Loading...
HomeMy WebLinkAboutPacket 05-03-2005 Workshop111 CALL TO ORDER: ROLL CALL: DISCUSSION: City of Cape Canaveral ►UNCIL WORKSHOP MEETING CITY HALL ANNEX Polk Avenue, Cape Canaveral, Florida TUESDAY May 3, 2005 5:00 PM AGENDA 1. Implementation of the Cart System —Waste Management, Inc. 2. City Hall Facilities Plan. ADJOURNMENT: Pursuant to Section 286.0105, Florida Statutes, the City hereby advises the public that: If a person decides to appeal any decision made by the City Council with respect to any matter considered at this meeting, that person will need a record of the proceedings, and for such purpose that person may need to ensure that a verbatim record of the proceedings is made, which record includes the testimony and evidence upon which the appeal is to be based. This notice does not constitute consent by the City for the introduction or admission into evidence of otherwise inadmissible or irrelevant evidence, nor does it authorize challenges or appeals not otherwise allowed by law. Persons with disabilities needing assistance to participate in any of these proceedings should contact the City Clerk's office (868-1221) 48 hours in advance of the meeting. 105 Polk Avenue • Post Office Box 326 • Cape Canaveral, FL 32920-0326 Telephone: (321) 868-1222 • SUNCOM: 982-1222 • FAX: (321) 868-1247 www.myflorida.com/cape • email: ccapecanaveral@cfl.rr.com Meeting Type: Workshop Meeting Date: 05-03-05 AGENDA Heading Discussion Item 1 No. Waste Management correspondence AGENDA REPORT CITY COUNCIL OF THE CITY OF CAPE CANAVERAL SUBJECT: DISCUSSION: IMPLEMENTATION OF THE AUTOMATED CART SYSTEM DEPT./DIVISION: LEGISLATIVE Requested Action: City Council have a discussion with Waste Management representatives on the implementation of the automated cart system for 1,600 residential units. Summary Explanation & Background: City Council wanted additional discussion on implementation issues. Exhibits Attached: Waste Management correspondence City ManaaWoffice Department LEGISLATIVE cape- m\mydo ents \ council \meeting\2005\05-03-05\wm aoc WWRA"Cam WASTE MANAGEMENT City of Cape Canaveral Customer Communication Plan Auto Cart Service Waste Management Inc. of Florida plans a three-phase campaign designed to communicate the benefits and advantages of the new auto cart service. Outreach will be made in the form of residential direct mail, the City of Cape Canaveral newsletter and Web site, fliers in the recycle bins and letters to homeowner associations. PHASE I Target distribution date: April 25 — May 6, 2005 Tools: Letter to Homeowners Associations (mailed on April 25) City newsletter and Web site (mailed/posted on April 25) Direct-mail piece (distributed on May 6) Key details: 1. Announcement of partnership between WMIF and the City of Cape Canaveral 2. Notification of service benefits • Cart sizes: 64 gallons or 96 gallons ➢ 64 -gallon size (equal to 2 cans) best for zero lot lines, retirement communities and townhouses ➢ 96 -gallon size (equal to 3 cans) best for single-family homes ➢ No change in price between the two sizes • Reduced spillage • Improved aesthetics 3. Notification of delivery date Scheduled for last two weeks in June 4. More information to come PHASE II Target distribution date: May 16, 2005 Tools: Direct mail piece Letters to HOA City website Key details: 1. Useful tips • Position with opening of cart facing the street • Place cart on side opposite of mailbox • Bag and tie all garbage inside cart 2. Green waste requirements • Routine yard maintenance: Use 64- or 96 -gallon carts and place curbside on Wednesdays. • Heavy annual yard maintenance: Bulky green waste collection provided quarterly during citywide cleanup schedule. Recommendation: one week in January, March, May and November. Four bulk green waste pickups per year. During this time residents can dispose of heavy green waste maintenance for spring or fall cutbacks done by the resident. 