HomeMy WebLinkAboutInspection Report.fnlThe following report provides a building permit inspections chronology showing date, type of
inspection and disposition, and in the case of failed inspections, cited codes and any inspector notes.
This report applies to all codes applicable to all permitted construction performed at 304, 306,
314 and 316 Fillmore Avenue.
The Council requested that the former Building Official provide a statement that all necessary inspections were ultimately approved. The Building Official (BO) resigned on April 30,
2024. However, prior to his departure, the former BO stated that a written statement would be
provided to the C&ED Director at the completion of the on-going site improvements as recommended in the Kimley Horn and Associates (KHA) Stormwater Report. While we have not yet recruited a replacement BO, we are currently utilizing the services of JPI, Inc. If the project is
completed prior to the hiring of the replacement BO, JPI will be requested to provide the
statement. If we have hired the replacement BO, then that employee will be asked to provide the statement.
.,Residential New Construction Permit I P21-0273
Property Information
24-37-23-CG-53-10 304 FILLMORE AVE Subdivision:
cape canaveral FL, 32920 Lot: Block:
Name Information
Owner: WITTEKIND ENTERPRISES INC; ABELES, RONALD; BABER E Phone:
Occupant:
Applicant:
Contractor:
Licensee:
License Issued:
License Expires:
Permit Information
ABC Concrete Inc
ABC Concrete Inc
Andre Miguel Baez
10/20/2020
08/31/2024
Date Issued: 03/09/2021
Work Description:
Date Expires: 04/04/2023
NEW CONSTRUCTION -2 Story town homes
Stipulations:
Final -Building Inspection I Michael German
Status: Completed
Scheduled: 10/06/2022 12:00 AM
Comments:
Scheduling Comment AM
Final -Electrical Inspection I Michael German
Status: Completed
Scheduled: 10/06/2022 12:00 AM
Conversion Comment No Conversion Comments
Final -Mechanical Inspection I Michael German
Status: Completed
Scheduled: 10/06/2022 12:00 AM
Conversion Comment No Conversion Comments
Final -Plumbing Inspection I Michael German
Status: Completed
Scheduled: 10/06/2022 12:00 AM
Conversion Comment No Conversion Comments
Final -Building Inspection I JPI
Status: Completed
Scheduled: 09/30/2022 12:00 AM
Comments:
Scheduling Comment AM please
304 Fillmore Ave Building Final (NSFR) FAIL
Phone:
Phone:
Phone:
Phone:
(321) 454-4240
(321) 454-4240
(321) 454-4240
Status: FINALED
Result:
Completed:
Result:
Completed:
Result:
Completed:
Result:
Completed:
Result:
Completed:
Approved
10/06/2022 11:02 AM
Approved
10/06/2022 11:01 AM
Approved
10/06/2022 11:01 AM
Approved
10/06/2022 11:02 AM
Disapproved
10/03/2022 10:59 AM
I identified the following reasons to Disapprove:
1. FBCR 318.5: condensate egress should point down, provide sufficient depth P trap.
2. FBCR M1411.8 Refrigerant valves must have locked refrigerant caps.
3. FBCP 305.1 "corrosion of pipes": copper and other metal pipe (e.g. hose bibs) must be isolated from stucco and other
concrete (max thickness 0.010 inches, e.g. tape)
4. NEC 250.53(A)(2) 2nd ground electrode required min 6 ft apart.
5. FBCB 110.5 No access to indoor. No key in lock box.
Pre-Power Inspection I Richard Mihalich
Status: Completed Result: Approved
Scheduled: 06/09/2022 12:00 AM Completed: 06/09/2022 10:43 AM
Comments:
Scheduling Comment
Inspection Notes
Am inspection for all 4 buildings
Prepower Form Recieved 6-10-22
Inspection Completed On Site 6-9-22
Driveway/Walks Inspection I Michael German
Status: Completed
Scheduled: 04/13/2022 12:00 AM
Comments:
INSPECTION LIMITS Driveway Apron
Sidewalk Driveway Inspection I Michael German
Status: Completed
Scheduled: 04/12/2022 12:00 AM
Comments:
Result:
Completed:
Result:
Completed:
Inspection Notes Sidewalk Pre-Pour Approved, Need to See Apron Pre-Pour.
Window & Door Bucks Inspection I Web Inspector
Status: canceled
Scheduled: 11/16/2021 12:00 AM
Comments:
Scheduling Comment Drywall screw inspection
Drywall Screw Inspection I Michael German
Status: Completed
Scheduled: 11/16/202112:00 AM
Conversion Comment No Conversion Comments
Insulation Inspection I Michael German
Status: Completed
Scheduled: 10/26/202112:00 AM
Comments:
Replace polyiso at plumbing installation areas.
