HomeMy WebLinkAboutPacket 07-15-2008 WorkshopCALL TO ORDER:
ROLL CALL:
DISCUSSION:
ity of Cape Canaveral
IL WORKSHOP MEETING
Y HALL ANNEX
ae, Cape Canaveral, Florida
TUESDAY
July 15, 2008
5:30 PM
1. Capital Facilities, Projects
ADJOURNMENT:
AGENDA
Pursuant to Section 286.1015, Florida Statutes, the City hereby advises the public that: If a person decides to appeal any decision made by
the City Council with respect to any matter considered at this meeting, that person will need a record of the proceedings, and for such
purpose that person may need to ensure that a verbatim record of the proceedings is made, which record includes the testimony and evidence
upon which the appeal is to be based. This notice does not constitute consent by the City for the introduction or admission into evidence of
otherwise inadmissible or irrelevant evidence, nor does it authorize challenges or appeals not otherwise allowed by law. Persons with
disabilities needing assistance to participate in any of these proceedings should contact the City Clerk's office (868-1221) 48 hours in
advance of the meeting.
105 Polk Avenue • Post Office Box 326 • Cape Canaveral, FL 32920-0326
Telephone: (321) 868-1220 • SUNCOM: 982-1220 • FAX: (321) 868-1248
www.myflorida.com/cape • e-mail: ccapecanaveral@cfl.rr.com
Capital Facilities, Projects
City Council Workshop
July 15, 2008
5:30 p.m.
Summary of Ntaj or Projects
New City Hall Campus Master Plan
New Police Station w/Land
New Fire Station w/Land
Renovation of existing Fire Station
Ridgewood Avenue Streetscape
N. Atlantic Avenue Streetscape
Central Blvd. Streetscape
Carver's Cove riverfront park
1
Jct*, Uc 1. 4ci i
Master Key Plan
18a
Eala0ng
1 Library
2a. Library Loading Area, Parking .6 Cars
3. Veteran's Park
18 Q 4. Veteran's Memorial
7 5. Seating' Display Area
6. Res�danital
7. CommemAal Building
8. ftecrealbn Building
" 15. ReqC P Courts
16. Tennisrmi. Courts
rl 17. Eluffle Parking Cars
w yY
5, 22. Shuttle Board Courts
e4 �_ Proposed
2b. New Parking Lot -17 cars
9. Council Assembly
1 1 2b 10.Cty Hall
19 11. Community Pleza
7� 12. Grand Esplanade
2a 13. Identity, leord Clock Tower! Message Kiosk
t4. Sherif. Depedment
f. IU ta. SherMs' Parking Lot- 26 car.
18a. Sh ifrs Secured Parking 20 cera
r t9. New Perking Lot -64 Cars
20. New Parking Arae -7 Car.
21a. New Perking Area -17 cars
M6 i 216- New Parking Area -27-
16
27-
1 8
22
City of Cape Canaveral- Site Plan B
CancaFrl Design 4.10.2007 .
Spatial Needs Assesameol and Master Plan
Cape Canaveral City Hall - Potice Department
Cape Catnveral, Florida
AUG Project No. 766-06
6.2. Ootlon "B": fear 2015 Need
6.2.1 New Buildings............................................................ ........
S 6,918.1105
-City Hall n $3,360,530
law Enforcement ,d $3.557.475
6212 Siteimprovemenrs(82(iacres).,........_..... _...., ..
$2,216_'05
-Grand Fsplanade n, $800,000
.identitc Icon! Cluck Tower._m $180,000
-CommunityPlaza! Hardscape :u. S290.000
-Landscaping and Irrigation td' $244,255
-Gmding'Drainaga`Utilities (d $203,550
-Parking 1178new spaces)�m.$498.4(HI __1__1__1_1.. _,._.
6,'.3 'AdditiunalC is 111_1..._: ._......._1111. ...:....___.1....
1.140.001)
-]knwiition a_: $375,000
-1)
-Site F mishings 'a $250.000
-Building Fumishings F 5395.0(W
Jel"omn tmicationslComputer n, 5120_(Nl)
6.2.4 Sob-Tetal......._................_......................_...........................
$10.274.210
6.2.5 Sott C ust r An:hitecwrc 8t Engineering, Surveys,
Geotechnical, Permit Fees. Mix. Expenses
($10,274210 ''a 12-0 _1_1__1,1 ___........_........
51.232.905
6.2.6 Contiagcrl !d:5%..............................................................
8 513.710
6.2.7 TOTALTSTIMATED PROJECT VALUE ........................
$12.0201125
(Excludes the cost of Law Enforcement Facility Site)
2
Spatial Needs Assessment and Master Plan
Cape Canaveral City Hall — Police Department
Cape Canaveral. Florida
AX, Project No. 766-06
6.2a Option "B": Year 2015 Need — Law Enforcement Site Only
6.2..1 \ew Buildings._._........................__..._..............__.............. $ 3.557.475
-Lain Enforcement (15.811 SF 'a. $2251SF1
6.2sL2 Site lmprovements(1.15aeresi.........,_..._......____......._...... S 371.050
-Site Preparation , a $45,OOWacre
-Landscaping and Irrigation','! 548,500
-Grading + Drainage'' tilities d. $42,000
-Parking (46 new spacesoa, $128.800
6.1_a.3Additional CoSISIr"........ ...... ....._........._._......._...........,_...... $3=8 770
-Dennolition u 585,000
-Building Furnishings �a, $186.570
-Telecommunications,Compmer ;a- $57.000
6.2x.4 SUB -TOTAL ................................... ........ .............. .............. $ 4,157,095
62a5 Soft Cost, Architecture K Engineering, Surveys.
