Loading...
HomeMy WebLinkAboutInspection Report.fnlThe following report provides a building permit inspections chronology showing date, type of inspection and disposition, and in the case of failed inspections, cited codes and any inspector notes. This report applies to all codes applicable to all permitted construction performed at 304, 306, 314 and 316 Fillmore Avenue. The Council requested that the former Building Official provide a statement that all necessary inspections were ultimately approved. The Building Official (BO) resigned on April 30, 2024. However, prior to his departure, the former BO stated that a written statement would be provided to the C&ED Director at the completion of the on-going site improvements as recommended in the Kimley Horn and Associates (KHA) Stormwater Report. While we have not yet recruited a replacement BO, we are currently utilizing the services of JPI, Inc. If the project is completed prior to the hiring of the replacement BO, JPI will be requested to provide the statement. If we have hired the replacement BO, then that employee will be asked to provide the statement. .,Residential New Construction Permit I P21-0273 Property Information 24-37-23-CG-53-10 304 FILLMORE AVE Subdivision: cape canaveral FL, 32920 Lot: Block: Name Information Owner: WITTEKIND ENTERPRISES INC; ABELES, RONALD; BABER E Phone: Occupant: Applicant: Contractor: Licensee: License Issued: License Expires: Permit Information ABC Concrete Inc ABC Concrete Inc Andre Miguel Baez 10/20/2020 08/31/2024 Date Issued: 03/09/2021 Work Description: Date Expires: 04/04/2023 NEW CONSTRUCTION -2 Story town homes Stipulations: Final -Building Inspection I Michael German Status: Completed Scheduled: 10/06/2022 12:00 AM Comments: Scheduling Comment AM Final -Electrical Inspection I Michael German Status: Completed Scheduled: 10/06/2022 12:00 AM Conversion Comment No Conversion Comments Final -Mechanical Inspection I Michael German Status: Completed Scheduled: 10/06/2022 12:00 AM Conversion Comment No Conversion Comments Final -Plumbing Inspection I Michael German Status: Completed Scheduled: 10/06/2022 12:00 AM Conversion Comment No Conversion Comments Final -Building Inspection I JPI Status: Completed Scheduled: 09/30/2022 12:00 AM Comments: Scheduling Comment AM please 304 Fillmore Ave Building Final (NSFR) FAIL Phone: Phone: Phone: Phone: (321) 454-4240 (321) 454-4240 (321) 454-4240 Status: FINALED Result: Completed: Result: Completed: Result: Completed: Result: Completed: Result: Completed: Approved 10/06/2022 11:02 AM Approved 10/06/2022 11:01 AM Approved 10/06/2022 11:01 AM Approved 10/06/2022 11:02 AM Disapproved 10/03/2022 10:59 AM I identified the following reasons to Disapprove: 1. FBCR 318.5: condensate egress should point down, provide sufficient depth P trap. 2. FBCR M1411.8 Refrigerant valves must have locked refrigerant caps. 3. FBCP 305.1 "corrosion of pipes": copper and other metal pipe (e.g. hose bibs) must be isolated from stucco and other concrete (max thickness 0.010 inches, e.g. tape) 4. NEC 250.53(A)(2) 2nd ground electrode required min 6 ft apart. 5. FBCB 110.5 No access to indoor. No key in lock box. Pre-Power Inspection I Richard Mihalich Status: Completed Result: Approved Scheduled: 06/09/2022 12:00 AM Completed: 06/09/2022 10:43 AM Comments: Scheduling Comment Inspection Notes Am inspection for all 4 buildings Prepower Form Recieved 6-10-22 Inspection Completed On Site 6-9-22 Driveway/Walks Inspection I Michael German Status: Completed Scheduled: 04/13/2022 12:00 AM Comments: INSPECTION LIMITS Driveway Apron Sidewalk Driveway Inspection I Michael German Status: Completed Scheduled: 04/12/2022 12:00 AM Comments: Result: Completed: Result: Completed: Inspection Notes Sidewalk Pre-Pour Approved, Need to See Apron Pre-Pour. Window & Door Bucks Inspection