Loading...
HomeMy WebLinkAboutPost Construction Letter = OMOU=_ìÑÑ~äç=qÉêê~ÅÉ= eçìëíçåI=qu==TTMNV= EqFTNPKVQOKRUOM=EcFVMNKPUUKRTSR= ïïïKÄÖâí~êÅÜáíÉÅíëKÅçã= October 4, 2023 Mr. Michael German City of Cape Canaveral Building Division 100 Polk Ave. Cape Canaveral, FL 32920 Via email: m.german@cityofcapecanaveral.org RE: Permit # P21-0927; Parcel # 2454903 Holiday Inn Express & Suites, 995 Shorewood Drive Michael, Please be advised that to the best of my professional knowledge, information, and belief, I hereby state the following: 1. I have performed site visits to the Project at intervals appropriate to the stage of construction generally once a month, and hereby state that the building is built in accordance with approved plans and specifications. Furthermore, to the best of my knowledge, construction is in compliance with applicable codes. 2. I have professional experience applying the requirements of the American with Disabilities Act (ADA), including the 2010 Standards, and the 2020 Florida Accessibility Code, Seventh Edition. 3. I have inspected all areas of the Project, including areas open to the public (and accessible guest rooms), and confirm that they comply with the above-listed Standards. Please let me know if you have any questions or require anything further. Submitted by, BGKT Architects, PLLC Arthur Killebrew, AIA principal JAK