Loading...
HomeMy WebLinkAbout09-02-1993 SpecialA Special Meeting September 2, 1993, Canaveral, Florida. Mayor Salamone. ROLL CALL: CITY COUNCIL SPECIAL MEETING September 2, 1993 of. the Cape Canaveral City Council was held on at the City Hall Annex, 111 Polk Avenue, Cape The meeting was called to order at 6:30 P.M. by Mayor Mayor Pro Tem Councilmember Councilmember Councilmember City Manager Acting Deputy City Clerk City Attorney BUSINESS: 1. Discussion Re: Future wastewater treatment, effluent disposal. slud•e treatment facilities and the financial im•act on s stem users. Mr. Boucher introduced Mr. Ted Hortenstine, of Dyer, Riddle, Mills & Precourt, Inc., who had been working on the City's application for State Revolving Loan funding. He explained that Mr. Hortenstine's presentation and the public hearing were required by the Department of Environmental Protection (DEP) for the State funding. Mr. Hortenstine stated that the Facilities Plan was developed in support of the City's application for State funding. He asked that copies of the overheads displayed during his presentation be made a part of the minutes. He explained that the reasons for the Facilities Plan was to evaluate the existing conditions of the City in general, establish design needs for the wastewater treatment facilities over a 20 year planning period, evaluate the best alternatives for the City, provide recommendation for the best alternative, identify the environmental impact, and identify financing needs. Mr. Hortenstine explained in detail each of the attached overheads: 1) Existing land use acreages; 2) Planning Area (Port Canaveral was taken into consideration, but not City of Cocoa water); 3) Statistics: Climate - moderate Soils - good for development Beach soils - Surface water Joy Salamone John Porter Arthur Berger Joan Calvert Rocky Randels Bennett Boucher Susan Chapman John Kancilia Present Absent Present Present Present Present Present Present Air quality Plant & Animal populations not suitable for development - Banana River - aquatic preserve - generally good, except for periodic emissions from power plants in the area - WWTP won't significantly impact any endangered species 4) Existing Process Flow Schematic - currently operating at 20 mg /1 total suspended solids, 14.2 mg /1 biochemical oxygen demand; 11.8 mg /1 total nitrogen; 0.61 mg /1 total phosphorous; 5 mg /1 dissolved oxygen; 5) Historical WWTP Flows - generally stayed constant; infiltration inflow was not significant; 6) Indian River Lagoon Act, Chapter 90 -262, Laws of Florida; 7) Population and Wastewater Flow Projections through 2013 - increasing flow through 2013 up to 1.7 mgd which was chosen as the design perimeter for the treatment plant; 400 0 City of Cape Canaveral, Florida City Council Special Meeting September 2 , 1993 Page 2 8) Effluent Disposal Options Analysis revealed that the wetland reuse option was the most beneficial to the environment, the most feasible to implement, and the most cost effective to the City. 9) Capital and Operation & Maintenance (O&M) Summary; 10) Effluent Parameters; 11) Wastewater Treatment Options Analysis Summary; 12) Sludge Treatment and Disposal Options Analysis Summary; 13) Proposed Process Flow Schematic; 14) Proposed Sludge Stabilization Process Schematic; 15) Estimated Project Cost - $8, 603, 017; 16) Capital Funding Plan - Data Utilized in Analysis; 17) Capital Financing Plan Summary - Provided for an average increase of $2.08 per residential user/per month; 18) Implementation Schedule; 19) Wastewater System Facilities Plan Recommendations. 