kimley-horn.com 7341 Office Park Place, Suite 102, Melbourne, FL 32940 321-430-1138
September 10, 2024
TO: Todd Morley
City Manager
City of Cape Canaveral
FROM: Kiel Causby, P.E.
Kimley-Horn and Associates
SUBJECT: Addendum #1 to the Villas at Fillmore Stormwater Memorandum dated April
4th, 2024
Parcel Numbers: 24-37-23-67-*-1
24-37-23-67-*-2
24-37-23-67-*-3
24-37-23-67-*-4
Kimley-Horn and Associates has reviewed the following documents pertaining to the Villas at Fillmore
Project:
1. Stormwater Computations for Fillmore Townhomes prepared by Allen Engineering, Inc.
a. Dated: September 2020
2. Construction Plans prepared by Allen Engineering, Inc.
a. Dated: September 24, 2020
3. Architectural Plans signed by Joe Deen, P.E. 36070
a. Dated: October 14, 2020
4. Notice of Commencement
a. Recorded: October 16, 2020
5. John A. Pekar, P.E. email to David Dickey approving the updated site plan and record plat.
a. Dated: December 2, 2020
6. Architectural Plans signed by Joe Deen, P.E. 36070
a. Dated: December 31, 2020
7. Boundary Surveys (Lots 1-4) prepared by Eric Nielsen Land Surveying, Inc.
a. Latest revision: March 24, 2021
8. Pre-Power Request; to Michael German, Building Official from Mark Hartery, Pres. A&W
Electric Co. Inc. (Permit #P21-0273)
a. Dated: June 9, 2022
9. As-Built prepared by Allen Engineering, Inc.
a. Dated: July 8, 2022
10. Memo from John Pekar, P.E. to Mike German; David Dickey with the subject: Villas at
Fillmore – Record Drawings
a. Dated: August 5, 2022
11. Certificate of Occupancy for 314 and 316 Fillmore Ave.
a. Dated: August 17, 2022
Page 2
kimley-horn.com 7341 Office Park Place, Suite 102, Melbourne, FL 32940 321-430-1138
12. “Memo: Community + Economic Development” email from John Pekar, P.E. to Dave Dickey,
Mike German, and Anna Young
a. Dated: October 5, 2022
13. Certificate of Occupancy for 304 and 306 Fillmore Ave.
a. Dated: October 6, 2022