AGENDA REPORT
CITY COUNCIL OF THE CITY OF CAPE CANAVERAL
i
SUBJECT: CONSIDERATION: NORTH CENTRAL DITCH STORMWATER IMPROVEMENT
PROJECT - PROPOSAL TO INSTALL A BAFFLE BOX SYSTEM
DEPT /DIVISION: PUBLIC WORKS /STORMWATER
1
I Requested Action:
i l
City Council review and consider a proposal to install a stormwater baffle box system instead of a wet pond
system for the North Central Ditch Stormwater Improvement Project, as recommended by the Florida I
I
Department of Environmental Protection (FDEP).
i
i
{ Summary Explanation & Background:
i
I On 06 -19 -07 the City Council approved a change in the project scope to a wet pond system as recommended
by Stottler, Stagg & Associates and our stormwater administrator, with an estimated project cost of $524,770.
i
These plans were submitted to FDEP for review and approval, and FDEP suggested that the City consider a
baffle box system with an estimated project cost of $353,000.
1
The attached memo from the stormwater administrator outlines the pros and cons of the two stormwater
treatment methods, and comparison of the project grant and costs.
1,
t
The acting public works director and stormwater administrator recommend the baffle box system. I
1
1
t
Exhibits Attached:
Public Works memo dated 10 -08 -07; Cost comparison of the two projects
1.
City Manager's • ffice Department PUBLIC WORKS /STORMWATER
....dit ei llilliiiii :0 011 411 , i
cap- 711110'myd lRy ` admin \coup ' - meeting \2007 \10- 16- 07 \ditch.doc -
&-
u.1F ■l
{
To: Bennett Boucher — City Manager
k e
Threugh: Walter Bandish — Acting Public Works Director
From: Jeff Ratliff— Stormwater Administrator
Date: October 8, 2007
Re: Agenda Item — October 16, 2007 Meeting
North Central Ditch Stormwater Improvements — Proposed
Changes
Work To Date:
• City has submitted design drawings to construct an online wet detention pond and associated
structures north of West Central Boulevard (see attached schematic diagram);
• Online wet detention pond to be constructed on City -owned property approximately 450 feet
north of West Central Boulevard;
• Design drawings currently under review by the Florida Department of Environmental
Protection (FDEP);
• Estimated cost — entire grant amount of $524,000+;
• Stonnwater permit could be challenging due to proposed online pond versus ofline pond —
i however, can most likely be obtained; and
• Next task — complete and submit stormwater permit application and advertise for bid.
BENEFITS:
• Provides good water quality benefits through use of a wet detention pond; and
• Eliminates open ditch north of West Central Boulevard.
DRAWBACKS:
• Maintenance issues — difficult to maintain pond area with limited staff;
• Doesn't include treatment of stonnwater from additional 42" pipe from the west; and
• Project will use entire grant amount.
FDEP Proposed Scenario:
• FDEP approached the City a few weeks ago with a proposed alternative design;
• FDEP is "pushing" the installation of mega bale boxes — cheaper stonnwater devices which
provide similar amount of water quality improvements as major construction projects (see
attached schematic diagram);
3
• Numerous mega - structures under construction in the Panhandle area — FDEP under contract
with Suntree Technologies (Cocoa, FL) to monitor baffle boxes (see attached photo from
FDEP);
• FDEP is looking for a mega -baffle box site in our area (outside of the Panhandle area) — good
publicity;
• Project would include four baffle boxes — three in Central Ditch and one on 42 "-diameter pipe
from the west; and
• Estimated cost — approximately $353,000 (see attached cost estimate) — all funds spent to date
toward City's 40% grant match (see attached table).
1 BENEFITS:
• Relatively easy to install, easy to maintain (inmates to clean debris) and monitor, and
provides similar water quality benefits as wet pond strategy;
• Includes treatment of stormwater from additional 42" pipe from the west;
• FDEP performs all monitoring tasks (long -term research project);
• Stormwater permitting process much easier — project to be completed sooner;
• Excellent publicity for the City; and
• Overall reduction in project costs. 1
DRAWBACKS:
• Only addresses vegetation cleanup of immediate area around West Central Boulevard.
