HomeMy WebLinkAboutcocc_council_mtg_minutes_20240523_cip_wkshpCITY OF CAPE CANAVERAL CITY COUNCIL
2nd CAPITAL IMPROVEMENT PLAN WORKSHOP MEETING
City Hall Council Chambers
100 Polk Avenue, Cape Canaveral, Florida 32920
Thursday
May 23, 2024
4:30 p.m.
MINUTES
CALL TO ORDER: City Attorney Garganese advised Council that a quorum of three was present
and a Chair would have to be selected in the absence of the Mayor and Mayor Pro Tem. City
Council reached consensus for Council Member Willis to chair the Workshop Meeting. Council
Member Willis called the Workshop Meeting to Order at 4:45 p.m. Council Member Davis led the
pledge of allegiance.
ROLL CALL:
Council Members Present:
Council Member
Council Member
Mayor Pro Tem
Council Member
Kim Davis
Kay Jackson
Mickie Kellum (arrived 4:56 p.m.)
Don Willis
Council Members Absent:
Mayor Wes Morrison
Others Present:
City Manager
City Attorney
Deputy City Clerk
Administrative/Financial Services (AFS) Director
AFS Senior Accountant
AFS Financial Analyst
Capital Projects Director
Community + Economic Development (CED) Dir.
CED Senior Planner
CED Resilience Engineering Services Manager
Human Resources/Risk Management Director
Parks, Recreation + Community Affairs (PRCA) Dir.
PRCA Community Engagement Manager
Public Works Services (PWS) Director
PWS Deputy Director
Brevard County Sheriff's Office (BCSO) Commander
BCSO Lieutenant
PUBLIC PARTICIPATION: None.
Todd Morley
Anthony Garganese
Daniel LeFever
John DeLeo
Joey Blacker
Cheryl Puleo (arrived 5:08 p.m.)
Tim Carlisle
David Dickey
Kyle Harris
Alexis Miller
Natalie Harmon
Molly Thomas
Amy Moody
June Clark
Jessica Erdman
Byron Keck
Scott Molyneaux
ITEM FOR DISCUSSION: Review and discuss Capital Improvement Plan (CIP) items presented
to the City Council at the April 4, 2024 CIP Workshop Meeting, as well as updated CIP items;
provide direction to Staff: City Manager Morley discussed the purpose of the Workshop Meeting
City of Cape Canaveral, Florida
City Council 2nd Capital Improvement Plan Workshop Meeting
Thursday, May 23, 2024 - Minutes
Page2of2
in relation to the April 4, 2024 Workshop Meeting. AFS Director DeLeo noted revised CIP
summaries that had been handed -out to City Council at the dais (Attached). Discussion ensued.
Mayor Pro Tem Kellum arrived at 4:56 p.m. and assumed duties of chairing the Meeting.
Discussion continued. City Council reached consensus to add a Stormwater CIP for research and
design of a stormwater retention pond at the western -end of Long Point Road for inclusion in
the FY 2024/2025 Budget. City Council reached consensus to postpone the Long Point Road
resurfacing CIP (IM-8) to FY 2025/2026. Discussion continued.
City Manager Morley summarized the discussions and requested City Council direction on the
revised CIPs, as attached, via consensuses. City Council reached consensuses to:
• Keep CED-1 as -is.
• Keep FR-1 through FR-8 as -is.
• Keep IM-1 through IM-4, IM-6, IM-7, and IM-9 through IM-13 as -is.
• Push IM-5 and IM-8 to FY 2025/2026, with IM-5 to include research and potential
implementation of corrosion-resistant/protective-coated components.
• Keep RD-1 and RD-2 as -is.
• Keep PRCA-1 through PRCA-10 and PRCA-12 as -is, with PRCA-12 to include research and
potential implementation of bollards at the entrance of the beach crossover.
• Push PRCA-11 to FY 2025/2026.
• Keep LB-1 as -is.
• Keep CR-1 through CR-6 as -is.
• Keep WW-1 through WW-19 as -is.
• Keep SW-1 through SW-8 as -is.
• Add research and design of a stormwater retention pond at the western -end of Long
Point Road as SW-9 for FY 2024/2025.
NEXT STEPS: Discussion ensued. AFS Director DeLeo stated the Proposed Budget will be ready
June 30, 2024; City Manager Morley noted the upcoming July 16, 2024 Budget Workshop Meeting.
