/31/2005 187500 6.00 28.27 6630 Type 1 0 28 8/31/2005 189000 6.00 28.27 6690 Type 2 Specifications: 4000 28 days REMARKS: X Cylinders made by PSI Cylinders made by Contractor X Cylinders picked up by PSI Cylinders picked up by Contractor X Test Results Comply with Test Results do not Comply with applicable specifications applicable specifications Concrete sampled in accordance with ASTM C172 and ASTM C31. Compressive Strength tests performed in accordance with ASTM C39. Respectfully Submitted Professional Service Industries, Inc. Professional Service Industries, Inc.. 1748 33rd Street. Orlando, FL 32839 . Phone 407/304-5560. Fax 407/304-5561 FL Engineering Business 3684 ____'~_,.__"""___~_'~'~_m_'''''_'''_'''''''_'''_~__,.__,_____,__.~_,_,~___ --_._--~-~-_._"'_._-"""'-"""''''''''''''- Build On Engineering .. Consulting.. Testing REPORT OF CONCRETE COMPRESSION TEST Tested For: A 1A Acquisition Group LTD., LLP Project: RESIDENCE INN Attn: Roger Dobson CAPE CANAVERAL, FL 3425 Atlantic Avenue Cocoa Beach, FL 32931 Project No: 761-50044 LOCATION: Section A, 4th floor slab, approx K-10 Date Placed: 8/3/2005 Technician: J. Kilderry Time Batched: 7:47 AM Supplier: Rinker Time Sampled: 8:43 AM Delivery Ticket/Truck No.: 92558918 Slump (in) (ASTM C143): 6.5 Mix No. & Proportions: 1156016 Air Temp. (F): 86 Concrete Temp. (F) (ASTM C1064): 92 Date Received in lab: 8/4/2005 Air Content (ASTM C173/C231): N/A COMPRESSIVE TEST RESULTS Test Date Total Cylinder Cylinder Compressive Type ~..., .... No. 10 (Days) Test (Ibs) (in) (sq. in.) (psi) Break 105 A 3 8/6/2005 111000 6.00 28.27 3930 Tvpe 1 B 7 8/10/2005 135000 6.00 28.27 4780 Tvpe 2 C 28 8/31/2005 191500 6.00 28.27 6770 Tvpe 1 0 28 8/31/2005 193000 6.00 28.27 6830 Tvpe 2 Specifications: 4000 28 days REMARKS: X Cylinders made by PSI Cylinders made by Contractor X Cylinders picked up by PSI Cylinders picked up by Contractor X Test Results Comply with Test Results do not Comply with applicable specifications applicable specifications 5 gallons water added to concrete Concrete sampled in accordance with ASTM C172 and ASTM C31. Compressive Strength tests performed in accordance with ASTM C39. Respectfully Submitted Professional Service Industries, Inc. Professional Service Industries, Inc.. 1748 33rd Street. Orlando, FL 32839. Phone 407/304-5560. Fax 407/304-5561 FL Engineering Business 3684 Build On Engineering. Consulting. Testing REPORT OF CONCRETE COMPRESSION TEST Tested For: A1A Acquisition Group LTD" LLP Project: RESIDENCE INN Attn: Roger Dobson CAPE CANAVERAL, FL 3425 Atlantic Avenue Cocoa Beach, FL 32931 Project No: 761-50044 LOCATION: Section A. 4th floor slab, approx S-14 Date Placed: 8/3/2005 Technician: J. Kilderry Time Batched: 8:43 AM Supplier: Rinker Time Sampled: 9:27 AM Delivery TickellTruck No.: N/A Slump (in) (ASTM C143): 7 Mix No. & Proportions: 1156016 Air Temp. (F): 87 Concrete Temp. (F) (ASTM C1064): 93 Date Received in lab: 8/4/2005 Air Content (ASTM C173/C231): N/A COMPRESSIVE TEST RESULTS Test Date Total Cylinder Cylinder Compressive Type ~.n ~~v ~. ~~w_ ~.vw No. 10 (Days) Test (Ibs) (in) (sq. in.) (psi) Break 106 A 3 8/6/2005 102000 6,00 28.27 3610 Type 1 B 7 8/10/2005 129500 6.00 28.27 4580 Type 2 C 28 8/31/2005 196000 6.00 28.27 6930 Type 1 D 28 8/31/2005 197500 6,00 28.27 6990 Type 2 Specifications: 4000 28 days REMARKS: X Cylinders made by PSI Cylinders made by Contractor X Cylinders picked up by PSI Cylinders picked up by Contractor X Test Results Comply with Test Results do not Comply with applicable specifications applicable specifications 10 gallons water added to concrete Concrete sampled in accordance with ASTM C172 and ASTM C31. Compressive Strength tests performed in accordance with ASTM C39. Respectfully Submitted Professional Service Industries, Inc. Professional Service Industries, Inc,. 1748 33rd Street. Orlando, FL 32839. Phone 407/304-5560. Fax 407/304-5561 FL Engineering Business 3684 Engineering .. Consulting" Testing REPORT OF CONCRETE COMPRESSION TEST Tested For: A1A Acquisition Group LTD., LLP Project: RESIDENCE INN Attn: Roger Dobson CAPE CANAVERAL, FL 3425 Atlantic Avenue Cocoa Beach, FL 32931 Project No: 761-50044 LOCATION: Section A, 4th floor slab, approx M-24 Date Placed: 8/3/2005 Technician: J. Kilderry Time Batched: 9:30 AM Supplier: Rinker Time Sampled: 10:16 AM Delivery TickellTruck No.: 92559643 Slump (in) (ASTM C143): 7 Mix No. & Proportions: 1156016 Air Temp. (F): 88 Concrete Temp. (F) (ASTM C1064): 93 Date Received in lab: 8/4/2005 Air Content (ASTM C173/C231): N/A COMPRESSIVE TEST RESULTS Test Date Total Cylinder Cylinder Compressive Type ''''. ~ -~-- ~.-- u. No. 10 (Days) Test (Ibs) (in) (sq. in.) (psi) Break 107 A 3 8/6/2005 103000 6.00 28.27 3640 Type 1 B 7 8/10/2005 131000 6.00 28.27 4630 Type 1 C 28 8/31/2005 190500 6.00 28.27 6740 Type 1 0 28 8/31/2005 192000 6.00 28.27 6790 Type 2 Specifications: 4000 28 days REMARKS: X Cylinders made by PSI Cylinders made by Contractor X Cylinders picked up by PSI Cylinders picked up by Contractor X Test Results Comply with Test Results do not Comply with applicable specifications applicable specifications Concrete sampled in accordance with ASTM C172 and ASTM C31. Compressive Strength tests performed in accordance with ASTM C39. Respectfully Submitted Professional Service Industries, Inc. Professional Service Industries, Inc.. 1748 33rd Street. Orlando, FL 32839 . Phone 407/304-5560. Fax 407/304-5561 FL Engineering Business 3684 Build On Engineering.. Consulting.. Testing REPORT OF CONCRETE COMPRESSION TEST Tested For: A 1A Acquisition Group LTD., LLP Project: RESIDENCE INN Attn: Roger Dobson CAPE CANAVERAL, FL 3425 Atlantic Avenue Cocoa Beach, FL 32931 Project No: 761-50044 LOCATION: Section A, 4th floor slab, approx Q-35 Date Placed: 8/3/2005 Technician: J. Kilderry Time Batched: 10:15 AM Supplier: Rinker Time Sampled: 11:01 AM Delivery TicketlTruck No.: 92560088 Slump (in) (ASTM C143): 6.5 Mix No. & Proportions: 1156016 Air Temp. (F): 90 Concrete Temp. (F) (ASTM C1064): 94 Date Received in lab: 8/4/2005 Air Content (ASTM C173/C231): N/A COMPRESSIVE TEST RESULTS Test Date Total Cylinder Cylinder Compressive Type .J - No. 10 (Days) Test (Ibs) (in) (sq. in.) (psi) Break 108 A 3 8/6/2005 109000 6.00 28.27 3860 Type 1 B 7 8/10/2005 132500 6.00 28.27 4690 Type 1 C 28 8/31/2005 188500 6.00 28.27 6670 Type 1 D 28 8/31/2005 190000 6.00 28.27 6720 Tvpe 2 Specifications: 4000 28 days REMARKS: X Cylinders made by PSI Cylinders made by Contractor X Cylinders picked up by PSI Cylinders picked up by Contractor X Test Results Comply with Test Results do not Comply with applicable specifications applicable specifications Concrete sampled in accordance with ASTM C172 and ASTM C31. Compressive Strength tests performed in accordance with ASTM C39. Respectfully Submitted Professional Service Industries, Inc. Professional Service Industries, Inc.' 1748 33rd Street. Orlando, FL 32839' Phone 407/304-5560' Fax 407/304-5561 FL Engineering Business 3684 Build On /Engineering.. Consulting.. Testing REPORT OF CONCRETE COMPRESSION TEST Tested For: A 1A Acquisition Group LTD., LLP Project: RESIDENCE INN Altn: Roger Dobson CAPE CANAVERAL, FL 3425 Atiantic Avenue Cocoa Beach, FL 32931 Project No: 761-50044 LOCATION: Section A, 4th floor slab, approx U-39 Date Placed: 8/3/2005 Technician: J. Kilderry Time Batched: 10:45 AM Supplier: Rinker Time Sampled: 11:20 AM Delivery TicketITruck No.: 92560314 Slump (in) (ASTM C143): 7.5 Mix No. & Proportions: 1156016 Air Temp. (F): 90 Concrete Temp. (F) (ASTM C1064): 94 Date Received in lab: 8/4/2005 Air Content (ASTM C173/C231): N/A COMPRESSIVE TEST RESULTS Test Date Total Cylinder Cylinder Compressive Type No. 10 (Days) Test (Ibs) (in) (sq. in.) (psi) Break 109 A 3 8/6/2005 96000 6.00 28.27 3400 Type 1 B 7 8/10/2005 119500 6.00 28.27 4230 Type 1 C 28 8/31/2005 188500 6.00 28.27 6670 Type 2 D 28 8/31/2005 187000 6.00 28.27 6610 Type 1 Specifications: 4000 28 days REMARKS: X Cylinders made by PSI Cylinders made by Contractor X Cylinders picked up by PSI Cylinders picked up by Contractor X Test Results Comply with Test Results do not Comply with applicable specifications applicable specifications 10 gallons water added to concrete Concrete sampled in accordance with ASTM C172 and ASTM C31. Compressive Strength tests performed in accordance with ASTM C39. Respectfully Submitted Professional Service Industries, Inc. Professional Service Industries, Inc.. 1748 33rd Street. Orlando, FL 32839. Phone 407/304-5560. Fax 407/304-5561 FL Engineering Business 3684 Build On Engineering .. Consulting.. Testing REPORT OF CONCRETE COMPRESSION TEST Tested For: A 1A Acquisition Group LTD., LLP Project: RESIDENCE INN Alln: Roger Dobson CAPE CANAVERAL, FL 3425 Atlantic Avenue Cocoa Beach, FL 32931 Project No: 761-50044 LOCATION: Roof Slab: elevator C, sampled approx. center of slab Date Placed: 8/23/2005 Technician: M.Odom Time Batched: 12:25 PM Supplier: Rinker Time Sampled: 1:16 PM Delivery TicketlTruck No.: 92628493 Slump (in) (ASTM C143): 8 Mix No. & Proportions: 1176347 Air Temp. (F): 95 Concrete Temp. (F) (ASTM C1064): 90 Date Received in lab: 8/24/2005 Air Content (ASTM C173/C231): N/A COMPRESSIVE TEST RESULTS Test Date Total Cylinder Cylinder Compressive Type No. 10 (Days) Test (Ibs) (in) (sq. in.) (psi) Break 130 A 3 8/26/2005 101000 6.00 28.27 3570 Type 2 B 7 8/30/2005 124500 6.00 28.27 4400 Type 1 C 28 9/20/2005 0 28 9/20/2005 Specifications: 5000 28 days REMARKS: X Cylinders made by PSI Cylinders made by Contractor X Cylinders picked up by PSI Cylinders picked up by Contractor Test Results Comply with Test Results do not Comply with applicable specifications applicable specifications Concrete sampled in accordance with ASTM C172 and ASTM C31. Compressive Strength tests performed in accordance with ASTM C39. Respectfully Submitted Professional Service Industries, Inc. Professional Service Industries, Inc.' 1748 33rd Street. Orlando, FL 32839' Phone 407/304-5560' Fax 407/304-5561 FL Engineering Business 3684 Build On Engineering. Consulting. Testing REPORT OF CONCRETE COMPRESSION TEST Tested For: A 1A Acquisition Group LTD., LLP Project: RESIDENCE INN Altn: Roger Dobson CAPE CANAVERAL, FL 3425 Atlantic Avenue Cocoa Beach, FL 32931 Project No: 761-50044 LOCATION: Down Cells: eMU walls and pilasters, col. Line A to G and 1 to 14 on 3rd floor Sampled Approx. Co!. Line A-1 Date Placed: 7/27/2005 Technician: M.Odom Time Batched: 2:28 PM Supplier: Rinker Time Sampled: 3:15 PM Delivery TickellTruck No.: 92538448 Slump (in) (ASTM C143): 9 Mix No. & Proportions: 1162918 Air Temp. (F): 87 Concrete Temp. (F) (ASTM C1064): 88 Date Received in lab: 7/28/2005 Air Content (ASTM C173/C231): N/A COMPRESSIVE TEST RESULTS Test Date Total Cylinder Cylinder Compressive Type No. 10 (Days) Test (Ibs) (in) (sq. in.) (psi) Break 93 A 7 8/3/2005 47000 3.50x3.60 12.60 3730 Type 1 B 28 8/24/2005 56500 3.40x3.50 11.90 4750 Type 1 C 28 8/24/2005 61000 3.55x3.50 12.43 4910 Type 2 H Specifications: 3000 28 days REMARKS: X Cylinders made by PSI Cylinders made by Contractor X Cylinders picked up by PSI Cylinders picked up by Contractor X Test Results Comply with Test Results do not Comply with applicable specifications applicable specifications Concrete sampled in accordance with ASTM C172 