Future Work On the Central Ditch:
• Set aside specific amount of funds (e.g., $40,000) annually from stormwater fund to clean
up Central Ditch north of West Central Boulevard;
• Another FDEP /SJRWMD grant will address stormwater quality in the southern portion of
the Central Ditch; and
• Entire intersection to be "spruced up" with available grant funds and City funds.
s
Based upon the review of both strategies and costs for stormwater improvements, City staff
recommends the approval of the FDEP proposal for the installation of baffle boxes at the
intersection of the Central Ditch and West Central Boulevard versus the construction of a wet
detention pond system.
• Page 2
1 . .
]
]
}
:
}
)
!
) c
: o » I >,
) 2 O q 3 \
) c
] L
)
)
! 1
] E .
a
U) $
( o 7 / ; g o
1 CO (0 '- < Lo G 0
e 2 & k ® 2
o
0
B
� > > > >
O -, O
c � 3 f
U. / 0
k
>
E I
a e e E
b ° 0 0 0 -
•D 0 N 0 0 0 o o E
w as
ER 40 $ \
I; ® a) a }
co
co 0. k
k ,-
y$ >,
Z @ &
° o c
0 0) 0 CD
0 2 ƒ b
' Ee 7 }
f I 5 2 E _ £
E c k \ k 7 ( CI
/ / @ / k $
co c . 2 .c k % 7 \ cf) in 1- a) ° \
C \ 7 J $ § $ m 2
« - - CD 0 a c 2
k § 7 k - 7 {
n Q a 0 w a 0 1 ,,
' � {
[
1
i.
1
]
1 Jeff Ratliff, CC Public Works
From: Scheinkman, Michael [Michael.Scheinkman @dep.state.fl.us]
Sent: Monday, October 08, 2007 3:12 PM
To: Jeff Ratliff, CC Public Works
Cc: Abendroth, John
Subject: RE: Baffle Boxes
1
i
1 Jeff: Our project G0184 to implement BMPs to improve the quality of
stormwater runoff through the Central Ditch to the Banana River was funded
1 with an FY05 section 319 grant. Engineering and design costs incurred for
the project since October 1, 2004 count towards the City's match. Page 5 of
3 15 of Attachment A of the agreement provides a breakdown of the project
funding and shows a match contribution of 40% or $209,848 if the full amount
of grant funds is used. $74,912 of this match is shown to be provided by the
SJRWMD for implementing the BMPs and the remainder is provided by the City.
If there are cost over runs for the engineering these can count towards the
City's match. Please let me know if you have any other questions. Mike.
E
i
i
4
A
4
z
4
1
i
k
i
E
4
t
I
4
I
4
4
4
I
4
k
k
I
e
1
S
1
1
1
i
}
3
f
i
3
i
a
t
a
I
3
3
1
1
5
I
,,
Headwaters near
Port Canaveral
I
i
1
1
1
1
1
1
i
Ditch Boundary
Open Channel
N
3 Central
Ditch
i
i
Not to scale
1
i
1 4
Channel banks to have On -line Wet Detention Pond (City -owned Property) 1
) vegetation removed, then
graded and covered with
sod
t )
r �
-; Weir /Maintenance Inlet
Triple (3) 48 "- diameter plastic pipe (ADS) in channel
bottom overlain with clean fill.
(
1 Maintenance Inlet _________• f '
f Muck to be excavated from channel
bottom - channel bottom backfilled with
clean fill from detention pond
2
Existing Storm Sewer
Landscaped area
West Central Boulevard
Southern Portion of
Central Ditch (Phase --% Existing storm sewer
II) Discharge
Existing nutrient - separating baffle box
(from Canaveral Drainage Basin)
. Ilr .