Foam voids around windows and doors.
SlUCCO-LATH Inspection I Michael German
Status: Completed
Scheduled: 10/07/202112:00 AM
Conversion Comment No Conversion Comments
Sewer Connection Inspection I Richard Mihalich
Status: Completed
Scheduled: 09/22/202112:00 AM
Comments:
Sewer tap for entire structure
Result:
Completed:
Result:
Completed:
Result:
Completed:
Result:
Completed:
Result:
Completed:
Approved
04/13/2022 02:33 PM
Approved
04/12/2022 02:02 PM
canceled
11/15/2021 02:03 PM
Approved
11/16/2021 01 :49 PM
Partially Approved
10/26/202111:26 AM
Approved
10/07/202111:15 AM
Approved
09/22/2021 09:35 AM
Scheduling Comment
INSPECTION NOTES UNDERGROUND EXTERIOR DRAIN PIPING FOR ALL FOUR UNITS
Rough -Mechanical Inspection I Richard Mihalich
Status: Completed Result: Approved
Scheduled: 09/20/202112:00 AM Completed: 09/20/2021 08:35 AM
Comments:
AM PLEASE
Rough -Electrical Inspection I Richard Mihalich
Status: Completed Result: Approved
Scheduled: 09/20/2021 12:00 AM Completed: 09/20/2021 08:34 AM
Comments:
AM PLEASE
Rough Plumbing Inspection I Richard Mihalich
Status: Completed
Scheduled: 09/20/202112:00 AM
Comments:
AM PLEASE
Framing Inspection I Richard Mihalich
Status: Completed
Scheduled: 08/04/2021 12:00 AM
Conversion Comment No Conversion Comments
Framing Inspection I Michael German
Status: Completed
Scheduled: 07/27/202112:00 AM
Comments:
Scheduling Comment am
2ND FLOOR ROOF TRUSS INSPECTION ONLY
Dry-In/Flashing Inspection I Richard Mihalich
Status: Completed
Scheduled: 07/23/202112:00 AM
Comments:
Scheduling Comment AM
Framing Inspection I Michael German
Status: Completed
Scheduled: 07/22/202112:00 AM
Comments:
Scheduling Comment AM
Result:
Completed:
Result:
Completed:
Result:
Completed:
Result:
Completed:
Result:
Completed:
Approved
09/20/2021 08:34 AM
Approved
08/04/2021 09:22 AM
Approved
07/27/2021 02:47 PM
Approved
07/23/2021 09:26 AM
Disapproved
07/22/2021 03:12 PM
TRUSS PACKAGE NOT ON SITE, WINDOWS AND DOORS NOT INSTALLED
Roof/Sidewall Sheating Inspection I Michael German
Status:
Scheduled:
Comments:
Completed
07/14/202112:00 AM
Result: Approved
Completed: 07/14/2021 02:33 PM
AM PLEASE SOMEONE WILL BE AVAILABLE ON SITE FROM 8 AM TO NOON
Roof/Sidewall Sheating Inspection I Richard Mihalich
Status:
Scheduled:
Comments:
canceled
07/13/202112:00 AM
AM PLEASE
Result: canceled
Completed: 07/13/2021 09:11 AM
NAILING AFFIDAVIT PLEASE PROVIDE A COMPLETED ROOF AND SHEATHING AFFIDAVIT FOR THIS INSPECTION
Framing Inspection I Richard Mihalich
Status: Completed
Scheduled: 07/06/202112:00 AM
Comments:
Scheduling Comment Bottom Plate Tiedown
Framing Inspection I Derek Yossifon
Status: Completed
Scheduled: 07/06/202112:00 AM
Comments:
Result:
Completed:
Result:
Completed:
Approved
07/06/2021 08:27 AM
Approved
07/06/202112:21 PM
Drywall screw IST LAYER OF FIREWALL AT THE TRUSSES
Lintel Inspection I Richard Mihalich
Status: Completed
Scheduled: 06/18/202112:00 AM
Comments:
Scheduling Comment AM
Lintel Inspection I Richard Mihalich
Status: Completed
Scheduled: 05/13/202112:00 AM
Comments:
AM PLEASE
SOIL TREATMENT Inspection I Michael German
Status:
Scheduled:
Completed
03/23/2021 12:00 AM
Conversion Comment No Conversion Comments
SLAB Inspection I Richard Mihalich
Status: Completed
Scheduled: 03/22/202112:00 AM
Comments:
INSPECTION LIMITS 1. NEED FORMBOARD SURVEY
Result:
Completed:
Result:
Completed:
Result:
Completed:
Result:
Completed:
2. NEED TERMITE TREATMENT CERTIFICATION
3. NEED COMPACTION RESULTS
