Loading...
HomeMy WebLinkAboutFinal Site As Built Survey and Elevations 10-5-23SHOREWOOD DRIVE GEORGE KING BOULEVARD(66' EASEMENT)SITE BM #2LOCATION MAPSURVEYOR'S CERTIFICATION:SITELEGEND:McMurry Construction Co., Inc. SITE AS-BUILT AND TREE SURVEYHOLIDAY INN EXPRESSMATCH LINE SEE SHEET 2SURVEYOR'S NOTES: ABBREVIATIONS:L:\Survey\Projects\980129 Cape Caribe\980129.20 Holiday Inn Express Stakeout\Drawings\CAD\980129_20 Site As-Built.dwg, Site, 10/5/2023 11:01:58 AM, RBelcik SHOREWOOD DRIVESITE BM #1ABBREVIATIONS:LOCATION MAPSITELEGEND:McMurry Construction Co., Inc. SITE AS-BUILT AND TREE SURVEYHOLIDAY INN EXPRESSMATCH LINE SEE SHEET 1L:\Survey\Projects\980129 Cape Caribe\980129.20 Holiday Inn Express Stakeout\Drawings\CAD\980129_20 Site As-Built.dwg, Site, 10/5/2023 11:02:13 AM, RBelcik