Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
09 A-802 2nd Floor Reflective Ceiling
GYP BD 7' - 8"GYP BD 7' - 8" GYP BD 7' - 8" GYP BD 8' - 6" GYP BD 8' - 6" GYP BD 7' - 6" GYP BD 7' - 6" GYP BD 7' - 6" GYP BD 7' - 6" GYP BD 7' - 6" GYP BD 7' - 6" GYP BD 7' - 6" GYP BD 7' - 6" GYP BD 7' - 6" GYP BD 7' - 6" GYP BD 7' - 6" GYP BD 7' - 6" GYP BD 7' - 6" GYP BD 7' - 6" GYP BD 8' - 6" GYP BD 8' - 6" GYP BD 8' - 6" GYP BD 8' - 6" GYP BD 8' - 6" GYP BD 8' - 6" GYP BD 8' - 6" GYP BD 8' - 6" GYP BD 8' - 6" GYP BD 8' - 6" GYP BD 8' - 6" GYP BD 8' - 6" GYP BD 8' - 6" GYP BD 8' - 6" GYP BD 8' - 6" GYP BD 8' - 6" GYP BD 8' - 6" GYP BD 8' - 6" GYP BD 8' - 6" GYP BD 8' - 6" GYP BD 8' - 6" GYP BD 8' - 6" GYP BD 8' - 6" GYP BD 8' - 6" GYP BD 8' - 6" GYP BD 8' - 6" GYP BD 8' - 6" GYP BD 8' - 6" GYP BD 8' - 6" GYP BD 8' - 6" GYP BD 8' - 6" GYP BD 8' - 6" GYP BD 8' - 6" GYP BD 8' - 6" GYP BD 8' - 6" GYP BD 8' - 6" GYP BD 8' - 6" GYP BD 8' - 6" GYP BD 8' - 6" GYP BD 8' - 6" ACT 7' - 8" GYP BD 8' - 0" GYP BD 8' - 0" STRUCT. 8' - 8" ACT 7' - 8" ACT 7' - 8" ACT 7' - 8" ACT 7' - 8" ACT 7' - 8" ACT 7' - 8" ACT 7' - 8" ACT 7' - 8" ACT 7' - 8" ACT 7' - 8" ACT 7' - 8" ACT 7' - 8" ACT 7' - 8" GYP BD 7' - 8" GYP BD 7' - 8" GYP BD 7' - 8" GYP BD 7' - 8" GYP BD 7' - 8" GYP BD 7' - 8" GYP BD 7' - 8" GYP BD 7' - 8" GYP BD 7' - 8" GYP BD 7' - 8" GYP BD 7' - 8" GYP BD 7' - 8" GYP BD 7' - 8" GYP BD 7' - 8" GYP BD 7' - 8" GYP BD 7' - 8" GYP BD 7' - 8" GYP BD 7' - 8" GYP BD 7' - 8" GYP BD 7' - 8" GYP BD 7' - 8" GYP BD 7' - 8" GYP BD 7' - 8" GYP BD 7' - 8" GYP BD 7' - 8" GYP BD 7' - 8" GYP BD 7' - 8" GYP BD 7' - 8" GYP BD 7' - 8" GYP BD 7' - 8" GYP BD 7' - 8" GYP BD 7' - 8" GYP BD 7' - 8" GYP BD 7' - 8" GYP BD 7' - 8" GYP BD 7' - 8" GYP BD 7' - 8" GYP BD 7' - 8" GYP BD 7' - 8" GYP BD 7' - 8" GYP BD 7' - 8" GYP BD 7' - 8" GYP BD 7' - 8" GYP BD 7' - 8" GYP BD 7' - 8" GYP BD 7' - 8" GYP BD 7' - 8" GYP BD 7' - 8" GYP BD 7' - 8" GYP BD 7' - 8" GYP BD 7' - 8" GYP BD 7' - 8" GYP BD 7' - 8" GYP BD 7' - 8" GYP BD 7' - 8" GYP BD 7' - 8" GYP BD 7' - 8" GYP BD 7' - 8" GYP BD 7' - 8" GYP BD 7' - 8" GYP BD 7' - 8" GYP BD 7' - 8" GYP BD 7' - 8" GYP BD 7' - 8" GYP BD 7' - 8" GYP BD 7' - 8" GYP BD 7' - 8" GYP BD 7' - 8" GYP BD 7' - 8" GYP BD 7' - 8" GYP BD 7' - 8" GYP BD 7' - 8" GYP BD 7' - 8" GYP BD 7' - 8" GYP BD 7' - 8" GYP BD 7' - 8" GYP BD 7' - 8" GYP BD 7' - 8" GYP BD 7' - 8" GYP BD 7' - 8" GYP BD 7' - 8" GYP BD 7' - 6" CEILING LIGHTING LEGEND 4" LED DOWNLIGHT FIXTURE EXTERIOR WALL SCONCE LIGHT 6" LED WALL WASHER LIGHT