Loading...
HomeMy WebLinkAboutResolution No.68-34RESOLUTION NO. 62, 3 �! A RESOLUTION ESTABLISHING TV CABLE RATES AND INSTALLATION CHARGES IN THE CITY OF CAPE CANAVERAL, FLORIDA; PROVIDING AN EFFECTIVE DATE. WHEREAS, there exists an Agreement between the City of Cape Canaveral, Florida, and Five Beaches Cable TV Inc., dated 15 September 1989, providing in Section X that a schedule of charges may be submitted to Council on every 2nd anniversary of the Agreement, for approval, and WHEREAS, the Five Beaches Cable TV, Inc, has submitted a schedule of charges which the Council has reviewed and approved commencing on September 15, 1988, NOW, THEREFORE, Be it resolved by the City Council of the City of Cape Canaveral, Florida, SECTION 1. That there be established under the Agreement between the City and Five Beaches Cable TV, Inc., a schedule of charges and installation fees as set forth in the schedule attached hereto and made a part hereof and marked "Exhibit A ". SECTION 2. This resolution shall become effective on September 15, 1988. ADOPTED BY THE CITY COUNCIL OF THE CITY OF CAPE CANAVERAL, FLORIDA, on this 3rd day of September 1988. ( Mayor ATTEST: cityCity Clerk Approved as to form: City Attorney ( iriii1ii yr a a,� -_X,.. COMMUNITY ANTENNA TELEVISION SYSTEMS .III ..MAMA _1. IlYO. • I.O. IO[ O . COCOA MUCH. r... 33911 Mos . m +roo ..uH s HA+au .�.. r,.,,e..+. c...,.. M. .. August 30, 1968 Honorable Richard Thum Mayor City of Cape Canaveral Res FIVE BEACHES CABLE TV, INC City Hall Cape Canaveral, Florida Dear Yiyor Thurms This letter will confirm the agreement which was entered into during the workshop session with the Council of the City of Cape Canaveral on Thursday, August 29, 1968. During that work- shop session the Council indicated that at their regularly scheduled meeting which is to take place on Tuesday, September 3, 1968 that they would approve the Schedule of Charges sub- mitted by Five Beaches Cable W. Inc. This Schedule of Charges is attached to this letter, marked "Exhibit All and is incorp- orated herein by reference. During the workshop session in the capacity as Vice President of Five Beaches Cable TV, Inc., I agreed that the Schedule of Charges as attached would not be negotiated to a lower figure with the Commission of the City of Cocoa Beach. I further agreed that in the event that this Schedule of Charges was reduced within the City of Cocoa Beach as finally determined by a court of competent jurisdlctlots, that Five Beaches Cable TV, Inc. would agree that the name reduction would be applied to the subscribers within the City of Cape Canaveral. It is our understanding that the Schedule of Charges attached hereto is to be passed by the Council of the City of Cape Canaveral on the basis outlined above. RSHsa 9 With cordial regards. Ralph S. Hatcher Vice President- General Manager FIVE BEACHES CABLE TV, INC. EXHIBIT "A" SCHEDULE OF CHARGES SCHEDULE "A" SINGLE FAMILY DWELLING: CHARGE Connection Charqes: For first outlet $23.50 Each additional outlet Time & line will be made as in single family material In the event it is necessary to install $23.50 more than 150 feet of cable from lot line Time & to TV outlet, an additional charge will be Material made at $.40 per foot of cable. Labor will be charged at the rate of $5.50 per man hour. Service Charge For initial outlet first month Service connected lst thru 10th $5.25 Service connected 11th thru 20th 3.50 Service connected 21st thru end 1.75 For each additional month or part 1.75 thereafter 5.25 For each additional outlet in same 5.25 structure - first month: Service connected lst thru 10th 2.65 Service connected 11th thru 20th 1.80 Service connected 21st thru end .90 For each additional month or part .90 thereafter 2.65 