2. Resolution No. 93-23 , Adopting the Wastewater System Facilities Plan for the City of Cape Canaveral. z Mayor Salamone read the title of the Resolution. A RESOLUTION OF THE CITY OF CAPE CANAVERAL, BREVARD COUNTY, FLORIDA; ADOPTING THE WASTEWATER SYSTEM FACILITIES PLAN FOR THE CITY OF CAPE CANAVERAL; REPEALING ALL RESOLUTIONS IN CONFLICT HEREWITH; AND PROVIDING FOR AN EFFECTIVE DATE. Motion by Mr. Randels, seconded by Mr. Berger to adopt Resolution No. 93-23. Motion carried with members voting as follows: Mayor Salamone, For; Councilman Berger, For; Councilwoman Calvert, For; Councilman Randels, For. 3. Resolution No. 93-24 , Adopting a Dispute Resolution Process E associated with the Planning, Design, Construction and Operation of Facilities financed by a loan from the State Revolving Loan Fund authorized by Chapter 403. 1835, Florida Statutes. 1 Mayor Salamone read the title of the Resolution. A RESOLUTION OF THE CITY OF CAPE CANAVERAL, BREVARD COUNTY, FLORIDA; ADOPTING A DISPUTE RESOLUTION PROCESS ASSOCIATED WITH THE PLANNING, DESIGN, CONSTRUCTION AND OPERATION OF FACILITIES FINANCED BY A LOAN 1 FROM THE STATE REVOLVING FUND AUTHORIZED BY CHAPTER 403 . 1835, FLORIDA STATUTES; REPEALING ALL RESOLUTIONS IN CONFLICT HEREWITH; AND PROVIDING FOR AN EFFECTIVE DATE. Motion by Mr. Randels, seconded by Mrs. Calvert to adopt Resolution 1 No. 93-24 . Mr. Kancilia advised that the Florida Administrative Code _ regulations required a Dispute Resolution Process for the City to ' adjudicate disputes when landowners were adversely affected. He 3 stated that it was a mediation type process wherein disputes would be x negotiated and resolved. Motion carried with members voting as ,follows: Mayor Salamone, For; Councilman Berger, For; Councilwoman Calvert, For; Councilman Randels, For. 3 _, There bein r--ther business, the meeting adjourned at 7: 00 P.M. t r Approved\this 7th`+ 1 day of September , 1993 . 4J _'C If / , / Q u w IA +-" Jo C.! Salamone, MAYOR ATTESJ• !/ "4, ! ���y usan Chapman, Act ng Deputy City Clerk Attachment to Special Council tines- Minutes of September 2, official minutes. /4-e. wt-cat -e,s C;-1-9 M- 2.. -1 \- -Lc7 . Filed with 5 77—t.-CO 1"\c, A :YR ItAr\-. a.;; 6'?t a ft eki / c, %e ":44./r._ c( t( C joj J(ro,e_ Z' t:74A) #117-gem St-0z 66--/t- Pale 16tAt<Wh M tcAa61 G 1 a,s i k,1141t4 Wmr/i)W '' (4o1) gIC4 -0S4�- Cht°9) aa.1 /1.3 fd7 7J se 9Y re. c' 44 tr) - SbiSt ya7 -~7g3.e OOz 253 -4-732 253- 4732 7fr9' 17P3 7(C,( . ,�..43 7r Attachment to Special Council ting Minutes of September 2, illp - Filed with official minutes. REFERENCES City of Cape Canaveral Reuse Feasibility Study, June 1992, Post, Buckley. Schuh & Jernigan, Inc. 2. The City of Cape Canaveral - Wastewater Treatment Plant Improvements and Wetland Reuse System Preliminary Design Report, April 1993, Hartman & Associates, Inc. 3. Initial Capacity Analysis Report for the City of Cape Canaveral Wastewater Treatment Plant, June 1993 Hartman & Associates, Inc. 4. City of Cape Canaveral, Florida Comprehensive Plan (as revised by Adopted Amendment #1, Janu ,l, 1990), October, 1985, Briley, Wild & Associates. Preliminary Rate Study, Burton and Associates, 1993. 