Loading...
HomeMy WebLinkAboutVillas at Fillmore Ave - Stormwater Addendum kimley-horn.com 7341 Office Park Place, Suite 102, Melbourne, FL 32940 321-430-1138 September 10, 2024 TO: Todd Morley City Manager City of Cape Canaveral FROM: Kiel Causby, P.E. Kimley-Horn and Associates SUBJECT: Addendum #1 to the Villas at Fillmore Stormwater Memorandum dated April 4th, 2024 Parcel Numbers: 24-37-23-67-*-1 24-37-23-67-*-2 24-37-23-67-*-3 24-37-23-67-*-4 Kimley-Horn and Associates has reviewed the following documents pertaining to the Villas at Fillmore Project: 1. Stormwater Computations for Fillmore Townhomes prepared by Allen Engineering, Inc. a. Dated: September 2020 2. Construction Plans prepared by Allen Engineering, Inc. a. Dated: September 24, 2020 3. Architectural Plans signed by Joe Deen, P.E. 36070 a. Dated: October 14, 2020 4. Notice of Commencement a. Recorded: October 16, 2020 5. John A. Pekar, P.E. email to David Dickey approving the updated site plan and record plat. a. Dated: December 2, 2020 6. Architectural Plans signed by Joe Deen, P.E. 36070 a. Dated: December 31, 2020 7. Boundary Surveys (Lots 1-4) prepared by Eric Nielsen Land Surveying, Inc. a. Latest revision: March 24, 2021 8. Pre-Power Request; to Michael German, Building Official from Mark Hartery, Pres. A&W Electric Co. Inc. (Permit #P21-0273) a. Dated: June 9, 2022 9. As-Built prepared by Allen Engineering, Inc. a. Dated: July 8, 2022 10. Memo from John Pekar, P.E. to Mike German; David Dickey with the subject: Villas at Fillmore – Record Drawings a. Dated: August 5, 2022 11. Certificate of Occupancy for 314 and 316 Fillmore Ave. a. Dated: August 17, 2022 Page 2 kimley-horn.com 7341 Office Park Place, Suite 102, Melbourne, FL 32940 321-430-1138 12. “Memo: Community + Economic Development” email from John Pekar, P.E. to Dave Dickey, Mike German, and Anna Young a. Dated: October 5, 2022 13. Certificate of Occupancy for 304 and 306 Fillmore Ave. a. Dated: October 6, 2022