Rough -Plumbing Inspection I Richard Mihalich
Status: Completed
Scheduled: 03/10/2021 12:00 AM
Comments:
AM PLEASE
Fee Information
Standard Item
Standard Item
Standard Item
Standard Item
Standard Item
Standard Item
Impact
State Surcharge
Impact
Impact
Impact
Impact
Impact
Standard Item
Impact
Standard Item
Permit Valuation Fee
Plan Review Income
New -Electrical -Single Family
New -Plumbing
New -Mechanical -Residential
Fire Plan Review
Impact Fee -Concurrency Mngt. Fees
2.5 Percent
Impact Fee -Fire/Rescue
Impact Fee -General Government
Impact Fee -Library
Impact Fee -Police
Impact Fee -Parks/Recreation
Sewer Tap Inspection
Impact Fee -Sewer
Certificate Of Occupancy
Result:
Completed:
Approved
06/18/2021 09:31 AM
Approved
05/13/2021 08:49 AM
Approved
03/23/202111:13 AM
Approved
03/22/2021 09:34 AM
Approved
03/10/202110:03 AM
175,000.00
175,000.00
1.00
2.50
1.00
37.50
1.00
1.00
74.39
1.00
1.00
1.00
1.00
1.00
1.00
1.00
943.50
471.75
110.00
175.00
85.00
37.50
100.00
45.01
74.39
105.71
80.03
128.29
151.55
25.00
1,348.80
50.00
:Residential New Construction Permit I P21-0274
Property Information
24-37-23-CG-53-10 314 FILLMORE AVE Subdivision:
cape canaveral FL, 32920 Lot: Block:
Name Information
Owner: WITTEKIND ENTERPRISES INC; ABELES, RONALD; BABER E Phone:
Occupant: Phone:
Applicant:
Contractor:
Licensee:
ABC Concrete Inc
ABC Concrete Inc
Andre Miguel Baez
10/20/2020
08/31/2024
Phone:
Phone:
Phone:
(321) 454-4240
(321) 454-4240
(321) 454-4240
License Issued:
License Expires:
Permit Information
Date Issued: 03/09/2021 Date Expires: 01/10/2023 Status: FINALED
Work Description:
new construction -2 story town homes
Stipulations:
Final -Building Inspection I Richard Mihalich
Status: Completed Result: Approved
Scheduled: 07/14/2022 12:00 AM Completed: 07/14/2022 03:03 PM
Comments:
Scheduling Comment AM
Inspection Notes Items needed and discussed at meeeting:
Power not on, cannot check electrical. Ron to advise when this is ready.
Plumbing 95% complete.
AC's not complete, need completed and started.
Misc Finishes in units not complete (kithen and bath misc trims)
Inspection Notes
Ron is to advise the bldg dept. when the svstems are complete and functioning, so we can complete the inspections.
Conditional CO Issued
Need to Correct 2nd Floor Bedroom Window Elevation. R310.2.2
Need to Submit As Built w/ Setback Dimensions.
Pre-Power Inspection I Richard Mihalich
Status: Completed
Scheduled: 06/09/2022 12:00 AM
Comments:
Inspection Notes
Am inspection for all 4 buildings
Prepower Form Recieved 6-10-22
Inspection Completed On Site 6-9-22
Driveway/Walks Inspection I Michael German
Status: Completed
Scheduled: 04/13/2022 12:00 AM
Comments:
INSPECTION LIMITS Driveway Apron
Sidewalk Driveway Inspection I Michael German
Status: Completed
Scheduled: 04/12/2022 12:00 AM
Comments:
Result:
Completed:
Result:
Completed:
Result:
Completed:
Inspection Notes Sidewalk Pre-Pour Approved, Need to See Apron Pre-Pour.
Approved
06/09/2022 10:43 AM
Approved
04/13/2022 02:35 PM
Approved
04/12/2022 02:05 PM
Insulation Inspection I Web Inspector
Status: canceled
Scheduled: 11/16/2021 12:00 AM
Comments:
Scheduling Comment Drywall screw inspection
Drywall Screw Inspection I Michael German
Status: Completed
Scheduled: 11/16/202112:00 AM
Conversion Comment No Conversion Comments
Insulation Inspection I Michael German
Status: Completed
Scheduled: 10/26/2021 12:00 AM
Comments:
Replace polyiso at plumbing installation areas.
Foam voids around windows and doors.