6. City of Cape Canaveral, Utilit System Budget. 7. Request for Inclusion on the SRF Priority' List, Hartman & Associates, Inc. DYER, RIDDLE, MILLS AND PRECOURT, INC. • • EXISTING LAND USE ACREAGESA LAND USE CLASSIFICATION AVERAGE DENSITY PER ACRE PERCENT OF PERCENT OF AREA, TOTAL DEVELOPED ACRES CITY ACRES Single Family Residential Duplex Residential Multi-Family Residential Mobile Home Residential TOTAL RESDENTIAL Commercial Industrial Public & Semi -Public Recreation & Open Space Agriculture & Conservation Streets, Highways & Drainage Facilities TOTAL DEVELOPED ACRES Vacant Land 7.88 units 8 units 14.2 units 11 units 105.48 7.53 28.75 2.05 297.48 21.24 64.54 4.61 496.25 35.43 72.21 5.165 61.29 4.38 25.54 1.80 13.80 0.99 0.00 0.00 170.53 12.18 839.32 59.93 561.22 40.07 12.57 3.43 35.44 7.69 59.13 8.6 7.3 3.0 1.64 0.00 20.32 100.00 TOTAL ACRES 1400.54 100.00 AThis table was presented by Post, Buckley, Schuh & Jernigan, Inc. in the Reuse Feasibility Study (June, 1992). m N! -1 O • > 3m O 0 O > m z N m 'fl z O D r z� 0 r N c W �o m OXIDATION DITCH ALUM FACILITIES CLARIFIER CHLORINATION FACUTIES WAS SLUDGE HOLDING Ys riCHLORINATION BASIN TO SLUDGE DRYING BEDS LEGEND AL ALUM FEED UNE CE CHLORINATED EFFLUENT CS CHLORINE SOLUTION F -E FINAL EFFLUENT INF INFLUENT MLSS MIXED LIQUOR SUSPENDED SOLIDS RAS RETURN ACTNATED SLUDGE WAS WASTE ACTIVATED SLUDGE F -E TO THE BANANA RIVER HISTORICAL WASTEWATER FLOWS CAPE CANAVERAL WWTP MONTH 1988 1989 YEAR 1990 1991 1992 1993 .January 0.580 0.892 1.058 0.923 1.090 0.980 February n/a 0.892 1.068 1.008 1.130 1.050 NI arch 1.125 0.970 1.063 1.048 1.290 1.120 April 1.124 0.961 0.969 1.245 1.120 1.000 May 1.080 0.897 0.902 1.153 0.880 0.84 .June 1.085 0.913 0.940 1.180 1.057 0.83 July 0.782 0.922 0.983 1.137 1.130 n/a August 0.805 1.005 1.027 1.144 1.070 n/a September 0.715 0.938 1.015 1.130 0.940 n/a October 0.814 1.220 0.998 1.390 1.070 n/a November 0.947 1.183 0.924 1.120 .930 n/a December 0.823 1.140 0.853 1.120 0.880 n/a AVERAGE 0.898 0.994 0.983 1.133 1.049 0.970 Source: City of Cape Canaveral FDER Monthly Operating Reports n/a - Indicates data not available INDIAN RIVER LAGOON ACT CHAPTER 90 -262, LAWS OF FLORIDA The Act requires each owner of an existing wastewater treatment facility discharging to the Lagoon or its tributaries to: Cease discharging or demonstrate the need for continued discharge by July 1, 1995. Investigate the feasibility of utilizing reclaimed water for beneficial purposes by July 1, 1992. CAPE CANAVERAL WASTEWATER TREATMENT PLANT POPULATION AND WASTEWATER FLOW PROJECTIONS One- fourth Seasonal Year Population Population 1993 8,560 850 1994 8,680 888 1995 8,880 925 1996 8,940 963 1997 9,080 1,000 1998 9,220 1,038 1999 9,360 1,075 2000 9,500 1,113 2001 9,700 1,150 2002 9,900 1,188 2003 10,100 1,225 2004 10,300 1,263 2005 10,500 1,300 2006 10,660 1,338 2007 10,820 1,375 2008 10,980 1,413 2009 11,140 1,450 2010 11,300 1,488 2011 11,450 1,526 2012 11,600 1,563 2013 11,750 1,600 Notes: Total Contributing Population 9,410 9,568 9,725 9,903 10,080 10,258 10,435 10,613 10,850 11,088 11,324 11,563 11,800. 