Wet Pond Schematic Drawing
I
1 '•
1
1
Headwaters near
Port Canaveral
1
j
3
j
s
Ditch Boundary
Open Channel
N
i
1
/►
Not to scale
Clean banks of debris with
future stormwater funds _________, --- -i
4
i
Central
Ditch
1
pti Place coquina rock along bank with future
stormwater funds
1
1
1
1
1 s
I
i
i
I Install new nutrient - separating baffle box Install three nutrient - separating baffle boxes to match
to match existing pipe existing pipes
Existing Storm Sewer
? A
1 West Central Boulevard
�. - - -- --------------- -
Southern Portion of
1 \ Central Ditch (Phases Existing storm sewer
II) Discharge
3 Existing nutrient - separating baffle box
. (from Canaveral Drainage Basin)
4 .11F
1
i
1
Baffle Box Schematic Drawing
i
i
1 •
.N x � x. ,: •
*.ry �.
•
•
z
t
1 � i .4
Y
i .rs
,�
`_
}}
. --
w i
' ; 2[
}
• x £ £ •
"' ',I4 *' .
o
�.
1 r - e z :•'`,-;;;L:1,,,'"
` ` '` 1 fiF rte y �`.�
iil c
'3
9
1
I
1
‘ i' e i
1
1 et
„,,,,,..,,,,,,
._;;:_,-,--,:i 4,--%,%.-3i..P. -( _:,“7„, /:,) ir" r
-,, ,-,,,,,, ,,„,_ d w $
[ zt I ,,i tfi e k'S
Phone (321) 63/-7 552
Fax (321) 637-
North
er 1
canarw -
Draina ' e W' Y
improvement
1 •
re
October 5 2007
Stormwater Filtration Systems
Version. 1.0
1
i
I
1
,i
6
P ` ' 1 l V 3 C
c4 41 iII [ I N c-z ri ii1 I
i 111
1 Ik I I g. ; e5 e5 Q i ii 1141A R cl.
3 V ate ?W m 1 2
i la la 0 r Doi liz i 0 I
m ..dry �o t 1 o N y J
k
x "VI i��.i®rabi�, H r ` T • • U J t l2 n N j 9. ..:1 1 111 1111111 0111 11 I\ I 1 T z
.__. 4 1 kJ Ai rl . s . p ., ......_, � W S 4i
„. ni
. , 0 ,
4 LJ1 k�= ' h �mF- �- �2 2 0 W
1 I N + vo ” 2 W o
_� h W a - NA Z a z p
' wigs lit/ � i i . . . � . .. •�� � _ _ 11 , J 4 Is Q I
!4114 N N y sleT ON Z 0 U U !
i 1 i 1 I MIL 0CC f i . iii i g h 1
(� ��1I ; . 2 p 1
Tr �• �� �t W P. tp i i �; ii i
Z '� �' ■ m ��.� ._.:.:) I I o co
a ES i 1
o oN O
pril � rj 1
Z w w it
Z Wei t z 1 k 7 13 4 1 0 ii
e r 1 i 1 tola
W 1 N1 I W g Rk $ la
I 1 T I t 8 ''' r y g
.§ 0 Ail LI : & g4ii
1 kJ 24
W ! I
Ibil hb O `t Obi pnw bYfO
i ,
ti ` O v. . w 1R (y b lue ly :;; i::: O I
, ..... , J
! 1 1 i
1
i t 0 ii i i ;"! Itl i
' t �i ¢¢¢
g Z i I p •• ; O I 11 1
4 R iI ; Z I iii It ; ae 1
s. A � a Iggtitial ° 1A! ft
_ � N 4 riK : a a k
b a4� y��^
Lii imglit , � "
*
1
I
56
MtEnm 72
____ . j
BM r1<_ 1 .
1 7 Oil It
I FLO I 72
1 , ,
ii 1
0 I -
,5 MiFL//ED
52
MIMED
® L........1., X3 1 ■ .....1..... I, .