Rough -Mechanical Inspection I Richard Mihalich
Status: Completed
Scheduled: 09/20/2021 12:00 AM
Comments:
AM PLEASE
Rough -Electrical Inspection I Richard Mihalich
Status: Completed
Scheduled: 09/20/202112:00 AM
Comments:
AM PLEASE
Rough -Plumbing Inspection I Richard Mihalich
Status: Completed
Scheduled: 09/20/202112:00 AM
Comments:
AM PLEASE
Framing Inspection I Richard Mihalich
Status: Completed
Scheduled: 08/04/2021 12:00 AM
Conversion Comment No Conversion Comments
Framing Inspection I Michael German
Status: Completed
Scheduled: 07/27/202112:00 AM
Comments:
Scheduling Comment am
2ND FLOOR ROOF TRUSS INSPECTION ONLY
Dry-In/Flashing Inspection I Richard Mihalich
Status:
Scheduled:
Comments:
Completed
07/23/2021 12:00 AM
Scheduling Comment AM
Framing Inspection I Michael German
Status: Completed
Scheduled: 07/22/202112:00 AM
Result: canceled
Completed: 11/15/2021 02:04 PM
Result: Approved
Completed: 11/16/2021 01:50 PM
Result:
Completed:
Result:
Completed:
Result:
Completed:
Result:
Completed:
Result:
Completed:
Result:
Completed:
Result:
Completed:
Result:
Completed:
Partially Approved
10/26/202111:27 AM
Approved
09/20/2021 08:34 AM
Approved
09/20/2021 08:34 AM
Approved
09/20/2021 08:34 AM
Approved
08/04/2021 09:21 AM
Approved
07/27/2021 02:46 PM
Approved
07/23/2021 09:26 AM
Disapproved
07/22/2021 03:11 PM
Comments:
Scheduling Comment am
TRUSS PACKAGE NOT ON SITE, WINDOWS AND DOORS NOT INSTALLED
Roof/Sidewall Sheating Inspection I Michael German
Status: Completed Result: Approved
Scheduled: 07/14/202112:00 AM Completed: 07/14/2021 02:32 PM
Comments:
AM PLEASE. SOMEONE WILL BE ON SITE FROM 8 AM TO NOON
Roof/Sidewall Sheating Inspection I Richard Mihalich
Status: canceled Result: canceled
Scheduled: 07/13/202112:00 AM Completed: 07/13/2021 09:13 AM
Comments:
AM PLEASE
PROVIDE AN AFFIDAVIT PLEASE PROVIDE A COMPLETED ROOF AND SHEATHING AFFIDAVIT FOR THIS INSPECTION
Framing Inspection I Richard Mihalich
Status: Completed
Scheduled: 07/06/202112:00 AM
Comments:
Scheduling Comment Bottom Plate Tiedown
Framing Inspection I Derek Yossifon
Status: Completed
Scheduled: 07/06/202112:00 AM
Comments:
Drywall screw IST LA YER OF FIREWALL AT THE TRUSSES
Lintel Inspection I Richard Mihalich
Status: Completed
Scheduled: 06/18/2021 12:00 AM
Comments:
Scheduling Comment AM
Lintel Inspection I Richard Mihalich
Status: Completed
Scheduled: 05/13/2021 12:00 AM
Comments:
AM PLEASE
SLAB Inspection I Richard Mihalich
Status:
Scheduled:
Comments:
Completed
03/22/2021 12:00 AM
Scheduling Comment AM
INSPECTION LIMITS 1. NEED FORMBOARD SURVEY
Result:
Completed:
Result:
Completed:
Result:
Completed:
Result:
Completed:
Result:
Completed:
2. NEED TERMITE TREATMENT CERTIFICATION
3. NEED COMPACTION RESULTS
Rough -Plumbing Inspection I Richard Mihalich
Status: Completed Result:
Scheduled: 03/10/2021 12:00 AM Completed:
Comments:
AM PLEASE
Fee Information
Approved
07/06/2021 08:27 AM
Approved
07/06/202112:19 PM
Approved
06/18/2021 09:31 AM
Approved
05/13/2021 08:48 AM
Approved
03/22/2021 09:34 AM
Approved
03/10/202110:03 AM
Standard Item Permit Valuation Fee 175,000.00 943.50
Standard Item Plan Review Income 175,000.00 471.75
Standard Item New -Electrical -Single Family 1.00 110.00
Standard Item New -Mechanical -Residential 1.00 85.00
Standard Item New -Plumbing 2.50 175.00
Standard Item Fire Plan Review 37.50 37.50
Impact Impact Fee -Concurrency Mngt. Fees 1.00 100.00
State Surcharge 2.5 Percent 1.00 45.01
Impact Impact Fee -Fire/Rescue 74.39 74.39
Impact Impact Fee -Library 1.00 80.03
