Loading...
HomeMy WebLinkAbout03 A-201 1st FloorUP UP JEC_UMBRELLA_UM_CANTILEVER SSFIREPITTERRACEBIKERACKST45° WL BEND UP 4.6 DET. RAM6" PVC REUSE MAIN113877FFWW LEGEND: DENOTES ACCESSIBLE ROOM TYPE DENOTES HEARING IMPAIRED ROOM TYPE 1 3 4 5 6 7 8 9 10 11A 11B 12 13 14 15 17 18 20 MBF KING SU ITE (RIS) 136CMU FACE TO CMU FACE20'-0"TERRACE 14'-0" 13'-10" 14'-0" 14'-1" 14'-11" A-502 6 A-503 1 A-504 1 Q/Q STANDARD 118 Q/Q STANDARD 122 Q/Q ST ANDARD 124 Q/Q STANDARD 126 Q/Q STANDARD 128 Q/Q ST ANDARD 130 Q/Q STANDARD 140 Q/Q STANDARD 142 Q/Q STANDARD 146 Q/Q STANDARD 148 KING SU ITE 149 KING SU ITE 147 Q/Q STANDARD 151 Q/Q STANDARD 145 KING STANDARD 120 KING STANDARD 144 Q/Q STANDARD 127 Q/Q STANDARD 129 Q/Q STANDARD 131 Q/Q SAF (Spe cial Acce ssibility Fe ature s) 150 KING SUIT E 132 KIN G SU ITE 134 Q/Q STANDARD 138 1 A-303 A-102 1 II HHRADIUS FOBR38'-8 1/8"2 19 A B C D E F 1614'-11"14'-1"14'-0"13'-10"14'-0"24'-0 1/2"35'-0"C.L CORRIDOR 32'-3 3/8"3'-1 1/4" 3'-1 1/8"27'-9 1/2"FOB FOS FOS FOB 13'-4 1/2" 13'-4 1/2" 13'-4 1/2" 13'-4 1/2" 13'-4 1/2" 13'-4 1/2" 13'-4 1/2" 13'-4 1/2" 13'-4 1/2" 13'-4 1/2" 13'-4 1/2" 13'-4 1/2" 13'-4 1/2" 13'-4 1/2" 9" 13'-4 1/2" 13'-4 1/2" 13'-4 1/2" 13'-4 1/2" 13'-8" 255'-2" 9'-4"4'-6" 28'-6"2'-4 5/8"3'-9 1/2" 13'-4 1/2" 13'-4 1/2" 13'-6" 13'-6" 13'-4 1/2"13'-4 1/2" 13'-6" C.L CORRIDORC.L CORRIDOR27'-9 3/8" 3'-1 1/8" 3'-1 1/8" 27'-9 3/8" 61'-9"FOBFOSFOSFOB5.8 6.5 7.2 255'-11 1/4"133'-7 1/4"A-505 1 A-506 1 A-507 1 G MECH - MBF Q/Q SUITE LOCKOUT CONFIG.5'-5 1/2"4'-5"35'-0"3'-8"144 100 101 115104 102 103 105 106 107 110109 111 112 113 114 116 122 117 118 119 120 124 123 125 126 127 128 129132 133134 136 138 139 137 141 131 130 143142 145140 12185'-0"44'-10 1/2"10'-4 1/2" 10'-10 3/4" 10'-10 3/4" 10'-4 1/2"43'-1"9'-2" 4'-2 1/2" 6'-8 1/4" 6'-8 1/4" 4'-2 1/2" 9'-2" 20'-8"20'-8"6'-0" A-502 5 5'-7"135 SWIMMING POOL CUBBIESWORK BENCH108 PUMPS & WATER HEATER ELECT RICAL STORAGE / ME CHANICAL OFFICEOFFICE PANTRY BREAKFAST B.O.H. CORRIDOR SERVER LU GGAGE S ALES EMPLOYEE BRE AK WORK AREA GEN ERAL MANAGER FRONT DESK MARKET MECH VESTIBULE LINEN TERM STAFF TOILE T LAUN DRY LINEN ST OR. WASHER P AD ST AIR #1 103 STAIR #2 EAST/WESTCORRIDORFIT NESS HALLWAY ELEV LOBBY NORTH/SOUTH CORRIDOR GUEST LAUNDRY B.O.H. ELEV M TLT W TLT ELEV 1 ELEV 2 PATIO SEATING MEETING LOBBY/GREAT ROOM BUSINESS CENTER CLUB VACATIONS ST OR. POOL PAVILION ARBOR VOLLEY BALL COURT BOCCE BALL 11 3/4"POOL EQUIPMENT TRASH ENCLOSURE SUN DECK CABANA CABANA A-104 1 A-104 5 A-105 1 A-105 7 A-104 8 1'-1 3/4"A-607 6 DECORATIVE CONC. BRICK PAVERS IN SAND BED OVER REINF. CONC. SUB-SLAB FLUSH CONC. BAND6'-1 1/4"BDA EQUIP. 149 FEC FEC FECFE FE FE FE FE FE FE WET PLAY AREA 4 7975 Stage Hills Boulevard, Suite 4 Memphis, Tennessee 38133 T. (901) 377-6603 F. (901) 388-5765 http://www.bgktarchitects.com These plans were derived from the Holiday Inn Express by IHG design and construction standards and are confidential and proprietary to IHG and may not be reproduced, disclosed, distributed or used without the express permission of an authorized representative of BGKT Architects, PLLC. ©2021 BGKT Architects, PLLC. Sheet: Date:Consultant:Project No:MarkDateRevisionBOUNDS GILLESPIE KILLEBREW TUSHEK Drawings, electronic media, design concepts and related material shall not be used, modified or reproduced in whole or in part by any persons or companies without prior written consent of BGKT Architects, PLLC ARCHITECTS, PLLC MEMPHIS HOUSTON 091920 06-21-2021 A-201FLOOR PLAN -LEVEL 1995 Shorewood Drive, Cape Canaveral, FL 32920HOLIDAY INN EXPRESS& SUITESSCALE: 3/32" = 1'-0"1 FLOOR PLAN - LEVEL 1 1 08-02-2021 PERMIT COMMENT RESPONSE 01 1 1 1 1 1 1 1 1 1 1 1 09-01-2021 FOR CONSTRUCTION 06-21-2021 FOR BUILDING PERMIT 4 07-15-2022 REVISED ELEVATOR HOISTWAYSTAT E O F FLO R I DAREGI S T ERED A R C H ITECT07-21-22 Received by MCCI 07-25-2022