_i .
-- ' 1 11 __ rirouii.ruiifl[ _ 11 _ ][ iIUlI1IIUU 72
IFLOW I I
Amen ==
1I 111
t:, ,
MEWED
1 52
-_'I _ __ _ ,i_ ■ III 1 11
W
12 li. �_I.11ll � 1? -I , 96 FLOS -- I ! 1 , 0
. 1 , M> 1
, , 168
J Jj AS NEEDED
FL 184 11 I
196
11111111 Fin
Elf ' I
Mil "
i
All
1
x o1111.111111
. I II.V
1
1
1 , i ,
......., , , P roposal 6668
1 ... S,J tI e
m 1Da/1)10 ►t ,s III 10/5/2007
798 Clearlake Rd., Suite 2, Cocoa, FL 32922
I
Ph: 321 - 637 -7552 Fax: 321 - 637 -7554
www.suntreetech.com
Order From Ship To
Stottler Stagg & Associates Job Site
8680 North Atlantic Ave. Cape Canaveral, FI
Cape Canaveral, FI. 32920
1
I
1
Phone 321 - 783 -1320 Fax 321- 783 -7065
I Sales Rep FOB Ship Via Terms Ordered By
BR Cocoa Our Truck TBD
Qty Description Unit Price Total
4 Nutrient Separating Baffle Box 42,955.00 171,820.00
Model No: NSBB -8 -14 -103
Inside Dimensions:96" Wide x 168" Long x 103" Tall
Includes:Stainless Steel Nutrient Separating Screen System
Two Turbulence Deflectors
Floating Skimmer & Storm Boom System
Three 30" x 48" Aluminum Hatches
H -20 Load Rated Concrete Structure
L k ust- E* NA-..M - c e-z-A Q1.2S.0 - — o - (35,i)2v
1„►sz 1/4—z-5S 5 .E-t,
Signature P.O. # Date:
By signing and returning this proposal to Suntree Technologies, Inc., the specifications and conditions of the proposal are agreed to
and ado owledged by the person signing. If a purchase order is required by the buyer, please FAX the purchase order along with Subtotal $1-717626:00
the signed proposal. Proposal is void if not accepted within 90 days. hi additon to its right or rights with respect to defaults
hereunder, seller shall have the right to interest on all balances not paid within agreed upon payment period at rate of interest
computed by applying a periodic monthly rate of 1.5% to the past due balance. Seller has the right to all collection costs, reasonable 6 % Sales Tax $0.00
attorneys' fees, whether suit brought or not, indudind attorneys' fees on appeal. The venue shall be in Brevard County, Florida.
Total $171,o2o.oe
.4 S1 sz0w
Meeting Type: Regular '7*
Meeting Date: 06-19 -07
_ 2 AGENDA
Hea d ins Consideration
trcm 2
Na
AGENDA REPORT
CITY COUNCIL OF THE CITY OF CAPE CANAVERAL
SUBJECT: CONSIDERATION: CHANGE ORDER - NORTH CENTRAL DITCH
STORMWATER IMPROVEMENT PROJECT
DEPT /DIVISION: PUBLIC WORKS /STORMWATER
Requested Action:
City Council consider the proposed engineering design change order from Stottler, Stagg & Associates, for
the North Central Ditch Stormwater Improvement Project in the amount of $9,040 as recommended by the
stormwater administrator.
Summary Explanation & Background:
Funds are available; see attached memo.
Please advise.