Impact Impact Fee -General Government 1.00 105.71
Impact Impact Fee -Parks/Recreation 1.00 151.55
Impact Impact Fee -Police 1.00 128.29
Standard Item Sewer Tap Inspection 1.00 25.00
Impact Impact Fee -Sewer 1.00 1,348.80
Standard Item Certificate Of Occupancy 1.00 50.00
!,Building Permit I Pl0-1455
Property Information
24-37-23-CG-53-10 306 FILLMORE AVE Subdivision:
cape canaveral FL, 32920 Lot: Block:
Name Information
Owner: WITTEKIND ENTERPRISES INC; ABELES, RONALD; PARASM Phone:
Occupant:
Applicant:
Contractor:
Licensee:
ABC Concrete Inc
ABC Concrete Inc
Andre Miguel Baez
License Issued: 10/20/2020
License Expires: 08/31/2024
Permit Information
Date Issued: 03/09/2021
Work Description:
New construction 2 story town homes
Stipulations:
Final -Building Inspection I Michael German
Status: Completed
Scheduled: 10/06/2022 12:00 AM
Comments:
Scheduling Comment AM
Date Expires: 04/04/2023
Final -Electrical Inspection I Michael German
Status: Completed
Scheduled: 10/06/2022 12:00 AM
Conversion Comment No Conversion Comments
Final -Mechanical Inspection I Michael German
Status: Completed
Scheduled: 10/06/2022 12:00 AM
Conversion Comment No Conversion Comments
Final -Plumbing Inspection I Michael German
Status: Completed
Scheduled: 10/06/2022 12:00 AM
Conversion Comment No Conversion Comments
Final -Building Inspection I JPI
Status: Completed
Scheduled: 09/30/2022 12:00 AM
Comments:
Scheduling Comment AM
Phone:
Phone:
Phone:
Phone:
(321) 454-4240
(321) 454-4240
(321) 454-4240
Status: FINALED
Result:
Completed:
Result:
Completed:
Result:
Completed:
Result:
Completed:
Result:
Completed:
Approved
10/06/2022 11:12 AM
Approved
10/06/2022 11: 11 AM
Approved
10/06/2022 11:11 AM
Approved
10/06/2022 11:11 AM
Disapproved
10/03/2022 10:58 AM
I identified the following reasons to Disapprove:
1.FBCB 107.3.1 seal all unused outdoor penetrations (e.g. old condensate etc) against pest intrusion OR properly terminate
any outdoor piping.
2. FBCR 318.5: condensate egress should point down, provide sufficient depth P trap.
3. FBCR M1411.8 Refrigerant valves must have locked refrigerant caps.
4. FBCP 305.1 "corrosion of pipes": copper and other metal pipe (e.g. hose bibs) must be isolated from stucco and other
concrete (max thickness 0.010 inches, e.g. tape)
5. NEC 250.53(A)(2) 2nd ground electrode required min 6 ft apart.
6. FBCB 107.3.1, FBCR 302.11 Seal AH duct to unconditioned attic.
7. FBCB 107.3.1 AC vent register missing.
8. NEC 362.48 dryer receptacle unfinished.
Pre-Power Inspection I Richard Mihalich
Status: Completed
Scheduled: 06/09/2022 12:00 AM
Comments:
Inspection Notes
Am inspection for all 4 buildings
Prepower Form Recieved 6-10-22
Inspection Completed On Site 6-9-22
Driveway/Walks Inspection I Michael German
Status: Completed
Scheduled: 04/13/2022 12:00 AM
Comments:
INSPECTION LIMITS Driveway Apron
Sidewalk Driveway Inspection I Michael German
Status: Completed
Scheduled: 04/12/2022 12:00 AM
Comments:
Result:
Completed:
Result:
Completed:
Result:
Completed:
Inspection Notes Sidewalk Pre-Pour Approved, Need to See Apron Pre-Pour.
Insulation Inspection I Web Inspector
Status: Canceled
Scheduled: 11/16/202112:00 AM
Comments:
Scheduling Comment Drywall screw inspection
Drywall screw Inspection I Michael German
Status:
Scheduled:
Completed
11/16/2021 12:00 AM
Conversion Comment No Conversion Comments
Insulation Inspection I Michael German
Status: Completed
Scheduled: 10/26/202112:00 AM
Comments:
Replace polyiso at plumbing installation areas.
Foam voids around windows and doors.
