HomeMy WebLinkAboutResolution No.68-15II 0 0
RESOLUTION NO. 68 -15
A RESOLUTION INSTRUCTING CITY 04GINEERS TO PREPARE A
FEASIBILITY STUDY FOR SEWER SERVICE TO CANAVERAL PORT
AUTHORITY: PROVIDING AN EFFECTIVE DATE.
WHEREAS, the City finds . it desirable that a feasibility
study be prepared, regarding providing sewer service to the
Canaveral Port Authority.
NOW THEREFORE, 'BE.IT RESOLVED BY THE CITY COUNCIL OF THE
CITY OF CAPE CANAVERAL, FLORIDA, that:
SECTION 1. The Consulting Engineer for the City, Briley,
Wild & Associates, are hereby instructed to prepare a feasibility
study pursuant to their letter addressed to the City of Cape Cana-
veral, dated April 1, 1968, acopy of same being attached hereto
and made a part hereof.
SECTION 2. This resolution shall become effective immediatel
upon its adoption.
ADOPTED BY THE CITY COUNCIL OF THE CITY OF CAPE CANAVERAL,
FLORIDA THIS /( C� DAY OF APRIL, A.D.,1968.
CITY OF
ATTEST:
U
.APPROVED AS TO FORtd:
j3zil,y, 'Wild c4alociata
.... I —M. CNOINCCPB
OAVTONA BCACN • ' CLCAPWATCR . SNI Vlildl -
w "
PLORIOA .NAm.LLi
w — April 1, 1968 coxvxlelrou
WHIN a OPGw �u0
-i
woo .. T D WI0111M IOUIIV.N _ '
- p.RpY MW 0.dWA IfOR
Mayor and Members of the City Council
City of Cape Canaveral
Cape Canaveral, Florida
Gentlamem `
Rd Sewer Sery ice to Port Canaveral
We submit herewith our proposal coverlrg a report on the desirability and feasibility of
providing sewer service to the Canaveral Part Authority. We propose to do the following
items of work and to report our findings to the CIty,Counell.
1 A review tcfprotmt and anti ipated future Port
d by their
the Port Area,
Engineers with respect a iloIn, the Port's Engineers master plan
onticipated present and reasonable Future sowog of wester:
for sewage collection and the characteristics of the various types
2. An analysis of the various portions of the City system which would be affected
by service to the Port Area. .
`
3. An analysts of Nie status of the City's financing structure with respect to the
outstanding sower system revenue certificates.
4. A study of reports and other available dote for the purpose of determining a
basis on which to predicate estimates of present and future taws^ revenues to be derived
from the Port Area.
9. The preparation of a feasibility report, based on the foregoing studies and
analyses, on the feasibility and practicability of providing sewer service to the Part Area.
Included in this Report will be o description of the method or methods of providing sewer
service. estimates of cosh, methods of financing and recommended charges.
6. The submission of fifteen (W copies of this Report to the City Council: '
Additional copies can be obtained, upon request by the City Council, at actual reproduct-
ion cost.. .
7. Attendance at conferences or meetings, upon request by the City Council.
I
Mayor and Members of the City Council -2- April 1, 1968
City of Cape Canaveral Re: -Sewer Service to Port Canaveral
Cape Canaveral, Florida
8. Service as an expert witness at Court hearings.
9. Engineering service, If required, to perform all functions necessary For
the City to contract and construct facilities for service to the Port Aron.
We are to be paid for the services described herein as follows:
A. For conducting the necessary studies and analyses and the preparation
and submission of the Feasibility Report (Items i - 6 above)sActval Cost.
B. For attendance, upon request, at meetings and conferences (Item 7 above)r
Actual Cost
C. For services as an expert witness In connection with the Project (Item 8
above): One Hundred Dollars ($100.00) per day or part thereof, together with all per-
tinent traveling and living expenses incurred.
D. For Engineering Services, if required, for the City to contract and construct
any facilities necessary for service to the Port Area Otani 9 above), services and payment
shall be In accordance with the Consulting Engineering Phase of the Contract between
the ENGINEERS and the CITY dated February 7, 1963, or any subsequent Contract. '
The term "Actual Cost" as hereln used shall mean and Include all salaries and
wages, social security and other taxes, overhead, and all other expenses, not paid directly,
which would normally accrue to the ENGINEERS In the prosecution of the agreed work.
For simplification "Actual Cat" shall be computed, billed, and paid as salary cosh plus
one hundred percent (100*Q together with all pertinent traveling and living expenses
Incurred.
The work will be completed at the earliest practicable date consistent with good
engineering practice.
Mayor and Members of tho City Council -3- April It 1968
City of Cape Canaveral Res Sewer Service to Port Canaveral
Cope Canaveral, *Florida
Upon your official acceptanea of this proposal, please so note In the space provided
below and return the executed carbon copy to us for our records.
Assuring you of our full cooperatlon and thanking you for the continued confidence
which you have expressed In this flame we remain,
Very truly yours,
BRILEY, WILD & ASSOCIATES
CONSULTING ENGINEERS
Harry E."WII ,d�.E.-
TGtr
This Proposal Accepted by Official Action
This 14 ' "Doy or 1968.
CITY OF CAPE CANAVERAL'
ATTESTi
r seph A.Z(GV , Uty Manage
Richard u , dayor J s�i�fi'A- is r , ty onager