Loading...
HomeMy WebLinkAbout06-20-1997 Special Meeting1 1 1 CITY COUNCIL SPECIAL MEETING CITY HALL ANNEX 111 Polk Avenue, Cape Canaveral, Florida FRIDAY June 20, 1997 4:00 P.M. MINUTES CALL TO ORDER: PLEDGE OF ALLEGIANCE: ROLL CALL: CONSIDERATIONS: Council Members Present Burt Bruns Tony Hernandez Buzz Petsos Mayor John Porter Others Present City Manager, Bennett Boucher City Clerk, Sandra Sims Council Member Absent Mayor Pro Tem Rocky Randels 1. (rape 1, 31)Mayor Porter explained that new information has been received relating to engineering findings discovered during the initial pedestrian bridge design work performed by Stottler, Starmer & Associates. Based on soil borings, pilings will be required to construct the bridge requiring an additional $15,000 to $20,0000. Therefore, the Florida Department of Transportation was informed of the additional costs. As a result, the Joint Participation Agreement with the State of Florida Department of Transportation to Fund a Pedestrian Overpass amount was increased from $60,000 to $75,000. A motion was made by Mr. Bruns and seconded by Mr. Hernandez to approve the Joint Participation Agreement with the Florida Department of Transportation to fund the Pedestrian Bridge, in the amount of $75,000, with the stipulation that the City Attorney obtain the appropriate payment schedule. The motion passed 4-0 with voting as follows: Mr. Bruns, For, Mr. Hernandez, For, Mr. Petsos, For, and Mayor Porter, For. 2. (Tape 1, 754) City Engineer, John Pekar reported that SSA has spoken with a bridge construction manufacturer who is familiar with the local soil conditions. He stated that the representative of Custom Docks installed the four (4) 35° deep pilings that support the reuse line in the same location as the proposed bridge. He reported that during the discussion, Custom Docks mentioned a wooden bridge in Malabar they recently constructed and is guaranteed for 25 years. He reported that the Customs Docks representative stated that he could construct a customized wooden bridge g\c it3 'clkiminutes‘special11997w6- 20- 97.doc 1 1 1 City Council Special Meeting Minutes June 20, 1997 Page 2 for the City of Cape Canaveral within two weeks at a cost of $20- 24,000, including the pilings. Mayor Porter queried, if the wooden pedestrian bridge were selected rather than the steel bridge, what would the total cost be? Mr. Pekar stated that the cost would be $20- 24,000 (depending on customization) for the bridge construction, plus approximately $1,000 permitting costs (SJRWMD), minus $3 -4,000 estimated FPL charges, FDOT charges would remain the same, plus $2,000 additional engineer costs for certifying the bridge structural design, or approximately $32,000 opposed to $75- 80,000 for the steel bridge under consideration for Sole Source Purchase from Steadfast Bridges in the amount of $27,882. Council concurred that the sole source purchase should be deferred because the design will be different due to the piling requirements and to receive more engineering investigative information. The City Engineer, John Pekar was instructed to query the Florida Department of Transportation to determine their assessment of a wooden bridge as opposed to a steel bridge. Council concurred to place approval of a pedestrian bridge design on the July 1, 1997 meeting agenda and the purchase approval on the July 15, 1997 agenda. The meeting adjourned at 4:45 p.m. Ai MST: Sims, CITY CLERK G:'CityCIMINUFES SPECIAL \1997\06.2a97.doc Sohn K. Porter, MAYOR