and ASTM C31. Compressive Strength tests performed in accordance with ASTM C39. Respectfully Submitted Professional Service Industries, Inc. Professional Service Industries, Inc.' 1748 33rd Street. Orlando, FL 32839' Phone 407/304-5560 . Fax 407/304-5561 FL Engineering Business 3684 Build On Engineering.. Consulting.. Testing REPORT OF CONCRETE COMPRESSION TEST Tested For: A 1A Acquisition Group LTD., LLP Project: RESIDENCE INN Attn: Roger Dobson CAPE CANAVERAL, FL 3425 Ailantic Avenue Cocoa Beach, FL 32931 Project No: 761-50044 LOCATION: Section C, 4th floor slab approx. col. Line L-9? Date Placed: 7/27/2005 Technician: J. Kilderry Time Batched: 8:13 AM Supplier: Rinker Time Sampled: 8:52 AM Delivery TicketlTruck No.: 9253 Slump (in) (ASTM C143): 7.5 Mix No. & Proportions: 1156016 Air Temp. (F): 85 Concrete Temp. (F) (ASTM C1064): 92 Date Received in lab: 7/28/2005 Air Content (ASTM C173/C231): N/A COMPRESSIVE TEST RESULTS Test Date Total Cylinder Cylinder Compressive Type No. 10 (Days) Test (Ibs) (in) (sq. in.) (psi) Break 94 A 3 7/30/2005 112000 6.00 28.27 3960 Tvpe 1 B 7 813/2005 141500 6.00 28.27 5010 Tvpe 1 C 28 8/24/2005 195500 6.00 28.27 6920 Tvpe 2 0 28 8/24/2005 193000 6.00 28.27 6830 Tvpe 1 H Specifications: 4000 28 days REMARKS: X Cylinders made by PSI Cylinders made by Contractor X Cylinders picked up by PSI Cylinders picked up by Contractor X Test Results Comply with Test Results do not Comply with applicable specifications applicable specifications 10 gallons water added to concrete Concrete sampled in accordance with ASTM C172 and ASTM C31. Compressive Strength tests performed in accordance with ASTM C39. Respectfully Submitted Professional Service Industries, Inc. Professional Service Industries, Inc.' 1748 33rd Street. Orlando, FL 32839' Phone 407/304-5560' Fax 407/304-5561 FL Engineering Business 3684 Build On Engineering .. Consulting" Testing REPORT OF CONCRETE COMPRESSION TEST Tested For: A 1A Acquisition Group LTD., LLP Project: RESIDENCE INN Attn: Roger Dobson CAPE CANAVERAL, FL 3425 Atlantic Avenue Cocoa Beach, FL 32931 Project No: 761-50044 LOCATION: Section C, 4th floor slab approx. col. Line A.5-98 Date Placed: 7/27/2005 Technician: J. Kilderry Time Balched: 6:23 AM Supplier: Rinker Time Sampled: 7:22 AM Delivery TicketITruck No.: 9253 Slump (in) (ASTM C143): 5 Mix No. & Proportions: 1156016 Air Temp. (F): 82 Concrete Temp. (F) (ASTM C1064): 94 Dale Received in lab: 7/28/2005 Air Conlenl (ASTM C173/C231): N/A COMPRESSIVE TEST RESULTS Test Date Total Cylinder Cylinder Compressive Type No. 10 (Days) Test (Ibs) (in) (sq. in.) (psi) Break 95 A 3 7/30/2005 97000 6.00 28.27 3430 Type 1 B 7 813/2005 130000 6.00 28.27 4600 Type 2 C 28 8/24/2005 185000 6.00 28.27 6540 Type 1 0 28 8/24/2005 182500 6.00 28.27 6460 Type 1 H Specifications: 4000 28 days REMARKS: X Cylinders made by PSI Cylinders made by Contractor X Cylinders picked up by PSI Cylinders picked up by Contractor X Test Results Comply with Test Results do not Comply with applicable specifications applicable specifications Concrete sampled in accordance with ASTM C172 and ASTM C31. Compressive Strength tests performed in accordance with ASTM C39. Respectfully Submitted Professional Service Industries, Inc. Professional Service Industries, Inc.. 1748 33rd Street. Orlando, FL 32839. Phone 407/304-5560. Fax 407/304-5561 FL Engineering Business 3684 Build On Engineering.. Consulting.. Testing REPORT OF CONCRETE COMPRESSION TEST Tested For: A1A Acquisition Group LTD" LLP Project: RESIDENCE INN Atln: Roger Dobson CAPE CANAVERAL, FL 3425 Atlantic Avenue Cocoa Beach, FL 32931 Project No: 761-50044 LOCATION: Section C, 4th floor slab approx. col. Line F .5-92 Date Placed: 7/27/2005 Technician: J. Kilderry Time Batched: 7:29 AM Supplier: Rinker Time Sampled: 8:07 AM Delivery TicketlTruck No.: 9253 Slump (in) (ASTM C143): 8 Mix No. & Proportions: 1156016 Air Temp. (F): 84 Concrete Temp. (F) (ASTM C1064): 92 Date Received in lab: 7/28/2005 Air Content (ASTM C173/C231): N/A COMPRESSIVE TEST RESULTS Test Date Total Cylinder Cylinder Compressive Type No. 10 (Days) Test (Ibs) (in) (sq. in.) (psi) Break 96 A 3 7/30/2005 96000 6.00 28.27 3400 Type 1 B 7 8/3/2005 117500 6.00 28,27 4160 Type 1 C 28 8/24/2005 1 70000 6.00 28.27 6010 Type 2 D 28 8/24/2005 172000 6.00 28.27 6080 Type 1 H Specifications: 4000 28 days REMARKS: X Cylinders made by PSI Cylinders made by Contractor X Cylinders picked up by PSI Cylinders picked up by Contractor X Test Results Comply with Test Results do not Comply with applicable specifications applicable specifications Concrete sampled in accordance with ASTM Ci72 and ASTM C3i. Compressive Strength tests performed in accordance with ASTM C39. Respectfully Submitled Professional Service Industries, Inc. Professional Service Industries, Inc.. 1748 33rd Street. Orlando, FL 32839. Phone 407/304-5560. Fax 407/304-5561 FL Engineering Business 3684 Build On Engineering. Consulting · Testing REPORT OF CONCRETE COMPRESSION TEST Tested For: A1A Acquisition Group LTD., LLP Project: RESIDENCE INN Attn: Roger Dobson CAPE CANAVERAL, FL 3425 Atlantic Avenue Cocoa Beach, FL 32931 Project No: 761-50044 LOCATION: Section C, 4th floor slab approx. col. Line S-97 Date Placed: 7/27/2005 Technician: J. Kilderry Time Batched: 9:04 AM Supplier: Rinker Time Sampled: 9:30 AM Delivery Ticket/Truck No.: 9253 Slump (in) (ASTM C143): 7.5 Mix No. & Proportions: 1156016 Air Temp. (F): 86 Concrete Temp. (F) (ASTM C1064): 94 Date Received in lab: 7/28/2005 Air Content (ASTM C173/C231): N/A COMPRESSIVE TEST RESULTS Test Date Total Cylinder Cylinder Compressive Type No. 10 (Days) Test (Ibs) (in) (sq. in.) (psi) Break 97 A 3 7/30/2005 108000 6.00 28.27 3820 Type 1 B 7 8/3/2005 137500 6.00 28.27 4860 Type 1 C 28 8/24/2005 188000 6.00 28.27 6650 Type 2 D 28 8/24/2005 187500 6.00 28.27 6630 Type 2 H Specifications: 4000 28 days REMARKS: X Cylinders made by PSI Cylinders made by Contractor X Cylinders picked up by PSI Cylinders picked up by Contractor X Test Results Comply with Test Results do not Comply with applicable specifications applicable specifications 10 gallons water added to concrete Concrete sampled in accordance with ASTM C172 and ASTM C31. Compressive Strength tests performed in accordance with ASTM C39. Respectfully Submitted Professional Service Industries, Inc. Professional Service Industries, Inc.. 1748 33rd Street. Orlando, FL 32839. Phone 407/304-5560. Fax 407/304-5561 FL Engineering Business 3684 Build On Engineering . Consulting. Testing REPORT OF CONCRETE COMPRESSION TEST Tested For: A 1A Acquisition Group LTD.. LLP Project: RESIDENCE INN Atln: Roger Dobson CAPE CANAVERAL, FL 3425 Atlantic Avenue Cocoa Beach, FL 32931 Project No: 761-50044 LOCATION: Section C. 4th floor slab approx. col. Line U-87 Date Placed: 7/27/2005 Technician: J. Kilderry Time Batched: 9:24 AM Supplier: Rinker Time Sampled: 10:14 AM Delivery TicketlTruck No.: 9253 Slump (in) (ASTM C143): 6.5 Mix No. & Proportions: 1156016 Air Temp. (F): 87 Concrete Temp. (F) (ASTM C1064): 95 Date Received in lab: 7/28/2005 Air Content (ASTM C173/C231): N/A COMPRESSIVE TEST RESULTS Test Date Total Cylinder Cylinder Compressive Type .~ No. 10 (Days) Test (Ibs) (in) (sq. in.) (psi) Break 98 A 3 7/30/2005 102500 6.00 28.27 3630 TVDe 1 B 7 8/3/2005 142500 6.00 28.27 5040 TVDe 2 C 28 8/24/2005 176000 6.00 28.27 6230 Type 1 0 28 8/24/2005 178500 6.00 28.27 6310 TVDe 1 H Specifications: 4000 28 days REMARKS: X Cylinders mClde by PSI Cylinders made by Contractor X Cylinders picked up by PSI Cylinders picked up by Contractor X Test Results Comply with Test Results do not Comply with applicable specifications applicable specifications Concrete sampled in accordance with ASTM C172 and ASTM C31. Compressive Strength tests performed in accordance with ASTM C39. Respectfully Submitled Professional Service Industries, Inc. Professional Service Industries, Inc.. 1748 33rd Street. Orlando, FL 32839. Phone 407/304-5560. Fax 407/304-5561 FL Engineering Business 3684 Build On Engineering .. Consulting.. Testing REPORT OF CONCRETE COMPRESSION TEST Tested For: A 1A Acquisition Group LTD., LLP Project: RESIDENCE INN Attn: Roger Dobson CAPE CANAVERAL, FL 3425 Atlantic Avenue Cocoa Beach, FL 32931 Project No: 761-50044 LOCATION: Section C, 4th floor slab approx. col. Line Q-82 Date Placed: 7/27/2005 Technician: J. Kilderry Time Batched: 10:36 AM Supplier: Rinker Time Sampled: 11:05 AM Delivery TicketlTruck No.: 9253 Slump (in) (ASTM C143): 6 Mix No. & Proportions: 1156016 Air Temp. (F): 87 Concrete Temp. (F) (ASTM C1064): 96 Date Received in lab: 7/28/2005 Air Content (ASTM C173/C231): N/A COMPRESSIVE TEST RESULTS Test Date Total Cylinder Cylinder Compressive Type No. 10 (Days) Test (Ibs) (in) (sq. in.) (psi) Break 99 A 3 7130/2005 96000 6.00 28.27 3400 Type 1 B 7 8/3/2005 125500 6.00 28.27 4440 Type 1 C 28 8/24/2005 179000 6.00 28.27 6330 Type 2 0 28 8/24/2005 176500 6.00 28.27 6240 Type 1 H Specifications: 4000 28 days REMARKS: X Cylinders made by PSI Cylinders made by Contractor X Cylinders picked up by PSI Cylinders picked up by Contractor X Test Results Comply with Test Results do not Comply with applicable specifications applicable specifications Concrete sampled in accordance with ASTM C172 and ASTM C31. Compressive Strength tests performed in accordance with ASTM C39. Respectfully Submitted Professional Service Industries, Inc. Professional Service Industries, Inc.. 1748 33rd Street. Orlando, FL 32839. Phone 407/304-5560. Fax 407/304-5561 FL Engineering Business 3684 Engineering .. Consulting" Testing REPORT OF CONCRETE COMPRESSION TEST Tested For: A 1A Acquisition Group LTD., LLP Project: RESIDENCE INN Altn: Roger Dobson CAPE CANAVERAL, FL 3425 Atlantic Avenue Cocoa Beach, FL 32931 Project No: 761-50044 LOCATION: Section C, 4th floor elevated slab, Approx. coL Line P-70 Date Placed: 7/27/2005 Technician: J. Kilderry Time Batched: 11:37 AM Supplier: Rinker Time Sampled: 12:04 PM Delivery Ticket/Truck No.: 9253 Slump (in) (ASTM C143): 5.5 Mix No. & Proportions: 1156016 Air Temp. (F): 87 Concrete Temp. (F) (ASTM C1064): 95 Date Received in lab: 7/28/2005 Air Content (ASTM C173/C231): N/A COMPRESSIVE TEST RESULTS Test Date Total Cylinder Cylinder Compressive Type - No. 10 (Days) Test (Ibs) (in) (sq. in.) (psi) Break 100 A 3 7/30/2005 98500 6.00 28.27 3480 Type 1 B 7 8/3/2005 138000 6.00 28.27 4880 Type 2 C 28 8/24/2005 175500 6.00 28.27 6210 Type 2 D 28 8/24/2005 177000 6.00 28.27 6260 Type 1 Specifications: 4000 28 days REMARKS: X Cylinders made by PSI Cylinders made by Contractor - X Cylinders picked up by PSI Cylinders picked up by Contractor X Test Results Comply with Test Results do not Comply with applicable specifications applicable specifications Concrete sampled in accordance with ASTM C172 and ASTM C31. Compressive Strength tests performed in accordance with ASTM C39. Respectfully Submilted Professional Service Industries, Inc. Professional Service Industries, Inc.. 1748 33rd Street. Orlando, FL 32839. Phone 407/304-5560. Fax 407/304-5561 FL Engineering Business 3684 Engineering. Consulting. Testing REPORT OF CONCRETE COMPRESSION TEST Tested For: A 1 A Acquisition Group L TO" LLP Project: RESIDENCE INN Alln: Roger Dobson CAPE CANAVERAL, FL 3425 Atlantic Avenue Cocoa Beach, FL 32931 Project No: 761-50044 LOCATION: Columns: line U-7, U.1-9, S, 1-16, S,2-19, S,2-24, S,1-26, S.2-28, S,2-33, S, 1-35, S,2-37 (3rd floor) Sampled column $,2-19 Date Placed: 7/28/2005 Technician: M, Odom Time Batched: 12:33 PM Supplier: Rinker Time Sampled: 1 :37 PM Delivery TicketlTruck No.: 92542509 Slump (in) (ASTM C143): 7,5 Mix No, & Proportions: 1176322 Air Temp. (F): 85 Concrete Temp, (F) (ASTM C1064): 86 Date Received in lab: 7/29/2005 Air Content IASTM C173/C231): N/A COMPRESSIVE TEST RESULTS Test Date Total Cylinder Cylinder CompressivE Type No. 10 (Days) Test (Ibs) (in) (sq. in.) (psi) Break 101 A 4 8/1/2005 103000 6,00 28,27 3640 Type 1 B 7 8/4/2005 117500 6,00 28,27 4160 Type 2 C 28 8/25/2005 172500 6,00 28,27 6100 Type 1 0 28 8/25/2005 174000 6.00 28,27 6150 Type 1 Specifications: 5000 28 days REMARKS: X Cylinders made by PSI Cylinders made by Contractor X Cylinders picked up by PSI Cylinders picked up by Contractor X Test Results Comply with Test Results do not Comply with applicable specifications applicable specifications Concrete sampled in accordance with ASTM C172 and ASTM C31. Compressive Strength tests performed in accordance with ASTM C39. Respectfully Submitted Professional Service Industries, Inc. Professional Service Industries, Inc,. 