Loading...
HomeMy WebLinkAboutChangeOrder#2A MEMORANDUM TO; Ryan Herold Brewer Paving and Development, Inc. FROM: Jeff Ratliff Assistant Public Works Director City of Cape Canaveral 868 -1240 DATE; 07/30110 RE; Change Order No. 2 Ridgewood Avenue Improvements Project Attached is a table showing the contract deletions and contract additions for the referenced City of Cape Canaveral (City) project. These contract changes, which constitute Change Order No. 2, were approved by the City Council on Tuesday, July 20, 2010. . The revised contract amount is $1,539,938.86. The extension. of the project to the north (Ocean Woods) will be included on the next change order. If in agreement, please sign below and return the original to the City. Walter Bandish Public Works Director City of Cape Canaveral. Billy Joe Brewer President Brewer Paving and Development, Inc. L. 1w m F.. 01 V R R R d y N Q� hp R LL O ri i O N t7 N d Z ti.. 61 'C7 w Table 2. Ridgewood Project Tracking Total Credit $ 17,348.80 Credits To Contract Sailfish Concrete ' Survey � Layout -1 LS $ 76.00 $ (75.01)) MOT -1 LS $ 25.00 $ 25.00 Remove Concrete -67 SY $ 5.00 $ 335.00) Remove Halle Gutter -16 SY $ 5.00 $ 80.00) New Conrete Turnout - 6" -67 SY $ 28.001$ (1,876.00 Subtotal $ (2,391.00) Stabilized Subgrade 12" Stabilized Subgrade -9813 SY . $ 4.00 $ 4252.00 8" Stabilized Subgrade 1 98131SY $ 3.38 $ 33,167.94 Sub #otal $ (6,084.06) Sidewalk at l=ast Side of Road .Rework Exists 4" Base Course -800 SY $ 3.50 $ 2,800.00) Install 2" Additional Base Rock -$00 SY $ 4.50 $ (3,600.00) Subtotal $ (6,400.00) Exiatin Inlet Replace Inlet To »1 1 EA $ 975.00 $ 975.00 subtotal $. (975.06) Total Credits To -Date $ (15,850.tI6� Additions To Contract Additional Work at Driveways Removal of Existing Concrete 1 96 1 SY $ Tool 480.00 6" Concrete for Driveways 96 1 SY $ 28.00 $ 2,688.00 Subtotal $ 3,1 58.00 Additional Curb @ Chandler Miami Curb I 33 Ll= I $ 8.5>3 $ 260.50 Subtotall Is 28 Raise Exlsting Inlet Tops Raise Inlets not shown 1 2 JEAJS 350,00 $ 700.00 Subtotal $ 700.00 Sidewalk at l=ast Side of Road Grading for Now Sidewalk 800 SY $ 2 75 $ 2,200.00 Install Fill Dirt for Grading( -4"j 800 1 SY $ 4.00 $ 3,200.00 Subtotal $ 5,400.00 C=ull Depth Base Rock Full Depth Road where Reuse is too Shallow (10" Thick) 400 LE 444 SY $ 13.00 $ 5,772.00 Credit for 6" Base & 8'" Stabilized Subgrade _44418Y $ 12.38 $ (6,496.72) Subtotal $ 275.28 Pedwa Tie -in Q Sailfish - Was Out of Tolerance Removal of Existing Concrete 20 5Y $ 5.00 $ 100.00 8" Stabilized Subgrade 20 SY $ 3.38 $ 67.50 6" Base Course 20 SY $ 5.00 $ 180.00 Asphalt 1.7 TN $ 90,00 $ 153.00 Subtotall $ 500.60 530 Adams Ave - Yard Drain Install Yard Drain & Assolcats. Piping 1 LS $ 750.00 1 $ 750.00 Subtotall $ 750.00 NW Corner of Madison & R €d ewoad Install New Dr €vewWA ron 20 JSYJ $ 28.00 $ 660.00 Subtotal $ 660,00 Additional Asphalt Canveral Sands Additional Asphalt @ Canveral Sands 1 4 TN $ 90.00 $ 360.00 Subtotal is 360.00 Exfiltration Trench - Plan Change Increase >= xfiltratlon Pipe (210 LF x 17 Separate Systems) - 8" 1 -340 LF $ 45.00 $ 16,300.00 Exfiitrat €an Pipe (20 LF x 17 Separate Systems) -12" 1 340 LF $ 65.00 .