HomeMy WebLinkAboutResolution 2009-19 ReconsideredRESOLUTION NO. 2009-19
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF
CAPE CANAVERAL, BREVARD COUNTY, FLORIDA,
AMENDING THE EXISTING FEE SCHEDULE SET FORTH
IN APPENDIX B TO THE CAPE CANAVERAL CODE OF
ORDINANCES FOR CHAPTER 82. BUILDING AND
BUILDING REGULATIONS; PROVIDING FOR REPEAL OF
PRIOR INCONSISTENT RESOLUTIONS, SEVERABILITY,
AND AN EFFECTIVE DATE.
WHEREAS, the City is granted the authority under Section 2(b), Article VIII, of the State
Constitution to exercise any power for municipal purposes, except when expressly prohibited by law;
and
WHEREAS, the City Council has, in the interest of the health, safety, and welfare of its
citizens, and in the furtherance of the requirements of Chapter 553, Florida Statutes, created the
City's Building Department and authorized said department to review building plans, process
building permits, conduct building inspections, and enforce building codes pursuant to the
requirements of the Florida Building Code; and
WHEREAS, section 553.80, Florida Statutes, enables the City to provide a schedule of fees
for carrying out the City's responsibility to enforce the Florida Building Code, which shall be based
j on direct costs and reasonable indirect costs associated with review of building plans building
inspections, re- inspections, and building permit processing; building code enforcement; and fire
inspections associated with new construction; and
WHEREAS, the building and permit fee schedule may also include training costs associated
with the enforcement of the Florida Building Code; and
WHEREAS, the existing schedule of fees is no longer sufficient to offset the costs incurred
by the City of Cape Canaveral; and
WHEREAS, the City Council desires to update the building and permit fee schedule so that
developers and property owners pay their fair share of the costs attributable to building plan review,
building permit processing, conducting building inspections, and enforcing building codes consistent
with the requirements of the Florida Building Code; and
WHEREAS, the City Council of the City of Cape Canaveral deems that this Resolution is
in the best interests of the public health, safety, and welfare of the citizens of Cape Canaveral.
NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY
OF CAPE CANAVERAL, BREVARD COUNTY, FLORIDA, AS FOLLOWS:
City of Cape Canaveral
Resolution No. 2009 -19
Page 1 of 2
Section 1. Recitals. The foregoing recitals are hereby fully incorporated herein by this reference
and are deemed a material part of this Resolution.
Section 2 Amendment of Existing Fee Schedule for Chapter 82. Buildings and Building
Regulations. The Cape Canaveral City Council hereby amends the existing fee schedule set forth
in Appendix B to the Cape Canaveral Code of Ordinances for Chapter 82. Buildings and Building
Regulations, as set forth in Exhibit "A." ( underlined type indicates additions and type
indicates deletions). All other existing fees set forth in Appendix B not expressly repealed or
modified herein shall remain in full force and effect.
Section 3. Incorporation into Appendix B to the Code of ordinances. The fee schedule set
forth in Exhibit " A " shall be incorporated into Appendix B to the Cape Canaveral Code of
Ordinances and any section or paragraph number or letter and any heading may change or be
modified as necessary to effectuate the foregoing.
Section 4. Repeal of Prior Inconsistent Resolutions. All prior resolutions or parts of
resolutions in conflict herewith are hereby repealed to the extent of the conflict.
Section 5. Severability. If any section, subsection, sentence, clause, phrase, word, or portion
of this Resolution is for any reason held invalid or unconstitutional by any court of competent
jurisdiction, such portion shall be deemed a separate, distinct and independent provision and such
holding shall not affect the validity of the remaining portion hereto.
Section 6. Effective Date. This Resolution shall become effective on October 1, 2009.
RESOLVED by the City Council of the City of Cape Canaveral, Florida this 1 st day of
ti
September
eptembe 2009: - t`
" r
ROCKY RAND LS, Mayor
A EST:
. �
M GOF . 'H, in Deputy City Clerk
4
Bob Hoog
Buzz Petsos
Rocky Rande is
C. Shannon Roberts
Betty Walsh
For Against
X
Motion
X
Second
X
Approved as to legal form and sufficiency for
the Ci Ca e Canaveral only:
ANTHONY A. GARGANESE, City Attorney
City of Cape Canaveral
Resolution No. 2009 -19
Page 2 of 2
Appendix B Schedule of Fees
Chapter 82. Buildings and Building Regulations
(A) Building Permit fees. On all buildings, structures or alterations requiring a building permit, a
fee set forth below shall be paid at the time the permit is issued:
Permit fees by total valuation:
Valuation
Fee
$500.00 or less:
45.00
$501.00 to and including $1,000.00.....