Exhibits Attached:
Stormwater Administrator's memo dated 6/14/07
City Manz Office Department PUBLIC WORKS /STORMWATER
•e- ktn \my..c sldmin \council\meet ng \2007 \06- 19- 07 \ditch.doc
c,„_.,
To: Bennett Boucher — City Manager
T uae& Walter Bandish — Acting Public Works Director
From Jeff Ratliff — Stormwater Administrator
Date: June 14, 2007
Re: Agenda Item for June 19, 2007
Additional Funds — North Central Ditch Stormwater
Improvement Project
The City Council approved funds in the amount of $53,000 for Stonier Stagg & Associates (SSA) in
June 2006 for the completion of engineering design tasks/engineering drawings for the North Central
Ditch Stormwater hnprovemme t Project The project was to include the construction of a stormwater
system as submitted to the Florida Department of Environmental Protection (FDEP) in the Section 319
grant application in 2005. However, based upon the results of surveying activities conducted by SSA, it
became apparent that the proposed design (system of culverts and dry retention areas) submitted in the
grant application would not be feasible — due in part to low elevations near residences along the
northern portion of the Central Ditch. Several attempts were made to modify the proposed design (i.e.,
'make it fit The site') — but none were deemed suitable.
Therefore, an alternative engineering design was developed as described to the City Coimcll in the
workshop on June 19, 2007. This proposed new design (system of culverts and a wet detention pond on
City-owned property) was presented to the FDEP the week of June 4 — the FDEP concurred that the
new design project was adequate to meet the Section 319 grant requirements.
SSA has requested additional funds ($9, 040.00) to complete the engineering design tasks /engineering
drawings for the alternative engineering design — these tasks include additional surveying, drafting, and
engineering design tasks (cost breakdown attached). The original grant application included $59,848.00
in funds for the completion of engineering design tasks/engineering drawings — the proposed funding
amount is $62,040.00. Original funds ($59,848.00) are included in the FY2006-2007 budget under the
Canaveral Ditch Project (6310) - Stormwater Fund. The total budget far project completion ('including
grants) is $524,618.00.
Recommend the approval of additional funds in the amount of $9,040 to SSA for completion of
additional engineering design tasks/engineering drawings for the North Central Ditch
Stormwater Improvement Project.
i
I ■
E A. pe rtech OFFER OF SERVICES
I Network Installation
i
;
•i
i
4
i Date: September 25, 2007 Quotation # 004 I
I
1
I Project: Lift Station 1
1 Attn:
Address: Walter Bandish
Force Main Replacement
105 Polk Avenue
1 City, State: Cape Canaveral, FL
i Zip Code: 32920
i Phone Number: 321-868-1240
i
CHANGE ORDER PROPOSAL
i
I Description of Work: ,
Install 1.5" Type S-III Asphalt Overlay – Columbia Street:
• Asphalt Grinding 1 L.S. $ 5,500.00
• 1.5" Type S-III Asphalt Surface Course 4971 S.Y. @ 10.20 50,704.20
• Clean-up 1 L.S. 2,200.00
$ 58,404.20
Install 1.5" Type S-III Asphalt Overlay- Church St.
• 1.5" Type S-111 Asphalt Surface Course 1410 S.Y @ 10.20 $ 14,382.00
Install 1.5" Type S-III Asphalt Overlay- Washington Ave.
• 1.5" Type S-III Asphalt Surface Course 213 S.Y. @ 10.20 $ 2.172.60
Credit for Deletion of Type S-111 from Contract
Bid Item for Pavement Restoration
• 1.5" Type S-III Asphalt Surface Course 765 S.Y. @ 10.20 ($ 7,803.00)
Total this Change Order $ 4-7T44640—
t (3 15C.So
i
i Notes:
Commencement Date: TBD
Completion Date: TBD
1
CONDITIONS AND ASSUMPTIONS:
I
r f
The pricing in this Offer of Service is based upon the performance of tasks and provision of deliverables specifically defined in this document. 1
Requests for additional work activities that are not described in this document, including customer required overtime or night work, or the application
I
of any different or additional criteria or testing in connection with any services or deliverables are subject to additional charges to the customer.
Certain matters may require a new quotation under a separate Offer of Services. Should additional charges be required, Expertech will utilize a
t
change order process for approval by both parties prior to commencement of work.
t
t
I
/