$ 22,100.00 Subtotall $ 6;800.00 Additional Sidewalk a Adams.& Ridgewood Needed for Transition Remove Extra Sidewalk - T x 4' S jsy .$ 5.00 $ . 15.00 install Extra Sidewalk - 7'x 4` 3 Is Y. $ 23.50 $ 70.50 Subtotal $ 85.50 Additional Yard Drains Install Yard aralns & Piping 1 3 EA $ 750.00 $ 2,260,00 Subtotall $ 2,250.00 Additional Asphalt Q !ores Del Mar Drive Removal of Ex €sting Driveway 16 5Y $ 5.00 $ 80.00 &' Stabilized Sub rode 16 SY $ 3.38 $ 54.08 6" Sase Course 16 SY $ 9.00 $ 144.00 Asphalt 14 . TN $ 90.40 $ 126.00 Subtotal $ 404.08 Install New Driveway Aprons Install New Driveway Apron (20 SY Q $28.001 SY) 1 3 EA $ 560-001$ 1 Subtotall 1$ 1,680.00 Re uestfor Additional Survey Work per SSA Additional Survey Work Needed 1 1 LS IS 6,814.50 1 $ 5,814.50 Subtotall $ 6,814:50 Shift Pedway for Light Pole Bases - 4 Locations Additional Base Rock 80 SY $ 9.00 $ 720:00 Additional Stabilization 80 SY S 3.38 $ 270.40 Asphalt at first location 2 TN S 90.00 $ 180.00 Additional Labor& Equipment for Production Loss 4 EA $ 500.00 $ 2,000.00 Landscape & Irrigation -TBD - Not Sure Cost 1 LS $ - $ - Subtotal $ 3,170.40 Total Additions To -Date $ 33,198.86 Additions Minus 10% Retainage $ 3,319.89 Amount of This Payment*** $ 29,878.97 Net Budget Impact $ 17,348.80 0 Table 3. Ridgewood .A - Landscape & I,rrgalE'ivn Credits CREDITS TO CONTRACT ITEM QUANTITY CST. EACH TOTAL 2" CHASE PIPE IN FT. -30 $ 1.35 $ (40.50) 3" CHASE PIPE IN FT. -208 $ 2.00. $ (41600) 4" CHASE PIPIT IN FT. -146 $ 2.20 $ (321.20) 9" CHASE PIPE IN FT. -55 $ 3.25 $ (176.75) 12" POP UP HEADS -83 $ 24.60 $ (1,649.80) VALVES 10 -6 $' 190.00 $ (1,140.00) CONNECTION TO RECLAIMED WATER -1 $ 110.00 $ 01(1:00) WIRE -1 $ 52.50 $ (52.50) MAIN LINE 2" PIPE. -515 $ 1100 $ (615.04) TRANSPLANTED PALM S -32 $ 110.01,! $ (3,520.00) TRANSPLANTED QUEEN PALM -1 $ 290.00 $ 290.00) Total Credits 3-25-10 $ 8,233.75 Credit for Sod Chan es - 428 -10 -1 $ 2,802:62 $ (2,802.62 Credit for Irrigation Not Used In Phase 1 & 2 - 5 -25 -10 -1 $11,563.42 $(11,503.42 Total Credits 5.25 -10 $11,563.42 Total Credits To -Date $(22,699.79) ADDITIONS TO CONTRACT LABOR AND MATERIALS TO REPAIR AND INSTALL NEW IRRIGATION FROM CHERI DOWN TO CENTRAL, ON RIDGEWOOD, 90% COMPLETE. WHOLE EAST- SIDE ON IRRIGATION WILL BE SODDED WITH FLORATAM ST. AUGUSTINE SOD. 1 $ 6,646.50 $ 5,545.50 Universal Bill 1 $ 400-00 $ 400.00 Total Additions - 3 -25 -10 $ 5,945.50 Irrigation Re airs for Islands on East Side - 4 -25 -10 1 $ 525.00 $ 525,40 Grading for Steep Yard Tansitions 1 $ 500.00 $ 500.00 Additional Irrigation for Sands, Medians, Cheri Dawn to Chandler, to Washingon on West side 1 $ 7,413.00 $ 7,413 -00 Total Additions - fi 26-10 $ 7,913.00 . Irrigation Cheri Dawn - Madison - 6-25-10 1 $ 5,067.00 $ 5,067.00 Total Additions To -Date $19,454.50 Additions Minus 10% Retainge $ 1,945.05 "Amount of This Payment** $17,505.45 Net Budget Impact $ (3,149.29)