60.00
$1,001.00 to and including $2,000.00..
$75.00
$2,001.00 to and including $20,000.00
$75.00 for the first $2,000.00 and $5.00
for each additional $1,000 or fraction
thereof to and including $20,000.00
$20,001.00 to $100,000.00
$165.00 for the first $20,000.00 and $5.00
for each additional $1,000 or fraction
thereof to and including $100,000.00
$100,001.00 to $500,000.00
$565.00 for the first $100,000.00 and
$4.00 for each additional $1,000 or
fraction thereof to and including $500,000
$500,001.00 and up
$2165.00 for the first $500,000.00 and
$3.00 for each additional $1,000 or
fraction thereof
The total valuation for assessment of permit fees for new structures shall be
based on the latest valuation data published by the International Code Council
(I.C.C.)
For construction work not addressed in the latest valuation data published by
the I.C.C., such valuation shall be based upon the actual construction contract price,
with satisfactory evidence of same being submitted to the building official, or a
construction cost estimate made by the building official, except as otherwise provided
in this section.
(B) Plan checking fee. In addition to any fee or fees charged in subsection (a) above:
When the valuation of the proposed construction exceeds $1,000.00 and plans
and /or specifications are required to be submitted, a plan checking fee shall be
paid at the time the permit is issued.
The plan checking fee shall be equal to '/2 (one -half) the building permit fee. Such
plan checking fee shall be in addition to the building permit fee.
When the valuation of the proposed construction exceeds $500,001.00, a non-
refundable plan review deposit shall be paid at the time of permit application
submittal. Such deposit may not exceed the anticipated plan review fee.
When a dispute exists in the review of the plans and specifications for construction, the
applicant may request a hearing before the construction board of adjustment.
(C) In addition to any fee or fees charged in subsections A and B, a fee set forth below shall
be paid at the time the permit is issued. Note: Re- roofing, remodeling, alterations, additions and
repairs permit fees shall be paid in accordance with subsections A and B only.
Plumbing, new, residential, per bathroom
$60.00
Plumbing, new, hotel /motel, per unit
$60.00
Plumbing, new, commercial, per bathroom
$60.00
Sewer tap inspection fee
$60.00
Electrical, new, single family
$100.00
Electrical, new, multi - family, per unit
$75.00
Electrical, new, hotel /motel, per unit
$60.00
Electrical, new, commercial, per unit
$60.00
Mechanical, new, residential, per unit
$75.00
Mechanical, new, hotel /motel, per unit
$50.00
Mechanical, new, commercial, per system
$50.00
Well, deep or shallow
$50.00
Moving of building
$150.00
Demolition of building
$100.00
(D) Other fees:
Fire alarm permit
Per valuation table "A"
plus Fire Department
fee calculation
Fire sprinkler permit
Per valuation table "A"
plus Fire Department
fee calculation
Preliminary review of construction plans
$50.00 per hour or
portion thereof
Permit Revision Fee. Minimum'/ hour charge.
$25.00 per V2 hour
Re- inspection fee - When extra inspection trips are
$45.00
necessary due to partial inspections, wrong address,
second call on rejected or condemned work, additional
work done after inspection has been made, or work not
ready for inspection when called, a charge of $45.00 shall
be paid in advance for each additional inspection or at the
discretion of the building official on large projects prior
to issuance of a Certificate of Occupancy or Completion.
Certificate of Occupancy
$50.00
Failure to Obtain an approved Final Inspection
$100.00
Work started prior to issuance of permit (ref. building
Double Permit Fee
code adopted by Chapter 82 of this code)
Special Inspection (after- hours, weekend, holiday,
$50 per hour
arranged 2 days in advance). Minimum 4 hour charge
for weekends and holidays
Final Inspection. Fine for failure to obtain a final
$100.00
approved inspection for a permit before it expires. No
further permits may be issued to any contractor or permit
applicant with an outstanding fine or to any contractor
with an expired permit due to failure to obtain a final
inspection.