1748 33rd Street. Orlando, FL 32839. Phone 407/304-5560. Fax 407/304-5561 FL Engineering Business 3684 Build On Engineering" Consulting.. Testing REPORT OF CONCRETE COMPRESSION TEST Tested For: A 1A Acquisition Group LTD., LLP Project: RESIDENCE INN Attn: Roger Dobson CAPE CANAVERAL, FL 3425 Atiantic Avenue Cocoa Beach, FL 32931 Project No: 761-50044 LOCATION: Section A Roof slab, sampled at approx. B-4 Date Placed: 8/17/2005 Technician: J Kilderry Time Batched: 9:15 AM Supplier: Rinker Time Sampled: 10:16 AM Delivery TickellTruck No.: 92607686 Slump (in) (ASTM C143): 6.5 Mix No. & Proportions: 1156016 Air Temp. (F): 85 Concrete Temp. (F) (ASTM C1064): 93 Date Received in lab: 8/18/2005 Air Content (ASTM C173/C231): N/A COMPRESSIVE TEST RESULTS Test Date Total Cylinder Cylinder Compressive Type No. 10 (Days) Test (Ibs) (in) (sq. in.) (psi) Break 122 A 3 8/20/2005 122500 6.00 28.27 4330 TVDe 1 B 7 8/24/2005 148000 6.00 28.27 5240 TVDe 2 C 28 9/14/2005 0 28 9/14/2005 Specifications: 4000 28 days REMARKS: X Cylinders made by PSI Cylinders made by Contractor - X Cylinders picked up by PSI Cylinders picked up by Contractor X Test Results Comply with Test Results do not Comply with applicable specifications applicable specifications 5 gallons water added to concrete Concrete sampled in accordance with ASTM C172 and ASTM C31. Compressive Strength tests performed in accordance with ASTM C39. Respectfully Submitted Professional Service Industries, Inc. Professional Service Industries. Inc.. 1748 33rd Street. Orlando, FL 32839. Phone 407/304-5560 . Fax 407/304-5561 FL Engineering Business 3684 Build On !Engineering" Consulting" Testing REPORT OF CONCRETE COMPRESSION TEST Tested For: A 1A Acquisition Group LTD., LLP Project: RESIDENCE INN Attn: Roger Dobson CAPE CANAVERAL, FL 3425 Atlantic Avenue Cocoa Beach, FL 32931 Project No: 761-50044 LOCATION: Section A Roof slab, sampled at approx. E-10 Date Placed: 8/17/2005 Technician: J Kilderry Time Batched: 10:00 AM Supplier: Rinker Time Sampled: 10:40 AM Delivery TickeVTruck No.: 92607852 Slump (in) (ASTM C143): 7 Mix No. & Proportions: 1156016 Air Temp. (F): 86 Concrete Temp. (F) (ASTM C1064): 94 Date Received in lab: 8/18/2005 Air Content (ASTM C173/C231): N/A COMPRESSIVE TEST RESULTS Test Date Total Cylinder Cylinder Compressive Type No. 10 (Days) Test (Ibs) (in) (sq. in.) (psi) Break 123 A 3 8/20/2005 120000 6.00 28.27 4240 Tvoe 2 B 7 8/24/2005 147500 6.00 28.27 5220 Tvoe 1 C 28 9/14/2005 0 28 9/14/2005 Specifications: 4000 28 days REMARKS: X Cylinders made by PSI Cylinders made by Contractor X Cylinders picked up by PSI Cylinders picked up by Contractor X Test Results Comply with Test Results do not Comply with applicable specifications applicable specifications Concrete sampled in accordance with ASTM C172 and ASTM C31. Compressive Strength tests performed in accordance with ASTM C39. Respectfully Submitted Professional Service Industries, Inc. Professional Service Industries, Inc.' 1748 33rd Street. Orlando, FL 32839' Phone 407/304-5560' Fax 407/304-5561 FL Engineering Business 3684 Build On Engineering.. Consulting.. Testing REPORT OF CONCRETE COMPRESSION TEST Tested For: A 1A Acquisition Group LTD., LLP Project: RESIDENCE INN Alln: Roger Dobson CAPE CANAVERAL, FL 3425 Atlantic Avenue Cocoa Beach, FL 32931 Project No: 761-50044 LOCATION: Section A Roof slab, sampled at approx. J-6 Date Placed: 8/17/2005 Technician: J Kilderry Time Batched: 10:46 AM Supplier: Rinker Time Sampled: 11:34 AM Delivery TickellTruck No.: 92608364 Slump (in) (ASTM C143): 8 Mix No. & Proportions: 1156016 Air Temp. (F): 88 Concrete Temp. (F) (ASTM C1064): 93 Date Received in lab: 8/18/2005 Air Content (ASTM C 173/C231): N/A COMPRESSIVE TEST RESULTS Test Date Total Cylinder Cylinder Compressive Type No. 10 (Days) Test (Ibs) (in) (sq. in.) (psi) Break 124 A 3 8/20/2005 110000 6.00 28.27 3890 Type 1 B 7 8/24/2005 141000 6.00 28.27 4990 Type 1 C 28 9/14/2005 0 28 9/14/2005 Specifications: 4000 28 days REMARKS: X Cylinders made by PSI Cylinders made by Contractor X Cylinders picked up by PSI Cylinders picked up by Contractor X Test Results Comply with Test Results do not Comply with applicable specifications applicable specifications 5 gallons water added to concrete Concrete sampled in accordance with ASTM Ci72 and ASTM C3i. Compressive Strength tests performed in accordance with ASTM C39. Respectfully Submitted Professional Service Industries, Inc. Professional Service Industries, Inc.. 1748 33rd Street. Orlando, FL 32839. Phone 407/304-5560. Fax 407/304-5561 FL Engineering Business 3684 Engineering . Consulting. Testing REPORT OF CONCRETE COMPRESSION TEST Tested For: A 1A Acquisition Group LTD., LLP Project: RESIDENCE INN Altn: Roger Dobson CAPE CANAVERAL, FL 3425 Atlantic Avenue Cocoa Beach, FL 32931 Project No: 761-50044 LOCATION: Section A Roof slab, sampled at approx. R5-10 Date Placed: 8/17/2005 Technician: J Kilderry Time Batched: 11:19 AM Supplier: Rinker Time Sampled: 11:55 AM Delivery TicketITruck No.: 92608575 Slump (in) (ASTM C143): 6.5 Mix No. & Proportions: 1156016 Air Temp. (F): 90 Concrete Temp. (F) (ASTM C1064): 94 Date Received in lab: 8/18/2005 Air Content (ASTM C173/C231): N/A COMPRESSIVE TEST RESULTS Test Date Total Cylinder Cylinder Compressive Type No. 10 (Days) Test (Ibs) (in) (sq. in.) (psi) Break 125 A 3 8/20/2005 115500 6.00 28.27 4090 TVDe 1 B 7 8/24/2005 136000 6.00 28.27 4810 TVDe 2 C 28 9/14/2005 0 28 9/14/2005 Specifications: 4000 28 days REMARKS: X Cylinders made by PSI Cylinders made by Contractor X Cylinders picked up by PSI Cylinders picked up by Contractor X Test Results Comply with Test Results do not Comply with applicable specifications applicable specifications Concrete sampled in accordance with ASTM Ci72 and ASTM C31. Compressive Strength tests performed in accordance with ASTM C39. Respectfully Submitted Professional Service Industries, Inc. Professional Service Industries, Inc.. 1748 33rd Street. Orlando, FL 32839. Phone 407/304-5560. Fax 407/304-5561 FL Engineering Business 3684 Build On Engineering .. Consulting.. Testing REPORT OF CONCRETE COMPRESSION TEST Tested For: A 1A Acquisition Group LTD., LLP Project: RESIDENCE INN AUn: Roger Dobson CAPE CANAVERAL, FL 3425 Atlantic Avenue Cocoa Beach, FL 32931 Project No: 761-50044 LOCATION: Section A Roof slab, sampled at approx. Q-19 Date Placed: 8/17/2005 Technician: J Kilderry Time Batched: N/A Supplier: Rinker Time Sampled: 12:36 PM Delivery Ticket/Truck No.: 92608908 Slump (in) (ASTM C143): 6 Mix No. & Proportions: 1156016 Air Temp. (F): 90 Concrete Temp. (F) (ASTM C1064): 94 Date Received in lab: 8/18/2005 Air Content (ASTM C173/C231): N/A COMPRESSIVE TEST RESULTS Test Date Total Cylinder Cylinder Compressive Type No. 10 (Days) Test (Ibs) (in) (sq. in.) (psi) Break 126 A 3 8/20/2005 117500 6.00 28.27 4160 Tvpe 2 B 7 8/24/2005 141500 6.00 28.27 5010 Tvpe 1 C 28 9/14/2005 D 28 9/14/2005 Specifications: 4000 28 days REMARKS: X Cylinders made by PSI Cylinders made by Contractor X Cylinders picked up by PSI Cylinders picked up by Contractor X Test Results Comply with Test Results do not Comply with applicable specifications applicable specifications Concrete sampled in accordance with ASTM C172 and ASTM C31. Compressive Strength tests performed in accordance with ASTM C39. Respectfully Submitted Professional Service Industries, Inc. - Professional Service Industries, Inc.. 1748 33rd Street. Orlando, FL 32839. Phone 407/304-5560 . Fax 407/304-5561 FL Engineering Business 3684 Engineering II Consulting.. Testing REPORT OF CONCRETE COMPRESSION TEST Tested For: A 1A Acquisition Group LTD., LLP Project: RESIDENCE INN Attn: Roger Dobson CAPE CANAVERAL, FL 3425 Atlantic Avenue Cocoa Beach, FL 32931 Project No: 761-50044 LOCATION: Section A Roof slab, sampled at approx. T-31 Date Placed: 8/17/2005 Technician: J Kilderry Time Batched: 12:29 PM Supplier: Rinker Time Sampled: 1 :01 PM Delivery Ticketrrruck No.: 92609110 Slump (in) (ASTM C143): 6.5 Mix No. & Proportions: 1156016 Air Temp. (F): 90 Concrete Temp. (F) (ASTM Ci064): 94 Date Received in lab: 8/18/2005 Air Content (ASTM C173/C231): N/A COMPRESSIVE TEST RESULTS Test Date Total Cylinder Cylinder Compressive Type No. 10 (Days) Test (Ibs) (in) (sq. in.) (psi) Break 127 A 3 8/20/2005 115000 6.00 28.27 4070 Type 1 B 7 8/24/2005 136500 6.00 28.27 4830 Type 1 C 28 9/14/2005 D 28 9/14/2005 Specifications: 4000 28 days REMARKS: X Cylinders made by PSI Cylinders made by Contractor . X Cylinders picked up by PSI Cylinders picked up by Contractor X Test Results Comply with Test Results do not Comply with applicable specifications applicable specifications Concrete sampled in accordance with ASTM C172 and ASTM C31. Compressive Strength tests performed in accordance with ASTM C39. Respectfully Submitted Professional Service Industries, Inc. Professional Service Industries, Inc.. 1748 33rd Street. Orlando, FL 32839. Phone 407/304-5560 . Fax 407/304-5561 FL Engineering Business 3684 Build On Engineering. Consulting. Testing REPORT OF CONCRETE COMPRESSION TEST Tested For: A 1A Acquisition Group LTD., LLP Project: RESIDENCE INN Attn: Roger Dobson CAPE CANAVERAL, FL 3425 Atlantic Avenue Cocoa Beach, FL 32931 Project No: 761-50044 LOCATION: Section A Roof slab, sampled at approx. K-37 Date Placed: 8/1712005 Technician: J Kilderry Time Batched: 12:55 PM Supplier: Rinker Time Sampled: 1 :28 PM Delivery Ticketrrruck No.: 92609306 Slump (in) (ASTM C143): 6.5 Mix No. & Proportions: 1156016 Air Temp. (F): 91 Concrete Temp. (F) (ASTM C1064): 95 Date Received in lab: 8/18/2005 Air Content (ASTM C173/C231): N/A COMPRESSIVE TEST RESULTS Test Date Total Cylinder Cylinder Compressive Type No. 10 (Days) Test (Ibs) (in) (sq. in.) (psi) Break 128 A 3 8/20/2005 120000 6.00 28.27 4240 Type 2 B 7 8/24/2005 144500 6.00 28.27 5110 Type 1 C 28 9/14/2005 0 28 9/14/2005 Specifications: 4000 28 days REMARKS: X Cylinders made by PSI Cylinders made by Contractor -- X Cylinders picked up by PSI Cylinders picked up by Contractor X Test Results Comply with Test Results do not Comply with applicable specifications applicable specifications Concrete sampled in accordance with ASTM C172 and ASTM C31. Compressive Strength tests performed in accordance with ASTM C39. Respectfully Submitted Professional Service Industries, Inc. Professional Service Industries, Inc.' 1748 33rd Street. Orlando, FL 32839 . Phone 407/304-5560 . Fax 407/304-5561 FL Engineering Business 3684 -'~""""""'*-~'-~ "---~--._-"'._,..",--",--,-,~-",_.