11,998 12,195 12,393 12,590 12,788 12,976 13,163 13,350 City Flow (MGD)(1) 1.026 1.043 1.060 1.079 1.099 1.118 1.137 1.157 1.183 1.209 1.234 1.260 1.286 1.308 1.329 1.351 1.372 1.394 1.414 1.435 1.455 Port Flow (MGD)(2) 0.088 0.096 0.104 0.112 0.120 0.129 0.137 0.145 0.153 0.161 0.169 0.177 0.185 0.193 0.201 0.210 0.218 0.226 0.234 0.242 0.250 Total Flow (MGD) 1.114 1.139 1.164 1.192 1.219 1.247 1.274 1.302 1.336 1.370 1.403 1.437 1.471 .1.501 1.531 1.560 1.590 1.620 1.648 1.677 1.705 1. City flow is calculated utilizing the total contributing population and per capita flow of 109 gpd. 2. Port flow is calculated by interpolating between the metered flow value of 80,000 GPD in 1992 and an estimation obtained from the Port Authority of 250,000 GPD in 2013. 3. This table was obtained from the Capacity Analysis Report developed by Hartman & Associates, Inc., June, 1993. EFFLUENT DISPOSAL OPTIONS No Action - Maintain existing discharge but upgrade to A%%T Standards Public Access Reuse - Maximuin, moderate and minimal reuse Rapid Infiltration Basins Adsorption Fields Wetland Restoration CAPE CANAVERAL REUSE CAPITAL AND OPERATION & MAINTENANCE (O &M) SUMMARY Description Capital Cost,$ O &M Cost,$year No Action Wetland Reuse Only Maximum PAR+ Wetland Medium PAR+ Wetland Minimal PAR+ Wetland Treatment - AWT Discharge to Banana $4,090,000 River $360,000 Treatment- Dual Media Filtration $1,890,000 $1,610,000 $1,260,000 + High Level Disinfection $110,000 595,000 $80,000 Storage - One day (ip, Average Annual $774,200 $583,800 $408,800 Reuse Flow 4 $10,000 $10,000 $10,000 Pumping - High Service $434,000 $392,000 $3$0,000 $55,000 $48,000 $40,000 Distribution System $4,193,000 $2,959,000 $2,330,000 $168,000 $118,000 $93,000 Wetland System $4,992,500 $4,992,500 54,992,500 $4,992,500 $100,000 $100,000 $100,000 $100,000 SUBTOTAL CAPITAL COST, $ $4,090,000 $4,992,500 $12,283,70 $10,537,30 $9,341,300 SUBTOTAL O &M COST, $ /year $360,000 $100,000 $443,000 $371,000 $323,000 WWTP Renovation $2,500,000 $2,500,000 52,500,000 $2,500,000 $2,500,000 Note 1: Treatment, Storage & Pumping Capital/Construction Ratio = 1.4 Wetland, Distribution System CapitaUConstruction Ratio = 1.25 Note 2: AWT Treatment includes Denitrification filters, High level disinfection, Dechiorination and Off-Spec. 1.8 MgaL Storage Note 3: Subtotal Capital and O &M costs include only those costs associated with the particular alternative, i.e., costs associated with WWTP renovations or existing level of treatment are not included in subtotals. Note 4: WWTP Renovations are to be implemented for all alternatives. Effluent Parameter EFFLUENT PARAMETERS Wetlands Influent/ Plant Effluent Wetlands Effluent/ Discharge to the Banana. River BOD5 5.0 mg/1 5.0 mg/1 TSS 5.0 mg/1 5.0 mg/1 TN 10.0 mg/1 1.0 mg/1 TP 0.3 mg/1 0.1 mg/1 Chlorine Residual 0.01 mg/1 0.0 mg/1 • • CAPE CANAVERAL WASTEWATER TREATMENT PLANT WASTEWATER TREATMENT OPTIONS ANALYSIS SUMMARY Unit Process NUTRIENT REMOVAL Annual Operating Present Subjective Capital Cost Cost Value. Ranking* A/O Process $874,784 A2 /O Process 755,405 Five Stage Bardenpho Process 1,031,285 Activated Sludge Nitrification with Chemical Addition 760,000 FILTRATION Continuous Backwash Filters Pulse Bed Filters Deep Bed Filters Traveling Bridge Filters DISINFECTION Chlorination Dechlorination Ultraviolet Disinfection Ozonation $330,000 270,000 431,900 430,000 $8,500 167,500 412,500 * The highest number represents the most $92,962 $4,058,535 17 21,435 1,489,497 25 36,217 2,271,652 21 262,908 9,764,072 7 $1,478 538 636 $380,627 45 308,423 21 453,698 37 62 432,109 10 $19,067 13,298 41,095 $661,504 622,937 1,819,932 favorable option. 