STUCCO-LATH Inspection I Michael German
Status: Completed
Scheduled: 10/07/202112:00 AM
Conversion Comment No Conversion Comments
Rough -Mechanical Inspection I Richard Mihalich
Status: Completed
Scheduled: 09/20/202112:00 AM
Comments:
AM PLEASE
Rough -Electrical Inspection I Richard Mihalich
Status: Completed
Scheduled: 09/20/2021 12:00 AM
Conversion Comment No Conversion Comments
Rough -Plumbing Inspection I Richard Mihalich
Status: Completed
Scheduled: 09/20/2021 12:00 AM
Result:
Completed:
Result:
Completed:
Result:
Completed:
Result:
Completed:
Result:
Completed:
Result:
Completed:
Result:
Completed:
Approved
06/09/2022 10:43 AM
Approved
04/13/2022 02:34 PM
Approved
04/12/2022 02:04 PM
Canceled
11/15/2021 02:03 PM
Approved
11/16/2021 01:49 PM
Partially Approved
10/26/202111:28 AM
Approved
10/07/202111:15 AM
Approved
09/20/2021 08:33 AM
Approved
09/20/2021 08:34 AM
Approved
09/20/2021 08:33 AM
Conversion Comment No Conversion Comments
Framing Inspection I Richard Mihalich
Status: Completed
Scheduled: 08/04/2021 12:00 AM
Conversion Comment No Conversion Comments
Framing Inspection I Michael German
Status: Completed
Scheduled: 07/27/202112:00 AM
Comments:
Scheduling Comment am
2ND FLOOR ROOF TRUSS INSPECTION ONLY
Dry-In/Flashing Inspection I Richard Mihalich
Status: Completed
Scheduled: 07/23/202112:00 AM
Comments:
Scheduling Comment AM
Framing Inspection I Michael German
Status: Completed
Scheduled: 07/22/202112:00 AM
Comments:
Scheduling Comment AM
Result: Approved
Completed: 08/04/2021 09:22 AM
Result: Approved
Completed: 07/27/2021 02:46 PM
Result:
Completed:
Result:
Completed:
Approved
07/23/2021 09:25 AM
Disapproved
07/22/2021 03:11 PM
TRUSS PACKAGE NOT ON SITE, WINDOWS AND DOORS NOT INSTALLED
Roof/Sidewall Sheating Inspection I Michael German
Status: Completed Result: Approved
Scheduled: 07/14/2021 12:00 AM Completed: 07/14/2021 02:33 PM
Comments:
AM PLEASE. SOMEONE WILL BE AVAILABLE ON SITE FROM 8 AM TO NOON
Roof/Sidewall Sheating Inspection I Richard Mihalich
Status: canceled Result: Canceled
Scheduled: 07/13/202112:00 AM Completed: 07/13/2021 09:13 AM
Comments:
AM PLEASE
PROVID AN AFFIDAVIT PLEASE PROVIDE A COMPLETED ROOF AND SHEATHING AFFIDAVIT FOR THIS INSPECTION
Framing Inspection I Richard Mihalich
Status: Completed Result: Approved
Scheduled: 07/06/202112:00 AM Completed: 07/06/2021 08:27 AM
Comments:
Scheduling Comment Bottom Plate Tiedown
Framing Inspection I Derek Yossifon
Status: Completed Result: Approved
Scheduled: 07/06/202112:00 AM Completed: 07/06/2021 12:21 PM
Comments:
Drywall screw IST LAYER OF FIREWALL AT THE TRUSSES
Lintel Inspection I Richard Mihalich
Status: Completed Result: Approved
Scheduled: 06/18/202112:00 AM Completed: 06/18/2021 09:31 AM
Comments:
Scheduling Comment AM please
Lintel Inspection I Richard Mihalich
Status: Completed Result:
Scheduled: 05/13/202112:00 AM Completed:
Comments:
AM PLEASE
SOIL lREATMENT Inspection I Michael German
Status: Completed Result:
Scheduled: 03/23/2021 12:00 AM Completed:
Conversion Comment No Conversion Comments
SLAB Inspection I Richard Mihalich
Status: Completed Result:
Scheduled: 03/22/202112:00 AM Completed:
Comments:
INSPECTION LIMITS 1. NEED FORMBOARD SURVEY
2. NEED TERMITE lREATMENT CERTIFICATION
3. NEED COMPACTION RESULTS
Rough ·• Plumbing Inspection I Richard Mihalich
Status: Completed
Scheduled: 03/10/2021 12:00 AM
Comments:
AM PLEASE