~,--,^"~,,,~, "-"'._.'-"-~-'-"""--'.'-'.-'--~'---"_._~"-''''''''~---''-...,--.,.-.-..... CO'lilERP ACF; (321) 433.f)171 ORLANDO (401) lO4-5SllH P1\1. NUMllFJl COVER PAGE NAf\([E: FIR,M: CITY: I;;' AX N1JM.BER~ -"--'"~.~'~-~..._~---~--..,~>~.......~~........_-------- -...........................-~._-,...._--~'_.-.'.....,...,-.,......,,_.._-_.........""_._._------~........,. FROM: NA...\lE: Steve NOT RECEIJl'E ALL P.A.GE.'j~ PLF..ASE CAU~ ASA.P. OPERATOR: SC --_.~--_.__._--~-,-,....-,..._-.--_....--.",.,,,-,,,,,_..._~- ~~""-__'''''~mlllli!. _1Il.~" U '~'Ul a ........"'~...........___"~ --...-----....- NOTES: ':Veeldy Summlll:i1' oftestmg and iEl.li',cu~n IiItr'vic,e!\l for the Resideuee _!.!lD,_~~: li~nt!i_Jlig71l3l~.~-=--________._____________._.__. '~~'-'~._--'~---'--'--""""""'--"""---,-,-,---",,,,,,-,,,,,-",,,,,,,,-,,",,,,,,,._,'''''''''''-,......"'-'*,-............."""....~~~~..... . --"'.- ,-"""',~......................~...........~ --'.-..,~'--._.,.__....__..................._~""-"''-.....;....-............_.....___...............~....__.~_'....,~'m.____...._____,~____'_'.__"_.,..._.'____."____._..~_..,_....__."~_"--.........."............,~~ ....~......."...........___......___..___~___.."~.,'__.,_~__._.~_..,,...'".___..~_~_._,_.__.._.____......_._~,.___._.__,~._,__".~___,~___._._~_,____"'__"....___.._u "'~............._"'__"___~"""'O__'_........._e'n.._~..._'>.___+.___._....._._~___...____~_______.______"..__._..._.__._,._._.~__..__..____.__._.~~_,.,.__....___._.."..__._..."...,.....~_._'____"_.._...._........~...........-_ '______~___.__~_~,___"'"....,"~___._...'__.__H__'___.,__u__M_~__.._._'.______~___.."'_,___________._..,.....r~_. --.--------~---~--.---,-~~..~__~.___.._.___,._,______..."'____.....__._..,.__..._.__.._.._.__..._~__.__..._................_._....., ''In' ..-- ."",--- ~._.,_.._...___~.___~____.____~___M'_.______.____,.~._'._.,____~__-'__,,_.'___..__~....__.__.__.__..."...~____._.__.__.--<<__.................__,. _____",'_..._~_.__..____.___._,______w...,~__~._._,_._.___..____...."._..__.__,_~~__......_.~______.___. _...._._.__~.~..w__._~.<_.~.~._~.,.,..,____"._....~.. PSI HAS OVER lStl OFFICES NA'ftONWim: .. CON5TR..,CflON n:SHNG AND QlL'ALITY CONTilOJ, .. ItOOif AND !>r;,VLMj:Nl' ~~ON]!mt.ltING .. llli:lnCAn:u PRUn'.CT u...."lNG ANU ms,.ECTlON . Ci:OTECK'iICAt E."4GfNli:ERlNG .. !.N"nlON1>\UtN"t AL ANti ASU,SlOO M/.NA.CtMENI '" ANA,LvncAI... stR.1I-1CES '_..__.....__n___.'_.~_.~'~..~_.~,_~_~__._..._._ _._._-~.._-~_.-_.._._._~"..,_._..~'.. .. .........',....._."_..,,..~~--------_. Prcr.yf;~if,i[~ii: S~n/!t~ ~ndiJ&ki~> !tiC. '} 1748 :JJrfJ S~r;,:j;:ei ~ Orl~l~d0~ i='L 3,2830" P,)(,ne- 4(}7,~04.~.s5el,J II Fs.::< 4.07.i:j04.-~56i 1 Remarks forms in were rem.oved to aUo\v tOI adjustment of rein1hrcing steel to attllin specif1ed CO})Cl:'et.e cover. m 910.5 with Floor and cell specifications. Concrete and grout complied with ptoject specifications. cell with cornplied with project specifications, structu.-ral about oon~ items. Documentation '_...._--'~..~--~-,."..c...__..>____~_".._..".._,_.^"__._______.,,~_~,..~____.______.____._,..,".....,_____,____._."^__~_~_.._, _'._.____.._".~._._~_~..~.._, .._____ Prote::sl'~Hldl :;sn/;(;e !n':fU;lr~, ~i1(:_ If '/"48 :.!i3t'd S1r6et €, Orlando, t:L 328:39 .. PhQnt:~ 4CF/3()4~.556C ~ Fa!< 407/304~65tn Build On Engineering.. Consulting.. Testing REPORT OF CONCRETE COMPRESSION TEST Tested For: A 1 A Acquisition Group L TO., LLP Project: RESIDENCE INN Attn: Roger Dobson CAPE CANAVERAL, FL 3425 Atlantic Avenue Cocoa Beach, FL 32931 Project No: 761-50044 LOCATION: Down Cells: CMU walls and pilasters, col. Line L to V and 86 to 99, G.8 to Nand 84 to 86-3rd floor Sampled Approx. Col. Line R-97 Date Placed: 7/21/2005 Technician: M.Odom Time Batched: 12:24 PM Supplier: Rinker Time Sampled: 1 :42 PM Delivery TicketlTruck No.: 92518005 Slump (in) (ASTM C143): 9 Mix No. & Proportions: 1162918 Air Temp. (F): 88 Concrete Temp. (F) (ASTM C1064): 86 Date Received in lab: 7/22/2005 Air Content (ASTM C173/C231): N/A COMPRESSIVE TEST RESULTS ! Test Date Total Cylinder Cylinder Compressive Type ~ No. 10 (Days) Test (Ibs) (in) (sq. in.) (psi) Break 92 A 7 7/28/2005 39500 3.60x3.55 12.78 3090 Type 1 B 28 8/18/2005 46500 3.60x3.50 12.60 3690 Type 2 r- 28 8/18/2005 49500 3.70x3.55 13.14 3770 Type 2 '-' H Specifications: 3000 28 days '. REMARKS: X Cylinders made by PSI Cylinders made by Contractor X Cylinders picked up by PSI Cylinders picked up by Contractor X Test Results Comply with Test Results do not Comply with applicable specifications applicable specifications Concrete sampled in accordance with ASTM C172 and ASTM C31. Compressive Strength tests performed in accordance with ASTM C39. Respectfully Submitted Professional Service Industries, Inc. -"""'--'---'~-"-"--'--~'-'--'-"--~"----'--'-'"~"---'---'---"---- Professional Service Industries, Inc.' 1748 33rd Street. Orlando, FL 32839' Phone 407/304-5560' Fax 407/304-5561 FL Engineering Business 3684 Build On Engineering .. Consulting.. Testing REPORT OF GROUT COMPRESSION TEST Tested For: A1A Acquisition Group LTD., LLP Project: RESIDENCE INN Attn: Roger Dobson CAPE CANAVERAL, FL 3425 Atlantic Avenue Cocoa Beach, FL 32931 Project No: 761-50044 LOCATION: Down cells: CMU walls and pilasters, col. Line C-8 to 13.7 (4th floor) Sampled: approx. Coi. Line C-9 Dale Placed: 8/11/2005 Technician: M. Odom Time Batched: 2:46 PM Supplier: Rinker Time Sampled: 3:45 PM Delivery TicketlTruck No.: 92590726 Slump (in) (ASTM C143): 11.25 Mix No. & Proportions: 1289966 Air Temp. (F): 85 Concrete Temp. (F) (ASTM C1064): 82 Date Received in lab: 8/12/2005 Air Content (ASTM C173/C231): N/A COMPRESSIVE TEST RESULTS } Test Date Total Prism Prism Compressive Type No. 10 (Days) Test (Ibs) (in) (sq. in.) (psi) Break 120 A 7 8/18/2005 35000 3.50x3.70 12.95 2700 Tvpe 3 B 28 9/8/2005 '" 28 9/8/2005 v Specifications: 3000 28 days . . \ REMARKS: X Prisms made by PSI Prisms made by Contractor X Prisms picked up by PSI Prisms picked up by Contractor Test Results Comply with Test Results do not Comply with applicable specifications applicable specifications Concrete sampled in accordance with ASTM C172 and ASTM C31. Compressive Strength tests performed in accordance with ASTM C39. Respectfully Submitted Professional Service Industries, Inc. Professional Service Industries, Inc.' 1748 33rd Street. Orlando, FL 32839 . Phone 407/304-5560' Fax 407/304-5561 FL Engineering Business 3684 Build On Engineering" Consulting" Testing REPORT OF CONCRETE COMPRESSION TEST Tested For: A1A Acquisition Group LTD., LLP Project: RESIDENCE INN AUn: Roger Dobson CAPE CANAVERAL, FL 3425 Atlantic Avenue Cocoa Beach, FL 32931 Project No: 761-50044 LOCATION: Columns: line U-7, U.1-9, S.1-16, S.2-19, S.2-24, S.1-26, S.2-28, S.2-33, S. 1-35, S.2-37 (4th floor) Sampled: column 5.2-19 Date Placed: 8/11/2005 Technician: M. Odom Time Batched: 2:28 PM Supplier: Rinker Time Sampled: 4:00 PM Delivery TickeVTruck No.: 92590748 Slump (in) (ASTM C143): 4.5 Mix No. & Proportions: 1176347 Air Temp. (F): 85 Concrete Temp. (F) (ASTM C1064): 90 Date Received in lab: 8/12/2005 Air Content (ASTM C173/C231): N/A COMPRESSIVE TEST RESULTS l Test Date Total Cylinder Cylinder Compressive Type No. 10 (Days) Test (Ibs) (in) (sq. in.) (psi) Break 121 A 4 8/15/2005 113000 6.00 28.27 4000 Tv De 2 B 7 8/18/2005 139500 6.00 28.27 4930 Type 1 C 28 9/8/2005 D 28 9/8/2005 Specifications: 5000 28 days '. REMARKS: X Cylinders made by PSI Cylinders made by Contractor X Cylinders picked up by PSI Cylinders picked up by Contractor Test Results Comply with Test Results do not Comply with applicable specifications applicable specifications Concrete sampled in accordance with ASTM C172 and ASTM C31. Compressive Strength tests performed in accordance with ASTM C39. Respectfully Submitted Professional Service Industries, Inc. Professional Service Industries, Inc.' 1748 33rd Street. Orlando, FL 32839' Phone 407/304-5560' Fax 407/304-5561 FL Engineering Business 3684 Build On Engineering.. Consulting.. Testing REPORT OF GROUT COMPRESSION TEST Tested For: A 1 A Acquisition Group L TD., LLP Project: RESIDENCE INN Attn: Roger Dobson CAPE CANAVERAL, FL 3425 Atiantic Avenue Cocoa Beach, FL 32931 Project No: 761-50044 LOCATION: Down cells: CMU walls and pilasters, col. Une A.3 to N-22, H.3 to T-26 to 41 (4th floor) Sampled: approx. Col. Line R-31 Date Placed: 8/15/2005 Technician: M. Odom Time Batched: 10:50 AM Supplier: Rinker Time Sampled: 11:45AM Delivery TicketlTruck No.: 92599270 Slump (in) (ASTM C143): 9 Mix No. & Proportions: 1162918 Air Temp. (F): 89 Concrete Temp. (F) (ASTM C1064): 85 Date Received in lab: 8/16/2005 Air Content (ASTM C 173/C231): N/A COMPRESSIVE TEST RESULTS 1 Test Date Total Prism Prism Compressive Type No. 10 (Days) Test (Ibs) (in) (sq. in.) (psi) Break 129 A 7 8/22/2005 41000 3.50x3.60 12.60 3250 Tvpe 2 B 28 9/12/2005 I I C I 28 19112/~O51 I Is~,"~.,J I I 3000 28 days . '. REMARKS: X Prisms made by PSI Prisms made by Contractor X Prisms picked up by PSI Prisms picked up by Contractor X Test Results Comply with Test Results do not Comply with applicable specifications applicable specifications Concrete sampled in accordance with ASTM C172 and ASTM C31. Compressive Strength tests performed in accordance with ASTM C39. Respectfully Submitted Professional Service Industries, Inc. Professional Service Industries, Inc.. 1748 33rd Street. Orlando, FL 32839. Phone 407/304-5560. Fax 407/304-5561 FL Engineering Business 3684 (/ .L Lj: CUI) 304~~S61 llME: W NUMBER INCLUIlIN'G COVER PAGE NAME: .._~o..~.~_________......_._,..____-_._...__ FlRM: _f~.'!!.s;.lIpt': C~m~:y!~t.___._~~_________- FAX NUM:BJ4:R: .....''''''''''''~.'"....,.___..~__,~~w_..-.-_..._.,_,..~~._'_.._.__~,..."__.__,_.-"",-,~__~ FROM: NAME: -1i.!~y.!. ~~!!!g~~.._____._____.__ .. ~,-~._--_.-....--- OPERATOR: SC .....--.""--,--,._---~-,--_._---,~"~-~,,..,...----- "'.-....- ~.~ ~\l!!U!;'!l!!,l'/!!I!!....... I;.....<i"_ "'''''-'--j "_1...:1 ..._... ] II - Weeklj' Summary of t~tiDg and inspection !!ht':M'kes {(pI' the Residence lBn Week Eudmfo> 1/16/05. _..._"_:::.t.....________~----___..._.__._....____._________- .....-~---........,.,,----.......',-....._._.__..- ...,.,..,....._-"'-_.--.......__._-----....-,.,-,_.-._----_._~"-~_._.""""' .'~~~;_"""_'.""',"',"'~"'Pf,...,._._._._-.~"'.___,~............""""'_'""""""~-,----.-,~_..~._;,,_...........______.__"_V________.,_...........___~.____"..,..._____;'_ ~w___---...._^..~__.~__,____._...________._.,."'-.--__. ~-'.._.__.-.--...--- ~~-------'" ... -,_._~-,----_..,~-.._-,.-.,.......~-~.....'~._.._..~_._-,-->._,.,~.,...--....,.."~----~--....__.__.---~-,-~....._~~_._--' ____.w.~_~+_."""""_...'~.,?'""""""'"..__.___~,___..'_,_~__~__.._.~_""~,,....._,"_.~"~__.~_".___,_._.'.........,.___,_.___._____.._.........._".__..,~-.'