Loading...
HomeMy WebLinkAboutOrdinance No. 15-1973MICROFILMED 3 -14-80 ".AMENDED ON 2ND READING MAY 1, 1973 ORDINANCE NO. 15-73 (AS AMENDED) AN ORDINANCE ESTABLISHING FEES AND BUILDING PERMITS ON ALL CONSTRUCTION IN THE CITY LIMITS` OF THE CITY OF CAPE CANAVERAL, FLORIDA; REVOK- ING ALL ORDINANCES OR PARTS OF ORDINANCES IN CONFLICT HEREWITH; PROVIDING AN EFFECTIVE DATE. oRD, 110-71 0RD, /- BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF CAPE CANAVERAL, FLORIDA, ;AS FOLLOWS: SECTION 1. Building Permit Fee Schedule: The City of Cape Canaveral, Florida, does hereby establish as its schedule for building permits on all construction in the City of Cape Canaveral, Florida, the following fee schedule, to -wit: A. Building and miscellaneous: On all buildings, structures or alterations requiring a building permit, a fee shall be paid as required at the time of filing application, as follows: (a) Alterations, remodeling, repairs and moving, in proportion to area of building and extent of inspection required, provided the fee shall not exceed one-half (1/2) of the regular fee for new construction of like classification, per $1, 000.00 valuation Minimum fee (b) Moving of building (c) Demolition (d) Building, per square foot (e) Signs, per $1, 000.00 valuation (f) Swimming pool, per $1, 000.00 valuation (g) Block walls and fences, per $1, 000.00 valuation (h) Seawall, per $1, 000.00 valuation (1) Retaining wall, per $1, 000.00 valuation (j) Well (deep or shallow) (k) Certificate of occupancy (replacement oR change of use) (1) Portable signs: 1 - 3 days 4 - 7 days 8 - 15 days `16 - 31 days All other permits not listed above, per $1,000.00 valuation 5.00 $ 5.00 5.00 10.00 10.00 . 04 5.00 5.00 5.00 5.00 5.00 & 00 5.00 2.50 5.00 7.50 15.00 B. Plumbing: mk IN ADDITION TO ANY FEE OR FEES CHARGED IN SECTION 1, PARAGRAPH A) Minimum permit charge $ 3.00 For each plumbing fixture, floor drain or trap (including water and drainage piping) 1.00 Water closet Laundry tub Lavatory Drinking fountain Bathtub Sewer Shower Floor drain Urinal Catch basin or sump Page 1 of 3 (ORD. 15 -73) MICROFILMED 3.i4 -S0 Sink Grease trap Disposal unit Service sink Dish washer Trailer connection Washing machine For installation, alteration or repair of water piping and /or water treating equipment For repair or alteration of drainage or vent piping (b) A charge of -two dollars and fifty cents ($2.50), shall be made for re- inspection of plumbing installation. • $ 1.00 1.00 (c) Sewer Tap -in Inspection fee 5.00 C. Electrical: 'cx(IN ADDITION TO ANY FEE OR FEES CHARGED IN SECTION 1, (a) PARAGRAPH A) x'C Minimum electrical permi t $ 3.00 Inspection fee - Residential 3.00 Inspection fee - Comm. Bldg. per floor 3.00 Outlets at which current is controlled or consumed - For each outlet .10 Each lighting fixture .10 Each outlet controlling window type air conditioning . 10 Continuous receptacle strip assemblies .10 Each service change 3.00 Motors or Generators 1 HP through 10 HP 1.00 Over 10 HP 2.00 Sign outlets per circuit .10 Each Heating Appliance Up to l KW .50 Over 1 KW but not over 10 KW 1.00 Over 10 KW 3.00 Electrical water heaters .75 Dishwasher, disposal, etc. .75 X -ray 1.00 Electric ranges, each appliance .75 Dental units 2.00 Oil burner units or central A/C units 2.00 Exhaust fans under 1 HP .25 Electric elevators 5.00 Electric Welders 1 HP through 10 HP 1.00 Over 10 HP 2.00 Electric signs (incandescent) 2.00 Sign flasher 1.00 Time switch .50 Neon Sign Each transformer .50 Flood or spot light, commercial 500 W or more 1.00 Kitchen centers to be computed according to above schedule of fees for outlets and appliances. For the inspection of any electrical equipment for which no fee is set $5.00 per hr. (b) Re- inspection fees. When extra inspection trips are necessary due to any one of the following reasons, a charge of five dollars ($5.00) shall be made for each trip: Page 2 of 3 (ORD. 15 -72 MICROFILMED 344'80 (1) Wrong address. .(2) Second call on condemned work. (3) Additional work done after inspection has been made. (4) Work not ready for inspection when called. SECTION 2. Where construction valuation is required to determine the permit fee, such valuation shall be based upon the actual construction contract price (with satisfactory evidence of same being submitted to the Building Official) or a construction cost estimate made by the Building Official. SECTION 3. All Ordinances or parts of Ordinances in conflict herewith are hereby repealed. SECTION 4. This Ordinance shall become effective immediately upon its adoption. ADOPTED by the City Council of the City of Cape Canaveral, Florida, the 1ST day of MAY, 19731 AVEig "Ai ved as to form: First reading: APRIL 17, 1973 Posted: APRIL 18, 1973 Second reading: MAY 1, 1973