ADJOURNMENT: A motion was made by Council Member Willis, seconded by Council Member
Davis, to adjourn the Workshop Meeting. The Workshop Meeting was adjourned at 7:10 p.m.
Daniel LeFever, Deputy City Clerk
Mick Kellum.l Mick'e Kellum, Mayor Pro Tem
Attachment to the May 23, 2024
City Council 2nd CIP Workshop
CITY OF CAPE CANAVERAL
CAPITAL IMPROVEMENT PROGRAM
GENERAL FUND
SUMMARY
FIVE YEAR PLAN FY FY FY FY FY Grant
2024-25 2025-26 2026-27 2027-28 2028-29 Funding
CIP# COMMUNITY AND ECONOMIC DEVELOPMENT
CED-1 Economic Development Action Plan-Update 50,000
I TOTAL CED 50,000 - - - -
CIP# FIRE/RESCUE SERVICES
FR-1 Vehicle Replacement 35,000 35,000 40,000 40,000 42,500
FR-2 Fire Fighting Equipment 25,000 35,000 35,000 40,000 40,000
FR-3 Radio Equipment 25,000 25,000 25,000 25,000 30,000
FR-4 New Fire Vehicle 450,000 500,000
FR-5 Medical Equipment 25,000 25,000 25,000 30,000
FR-6 Computer-Vehicle 12,500 13,000 15,000
FR-7 Air Conditioner Replacement(s) 20,000 20,000
FR-8 Building Equipment 7,000 4,000 19,000 14,000 11,500
I TOTAL FIRE/RESCUE 599,500 99,000 177,000 144,000 669,000 -
CIP# INFRASTRUCTURE MAINTENANCE
IM-1 IM Building Replacement 700,000 800,000
IM-2 IM Vehicle Replacements 55,000
IM-3 Beach Crossover Improvements 34,500 20,700 34,500 20,700 34,500
IM-4 Central Boulevard Improvements 250,000
IM-5 City Hall Air Conditioning Replacement 350,000
IM-6 BCSO Cape Canaveral Precinct Rooftop Solar Array 180,000 735,000
IM-7 Oak Lane Improvements 550,000
IM-8 Roadway Repair and Replacement 250,000 175,000 350,000
IM-9 New Bucket Truck 260,000
IM-10 C5 Energy Storage System Project 110,000 75,000
IM-11 Thurm Boulevard Improvements 1,480,000
IM-12 Portable Generator 110,000 75,000
IM-13 City Hall Office Buildout 108,000
I TOTAL IM 2,877,500 1,505,700 1,184,500 270,700 34,500 285,000
CIP# RESILIENCY DIVISION
RD-1 Resilience Division Fleet Vehicle Upgrade 26,000
RD-2 Banana River Park Shoreline Enhancement Design Study 60,000 60,000
I TOTAL RESILIENCY 86,000 - - - - 60,000
CIP# 'PARKS RECREATION+COMMUNITY AFFAIRS
PRCA-1 PRCA Department Vehicle Replacement 20,000 20,000
PRCA-2 Replacement of Entrance Sign 16,000
PRCA-3 Park Redevelopment 100,000 115,000 1,250,000
PRCA-4 Tennis Court Resurface 115,000
PRCA-5 Rovers Space West 90,000
PRCA-6 Manatee Sanctuary Park Infrastructure Upgrades 30,000 20,000 10,000
PRCA-7 Banana River Kayak Master Plan 150,000 135,000
PRCA-8 Gymnasium Court Dividers 20,000
PRCA-9 Center Street Park Upgrades 70,000
PRCA-10 Community Garden Redevelopment 90,000
PRCA-11 Canaveral City Park Tennis Courts 70,000 335,000
PRCA-12 Ridgewood Crossover and Memorial Pavers 10,000
I TOTAL PRCA 245,000 761,000 275,000 1,385,000 - -
ITOTAL GENERAL FUND $ 3,858,000 $ 2,365,700 $ 1,636,500 $ 1,799,700 $ 703,500 $ 345,000
GRAND TOTAL FY2025-FY2029 $ 10,363,400
CITY OF CAPE CANAVERAL
CAPITAL IMPROVEMENT PROGRAM
LIBRARY FUND
SUMMARY