~,__._ __._n ._.,._.,._.,__._.___.,__.......-;<,.__.""__~r__'___._.,_____...._..__~..___._,_,.___--..-......._._.___.__,.....__.....---~ _~__~*_"____.__......~.___,__,_'.,..~=__~_-_____,_._._'.__..__,___._._.______"~_._.__;o,-_..___._~~ -........--.-..-- -------""------............--.,......-'----,..-..--..,----------..--- ~--- PSI .HAS OVER 15\J OF'n:CES N4 TIONWIDE .. Cu!'.lSTRUCnON TESl1NG A,..liIJ) Ql.iAUrv n)NIROL .. ~OOf .A..ilib J' A VEMENT CONSlTLIlNG .. OI:I.lC;\nf) f':!ll.()JE(;fTESllNG AND IN8PECnON .. GE<rrEClfNfCi\L ~"'GLl\l"EElt.ING ~ ilNI/(t!ON.MUil' AL ANfI A:sm:S"f(~ lliAl>lIl.GEI>fEN'T " ANAl, '(J1CAL Bt:RViCES -_._-~.._._'--_.~.._~----_.,,-~------,-~----,_._-~.--_._,-" _~ ____m._.~.__.___~".___._~...________....,:..... '"'''__ FTntflls,8'i,)na,i Service: indu.S;f,iGS, Inc. il 1'748 3.3r:;) ShG~t.,. Orhardo, Ft J2839 iii Phone 4C7/304~5:SEG,. F;;x a07f304.fJbf51 )", ,.j. q fii~lllb Il~Mrlnfl . fOf Ser..ke!> 07il6!(JS 1M PSI # 761-50044 COf1tt'oc'tor: Welbm PIll&l:: I on Dat..: A ~'Aen6l were to fm~d and this hem bas been on the non-compUance list until OOfre(;ted. l'Oi"mWOr.k., S",,"1;ion coloom forms $Il1t 5 concrete were to insufficient colur.ru.ls IIbtrve. cJeara.\lce. forms W{'''re eithl/!rre:m.oved aodJor &djust~l to aUow for the minimum specification of .::;'" of concrete (~over. Concrete comJ,lied with proJe.ct 07 r07/0:5 Sedion, "A" Seweral SpHce lengths werebeJow the FleJor Wall&. "let on grout prisms CliiiSt minimum required. Additional bars wert aboVt~. added \,;onversadon with Eniineer of D..x:umentation our htb. ~_.__..~_ _'_."~.__~~.~~ __,___~l_ ---~~ " ..~ I 07/W/05 Reinfo,cing Steel .ln1if>'l;'l;:tion Section "C" 3' I Reiuforeing steel was llJlprox.50% I I Slab. Preliminary. colnpk1:e. Win contmue just ahead of I I placement on 7/11/05. I I t,1 mii,-/os- , -- -.-S...r----se-:,;;;; "C" ,~Re'nfO'cing st;;,,1 """ In-Comp!i.... ~. Fk)()f Slab. ; sets were ,:Mt I except mat additl('MI "An remforcemeut I I Ilbo\{~ t1vor slab. I was .not present @ coL Lme N tJo Q-% per I I ! I deuul However Bands w~re PlS,ced@6"1! L I 'I OC typkal withIn beams. Two trucks ~~'.""-----'1!'--'" . ----~.--.,.. _~~'1ed due to 90 minute time Umit. I i ' I' 07/12/05 I Rt\int~;JrciI1g S~l Section II Fotm\\'ork around reinforcing steel Wll!, I " Preiimin,a.y 20<1 floor s;e(tiOI1. "A': columns. incomplete and will be re.inspected prior to i I r Concrete " were remevea and I concrete plACement J L__~._,lJr.a~ned to our I~~: . ~~..___.~.J__. _,~___ '.~....'---._--~_._~_..' .. "'"-~~-""-'''-''----,-,~,-,"._-_.~-,--"----~,_._----'~- .-....,_._..~_.,-'"._----._-"._-~_._,,-_._...~,-"-~-~,.,..-,......', ..-.,--~., ~---,---,., ----"---,---,--.'---,,.- ~"Iotess. '~~8rlJ'icf) jm,i~!1str;e:5. 1748 33rd ~ Ot1anoo, FL 328:3:9 'Il pnone 401/304~S5BO" FSF 407/304...s5e1 .L ~-.; "- for lUlU ~/i(;e~ Residence II)Jll PSI It 761~S0044 u:mtm;;tur: Wefuro Page '2 0,[2 Date Description Rmnark~ Sted S~'1;i"n stool was 07!B/()j flotH' Section "A'" coh:!ttlllS, im:omp!cte llnd will be re-inspwted 1:0 l;;oncrete plllcemen.t () 7fl4/05 st('~t was in floor Section "A" columns, Cost 1 set of 5 project s~jfical;i.ons except Column 5,2- lepresenting alxwe 19 js offsetapprox, l"south of pilL"! Item placed on non--complianctil Retrieved COllcrete cylinders out lab ffi.1i1 Build On Engineering" Consulting" Testing REPORT OF CONCRETE COMPRESSION TEST Tested For: A1A Acquisition Group LTD., LLP Project: RESIDENCE INN Attn: Roger Dobson CAPE CANAVERAL, FL 3425 Atlantic Avenue Cocoa Beach, FL 32931 Project No: 761-50044 LOCATION: Columns: line U-7, U.1-9, 5.1-16, 5.2-19, 5.2-24, 5.1-26, 5.2-28, 5.2-33, 5.1-35, 5.2-37 (2nd floor) 5ampled: columns 5.2-28 Date Placed: 7/14/2005 Technician: M.Odom Time Batched: 7:45 AM Supplier: Rinker Time Sampled: 8:43 AM Delivery TickeUTruck No.: 92492566 Slump (in) (ASTM C143): 6 Mix No. & Proportions: 1176322 Air Temp. (F): 82 Concrete Temp. (F) (ASTM C1064): 84 Date Received in lab: 7/15/2005 Air Content (ASTM C173/C231): N/A COMPRESSIVE TEST RESULTS Test Date Total Cylinder Cylinder Compressive Type . - . -. . .., No. 10 (Davs) Test (Ibs) (in) (SQ, il1,) (psi) Break 81 A 4 7/18/2005 127000 6.00 28.27 4490 Type 1 B 7 7/21/2005 152000 6.00 28.27 5380 Type 1 C 28 8/11/2005 190000 6.00 28.27 6720 Type 1 D 28 8/11/2005 188000 6.00 28.27 6650 Type 1 H Specifications: 5000 28 days . I REMARKS: X Cylinders made by PSI Cylinders made by Contractor X Cylinders picked up by PSI Cylinders picked up by Contractor X Test Results Comply with Test Results do not Comply with applicable specifications applicable specifications Concrete sampled in accordance with ASTM C172 and ASTM C31. Compressive Strength tests performed in accordance with ASTM C39. Respectfully Submitted Professional Service Industries, Inc. --"---"---~---"'---"---------,-----_. ---,-,-,~,-,.,-"--,-_._,.,-,-,---,~,-,----,-,-"-,---,----."".-----.-.-- Professional Service Industries, Inc.. 1748 33rd Street. Orlando, FL 32839. Phone 407/304-5560. Fax 407/304-5561 Engineering. Consulting. Testing REPORT OF GROUT COMPRESSION TEST Tested For: A 1A Acquisition Group LTD., LLP Project: RESIDENCE INN AUn: Roger Dobson CAPE CANAVERAL, FL 3425 Atlantic Avenue Cocoa Beach, FL 32931 Project No: 761-50044 LOCATION: Down cells: eMU walls and pilasters, col. line A to J and 88 to 99 on 3rd floor Sampled: approx. col. Line G-92 Date Placed: 7/19/2005 Technician: ~,,1. Odom Time Batched: 9:25 AM Supplier: Rinker Time Sampled: 10:30 AM Delivery TicketlTruck No.: 92507165 Slump (in) (ASTM C143): 9.75 Mix No. & Proportions: 1162918 Air Temp. (F): 85 Concrete Temp. (F) (ASTM C1064): 87 Date Received in lab: 7/20/2005 Air Content (ASTM C173/C231): N/A COMPRESSIVE TEST RESULTS Test Date Total Prism Prism Compressive Type "'_" D,' . L , . . No. 10 (Days) Test (Ibs) (in) (SQ. in.) (psi) Break 82 A 7 7/26/2005 36500 3.50x3.30 11.55 3160 TVDe 2 B 28 8/16/2005 51000 3.60x3.70 13.32 3830 Tvpe 1 C 28 8/16/2005 54000 3. 70x3. 70 13.69 3940 Tvpe 1 0 28 8/16/2005 H Specifications: 3000 28 days REMARKS: X Prisms made by PSI Prisms made by Contractor X Prisms picked up by PSI Prisms picked up by Contractor X Test Results Comply with Test Results do not Comply with applicable specifications applicable specifications Concrete sampled in accordance with ASTM C172 and ASTM C31. Compressive Strength tests performed in accordance with ASTM C39. Respectfully Submitted Professional Service Industries, Inc. ---~--,- -~,- ---",,-_._------,-..- ---"-,--,,."'-,,- Professional Service Industries, Inc.. 1748 33rd Street. Orlando, FL 32839 . Phone 407/304-5560. Fax 407/304-5561 Build On Engineering.. Consulting.. Testing REPORT OF CONCRETE COMPRESSION TEST Tested For: A 1A Acquisition Group LTD., LLP Project: RESIDENCE INN Attn: Roger Dobson CAPE CANAVERAL, FL 3425 Atlantic Avenue Cocoa Beach, FL 32931 Project No: 761-50044 LOCATION: Columns, lines S.1-68, S.2-70, S.2-75, S.1-77, S.2-79, S.2-84, S.1-86, U.1-94, U-96 (3rd floor) Sampled: approx. col. Line S.1-86 Date Placed: 7/19/2005 Technician: rv1. Odom Time Batched: 12:35 PM Supplier: Rinker Time Sampled: 1 :50 PM Delivery TickeUTruck No.: 92408555 Slump (in) (ASTM C143): 4.75 Mix No. & Proportions: 1176322 Air Temp. (F): 90 Concrete Temp. (F) (ASTM C1064): 86 Date Received in lab: 7/20/2005 Air Content (ASTM C173/C231): N/A COMPRESSIVE TEST RESULTS Test Date Total Cylinder Cylinder Compress ive Type No. 10 (Days) Test (Ibs) (in) (sq. in.) (psi) Break 83 A 3 7/22/2005 110000 6.00 28.27 3890 Tvee 1 B 7 7/26/2005 137000 6.00 28.27 4850 Tvee 1 C 28 8/16/2005 179500 6.00 28.27 6350 Tvee 1 0 28 8/16/2005 181000 6.00 28.27 6400 Tvee 2 H Specifications: 5000 28 days . . REMARKS: X Cylinders made by PSI Cylinders made by Contractor X Cylinders picked up by PSI Cylinders picked up by Contractor X Test Results Comply with Test Results do not Comply with applicable specifications applicable specifications Concrete sampled in accordance with ASTM C172 and ASTM C31. Compressive Strength tests performed in accordance with ASTM C39. Respectfully Submitted Professional Service Industries, Inc. ---------- ---- -------~-----_.,--~-,._-,-"'---"'- Professional Service Industries, Inc.. 1748 33rd Street. Orlando, FL 32839. Phone 407/304-5560. Fax 407/304-5561 Build On Engineering.. Consulting" Testing REPORT OF CONCRETE COMPRESSION TEST Tested For: A 1A Acquisition Group LTD., LLP Project: RESIDENCE INN Altn: Roger Dobson CAPE CANAVERAL, FL 3425 Atlantic Avenue Cocoa Beach, FL 32931 Project No: 761-50044 LOCATION: Section A, 3rd floor slab, all column lines, sampled A.5-3 Date Placed: 7/20/2005 Technician: J. Kilderrj Time Batched: 6:43 AM Supplier: Rinker Time Sampled: 7:34 AM Delivery TicketlTruck No.: 92510392 Slump (in) (ASTM C143): 5 Mix No. & Proportions: 1156016 Air Temp. (F): 84 Concrete Temp. (F) (ASTM C1064): 91 Date Received in lab: 7/21/2005 Air Content (ASTM C173/C231): N/A COMPRESSIVE TEST RESULTS Test Date Total Cylinder Cylinder Compressive Type No. 10 (Days) Test (Ibs) (in) (sq. in.) (psi) Break 85 A 3 7/23/2005 119500 6.00 28.27 4230 Type 1 B 7 7/27/2005 142500 6.00 28.27 5040 Type 1 C 28 8/17/2005 189500 6.00 28.27 6700 Type 1 0 28 8/17/2005 186000 6.00 28.27 6580 Type 1 H Specifications: 4000 28 days . . REMARKS: X Cylinders made by PSI Cylinders made by Contractor X Cylinders picked up by PSI Cylinders picked up by Contractor X Test Results Comply with Test Results do not Comply with applicable specifications applicable specifications Concrete sampled in accordance with ASTM Ci72 and ASTM C3i. Compressive Strength tests performed in accordance with ASTM C39. Respectfully Submilted Professional Service Industries, Inc. -------"-- ---,- --""~"--,-"'---,-,-"---,-""-,--""--_.,- Professional Service Industries, Inc.' 1748 33rd Street. Orlando, FL 32839 . Phone 407/304-5560' Fax 407/304-5561 Build On Engineering. Consulting. Testing REPORT OF CONCRETE COMPRESSION TEST Tested For: A1A Acquisition Group LTD., LLP Project: RESIDENCE INN Attn: Roger Dobson CAPE CANAVERAL, FL 3425 Atlantic Avenue Cocoa Beach, FL 32931 Project No: 761-50044 LOCATION: Section A, 3rd floor slab, all column lines, sampled E-10 Date Placed: 7/20/2005 Technician: J. KHderry Time Batched: 7:04 AM Supplier: Rinker Time Sampled: 8:09 AM Delivery TicketlTruck No.: 92510675 Slump (in) (ASTM C143): 6 Mix No. & Proportions: 1156016 Air Temp. (F): 85 Concrete Temp. (F) (ASTM C1064): 91 Date Received in lab: 7/21/2005 Air Content (ASTM C173/C231): N/A COMPRESSIVE TEST RESULTS Test Date Total Cylinder Cylinder Compressive Type . No. 10 (Days) Test (Ibs) (in) (sq. in.) (psi) Break 86 A 3 7/23/2005 114000 6.00 28.27 4030 Type 1 B 7 7/27/2005 129500 6.00 28.27 4580 Type 1 C 28 8/17/2005 166500 6.00 28.27 5890 Type 1 D 28 8/17/2005 1 70000 6.00 28.27 6010 Type 2 H Specifications: 4000 28 days . I REMARKS: X Cylinders made by PSI Cylinders made by Contractor X Cylinders picked up by PSI Cylinders picked up by Contractor X Test Results Comply with Test Results do not Comply with applicable specifications applicable specifications Concrete sampled in accordance with ASTM C172 and ASTM C31. Compressive Strength tests performed in accordance with ASTM C39. Respectfully Submitted Professional Service Industries, Inc. --------,------------~---~""-,-"'-"----"'-,--"-"-'-""-'-'---""~"'~'---'-'_._-,-,-',_._,--",-,,--",-,~,-"'._'- Professional Service Industries, Inc.. 1748 33rd Street. Orlando, FL 32839. Phone 407/304-5560 . Fax 407/304-5561 Engineering · Consulting. Testing REPORT OF CONCRETE COMPRESSION TEST Tested For: A1A Acquisition Group LTD., LLP Project: RESIDENCE INN Attn: Roger Dobson CAPE CANAVERAL, FL 3425 Atlantic Avenue Cocoa Beach, FL 32931 Project No: 761-50044 LOCATION: Section A, 3rd floor slab, all column lines, sampled K-6 Date Placed: 7/20/2005 Technician: J. Kilderry' Time Batched: 7:51 AM Supplier: Rinker Time Sampled: 8:41 AM Delivery Ticket/Truck No.: 92510981 Slump (in) (ASTM C143): 8.5 Mix No. & Proportions: 1156016 Air Temp. (F): 86 Concrete Temp. (F) (ASTM C1064): 91 Date Received in lab: 7/21/2005 Air Content (ASTM C173/C231): N/A COMPRESSIVE TEST RESULTS Test Date Total Cylinder Cylinder Compressive Type No_ lO (Days) Test (Ibs) (in) (sq. in.) (psi) Break 87 A 3 7/23/2005 116500 6.00 28.27 4120 Type 1 B 7 7/27/2005 139000 6.00 28.27 4920 Type 1 C 28 8/17/2005 176500 6.00 28.27 6240 Tvpe 1 D 28 8/17/2005 174000 6.00 28.27 6150 Type 1 H Specifications: 4000 28 days . . REMARKS: X Cylinders made by PSI Cylinders made by Contractor X Cylinders picked up by PSI Cylinders picked up by Contractor X Test Results Comply with Test Results do not Comply with applicable specifications applicable specifications 5 gallons water added to concrete Concrete sampled in accordance with ASTM C172 and ASTM C31. Compressive Strength tests performed in accordance with ASTM C39. Respectfully Submitted Professional Service Industries, Inc. ---~--~~---"-"--------------~-~,~~"'-,-~,~-"'---- ------".