32 37 16 • • CAPE CANAVERAL WASTEWATER TREATMENT PLANT SLUDGE TREATMENT AND DISPOSAL OPTIONS ANALYSIS SUMMARY Unit Process SLUDGE STABILIZATION (without dewatering) Aerobic Digestion ATAD Lime Stabilization SLUDGE STABILIZATION (with dewatering) Aerobic Digestion ATAD Lime Stabilization Lime Pasteurization Auuival Operating Present Subjective Capital Cost Cost Value Rankine* $336,000 $218,720 940,000 150,170 307,744 133,421 $583,000 1,187,000 490,744 575,000 $115,407 46,857 26,608 25,358 $7,826,716 6,083,018 4,877,142 $4,535,445 2,791,747 1,402,003 1,443,449 * The highest number represents the most favorable option. 26 34 8 26 34 8 8 m 17 .0 mn 0 �m n nz H< 3. 0 rn 0r 0 m 0 CA G) s C i FERMENTATION BASIN MECHANICAL SCBREEN GRIT REMOVAL ANOXIC BASIN `MLSS ALUM FACILITIES r-) L,J di OXIDATION DITCH /- - LEGEND NR AIR AL ALUM FEED LINE BYP BYPASS CE CHLORINATED EFFLUENT CS CHLORINE SOLUTION FE FILTER EFFLUENT F -E FINAL EFFLUENT IR INTERNAL RECYCLE NF INFLUENT MLSS MIXED LIOUOR SUSPENDED SOLIDS RAS RETURN ACTIVATED SLUDGE RET RETURN ROW RAW WASTEWATER WAS WASTE ACTIVATED SLUDGE PROPOSED STRUCTURE EXISTING STRUCTURE CONTRACT HAULER LIME STABLIZATION CHLORINATION FACILITIES r-� L,J CI • T cm 5 1 C 14 33 • • ESTIMATED PROJECT COST Construction Related Item Estimated Cost Administration (including legal and fiscal services $ 43,256 prior to obtaining loan) (0.6% of Construction Cost) Basic engineering services for planning, design, 273,441 and construction procurement (6.45% of Construction Cost) Legal and teclurical services during construction 170,600 Start -up Services 170,600 Construction and related procurement 3,854,000 Eligible land (for wastewater /residue reuse or 2,970,000 ultimate disposal only) Contingency (10% of construction) 385,400 Interim financing (excluding SRF capitalized interest) -0- Cost of refinancing (such as underwriter fees) -0- Close -out audit 30,000 Other (Loan Reserve Fee) 157,946 Subtotal 8,055,244 Service Fee (2.5% of Subtotal) 197,432 Capitalized Interest Estimate 350,341 (18 month const. period, 3% interest) Total Cost $8,603,017 Note: Loan Service Fee, Loan Reserve Fee and Capitalized Interest are calculated for the SRF Loan Amount only ($7,435,017) CAPITAL FUNDING PLAN DATA UTILIZED IN ANALYSIS SRF FUNDING ASSUMPTIONS Borrowed Amount $8,603,017 SRF Interest Rate 3% Repayment Period 20 Years Annual Debt Service $499,750 Loan Repayment Reserve $157,946 (2% of Construction Cost Borrowing) Pledged Revenue Coverage 15% Payments Begin March, 1996 OTHER DATA Household Income $ 17,920 Household Size 1.5 persons Population Growth 2% per year Expenses: Total Existing Expenses Total Incremental Expenses Total Expenses CAPITAL FINANCING PLAN SUMMARY 1995 1996 1997 1998 1999 $1,082,000 $1,048,000 $1,056,000 $1,058,600 $1,059,000 437,356 729,712 734,712 739,712 739,712 1,519,336 1,777,712 1,790,712 1,798,312 1,799,084 Revenues: Operating $1,261,356 $1,518,114 $1,563,595 $1,579,231 $1,595,024 Non - Operating 128,000 97,000 103,000 103,000 103,000 (Interest Earning) Impact /Connection Fees 130,000 138,000 140,000 140,000 140,000 Total Revenues 1,519,356 1,783,114 1,806,595 1,822,231 1,838,024 User Fee Increase Required 3.6% 21.5% 0 0 0 CAPITAL FINANCING PLAN SUMMARY YEAR 1995 1996 1997 1998 1999 Wastewater Management Data Total estimated annual $1,519,356 $1,777,712 $1,790,712 $1,798,312 $1,799,084 wastewater management costs Non - residential share of 561,594 650,637 659,310 662,108 662,392 total annual wastewater management costs Residential share of total 957,762 1,127,076 1,131,402 1,136,204 1,136,692 annual wastewater management costs Number of households Average residential user charge /per month /customer Average connection fee per residential unit 6,302 6,365 6,429 6,493 6,558 12.67 14.75 14.67 14.58 14.45 Average impact fee per $2,156 $2,156 $2,156 $2,156 $2,156 residential unit • • IMPLEMENTATION SCHEDULE Draft Facilities Plan and Capital Financing 7/23/93 Plan submitted to the City City Review Period 7/23- 7/30/93 Advertise Public Hearing for Facilities Plan and 7/31/93 Dedicated Revenue Hearing (30 day advertisement period required) Submittal Package to FDER. to include: 8/7/93 a. Facilities Plan with certified copy of public hearing advertisement b. Capital Financing Plan with certification of the City's chief financial officer c. Current wastewater service agreement with Port Canaveral d. Sewer Use Ordinance e. User Charge Ordinance Public Hearing - Facilities Plan and Dedicated Revenue Hearing - City Council to pass the following Resolutions: a. Adoption of Facilities Plan b. Adoption of Dispute Resolution Process 9/2/93 Submittal of Resolutions and Public Hearing 9/93 minutes to FDER Notice of Intent to permit construction of 10/93 treatment plant issued Sign SRF loan agreement 11/93 Advertise for Bids 11/93 Open construction bids 12/93 Approve low bidder 12/93 Start treatment plant construction 1/94 Complete construction of treatment plant 3/3/95 Begin SRF loan repayments 3/3/96 Certify operational performance of the 3/3/96 treatment plant and close out project WASTEWATER SYSTEM FACILITIES PLAN RECOMMENDATIONS 1. Adopt the facilities plan which should consist of the following: Implement the most feasible effluent disposal alternative of creating a 33 -acre natural wetlands system for effluent disposal and final nutrient removal. Implement the cost - effective alternative of upgrading the . treatment facility to include a new pretreatment system, system additions to achieve biological nutrient removal, additional clarification systems, and new disinfection and filtration systems. Implement the cost- effective sludge management alternative of providing dewatering and lime stabilization prior to land disposal. 2. FDEP issuance of Finding of No Significant Impact (FNSI). Site Certification for All Project Sites Plant & Wetlands. Construction Permits for Project - Plant & Wetlands. 5. FDEP Modification of Project Status from Planning to Fundable (30 -45 Day Public Notice Period). 6. Execution of Loan Agreement.