HomeMy WebLinkAboutPublic Workshop NoticeMEMORANDUM
TO: Property Owners
Ridgewood Avenue
FROM: Public Works Department
City of Cape Canaveral
(321) 868-1240
DATE: 11/19/09
RE: Ridgewood Avenue Improvements Project
Public Workshop Notice
As you may be aware, the City of Cape Canaveral (City) has approved the Ridgewood
Avenue Improvements Project. This project includes the redevelopment of Ridgewood
Avenue and the reclaiming of the City's rights -of -way on Ridgewood Avenue from Grant
Avenue to East Central Boulevard. (Note: In early -December, the rights -of -way lines
along Ridgewood Avenue will be marked in front of your property by the City's
surveying contractor.) The project has been publicly bid and a contractor has been
selected. Please be aware that this project may impact your property and may require
actions on your part. Potential actions for property owners include (1) the removal/
relocating of fencing, (2) the removal/relocating of vegetation, and (3) the redesign of
parking areas. Many of the costs to complete these tasks will be the responsibility of the
property owner.
In general, the City will be constructing new sidewalks (east side of roadway) and a
pedway (west side of roadway) to the legal right-of-way line. Other improvements
include milling/paving of the roadway and the performance of landscaping, irrigation,
and stormwater improvements.
A Public Workshop is scheduled for December 8, 2009 at 6:00 pm at the City
Library Meeting Room to present the project details, present the proposed project
schedule, and discuss actions that may be required of property owners. City staff as
well as staff from the City's contractor and engineering firm for the project will be
present. All property owners along Ridgewood Avenue are urged to attend this important
workshop meeting. Please contact the Public Works Department at the above -listed
number if you have any questions — we look forward to working with City residents on
this project.