-"-----,-.,.-."""'.--.- --- --~_.,---~~ -.,~,-- Professional Service Industries, Inc.. 1748 33rd Street. Orlando, FL 32839. Phone 407/304-5560. Fax 407/304-5561 Engineering. Consulting. Testing REPORT OF CONCRETE COMPRESSION TEST Tested For: A 1A Acquisition Group LTD., LLP Project: RESIDENCE INN Attn: Roger Dobson CAPE CANAVERAL, FL 3425 Atlantic Avenue Cocoa Beach, FL 32931 Project No: 761-50044 LOCATION: Section A, 3rd fioor slab, all column lines, sampled S-9 Date Placed: 7/20/2005 Technician: J. Kilderry Time Batched: 8:10 AM Supplier: Rinker Time Sampled: 9:10 AM Delivery TicketlTruck No.: 92511193 Slump (in) (ASTM C143): 8 Mix No. & Proportions: 1156016 Air Temp. (F): 86 Concrete Temp. (F) (ASTM C1064): 90 Date Received in lab: 7/21/2005 Air Content (ASTM C173/C231): N/A COMPRESSIVE TEST RESULTS Test Date Total Cylinder Cylinder Compressive Type No. 10 (Days) Test (Ibs) (in) (sq. in.) (psi) Break 88 A 3 7/23/2005 111000 6.00 28.27 3930 Tvpe 1 B 7 7/27/2005 131500 6.00 28.27 4650 Tvpe 1 ,... 28 8/17/2005 188000 6.00 28.27 6650 Tvpe 1 v 0 28 8/17/2005 191500 6.00 28.27 6770 Tvpe 1 H Specifications: 4000 28 days . . REMARKS: X Cylinders made by PSI Cylinders made by Contractor X Cylinders picked up by PSI Cylinders picked up by Contractor X Test Results Comply with Test Results do not Comply with applicable specifications applicable specifications 5 gallons water added to concrete Concrete sampled in accordance with ASTM C172 and ASTM C31. Compressive Strength tests performed in accordance with ASTM C39. Respectfully Submitted Professional Service Industries, Inc. ----"--"""----"~----~------,--,,~-,-"""""""-~""-"'~"''''''''''~""'" _,____.___.__,_,,_ ___"_M_"___.""_,,_____,,..__'''''''____''''''~_ ",_",_._",___,_,,_,,_,,_,_,_,___ Professional Service Industries, Inc.. 1748 33rd Street. Orlando, FL 32839 . Phone 407/304-5560. Fax 407/304-5561 Build On Engineering. Consulting. Testing REPORT OF CONCRETE COMPRESSION TEST Tested For: A 1A Acquisition Group LTD., LLP Project: RESIDENCE INN Attn: Roger Dobson CAPE CANAVERAL, FL 3425 Atlantic Avenue Cocoa Beach, FL 32931 Project No: 761-50044 LOCATION: Section A, 3rd floor slab, all column lines, sampled M-19 Date Placed: 7/20/2005 Technician: J. Kilderry Time Batched: 8:45 AM Supplier: Rinker Time Sampled: 9:56 AM Delivery Tickel/Truck No.: Slump (in) (ASTM C143): 8 Mix No. & Proportions: 1156016 Air Temp. (F): 88 Concrete Temp. (F) (ASTM C1064): 91 Date Received in lab: 7/21/2005 Air Content (ASTM C173/C231): N/A COMPRESSIVE TEST RESULTS Test Date Total Cylinder Cylinder Compressive Type No. 10 (Days) Test (Ibs) (in) (sq. in.) (psi) Break 89 A 3 7/23/2005 105500 6.00 28.27 3730 Type 1 B 7 7/27/2005 127500 6.00 28.27 4510 Type 1 C 28 8/17 i2005 1 73500 6.00 28.27 6140 Type 1 0 28 8/17/2005 176000 6.00 28.27 6230 Type 2 H Specifications: 4000 28 days . . REMARKS: X Cylinders made by PSI Cylinders made by Contractor X Cylinders picked up by PSI Cylinders picked up by Contractor X Test Results Comply with Test Results do not Comply with applicable specifications applicable specifications 7 gallons water added to concrete Concrete sampled in accordance with ASTM C172 and ASTM C31. Compressive Strength tests performed in accordance with ASTM C39. Respectfully Submitted Professional Service Industries, Inc. Professional Service Industries, Inc. . 1748 33rd Street. Orlando, FL 32839 . Phone 407/304-5560. Fax 407/304-5561 FL Engineering Business 3684 -_._..._.._..~--"-,~."'_.~~--,....,,~,-,...."'~,-_._..__.~,---,-,,-_.._,_.__.,--,~".._..__.._,-_..,--_._,----_.._'''' Build On Engineering. Consulting. Testing REPORT OF CONCRETE COMPRESSION TEST Tested For: A 1A Acquisition Group LTD., LLP Project: RESIDENCE INN Alln: Roger Dobson CAPE CANAVERAL, FL 3425 Atlantic Avenue Cocoa Beach, FL 32931 Project No: 761-50044 LOCATION: Section A, 3rd ffoor slab, all column lines, sampled Q-28 Date Placed: 7/20/2005 Technician: J. Kilderry Time Batched: 9:37 AM Supplier: Rinker Time Sampled: 10:45 AM Delivery Ticket/Truck No.: 92512009 Slump (in) (ASTM C143): 7.5 Mix No. & Proportions: 1156016 Air Temp. (F): 89 Concrete Temp. (F) (ASTM C1064): 92 Date Received in lab: 7/21/2005 Air Content (ASTM C173/C231): N/A COMPRESSIVE TEST RESULTS Test Date Total Cylinder Cylinder Compressive Type No. 10 (Days) Test (Ibs) (in) (sq. in.) (psi) Break 90 A 3 7/23/2005 99500 6.00 28.27 3520 Type 1 B 7 7/27/2005 113500 6.00 28.27 4010 Type 2 C 28 8/17/2005 158000 6.00 28.27 5590 Type 2 D 28 8/17/2005 161000 6.00 28.27 5700 Type 2 H Specifications: 4000 28 days . REMARKS: X Cylinders made by PSI Cylinders made by Contractor X Cylinders picked up by PSI Cylinders picked up by Contractor X Test Results Comply with Test Results do not Comply with applicable specifications applicable specifications 10 gallons water added to concrete Concrete sampled in accordance with ASTM C172 and ASTM C31. Compressive Strength tests performed in accordance with ASTM C39. Respectfully Submitted Professional Service Industries, Inc. --,--"""""~""""""'~-- ~"'~"-''''''''-''''_.~ Professional Service Industries, Inc.. 1748 33rd Street. Orlando, FL 32839. Phone 407/304-5560. Fax 407/304-5561 FL Engineering Business 3684 Engineering. Consulting. Testing REPORT OF CONCRETE COMPRESSION TEST Tested For: A1A Acquisition Group LTD., LLP Project: RESIDENCE INN Atln: Roger Dobson CAPE CANAVERAL. FL 3425 Atlantic Avenue Cocoa Beach. FL 32931 Project No: 761-50044 LOCATION: Section A, 3rd floor slab, all column lines, sampled T-37 Date Placed: 7/20/2005 Technician: J. Kiiderry Time Batched: 10:18 AM Supplier: Rinker Time Sampled: 11:28 AM Delivery Tickel/Truck No.: 92512340 Slump (in) (ASTM C143): 7 Mix No. & Proportions: 1156016 Air Temp. (F): 91 Concrete Temp. (F) (ASTM C1064): 94 Dale Received in lab: 7/21/2005 Air Content (ASTM C173/C231): N/A COMPRESSIVE TEST RESULTS Test Date Total Cylinder Cylinder Compressive Type No. 10 (Days) Test (Ibs) (in) (sq. in.) (psi) Break 91 A 3 7/23/2005 113000 6.00 28.27 4000 Tvpe 1 B 7 7/27/2005 132500 6.00 28.27 4690 Tvpe 1 r- 28 8/17/2005 169500 6.00 28.27 6000 Tvpe 1 v D 28 8/17/2005 172000 6.00 28.27 6080 Type 1 H Specifications: 4000 28 days . . REMARKS: X Cylinders made by PSI Cylinders made by Contractor X Cylinders picked up by PSI Cylinders picked up by Contractor X Test Results Comply with Test Results do not Comply with applicable specifications applicable specifications 5 gallons water added to concrete Concrete sampled in accordance with ASTM C172 and ASTM C31. Compressive Strength tests performed in accordance with ASTM C39. Respectfully Submitted Professional Service Industries, Inc. Professional Service Industries, Inc.' 1748 33rd Street. Orlando, FL 32839' Phone 407/304-5560' Fax 407/304-5561 FL Engineering Business 3684 Build On Engineering . Consulting. Testing REPORT OF CONCRETE COMPRESSION TEST Tested For: A1A Acquisition Group LTD., LLP Project: RESIDENCE INN Attn: Roger Dobson CAPE CANAVERAL, FL 3425 Atlantic Avenue Cocoa Beach, FL 32931 Project No: 761-50044 LOCATION: Section A, 4th floor slab, approx B-3 Date Placed: 8/3/2005 Technician: J. Kilderry Time Batched: 6:24 AM Supplier: Rinker Time Sampled: 7:15 AM Delivery TicketlTruck No.: 40499948 Slump (in) (ASTM C143): 6 Mix No. & Proportions: 1156016 Air Temp. (F): 86 Concrete Temp. (F) (ASTM C1064): 91 Date Received in lab: 8/4/2005 Air Content (ASTM C173/C231): N/A COMPRESSIVE TEST RESULTS Test Date Total Cylinder Cylinder Compressive Type No. 10 (Days) Test (Ibs) (in) (sq. in.) (psi) Break 103 A 3 8/6/2005 121000 6.00 28.27 4280 Type 1 B 7 8/10/2005 146000 6.00 28.27 5160 Type 1 C 28 8/31/2005 0 28 8/31/2005 Specifications: 4000 28 days . REMARKS: X Cylinders made by PSI Cylinders made by Contractor X Cylinders picked up by PSI Cylinders picked up by Contractor X Test Results Comply with Test Results do not Comply with applicable specifications applicable specifications 5 gallons water added to concrete Concrete sampled in accordance with ASTM C172 and ASTM C31. Compressive Strength tests performed in accordance with ASTM C39. Respectfully Submitted Professional Service Industries, Inc. _._"--,~""-""~"'-~~--~,-~"-,-~~-,~-"-"-----~- -"._.._--,~"'-- Professional Service Industries. Inc. . 1748 33rd Street. Orlando. FL 32839' Phone 407/304-5560 . Fax 407/304-5561 FL Engineering Business 3684 Build On Engineering .. Consulting.. Testing REPORT OF CONCRETE COMPRESSION TEST Tested For: A1A Acquisition Group LTD., LLP Project: RESIDENCE INN Attn: Roger Dobson CAPE CANAVERAL, FL 3425 Atiantic Avenue Cocoa Beach, FL 32931 Project No: 761-50044 LOCATION: Section A, 4th floor slab, approx E-7 Date Placed: 8/3/2005 Technician: J. Kiiderry Time Batched: 7:20 AM Supplier: Rinker Time Sampled: 7:52 AM Delivery TicketlTruck No.: 92558555 Slump (in) (ASTM C143): 6 Mix No. & Proportions: 1156016 Air Temp. (F): 86 Concrete Temp. (F) (ASTM C1064): 92 Date Received in lab: 8/4/2005 Air Content IASTM C173/C231): N/A COMPRESSIVE TEST RESULTS Test Date Total Cylinder Cylinder Compressive Type No. 10 (Days) Test (Ibs) (in) (sq. in.) (psi) Break 104 A 3 8/6/2005 108000 6.00 28.27 3820 Tvpe 1 B 7 8/10/2005 132500 6.00 28.27 4690 Tvpe 1 C 28 8/31/2005 D 28 8/31/2005 Specifications: 4000 28 days . REMARKS: X Cylinders made by PSI Cylinders made by Contractor X Cylinders picked up by PSI Cylinders picked up by Contractor X Test Results Comply with Test Results do not Comply with applicable specifications applicable specifications Concrete sampled in accordance with ASTM C172 and ASTM C31. Compressive Strength tests performed in accordance with ASTM C39. Respectfully Submitted Professional Service Industries, Inc. --- ~,~""~._- Professional Service Industries, Inc. . 