DUPLEX 2.65 Connection Charoes: For .irst outlet in each side of duplex, providing only one feeder line is required. (Where more than one feeder line is re- quired, then the same charge per feeder line will be made as in single family dwelling.) $23.50 Each additional outlet Time & Material In the even it is necessary to install more than 150 feet of cable from lot line to TV outlet, an additional charge will be made at $.40 per foot of cable. Labor will be charged at the rate of $5.50 per man hour. For initial outlet first month Service connected 1st thru 10th $5.25 Service connected 11th thru 20th 3.50 Service connected 21st thru end 1.75 For each additional month or part there- after 5.25 For each additional outlet in same structure first month: Service connected lst thru 10th 2.65 Service connected 11th thru 20th 1.80 Service connected 21st thru end .90 For each additional month or part thereafter 2.65 Page 1 of Schedule "A" FRANCHISE FEE 38 38 3E 38 3% 3% 39 38 39 38 38 38 38 38 38 3% MULTIPLE FAMILY DWELLING CHARGE be credited) FRANCHISE FEE (Where chrges wil a assessed directly month 8.40 38 on each individual family): where building Retai stores, restaurants, bars, has been wired by Grantee for individual industrial offices and plants. service. Per feeder line $70.00 Connection Charge: Time e Material For first outlet in each family area $5.00 Each additional outlet Time & Service Charge: Material For initial outlet first month: Service connected 1st thru 10th $5.25 38 service connected 11th thru 20th 3.50 3% Service connected 21st thru end 1.75 38 For each additional month thereafter. 5,25 38 Connection charges: (Apartments 6 Motels - Bulk Rate) Building previously wired for TV each feeder line $70.00 Service Charges: Apartments First outlet in building $4.20 Per Mo. 38 1 to 6 Apts. in same building Per outlet 7 to 15 Apts. in same building 2.25 Per Mo. 38 Per outlet 16 to 30 Apts. in same building 2.15 Per Mo. 38 Per outlet 30 or more Apts.. in same building 2.00 Per Mo. 38 Per outlet 1.80 Per Mo. 38 Service Charges: Motels and Hotels First outlet $4.20 Per Mo. 38 Each additional outlet 1.40 Per Mo. 3% Minimumcharge per outlet per month for rental. units M i 1.40 Per Mo. 38 ax mum charge per outlet for rented unit for each day rented (minimum to be credited) .21 98 For outlets outside rental units per month 8.40 38 COMMERCIAL Retai stores, restaurants, bars, cocktail lounges, professional and industrial offices and plants. Connection charges: Per feeder line $70.00 Inside work Time e Material Page 2 of Schedule "A" page 3 of Schedule "A" FRANCHISE FEE 6i COMMIL Service Charqes: except TV per outlet l shops), 38 $10.50 Per moot retail and repair depts- repair an 38 stores and TV rel-ail month 10.50 - first outlet per TV shops outlet 38 1.80 - each additional per month TRAILER PARKS - COMMERCIAL: Connecter eses� $23.50 Installation first outlet 38 5.25 38 Service Charqes° 1st thru 10th ed 3.50 38 Servic 11th thru 20th end 1.75 Service connected 21st thru Service connected al month or part of $8' 5,25 For each addition thereafter each additio nal outlet in same 38 $2.65 38 For er structure p month: 1st thru 10th 20th 1. 80 38 Service connected Service connected 11th thru 21st thru end of •10 38 Service connected art tinal month or p o 2,65 _ . For each addi thereafter due and payable All service charges are monthly in advance. ! , service Deposit equal to one'Den os may be used P ill be re charge is Required. for last month's servitei tion of of funded pon notice servic . lowed 108 r y adv cea an I Pre- a disc at. be t rmi ted if account connect e wil ❑e }, Re- Sery a s iag nt o£ all delin- 45 of all beco s OY00 d , sercive charg o£ a s b qs re ae is re t e page 3 of Schedule "A"