'Fee Information
Standard Item
Standard Item
Standard Item
Standard Item
Standard Item
Standard Item
Impact
State Surcharge
Impact
Impact
Impact
Impact
Impact
Impact
Standard Item
Standard Item
Permit Valuation Fee
Plan Review Income
New -Electrical -Single Family
New -Plumbing
New -Mechanical -Residential
Fire Plan Review
Impact Fee -Concurrency Mngt. Fees
2.5 Percent
Impact Fee -Fire/Rescue
Impact Fee -General Government
Impact Fee -Library
Impact Fee -Parks/Recreation
Impact Fee -Police
Impact Fee -Sewer
Sewer Tap Inspection
Certificate Of Occupancy
Result:
Completed:
Approved
05/13/2021 08:50 AM
Approved
03/23/202111:15 AM
Approved
03/22/2021 09:33 AM
Approved
03/10/2021 10:04 AM
17S,00O.00
175,000.00
1.00
2.50
1.00
37.50
1.00
1.00
74.39
105.71
80.03
151.55
128.29
1,348.80
1.00
1.00
943.50
471.75
110.00
175.00
85.00
37.50
100.00
45.01
74.39
105.71
80.03
151.55
128.29
1,348.80
25.00
50.00
LR,esidential New Construction Permit I P21-0275
.Property Information
24-37-23-CG-53-10
1·Name Information
Owner:
Occupant:
Applicant:
Contractor:
Licensee:
License Issued:
License Expires:
Permit Information
316 FILLMORE AVE Subdivision:
cape canaveral FL, 32920 Lot:
WTTTEKIND ENTERPRISES INC; ABELES, RONALD; BABER E Phone:
ABC Concrete Inc
ABC Concrete Inc
Andre Miguel Baez
10/20/2020
08/31/2024
Phone:
Phone:
Phone:
Phone:
AVON BY THE SEA
10, 11, 12 Block:
(321) 454-4240
(321) 454-4240
(321) 454-4240
Date Issued: 03/09/2021 Date Expires: 01/10/2023 Status: FINALED
Work Description:
NEW CONSTRUCTION -2 story town homes
Stipulations:
Final -Building Inspection I Michael German
Status: Completed Result: Approved
Scheduled: 07/14/2022 12:00 AM Completed: 07/14/2022 04:39 PM
Comments:
Scheduling Comment
Inspection Notes
AM
Items needed and discussed at meeeting:
Power not on, cannot check electrical. Ron to advise when this is ready.
Plumbing 95% complete.
AC's not complete, need completed and started.
Misc Finishes in units not complete (kithen and bath misc trims)
53
Inspection Notes
Ron is to advise the bldg dept. when the systems are complete and functioning, so we can complete the inspections.
Conditional CO Issued
Need to Correct 2nd Floor Bedroom Window Elevation. R310.2.2
Need to Submit As Built w/ Setback Dimensions.
Pre-Power Inspection I Richard Mihalich
Status: Completed
Scheduled: 06/09/2022 12:00 AM
Comments:
Inspection Notes
Am inspection for all 4 buildings
Prepower Form Recieved 6-10-22
Inspection Completed On Site 6-9-22
Driveway/Walks Inspection I Michael German
Status: Completed
Scheduled: 04/13/2022 12:00 AM
Comments:
INSPECTION LIMITS Driveway Apron
Sidewalk Driveway Inspection I Michael German
Status: Completed
Scheduled: 04/12/2022 12:00 AM
Comments:
Result:
Completed:
Result:
Completed:
Result:
Completed:
Inspection Notes Sidewalk Pre-Pour Approved, Need to See Apron Pre-Pour.
Approved
06/09/2022 10:43 AM
Approved
04/13/2022 02:36 PM
Approved
04/12/2022 02:07 PM
Insulation Inspection I Web Inspector
Status: canceled
Scheduled: 11/16/2021 12:00 AM
Comments:
Scheduling Comment Drywall screw inspection
Drywall Screw Inspection I Michael German
Status: Completed
Scheduled: 11/16/2021 12:00 AM
Conversion Comment No Conversion Comments
Insulation Inspection I Michael German
Status: Completed
Scheduled: 10/26/2021 12:00 AM
Comments:
Replace polyiso at plumbing installation areas.
Foam voids around windows and doors.