1748 33rd Street. Orlando, FL 32839 . Phone 407/304-5560 . Fax 407/304-5561 FL Engineering Business 3684 REPORT OF CONCRETE COMPRESSION TEST Tested For: A 1A Acquisition Group L TO, LLP Project: RESIDENCE INN Attn: Roger Dobson CAPE CANAVERAL, FL 3425 Atlantic Avenue Cocoa Beach, FL 32931 Project No: 761-50044 LOCATION: Section A, 4th floor slab, approx K-10 Date Placed: 8/3/2005 Technician: j. Kiiderry Time Batched: 7:47 AM Supplier: Rinker Time Sampled: 8:43 AM Delivery TickeUTruck No.: 92558918 Slump (in) (ASTM C143): 6.5 Mix No. & Proportions: 1156016 Air Temp. (F): 86 Concrete Temp. (F) (ASTM C1064): 92 Date Received in lab: 8/4/2005 Air Content (ASTM C173/C231): N/A COMPRESSIVE TEST RESULTS Test Date Total Cylinder Cylinder Compressive Type No. 10 (Days) Test (Ibs) (in) (sq. in.) (psi) Break 105 A 3 8/6/2005 111000 6.00 28.27 3930 Tvpe 1 B 7 8/10/2005 135000 6.00 28.27 4780 Tvpe 2 C ..,,, 8/31/2005 ""u 0 28 8/31/2005 Specifications: 4000 28 days I . REMARKS: X Cylinders made by PSI Cylinders made by Contractor X Cylinders picked up by PSI Cylinders picked up by Contractor X Test Results Comply with Test Results do not Comply with applicable specifications applicable specifications 5 gallons water added to concrete Concrete sampled in accordance with ASTM C172 and ASTM C31. Compressive Strength tests performed in accordance with ASTM C39. Respectfully Submitted Professional Service Industries, Inc. Professional Service Industries. Inc. . 1748 33rd Street. Orlando. FL 32839 . Phone 407/304-5560 Fax 407/304-5561 FL Engineenng Business 3684 Engineering.. Consulting" Testing REPORT OF CONCRETE COMPRESSION TEST Tested For: A1A Acquisition Group LTD., LLP Project: RESIDENCE INN Attn: Roger Dobson CAPE CANAVERAL, FL 3425 Atlantic Avenue Cocoa Beach, FL 32931 Project No: 761-50044 LOCATION: Section A, 4th floor slab, approx S-14 Date Placed: 8/3/2005 Technician: J. Kiiderry Time Batched: 8:43AM Supplier: Rinker Time Sampled: 927 AM Delivery TickeUTruck No.: N/A Slump (in) (ASTM C143): 7 Mix No. & Proportions: 1156016 Air Temp. (F): 87 Concrete Temp. (F) (ASTM C1064): 93 Date Received in lab: 8/4/2005 Air Content (ASTM C 173/C231): NIA COMPRESSIVE TEST RESULTS Test Date Total Cylinder Cylinder Compressive Type No. 10 (Days) Test (Ibs) (in) (sq. in.) (psi) Break 106 A 3 8/6/2005 102000 6.00 28.27 3610 Tvee 1 B 7 8/10/2005 129500 6.00 28.27 4580 Tvee 2 r- 28 8/31/2005 v D 28 8/31/2005 Specifications: 4000 28 days . . REMARKS: X Cylinders made by PSI Cylinders made by Contractor X Cylinders picked up by PSI Cylinders picked up by Contractor X Test Results Comply with T est Results do not Comply with applicable specifications applicable specifications 10 gallons water added to concrete Concrete sampled in accordance with ASTM C172 and ASTM C31. Compressive Strength tests performed in accordance with ASTM C39. Respectfully Submitted Professional Service Industries, Inc. ProfeSSional Service Industries. Inc.. 1748 33rd Street. Orlando, FL 32839. Phone 407/304-5560. Fax 407/304-5561 FL Engineering Business 3684 Build On Engineering.. Consulting.. Testing REPORT OF CONCRETE COMPRESSION TEST Tested For: A 1A Acquisition Group LTD., LLP Project: RESIDENCE INN Attn: Roger Dobson CAPE CANAVERAL, FL 3425 Atlantic Avenue Cocoa Beach, FL 32931 Project No: 761-50044 LOCATION: Section A, 4th floor slab, approx M-24 Date Placed: 8/3/2005 Technician: J. Kiiderry Time Batched: 9:30 AM Supplier: Rinker Time Sampled: 10:16 AM Delivery TicketlTruck No.: 92559643 Slump (in) (ASTM C143): 7 Mix No. & Proportions: 1156016 Air Temp. (F): 88 Concrete Temp. (F) (ASTM C1064): 93 Date Received in lab: 8/4/2005 Air Content (ASTM C173/C231): NIA COMPRESSIVE TEST RESULTS Test Date Total Cylinder Cylinder Compressive Type No. 10 (Days) Test (Ibs) (in) (sq. in.) (psi) Break 107 A 3 8/6/2005 103000 6.00 28.27 3640 Tvpe 1 B 7 8/10/2005 131000 6.00 28.27 4630 Tvpe 1 C 28 8/31/2005 0 28 8/31/2005 Specifications: 4000 28 days REMARKS: X Cylinders made by PSI Cylinders made by Contractor X Cylinders picked up by PSI Cylinders picked up by Contractor X Test Results Comply with Test Results do not Comply with applicable specifications applicable specifications Concrete sampled in accordance with ASTM C172 and ASTM C31. Compressive Strength tests performed in accordance with ASTM C39. Respectfully Submitted Professional Service Industries, Inc. -"--~--,----,-~--~,~"'-,,- -"._---,.~-~ Professional Service Industries. Inc.' 1748 33rd Street. Orlando, FL 32839' Phone 407/304-5560 . Fax 407/304-5561 FL Engineering Business 3684 Engineering " Consulting" Testing REPORT OF CONCRETE COMPRESSION TEST Tested For: A 1A Acquisition Group LTD., LLP Project: RESIDENCE INN Alln: Roger Dobson CAPE CANAVERAL, FL 3425 Atlantic Avenue Cocoa Beach, FL 32931 Project No: 761-50044 LOCATION: Section A, 4th floor slab, approx Q-35 Date Placed: 8/3/2005 Technician: j. Kiiderry Time Batched: 10:15 AM Supplier: Rinker Time Sampled: 11:01 AM Delivery TicketlTruck No.: 92560088 Slump (in) (ASTM C143): 6.5 Mix No. & Proportions: 1156016 Air Temp. (F): 90 Concrete Temp. (F) (ASTM C1064): 94 Date Received in lab: 8/4/2005 Air Content (ASTM C173/C231): N/A COMPRESSIVE TEST RESULTS Test Date Total Cylinder Cylinder Compressive Type No. 10 (Days) Test (Ibs) (in) (sq. in.) (psi) Break 108 A 3 8/6/2005 109000 6.00 28.27 3860 Tvpe 1 B 7 8/10/2005 132500 6.00 28.27 4690 Tvpe 1 r- 28 8/31/2005 v 0 28 8/31/2005 Specifications: 4000 28 days . . REMARKS: X Cylinders made by PSI Cylinders made by Contractor X Cylinders picked up by PSI Cylinders picked up by Contractor X Test Results Comply with Test Results do not Comply with applicable specifications applicable specifications Concrete sampled in accordance with ASTM C172 and ASTM C31. Compressive Strength tests performed in accordance with ASTM C39. Respectfully Submitted Professional Service Industries, Inc. Professional Service Industries, Inc.' 1748 33rd Street. Orlando, FL 32839' Phone 407/304-5560' Fax 407/304-5561 FL Engineering Business 3684 Engineering. Consulting. Testing REPORT OF CONCRETE COMPRESSION TEST Tested For: A 1A Acquisition Group LTD., LLP Project: RESIDENCE INN Attn: Roger Dobson CAPE CANAVERAL, FL 3425 Atlantic Avenue Cocoa Beach, FL 32931 Project No: 761-50044 LOCATION: Section A, 4th floor slab, approx U-39 Date Placed: 8/3/2005 Technician: J. Kilderry Time Batched: 10:45 AM Supplier: Rinker Time Sampled: 11:20 AM Delivery TicketlTruck No.: 92560314 Slump (in) (ASTM C143): 7.5 Mix No. & Proportions: 1156016 Air Temp. (F): 90 Concrete Temp. (F) (ASTM C1064): 94 Date Received in lab: 8/4/2005 Air Content IASTM C173/C231): N/A COMPRESSIVE TEST RESULTS Test Date Total Cylinder Cylinder Compressive Type No. 10 (Days) Test (Ibs) (in) (sq. in.) (psi) Break 109 A 3 8/6/2005 96000 6.00 28.27 3400 Type 1 B 7 8/10/2005 119500 6.00 28.27 4230 Type 1 C 28 8/31/2005 D 28 8/31/2005 Specifications: 4000 28 days . . REMARKS: X Cylinders made by PSI Cylinders made by Contractor X Cylinders picked up by PSI Cylinders picked up by Contractor X Test Results Comply with Test Results do not Comply with applicable specifications applicable specifications 10 gallons water added to concrete Concrete sampled in accordance with ASTM C172 and ASTM C31. Compressive Strength tests performed in accordance with ASTM C39. Respectfully Submitted Professional Service Industries, Inc. ~~._~-~,-"~-,-,-""~"'-""-,-""'~,-""""'--,,-"""-"'~""'-,- ~,-""""""""-"""'-~-,~ Professional Service Industries, Inc.. 1748 33rd Street. Orlando, FL 32839. Phone 407/304-5560. Fax 407/304-5561 FL Engineering Business 3684 Build On Engineering. Consulting. Testing REPORT OF CONCRETE COMPRESSION TEST Tested For: A 1A Acquisition Group LTD., LLP Project: RESIDENCE INN Alln: Roger Dobson CAPE CANAVERAL, FL 3425 Atlantic Avenue Cocoa Beach, FL 32931 Project No: 761-50044 LOCATION: Columns: lines S.1-68, S.2-70, S.2-75, S.1-77, S.2-79, S.2-84, S.1-86, U.1-94, U-96 (4th floor) sampled colulmn 5.1-77 Date Placed: 8i4i2005 Technician: M. Odom Time Batched: 11:20 AM Supplier: Rinker Time Sampled: 12:00 PM Delivery TickeliTruck No.: 92565156 Slump (in) (ASTM C143): 8 Mix No. & Proportions: 1176322 Air Temp. (F): 85 Concrete Temp. (F) (ASTM C1064): 84 Date Received in lab: 8i5/2005 Air Content (ASTM C173/C231): N/A COMPRESSIVE TEST RESULTS Test Date Total Cylinder Cylinder Compressive Type No. 10 (Days) Test (Ibs) (in) (sq. in.) (psi) Break 110 A 4 8/8/2005 109000 6.00 28.27 3860 TVDe 1 B 7 8/11/2005 127500 6.00 28.27 4510 TVDe 1 C 28 9/1/2005 0 28 9/1/2005 Specifications: 5000 28 days REMARKS: X Cylinders made by PSI Cylinders made by Contractor X Cylinders picked up by PSI Cylinders picked up by Contractor Test Results Comply with Test Results do not Comply with applicable specifications applicable specifications Concrete sampled in accordance with ASTM C172 and ASTM C31. Compressive Strength tests performed in accordance with ASTM C39. Respectfully Submitted Professional Service Industries, Inc. Professional Service Industries. Inc.. 1748 33rd Street. Orlando, FL 32839' Phone 407/304.5560. Fax 407/304.5561 FL Engineering Business 3684 /Engineering . Consulting. Testing REPORT OF GROUT COMPRESSION TEST Tested For: A 1A Acquisition Group LTD., LLP Project: RESIDENCE INN Attn: Roger Dobson CAPE CANAVERAL, FL 3425 Atlantic Avenue Cocoa Beach, FL 32931 Project No: 761-50044 LOCATION: Down cells: CMU walls and pilasters, col. Line A to J and 88 to 99 (4th floor) sampled approx. col. Line E-97 Date Placed: 8/4/2005 Technician: M. Odom Time Batched: 11:50 AM Supplier: Rinker Time Sampled: 12:30 PM Delivery TicketlTruck No.: 92565320 Slump (in) (ASTM C143): 10 Mix No. & Proportions: 1162918 Air Temp. (F): 86 Concrete Temp. (F) (ASTM C1064): 88 Date Received in lab: 8/5/2005 Air ContentJASTM C173/C231): N/A COMPRESSIVE TEST RESULTS Test Date Total Prism Prism Compressive Type No. 10 (Days) Test (Ibs) (in) (sq. in.) (psi) Break 111 A 7 8/11/2005 31500 3.60x3.85 13.86 2270 Tvpe 2 B 28 9/1/2005 ,... 28 9/1/2005 v Specifications: 3000 28 days REMARKS: X Prisms made by PSI Prisms made by Contractor X Prisms picked up by PSI Prisms picked up by Contractor Test Results Comply with Test Results do not Comply with applicable specifications applicable specifications Concrete sampled in accordance with ASTM C172 and ASTM C31. Compressive Strength tests performed in accordance with ASTM C39. Respectfully Submitted Professional Service Industries, Inc. Professional Service Industries. Inc.. 1748 33rd Street. Orlando. FL 32839 . Phone 407/304-5560 . Fax 407/304-5561 FL Engineering Business 3684 Build On Engineering. Consulting. Testing REPORT OF GROUT COMPRESSION TEST Tested For: A 1A Acquisition Group LTD., LLP Project: RESIDENCE INN Attn: Roger Dobson CAPE CANAVERAL, FL 3425 Ailantic Avenue Cocoa Beach, FL 32931 Project No: 761-50044 LOCATION: Down cells: CMU walls and pilasters, col. Line G.9 to Nand 84 to 86, G.9 to T and 66 to 79 (4th floor) sampled approx. col. Line R-68 Date Placed: 8/8/2005 Technician: M. Odom Time Batched: 10:05 AM Supplier: Rinker Time Sampled: 11 : 1 7 AM Delivery Ticket/Truck No.: 92575062 Slump (in) (ASTM C143): 9 Mix No. & Proportions: 1162918 Air Temp. (F): 84 Concrete Temp. (F) (ASTM C1064): 82 Date Received in lab: 8/9/2005 Air Content (ASTM C173/C231): N/A COMPRESSIVE TEST RESULTS Test Date Total Prism Prism Compressive Type No. 10 (Days) Test (Ibs) (in) (sq. in.) (psi) Break 112 A 7 8/15/2005 32500 3.50x3.65 12.78 2540 Tvpe 1 B 28 9/5/2005 C 28 9/5/2005 Specifications: 3000 28 days REMARKS: X Prisms made by PSI Prisms made by Contractor X Prisms picked up by PSI Prisms picked up by Contractor Test Results Comply with Test Results do not Comply with applicable specifications applicable specifications Concrete sampled in accordance with ASTM C172 and ASTM C31. Compressive Strength tests performed in accordance with ASTM C39. Respectfully Submitted Professional Service Industries, Inc. ---,-~~~~------,~--,-"""-,,-,~-~,~,~""""""~""""'-"'''''''''''-''''"""""""'-"""""~ Professional Service Industries, Inc. . 