3. Bulky item collection • Clamshell weekly collection 4. Garbage collection twice weekly • Monday/Thursday (north side of city) and Tuesday/Friday (south side of city) • All garbage placed in carts at curbside PHASE III Target distribution date: Last two weeks in June with cart delivery Tools: Manufacturer's brochure Key details: 1. Literature located inside cover of cart 2. Maintenance and cleaning tips 3. Contact information FOLLOW-UP Target distribution date: July 1, 2006 Tools: Direct mail piece Key details: ➢ Customer satisfaction survey x 7��'S%••t sy � ,�vii�a Y II f ANEWp.Rose "•eq V 4 A Y le.iBAeue:) a (1) 4-J V) ra ru >4 Ej (1) 4-J ro L. ro n Q) V) • e:) of juawliww 01 ru 4-J E 70 0 0 4-J ru u 73 ru ru ro le.iBAeue:) a (1) 4-J V) ra ru >4 Ej (1) 4-J ro L. ro n Q) V) • e:) of juawliww 01 U E E 4-J 0 le.iBAeue:) a (1) 4-J V) ra ru >4 Ej (1) 4-J ro L. ro n Q) V) • e:) of juawliww 01 je.mAeuej a e:) of juatulitutu El V) 0 ra u U 4-J 0) (l ru 4-J ru L*4 ru rU 4-J V) 4-) '0 C, (3) L. ro (1) >V) u 0 0 0) ro ro M > C: :3 E 0 0 kJO (1) u �� je.mAeuej a e:) of juatulitutu El of juawl!ww 01 W \ Q Q . � s 4J U (1) a-1 O L. r • El I eiOAeue:) a a ru D fU 4-J 0 fu -0 ro 0) Jc u ru 4-J U ru 73 r- 0 > ru U 4-J u Q)(!1 4-) r. (1) 0 L. m 4-J 0 - 0 u m u I eiOAeue:) a a c 0 4-j ra V �l 7D Q) A 0 I eiOAeue:) a- e:) of juawl!wtu El V (1) 0 4-J U) < > fu E -0 Q) E U 0 E w 4-J m -0 O 4-J 4-J :3 V 4-)0 C Q) 4-J -0 L- (3) 4-J 0 Q) 4-J Q) 0 CC I U LL I eiOAeue:) a- e:) of juawl!wtu El O 4J IZ- .O a -J co •V Q) O C: rn O Ov V Q) H � L 0- • c Q) O E H L ru V 4-- O H L Q V •> Q) CL -0 • El W 4-J � N .L Q � L Lis Q O a- a -J = 4� Cn O L L 4J 0) -T 0 4-J L 4-J� (f).- O H Q • O 4J IZ- .O a -J co •V Q) O C: rn O Ov V Q) H � L 0- • c Q) O E H L ru V 4-- O H L Q V •> Q) CL -0 • El I ei9Aeue:) a a 0 (a � CY a Meeting Type: Workshop Meeting Date: 05-03-05 AGENDA Heading Discussion Item 2 No. 3. Old IBM building, AGENDA REPORT CITY COUNCIL OF THE CITY OF CAPE CANAVERAL SUBJECT: DISCUSSION: CITY HALL FACILITIES PLAN DEPT./DIVISION: LEGISLATIVE Requested Action: City Council continue to evaluate City Hall options with staff. Summary Explanation & Background: Options include: 1. City staff— Total redevelopment of existing site; move operations to IAP World Services Building, 2. AJT offer on their new building, 3. Old IBM building, 4. Councilmember Morgan's suggested building plan on existing site. Exhibits Attached: City M er's'Ofiice '' , Department LEGISLATIVE - m\my umen dmin\council \meeting\2005\05-03-05\chfacilities.doc April 20, 2005 Mr. Bennett C. Boucher, City Manager City of Cape Canaveral 105 Polk Avenue Cape Canaveral, FL 32920-1348 Dear Mr. Boucher: �ro9LD �.. M91MCMSM As we have discussed, Johnson Controls World Services Inc. (JCWSI) has been acquired by IAP Worldwide Services, which is largely owned be Cerberus, a private investment company located in New York City. The closing of this transaction took place on March 30, 2005, and the name of JCWSI has been changed to IAP World Services. The new name has been duly registered with the Department of State of the State of Florida. The office building located at 7321 North Atlantic Avenue in the City of Cape Canaveral is now owned by AIP World Services. This building has largely been unoccupied for the past six years. It is my understanding that the City is currently contemplating the construction of a new building for local governmental use on the site of the current City Hall. If consistent with the plans of the City, the new owners on the aforementioned building have advised me that they are prepared to offer the