Geotechnical, Pcmnit Fees. ;.fisc. Expenses '
($4.157.095,ii.12%)....__........... ............. ..... ................_...... S 498,851
6.2a.6 Contingency d 5% .............................................................. $ 207,855
6.2,..7 TOTAL/ESTIMATED PROJECT VALUE ...... ............... S4,863,801
(Excludes the cost of the Site)
Campus Master Plan options
Construct entire master plan $12,020,825
Millage rate of 0.70 mills to cover debt
service for 30 years.
Or
Construct new police station w/Land cost
$6,689,000
Millage rate of 0.35 mills to cover debt
service for 30 years.
rQ
Fire Station options
Construct new fire station - $2,600,000
Land purchase - $750,000
Millage rate of 0.21 mills to cover debt
service for 30 years.
Or
Renovate existing fire station $500,000
Brad Smith
Associates, Inc. 1W
■eJ NN�N4 ��ANOSC4PE A�f,H:I ELT I�nE
Ridgewood Ave. Remobilization Summary
6/11 2008
Professional Service Fees
fSL
Ana. Rw"otna
—1-1 N— New
ptlaraes
j Total
Rema011¢Mron
$0.00
$2.50000
$2,500.00
F-1 Cpnsl/pd ocument
Ds- 30%completed
$27.705.00
$000
$27705.00
c--Ptrase se—
$9.900.00
$0.00
$9,900.00
R—burs * Espensee
-$58.80
$750.00
$691.20
ASA #1 (Expand project) - 40% compbted
$7 680 75
$000
S758075
ASA #2(ConBict Boards)-70%ro pleted
$83325
$0.00
$833.25
ASA #3 (R—d exhlbn$)
$D. DD
NO
$0.00
S4606020
$3 250.00
$49 31020 $19,310.20
NWe
llm cosi shall txr rrep natal
Opinion of Probable Construction Costs
Ibased m 301A desgn drawings)
t!!_
Prev1--71061 CurrvM
Landscaping
$140 O00
147,000
Irrgatwn
$116.000
1800
50
Lghing 151 fixtures/
SS7.00D
6o -,85o
Srop Sgns and Street Sgns
`.
$215.000
225 750
Pavng (B*ke s,d®waus e1i l
5260,000
273.000
Bus 5he#era 5 slruauresl5185.000
1�
Prppct s-1111
$1 493.000
1 596.650
15%Cmnngency
$223.950
239498
PROJECT TOTAL
$1,716.950
1,636,148
4
Ridgewood Avenue Streetscape Funding
Tree Mitigation funds $297,800
General Fund Reserves $948,160
Beautification Fund Reserves $400,000
Stormwater Utility Fund $102,600
County Funds in hand $167,320
5
Ridge ood Avenue Cost Summary
Goal
PmPmW Fwft S_ a W %
LDrw ASasn@Uw Cash
1). Prot a k"
S4%310
Gom+ral Fund I 1W%)
Na9onate 1pws fees
FN
2), Landscaping
S1A).OW
Tree Aktigaron Fund I I W%1
Pessibk sannps from rBduntron In number of
Ireeaamall plans.
]) IT/gafbn
4150.BOO
Trae sMfi9alion FuM f 100%1
side savings from reductwn In numbeu of
Maew'smal pwm - leas �mga ___plies
I). UOnflrtp
5605-BSO
BBavllfealwn Fund 151,57
Redu[u n+umbw of Ignts to 34ltwo ligbd per dock)
General FUMt!W%1.
—IN. cou savings.1 V 211,W0.
5). Signa
5225,150
+autlfirvtinn Fund (50%) Gonnnal
F.limuwte dacorafrve rtwnumemta/slpns p ,Wo coat
Fund (50%1
sa'vtrgs of $2W.OW
6). Dacwaflva
52r3,oW
BBautllicalWn FurK115U%)
F.Nminate decoranva paving In inlersec.tlons pesslde
a
PIoq/pafnw�ys
General FUM i IW%7.
coal nevim#a of SMOOO
Pamq
Sr61..000
County Fund OWI)
t5eautlfira[lon FUM (50%)
Uae SCAT grant IOMa (a avaaable) to a o d
e1- eu, snanen
$1sa,250
celwnal Fund I+nu%f
'standard• bus anetters posade coat savings w
51ti0,1kq..
D) Sbrmwslar
$IO2.600
SlnnnwalBr Utility Fqe (1 W%>
Repan stonneatm mlaa to exiaiig mntlltior.a onty
possible cost sar,ng, of $81,000.
10). Conarganry5239,098
AnY negulrBd roolingendea homenera
Gl FUM
N1)
Tact Coati
$2.153,0511
Ridgewood Avenue Streetscape Funding
Tree Mitigation funds $297,800
General Fund Reserves $948,160
Beautification Fund Reserves $400,000
Stormwater Utility Fund $102,600
County Funds in hand $167,320
5
N. Atlantic Avenue Preliminary Design
Study
Planning Phase $7,620.00
Conceptual Design Phase $15,290.00
Graphic Design Phase $5,060.00
Reimbursable Expenses (allowance)
$2,200.00
Total Fixed Fee Amount $30,170.00
Project Scope - Monroe Avenue to just
North of Shorewood Drive.
Central Blvd. Preliminary Design Study
Planning Phase $6,465.00
Conceptual Design Phase $12,900.00
Graphic Design Phase $4,180.00
Reimbursable Expenses (allowance)
$2,200.00
Total Fixed Fee Amount $25,745.00
Project Scope - A1A to Ridgewood
Avenue.
6
Carvers Cove 3.8 Acre Mverfront park
Carver's Cove
Land Acquisition cost $3,550,000
Site Development could be in the range of
$3,000,000 to $5,000,000
Millage rate of 0.50 to 0.75 to cover debt
service for 30 years.
7