1748 33rd Street. Orlando, FL 32839 . Phone 407i304-5560 . Fax 407i304.5561 FL Engineering Business 3684 Engineering. Consulting · Testing REPORT OF CONCRETE COMPRESSION TEST Tested For: A1A Acquisition Group LTD., LLP Project: RESIDENCE INN Attn: Roger Dobson CAPE CANAVERAL, FL 3425 Atiantic Avenue Cocoa Beach, FL 32931 Project No: 761-50044 LOCATION: Section C roof slab, sampled at approx. A-97 Date Placed: 8/10/2005 Technician: J. Kilderry Time Batched: 6:29 AM Supplier: Rinker Time Sampled: 7:30 AM Delivery TicketlTruck No.: N/A Slump (in) (ASTM C143): 5.5 Mix No. & Proportions: 1156016 Air Temp. (F): 80 Concrete Temp. (F) (ASTM C1064): 88 Date Received in lab: 8/11/2005 Air Content (ASTM C173/C231): N/A COMPRESSIVE TEST RESULTS Test Date Total Cylinder Cylinder Compressive Type No. 10 (Days) Test (Ibs) (in) (sq. in.) (psi) Break 113 A 3 8/13/2005 112500 6.00 28.27 3980 TVDe 2 B 7 8/17/2005 125500 6.00 28.27 4440 TVDe 1 C 28 9/7/2005 D 28 91712005 Specifications: 4000 28 days REMARKS: X Cylinders made by PSI Cylinders made by Contractor X Cylinders picked up by PSI Cylinders picked up by Contractor X Test Results Comply with Test Results do not Comply with applicable specifications applicable specifications Concrete sampled in accordance with ASTM C172 and ASTM C31. Compressive Strength tests performed in accordance with ASTM C39. Respectfully Submitted Professional Service Industries, Inc. ~--~-_.._"-"-~-,---,-,~~-- ~_._--_.,--"---,-,-,~,~"""~ -""'''''''-''''~ Professional Service Industries, Inc.. 1748 33rd Street. Orlando, FL 32839. Phone 407/304-5560. Fax 407/304-5561 FL Engineering Business 3684 Build On Engineering. Consulting. Testing REPORT OF CONCRETE COMPRESSION TEST Tested For: A 1 A Acquisition Group LTD., LLP Project: RESIDENCE INN Alln: Roger Dobson CAPE CANAVERAL, FL 3425 Atlantic Avenue Cocoa Beach, FL 32931 Project No: 761-50044 LOCATION: Section C roof slab, sampled at approx. 04.5-92 Date Placed: 8/10/2005 Technician: J. Kilderry Time Batched: 7:05 AM Supplier: Rinker Time Sampled: 8:09 AM Delivery TicketlTruck No.: 92582781 Slump (in) (ASTM C143): 8.5 Mix No. & Proportions: 1156016 Air Temp. (F): 80 Concrete Temp. (F) (ASTM C1064): 90 Date Received in lab: 8/11/2005 Air Content IASTM C173/C231): N/A COMPRESSIVE TEST RESULTS Test Date Total Cylinder Cylinder Compressive Type No. 10 (Days) Test (Ibs) (in) (sq. in.) (psi) Break 114 A 3 8/13/2005 115000 6.00 28.27 4070 Tvpe 1 B 7 8/17/2005 134500 6.00 28.27 4760 Tvpe 1 C 28 9m2005 D 28 9/7/2005 Specifications: 4000 28 days . - REMARKS: X Cylinders made by PSI Cylinders made by Contractor X Cylinders picked up by PSI Cylinders picked up by Contractor X Test Results Comply with Test Results do not Comply with applicable specifications applicable specifications Concrete sampled in accordance with ASTM C172 and ASTM C31. Compressive Strength tests performed in accordance with ASTM C39. Respectfully Submitted Professional Service Industries, Inc. Professional Service Industries, Inc. . 1748 33rd Street. Orlando, FL 32839. Phone 407/304-5560 . Fax 407/304-5561 FL Engineering Business 3684 Engineering. Consulting. Testing REPORT OF CONCRETE COMPRESSION TEST Tested For: A 1A Acquisition Group LTD., LLP Project: RESIDENCE INN Attn: Roger Dobson CAPE CANAVERAL, FL 3425 Atlantic Avenue Cocoa Beach, FL 32931 Project No: 761-50044 LOCATION: Section C roof slab, sampled at approx. L-98 Date Placed: 8;10/2005 Technician: J. Kilderry Time Batched: 7:45 AM Supplier: Rinker Time Sampled: 8:29 AM Delivery TickellTruck No.: 92583778 Slump (in) (ASTM C143): 4.5 Mix No. & Proportions: 1156016 Air Temp. (F): 82 Concrete Temp. (F) (ASTM C1064): 90 Date Received in lab: 8/11/2005 Air Content (ASTM C173/C231): N/A COMPRESSIVE TEST RESULTS Test Date Total Cylinder Cylinder Compressive Type No. 10 (Days) Test (Ibs) (in) (sq. in.) (psi) Break 115 A 3 8/13/2005 116000 6.00 28.27 4100 Tv De 2 B 7 8;17;2005 143000 6.00 28.27 5060 TVDe 1 C 28 9/7/2005 0 28 9i712005 Specifications: 4000 28 days REMARKS: X Cylinders made by PSI Cylinders made by Contractor X Cylinders picked up by PSI Cylinders picked up by Contractor X Test Results Comply with Test Results do not Comply with applicable specifications applicable specifications Concrete sampled in accordance with ASTM C172 and ASTM C31. Compressive Strength tests performed in accordance with ASTM C39. Respectfully Submitted Professional Service Industries, Inc. Professional Service Industries. Inc.' 1748 33rd Street. Orlando, FL 32839 . Phone 407/304-5560 . Fax 407/304-5561 FL Engineering Business 3684 Build On Engineering . Consulting. Testing REPORT OF CONCRETE COMPRESSION TEST Tested For: A1A Acquisition Group LTD., LLP Project: RESIDENCE INN Attn: Roger Dobson CAPE CANAVERAL, FL 3425 Atiantic Avenue Cocoa Beach, FL 32931 Project No: 761-50044 LOCATION: Section C roof slab, sampled at approx. N-85 Date Piaced: 8/iO/2005 Technician: J. Kilderry Time Batched: 8:20 AM Supplier: Rinker Time Sampled: 9:18 AM Delivery TicketiTruck No.: 92583467 Slump (in) (ASTM C143): 6 Mix No. & Proportions: 1156016 Air Temp. (F): 82 Concrete Temp. (F) (ASTM C1064): 88 Date Received in lab: 8/11/2005 Air Content (ASTM C173/C231): N/A COMPRESSIVE TEST RESULTS Test Date Total Cylinder Cylinder Compressive Type No. 10 (Days) Test (Ibs) (in) (sq. in.) (psi) Break 116 A 3 8/13/2005 125000 6.00 28.27 4420 Tvoe 1 B 7 8/17/2005 152000 6.00 28.27 5380 Type 2 C 28 9/7/2005 0 28 9/7/2005 Specifications: 4000 28 days . REMARKS: X Cylinders made by PSI Cylinders made by Contractor X Cylinders picked up by PSI Cylinders picked up by Contractor X Test Results Comply with Test Results do not Comply with applicable specifications applicable specifications Concrete sampled in accordance with ASTM C172 and ASTM C31. Compressive Strength tests performed in accordance with ASTM C39. Respectfully Submitted Professional Service Industries, Inc. -~--""-"'~"~ _.~,~--,~,-,,~ -~,~,.,"'~""""'- Professional Service Industries, Inc' 1748 33rd Street. Orlando, FL 32839' Phone 407/304-5560 . Fax 407/304-5561 FL Engineering Business 3684 Build On Engineering. Consulting. Testing REPORT OF CONCRETE COMPRESSION TEST Tested For: A1A Acquisition Group LTD., LLP Project: RESIDENCE INN Attn: Roger Dobson CAPE CANAVERAL, FL 3425 Atlantic Avenue Cocoa Beach, FL 32931 Project No: 761-50044 LOCATION: Section C roof slab, sampled at approx. K-75 Date Placed: 8/10/2005 Technician: J. Kilderry Time Batched: 9:20 AM Supplier: Rinker Time Sampled: 9:45 AM Delivery TickeUTruck No.: 92584194 Slump (in) (ASTM C143): 6.5 Mix No. & Proportions: 1156016 Air Temp. (F): 83 Concrete Temp. (F) (ASTM C1064): 90 Date Received in lab: 8/11/2005 Air Content (ASTM C173/C231): N/A COMPRESSIVE TEST RESULTS Test Date Total Cylinder Cylinder Compressive Type No. 10 (Days) Test (Ibs) (in) (sq, in.) (psi) Break 117 A 3 8/13/2005 118500 6.00 28.27 4190 Type 1 B 7 8/17/2005 145500 6.00 28.27 5150 Type 1 C 28 9/7/2005 0 28 9/7/2005 Specifications: 4000 28 days . . REMARKS: X Cylinders made by PSI Cylinders made by Contractor X Cylinders picked up by PSI Cylinders picked up by Contractor X Test Results Comply with Test Results do not Comply with applicable specifications applicable specifications Concrete sampled in accordance with ASTM C172 and ASTM C31. Compressive Strength tests performed in accordance with ASTM C39. Respectfully Submitted Professional Service Industries, Inc. Professional Service Industries, Inc. . 1748 33rd Street. Orlando, FL 32839 . Phone 407/304-5560' Fax 407/304-5561 FL Engineering Business 3684 Build On Engineering. Consulting. Testing REPORT OF CONCRETE COMPRESSION TEST Tested For: A 1A Acquisition Group LTD., LLP Project: RESIDENCE INN Alln: Roger Dobson CAPE CANAVERAL, FL 3425 Atlantic Avenue Cocoa Beach, FL 32931 Project No: 761-50044 LOCATION: Section C roof slab, sampled at approx. M-70 Date Placed: 8/10/2005 Technician: J. Kilderry Time Batched: 9:55 AM Supplier: Rinker Time Sampled: 11:22 AM Delivery TicketITruck No.: NIA Slump (in) (ASTM C143): 7 Mix No. & Proportions: 1156016 Air Temp. (F): 85 Concrete Temp. (F) (ASTM C1064): 90 Date Received in lab: 8/11/2005 Air Content lASTM C173/C231): N/A COMPRESSIVE TEST RESULTS Test Date Total Cylinder Cylinder Compressive Type No. 10 (Days) Test (Ibs) (in) (sq. in.) (psi) Break 118 A 3 8/13/2005 109500 6.00 28.27 3870 Tvee 1 B 7 8/17/2005 119500 6.00 28.27 4230 Tvee 1 r- 28 9/7/2005 '-' D 28 9/7/2005 Specifications: 4000 28 days . REMARKS: X Cylinders made by PSI Cylinders made by Contractor X Cylinders picked up by PSI Cylinders picked up by Contractor X Test Results Comply with Test Results do not Comply with applicable specifications applicable specifications 10 gallons water added to concrete Concrete sampled in accordance with ASTM Ci72 and ASTM C3i. Compressive Strength tests performed in accordance with ASTM C39. Respectfully Submitted Professional Service Industries, Inc. Professional Service Industries, Inc. . 1748 33rd Street. Orlando, FL 32839. Phone 407/304-5560 . Fax 407/304-5561 FL Engineering Business 3684 Build On Engineering .. Consulting" Testing REPORT OF CONCRETE COMPRESSION TEST Tested For: A 1A Acquisition Group LTD., LLP Project: RESIDENCE INN Attn: Roger Dobson CAPE CANAVERAL, FL 3425 Atlantic Avenue Cocoa Beach, FL 32931 Project No: 761-50044 LOCATION: Section C roof slab, sampled at approx. L-69 Date Placed: 8i10i2005 Technician: J. Kilderry Time Batched: N/A Supplier: Rinker Time Sampled: 11:50 AM Delivery TicketlTruck No.: N/A Slump (in) (ASTM C143): 6.5 Mix No. & Proportions: 1156016 Air Temp. (F): 86 Concrete Temp. (F) (ASTM C1064): 90 Date Received in lab: 8/11/2005 Air Content (ASTM C173/C231): N/A COMPRESSIVE TEST RESULTS Test Date Total Cylinder Cylinder Compressive Type No. 10 (Days) Test (Ibs) (in) (sq. in.) (psi) Break 119 A 3 8/13/2005 110500 6.00 28.27 3910 Type 2 B 7 8/17/2005 130000 6.00 28.27 4600 Type 1 '"' 28 9/7/2005 \J D 28 9m2005 Specifications: 4000 28 days REMARKS: X Cylinders made by PSI Cylinders made by Contractor X Cylinders picked up by PSI Cylinders picked up by Contractor X Test Results Comply with Test Results do not Comply with applicable specifications applicable specifications Concrete sampled in accordance with ASTM Ci72 and ASTM C3i. Compressive Strength tests performed in accordance with ASTM C39. Respectfully Submitted Professional Service Industries, Inc. Professional Service Industries, Inc.. 1748 33rd Street. Orlando, FL 32839. Phone 407/304-5560. Fax 407/304-5561 FL Engineering Business 3684