property to the City on a lease basis for interim use by the City during the construction period of the City's new facility. While the lease terms are negotiable, depending on the City's needs for building modifications for its interim occupancy I would suggest that some of the salient terms of the lease would be as follows: • The owners of the building would, at the owner's expense renovate the building to make it suitable for occupancy by the City. Such renovations would include: 1. Replacing the carpet in all of the currently carpeted areas of the Building 2. Thoroughly cleaning and sanitizing all air conditioning ducts and inlet and exhaust vents. 3. Assuring that all mechanical equipment (plumbing, lighting, HVAC, fire alarm system, security system) are in good operating condition 4. Repainting of the fire escapes on the rear of the building 5. Replacing of the steel door on the rear of the building 6. Patching and touch-up painting of damaged walls 7315 N. Atlantic Avenue Cape Canaveral, FL 32920 (321) 784-7100 Fax (321) 784-7336 • It is assumed that occupancy by the City would begin in the third or fourth quarter of calendar year 2005, and would extend for a period of at least twelve months, and not to exceed eighteen months. • The lease rate would be $24,000 per month for the period of the occupancy of the approximately 20,000 square foot building • The Owner would be responsible for normal exterior building and grounds maintenance. Special requirements, if any, would be the obligation of the City. • The City would have exclusive use of the off-street parking provided to the east of the building, and non-exclusive use of the parking lot to the west of the building. • The City would be responsible for the cost of all utilities provided to the building, including electricity, potable water, sewage, solid waste disposal, and communications. • The Owner will provide property damage insurance on the building, but will not provide insurance coverage on the City -owned property and equipment in the building. • The City will provide for such custodial, janitorial and security services as it may require within the building. • Any interior construction required by the City would be the obligation of the City, and subject to the approval of the Owner. Such approval will not be unreasonably withheld Sincerely, AIP Worl Services James Jennings, Chief Financial Officer Cc: Alfred Neffgen AJT & ASSOCIATES INC April 15, 2005 Bennett Boucher City Manager City of Cape Canaveral, P. O. Box 326 Cape Canaveral, Florida 32920. Subject: New 3 -Story Sheriff and Public Facilities Building Dear Mr. Boucher: AJT-JJ-05.037B AJT & Associates (AJT) is pleased to submit a Total Delivered Price for the subject building. AJT is proud of its 18 -year history of providing first-class engineering and construction services to our Cape Canaveral and Brevard County clients. Please note that the price presented below is based on the most recent construction costs and includes design, construction, site improvements, and land acquisition costs. Additionally, please be assured that AJT is fully licensed and insured to perform the proposed work. Pricing Breakdown: 1) Construction: New Building (+/- 23,800 sq. ft. @ $120.00/sq. ft.) $2,856,000.00 Site Work & Demolition $ 300,000.00 Landscaping Improvements $ 15,000.00 Subtotal $3,171,000.00 2) En-gineering, Design Permitting Construction Supervision Project Superintendent Proiect Manager, Architect, Surveyor, and As -Built CADD: Pre -Construction Management @ 9% of Construction Price $ 285,390.00 Construction Management & Supervision Price @ 10% of Construction Price $ 317,100.00 Subtotal S 602,490.00 3) Land Acquisition Ingress Egress Parking and Water -Retention Tie In To Existing/Adjacent