Rough -Mechanical Inspection I Richard Mihalich
Status: Completed
Scheduled: 09/20/2021 12:00 AM
Comments:
AM PLEASE
Rough -Electrical Inspection I Richard Mihalich
Status: Completed
Scheduled: 09/20/2021 12:00 AM
Conversion Comment No Conversion Comments
Rough -Plumbing Inspection I Richard Mihalich
Status: Completed
Scheduled: 09/20/2021 12:00 AM
Conversion Comment No Conversion Comments
Framing Inspection I Richard Mihalich
Status: Completed
Scheduled: 08/04/2021 12:00 AM
Conversion Comment No Conversion Comments
Framing Inspection I Michael German
Status: Completed
Scheduled: 07/27/202112:00 AM
Comments:
Scheduling Comment am
2ND FLOOR ROOF lRUSS INSPECTION ONLY
Dry-In/Flashing Inspection I Richard Mihalich
Status: Completed
Scheduled: 07/23/202112:00 AM
Comments:
Scheduling Comment AM
Framing Inspection I Michael German
Status: Completed
Scheduled: 07/22/202112:00 AM
Comments:
Scheduling Comment AM
Result:
Completed:
Result:
Completed:
Result:
Completed:
Result:
Completed:
Result:
Completed:
Result:
Completed:
Result:
Completed:
Result:
Completed:
Result:
Completed:
Result:
Completed:
canceled
11/15/2021 02:05 PM
Approved
11/16/2021 01:49 PM
Partially Approved
10/26/202111:26 AM
Approved
09/20/2021 08:33 AM
Approved
09/20/2021 08:33 AM
Approved
09/20/2021 08:33 AM
Approved
08/04/2021 09:22 AM
Approved
07/27/2021 02:47 PM
Approved
07/23/2021 09:26 AM
Disapproved
07/22/2021 03:12 PM
lRUSS PACKAGE NOT ON SITE, WINDOWS AND DOORS NOT INSTALLED
Roof/Sidewall Sheating Inspection I Michael German
Status: Completed Result: Approved
Scheduled: 07/14/202112:00 AM Completed: 07/14/2021 02:32 PM
Comments:
AM PLEASE. SOMEONE WILL BE AVAILABLE ON SITE FROM 8 AM TO NOON
Roof/Sidewall Sheating Inspection I Richard Mihalich
Status: canceled Result: canceled
Scheduled: 07/13/202112:00 AM Completed: 07/13/2021 09:12 AM
Comments:
AM PLEASE
PRIVIDE AN AFFIDAVIT PLEASE PROVIDE A COMPLETED ROOF AND SHEATHING AFFIDAVIT FOR THIS INSPECTION
Framing Inspection I Richard Mihalich
Status: Completed Result:
Scheduled: 07/06/202112:00 AM Completed:
Comments:
Scheduling Comment Bottom Plate Tiedown
Framing Inspection I Derek Yossifon
Status: Completed Result:
Scheduled: 07/06/202112:00 AM Completed:
Comments:
Drywall screw IST LA YER OF FIREWALL AT THE lRUSSES
Lintel Inspection I Richard Mihalich
Status: Completed Result:
Scheduled: 06/18/2021 12:00 AM Completed:
Comments:
Scheduling Comment am
Lintel Inspection I Richard Mihalich
Status: Completed Result:
Scheduled: 05/13/2021 12:00 AM Completed:
Comments:
AM PLEASE
SLAB Inspection I Richard Mihalich
Status: Completed Result:
Scheduled: 03/22/202112:00 AM Completed:
Comments:
INSPECTION LIMITS 1. NEED FORMBOARD SURVEY
2. NEED TERMITE lREATMENT CERTIFICATION
3. NEED COMPACTION RESULTS
Rough -Plumbing Inspection I Richard Mihalich
Status: Completed
Scheduled: 03/10/202112:00 AM
Comments:
AM PLEASE
Fee Information
Standard Item
Standard Item
Standard Item
Permit Valuation Fee
Plan Review Income
New -Electrical -Single Family
Result:
Completed:
Approved
07/06/2021 08:27 AM
Approved
07/06/202112:20 PM
Approved
06/18/2021 09:31 AM
Approved
05/13/2021 08:49 AM
Approved
03/22/2021 09:33 AM
Approved
03/10/2021 10:04 AM
175,000.00
175,000.00
1.00
943.50
471.75
110.00
Standard Item New -Plumbing 2.50 175.00
Standard Item New -Mechanical -Residential 1.00 85.00
Standard Item Fire Plan Review 37.50 37.50
Impact Impact Fee -Concurrency Mngt. Fees 1.00 100.00
State Surcharge 2.5 Percent 1.00 45.01
Impact Impact Fee -Fire/Rescue 74.39 74.39
Impact Impact Fee -Library 1.00 80.03
Impact Impact Fee -General Government 1.00 105.71
Impact Impact Fee -Parks/Recreation 1.00 151.55
Impact Impact Fee -Police 1.00 128.29
Impact Impact Fee -Sewer 1.00 1,348.80
Standard Item Sewer Tap Inspection 1.00 25.00
Standard Item Certificate Of Occupancy 1.00 50.00