FIXTURE 2x2 INDIRECT CONCAVE LIGHT FIXTURE EXTERIOR LIGHT WALL MTD EXTERIOR UP LIGHT 2x4 LED TROFFER PRISMATIC LIGHT FIXTURE 1x4 LED PRISMATIC LIGHT FIXTURE - SURFACE MTD 2x2 LED TROFFER PRISMATIC LIGHT FIXTURE EXTERIOR GRADE SPEAKERS INTERIOR LED WALL SCONCE LIGHT FIXTURE INTERIOR LIGHTING FIXTURE, WALL MTD GENERAL NOTES - REFLECTED CEILING PLANS: 1. TYPICAL GUESTROOM CEILINGS TO BE PAINT FINISH ON SUSPENDED GYPSUM BOARD AT HEIGHTS SHOWN A.F.F. 3. GUESTROOM CEILING HEIGHT IS NOMINAL @ TYPICAL FLOORS. ACTUAL CEILING HEIGHT IS THE BOTTOM OF RATED FLOOR / CEILING ASSEMBLY. 4. ALL BATHROOM CEILINGS TO BE PAINTED FINISH ON SUSPENDED MOISTURE AND MOLD RESISTANT GYPSUM BOARD CEILING AT HEIGHTS SHOWN A.F.F. 5. PAINTED MOISTURE AND MOLD RESISTANT GYPSUM BOARD SHALL BE USED AT DRYERS, PANTRY, BATHROOMS AND MECHANICAL SPACES. 6. REFER TO ELECTRICAL DRAWINGS/SCHEDULES AND SPECIFICATIONS FOR LIGHTING FIXTURES AND ITEMS NOT SHOWN OR LISTED ON THIS SHEET. 7. CENTERLINE OF WALL SUPPORTED PENDANTS IN GUESTROOMS TO ALIGN W/ WALL OUTLET, 2'-0" TYP FROM EXTERIOR WALL TO CENTERLINE OF PENDANT SUPPORT. STAGGER WALL OUTLETS WHENEVER BACK- TO-BACK IN DEMISING WALL. 8. REFER TO MECHANICAL/PLUMBING DRAWINGS, SCHEDULES AND SPECIFICATIONS FOR HVAC TYPES AND SPECIFICATIONS. 7975 Stage Hills Boulevard, Suite 4 Memphis, Tennessee 38133 T. (901) 377-6603 F. (901) 388-5765 http://www.bgktarchitects.com These plans were derived from the Holiday Inn Express by IHG design and construction standards and are confidential and proprietary to IHG and may not be reproduced, disclosed, distributed or used without the express permission of an authorized representative of BGKT Architects, PLLC. © 2021 BGKT Architects, PLLC. Sheet: Date:Consultant:Project No:MarkDateRevisionBOUNDS GILLESPIE KILLEBREW TUSHEK Drawings, electronic media, design concepts and related material shall not be used, modified or reproduced in whole or in part by any persons or companies without prior written consent of BGKT Architects, PLLC ARCHITECTS, PLLC MEMPHIS HOUSTON 091920 06-21-2021 A-802REFLECTED CEILING PLAN - LEVEL 2995 Shorewood Drive, Cape Canaveral, FL 32920HOLIDAY INN EXPRESS& SUITESSCALE: 3/32" = 1'-0"1 REFLECTED CEILING PLAN - LEVEL 2 09-01-2021 FOR CONSTRUCTION 06-21-2021 FOR BUILDING PERMIT STAT E O F FLO R I DAREGI S T ERED A R C H ITECT09-13-21 Received by MCCI 09-14-2021 J Arthur Killebrew J Arthur Killebrew C=US, E=a.killebrew@BGKTar chitects.com,O="BGKT Architects, PLLC", CN=J Arthur Killebrew 2021.09.14 11:07:19-05'00'