Improvements: Subtotal S 900,000.00 TOTAL DELIVERED PRICE (BUILDING, SITE AND LAND) S 4,673,490.00 E N G I N E E R I N G E N V I R O N M E N T A L S C I E N C E S 8910 Astronaut Boulevard johnj n ajtcom or fabianh cz ajtcom Tel: (321) 783-7989, Ext. 239 or 260 Cape Canaveral, Florida 32920 Fax: (321) 784-4108 PLEASE NOTE THE FOLLOWING: 1) Not included in the above estimate is an allowance for other improvements or special partitions, beyond that which is demonstrated in AJT's proposed design package. Such improvements or partitions can be performed at an additional cost. 2) Other additional costs may result, due to unforeseen and unanticipated events, such as Acts of God, or due to delays beyond the control of AJT. 3) With the exception of the aforementioned additional costs, the Total Delivered Price is a "turn- key" price, and the Pricing Breakdown is provided herein only for the purposes of providing the City with an understanding the top-level costs that AJT will incur on this effort 4) Enclosed, please find a Pricing Summary Sheet, and AJT's concept design, entitled "Office Building Phase III". 5) AJT will be pleased to provide the City with a proposed purchase contract, in the event the City issues AJT a Letter of Acceptance with regard to the Total Delivered Price. The City's Letter of Acceptance is suggested to be contingent upon final negotiation with AJT of the terms for the purchase contract, within 90 days of its issuance. We look forward to working with the City of Cape Canaveral on this most important project and believe our qualifications and track record uniquely qualify us to provide the City with a structure that meets and exceeds your expectations. We respectfully request favorable consideration of our proposal, and wish you continued success in all your ventures. Should you have any questions regarding the above, please contact us at your convenience at the addresses and telephone numbers shown on this letterhead. Sinc4lely Yours, Fab' n Hurtado, P. E. John G. Jansen Se for Vice President of Construction Operations Director, Contracts Enclosures cc: Alfredo Teran, CEO & President, AJT & Associates, Inc. Page 2 of 2, plus Enclosures New 3 -Story Sheriff and Public Facilities Building Pricin! Summary Sheet April 15, 2004 1) Construction CSI DIVISION DESCRIPTION PRICE S 1 General Requirements 105,000.00 2 Site Work & Landscaping 315,000.00 3 Concrete Work 410,000.00 4 Masonry 90,000.00 5 Metal Fabrications 480,000.00 6 Carpentry & Cabinetry 15,000.00 7 Roofing, Fireproofing, Sealants 95,000.00 8 Doors & Windows 230,000.00 9 Finishes (EIFS), Tile, Painting 656,000.00 10 Specialties, Toilet & Bath Accessories 15,000.00 11 Equipment, Kitchen Cabinets 3,000.00 12 Furnishings, Benches, Fire Extinguishers TBD (if needed) 13 Interior Partitions & Special Construction TBD (if needed) 14 Elevator 85,000.00 15A Plumbing & Sewerage 72,000.00 15B Heating & Air Conditioning 250,000.00 15C Fire Sprinkler Systems 60,000.00 16 Electrical 290,000.00 Subtotal: S 3,171,000.00 2) Enaineerina, Design Permitting Construction Supervision Project Superintendent Project Mana-,er, Architect Surveyor, As -Built CADD: Subtotal: S 602,490.00 3) Land Acquisition Ingress Egress Parking and Water -Retention Tie -In To Existing/Adjacent Improvements: Subtotal: S 900,000.00 TOTAL DELIVERED PRICE (BUILDING SITE AND LAND) S 4,673,490.00 3AV UT13suiod �1 i J7T[TT-n--r I c� sa rds 9 / V `n sa ed� S TTU 14.4 IE U W N somwia v paTluH _ � [T Tq Z V I V 'XnnH C3 w C3 U 0 0 a 0 ct Q ct 0 0 0 I U Ct rr1 saords 0£ sa eds o r i QI lsamw5V5v Pa1iun VIV 'XMH N a Cd Cd so d 9 N c�3 U sa eds o r i QI lsamw5V5v Pa1iun VIV 'XMH N . O ct o p ct 0 i dp �(A Of V] 0 0 0~ 01 c00 , [- M t-- N Ql . O ct Of V] U U suumjo �aiauo� i . O ct