FIVE YEAR PLAN FY FY FY FY FY
2024-25 2025-26 2026-27 2027-28 2028-29
CIP# LIBRARY FUND
LB-1 Books,DVDs,Audio Books 30,000 30,000 30,000 30,000 30,000
ITOTAL $ 30,000 $ 30,000 $ 30,000 $ 30,000 $ 30,000
GRAND TOTAL FY2025-FY2029 $ 150,000
CITY OF CAPE CANAVERAL
CAPITAL IMPROVEMENT PROGRAM
CAPE CANAVERAL COMMUNITY REDEVELOPMENT AGENCY FUND
SUMMARY
FIVE YEAR PLAN FY FY FY FY FY Grant
2024-25 2025-26 2026-27 2027-28 2028-29 Funding
CIP# CRA FUND
CR-1 Canaveral City Park Redevelopment 12,000 400,000
CR-2 Civic Hub 1,050,000
CR-3 Presidential Streets 1,600,000 1,600,000 1,600,000 1,600,000 1,600,000
CR-4 Traffic Safety Public Art Installation 15,000 6,500
Canaveral Fire Rescue Station#53
CR-5 Enhaced Lightning Protection System 16,000
CR-6 Canaveral City Park Concession Stand 315,000
TOTAL CRA $ 3,008,000 $ 2,000,000 $ 1,600,000 $ 1,600,000 $ 1,600,000 $ 6,500
GRAND TOTAL FY2025-FY2029 $ 9,808,000
CITY OF CAPE CANAVERAL
CAPITAL IMPROVEMENT PROGRAM
WASTEWATER ENTERPRISE FUND
SUMMARY
FIVE YEAR PLAN FY FY FY FY FY Grant
2024-25 2025-26 2026-27 2027-28 2028-29 Funding
CIP# WASTEWATER ENTERPRISE FUND
WW-1 RAS Pump/Motor Replacement 65,000
WW-2 Internal Recycle Pump/Motor Replacement 75,000
WW-3 Reclaimed Water Pump/Motor Replacement 65,000
WW-4 Lift Station Pump Replacements 60,000 60,000 60,000 60,000 65,000
WW-5 VFD Installation 38,000 45,000
WW-6 Mixer Replacements 10,000 12,000 12,000 12,000 13,000
WW-7 Piermount Mixer Rehabilitation 72,000 75,000
WW-8 Special Laboratory Equipment 18,000 18,000 18,000 20,000 22,000
WW-9 Vehicle Replacements 45,000 125,000
WW-10 Valve Replacements 35,000 35,000 35,000 40,000 40,000
WW-11 Air Conditioner Replacements 12,000 15,000
WW-12 Wastewater Facility Fence Replacement 100,000
WW-13 Sodium Bisulfate System 5,000 5,500 6,000 25,000 6,500
WW-14 Sanitary Sewer GIS Mapping 100,000 100,000 100,000
WW-15 Collection System Upgrade 40,000 40,000 40,000 45,000 50,000
WW-16 Blower Pipe for Effluent Transfer 100,000 350,000
WW-17 Pump Enclosure Structures 1,560,000
WW-18 Resilience Operations+ 170,000 727,500
Utility V2X Energy Backup System
WW-19 Vac Truck 540,000
TOTAL WASTEWATER ENTERPRISE FUND $ 2,215,000 $ 1,275,500 $ 471,000 $ 202,000 $ 496,500 $ 127,500
GRAND TOTAL FY2025-FY2029 $ 4,660,000
•
CITY OF CAPE CANAVERAL
CAPITAL IMPROVEMENT PROGRAM
STORMWATER ENTERPRISE FUND
SUMMARY
FIVE YEAR PLAN FY FY FY FY FY Grant
2024-25 2025-26 2026-27 2027-28 2028-29 Funding
CIP# STORMWATER ENTERPRISE FUND
SW-1 Central Boulevard Improvements 66,500 300,000
SW-2 Canaveral Drainage Basin Improvements 650,000
SW-3 Harbor Heights Stormwater Pipe Replacement 120,500
SW-4 Center Street Wet Pond 300,000 300,000
SW-5 West Central Boulevard Wet Pond 121,500 2,500,000
SW-6 Oak Lane Improvements 300,000
SW-7 Thurm Boulevard Improvements 600,000
SW-8 Portable SW Pump 160,000
TOTAL STORMWATER ENTERPRISE FUND $ 1,180,500 $ 950,000 $ 488,000 $ 2,800,000 $ - $