I Web Inspector Status: canceled Scheduled: 11/16/2021 12:00 AM Comments: Scheduling Comment Drywall screw inspection Drywall Screw Inspection I Michael German Status: Completed Scheduled: 11/16/202112:00 AM Conversion Comment No Conversion Comments Insulation Inspection I Michael German Status: Completed Scheduled: 10/26/202112:00 AM Comments: Replace polyiso at plumbing installation areas. Foam voids around windows and doors. SlUCCO-LATH Inspection I Michael German Status: Completed Scheduled: 10/07/202112:00 AM Conversion Comment No Conversion Comments Sewer Connection Inspection I Richard Mihalich Status: Completed Scheduled: 09/22/202112:00 AM Comments: Sewer tap for entire structure Result: Completed: Result: Completed: Result: Completed: Result: Completed: Result: Completed: Approved 04/13/2022 02:33 PM Approved 04/12/2022 02:02 PM canceled 11/15/2021 02:03 PM Approved 11/16/2021 01 :49 PM Partially Approved 10/26/202111:26 AM Approved 10/07/202111:15 AM Approved 09/22/2021 09:35 AM Scheduling Comment INSPECTION NOTES UNDERGROUND EXTERIOR DRAIN PIPING FOR ALL FOUR UNITS Rough -Mechanical Inspection I Richard Mihalich Status: Completed Result: Approved Scheduled: 09/20/202112:00 AM Completed: 09/20/2021 08:35 AM Comments: AM PLEASE Rough -Electrical Inspection I Richard Mihalich Status: Completed Result: Approved Scheduled: 09/20/2021 12:00 AM Completed: 09/20/2021 08:34 AM Comments: AM PLEASE Rough Plumbing Inspection I Richard Mihalich Status: Completed Scheduled: 09/20/202112:00 AM Comments: AM PLEASE Framing Inspection I Richard Mihalich Status: Completed Scheduled: 08/04/2021 12:00 AM Conversion Comment No Conversion Comments Framing Inspection I Michael German Status: Completed Scheduled: 07/27/202112:00 AM Comments: Scheduling Comment am 2ND FLOOR ROOF TRUSS INSPECTION ONLY Dry-In/Flashing Inspection I Richard Mihalich Status: Completed Scheduled: 07/23/202112:00 AM Comments: Scheduling Comment AM Framing Inspection I Michael German Status: Completed Scheduled: 07/22/202112:00 AM Comments: Scheduling Comment AM Result: Completed: Result: Completed: Result: Completed: Result: Completed: Result: Completed: Approved 09/20/2021 08:34 AM Approved 08/04/2021 09:22 AM Approved 07/27/2021 02:47 PM Approved 07/23/2021 09:26 AM Disapproved 07/22/2021 03:12 PM TRUSS PACKAGE NOT ON SITE, WINDOWS AND DOORS NOT INSTALLED Roof/Sidewall Sheating Inspection I Michael German Status: Scheduled: Comments: Completed 07/14/202112:00 AM Result: Approved Completed: 07/14/2021 02:33 PM AM PLEASE SOMEONE WILL BE AVAILABLE ON SITE FROM 8 AM TO NOON Roof/Sidewall Sheating Inspection I Richard Mihalich Status: Scheduled: Comments: canceled 07/13/202112:00 AM AM PLEASE Result: canceled Completed: 07/13/2021 09:11 AM NAILING AFFIDAVIT PLEASE PROVIDE A COMPLETED ROOF AND SHEATHING AFFIDAVIT FOR THIS INSPECTION Framing Inspection I Richard Mihalich Status: Completed Scheduled: 07/06/202112:00 AM Comments: Scheduling Comment Bottom Plate Tiedown Framing Inspection I Derek Yossifon Status: Completed Scheduled: 07/06/202112:00 AM Comments: Result: Completed: Result: Completed: Approved 07/06/2021 08:27 AM Approved 07/06/202112:21 PM Drywall screw IST LAYER OF FIREWALL AT THE TRUSSES Lintel Inspection I Richard Mihalich Status: Completed Scheduled: 06/18/202112:00 AM Comments: Scheduling Comment AM Lintel Inspection I Richard Mihalich Status: Completed Scheduled: 05/13/202112:00 AM Comments: AM PLEASE SOIL TREATMENT Inspection I Michael German Status: Scheduled: Completed 03/23/2021 12:00 AM Conversion Comment No Conversion Comments SLAB Inspection I Richard Mihalich Status: Completed Scheduled: 03/22/202112:00 AM Comments: INSPECTION LIMITS 1. NEED FORMBOARD SURVEY Result: Completed: Result: Completed: Result: Completed: Result: Completed: 2. NEED TERMITE TREATMENT CERTIFICATION 3. NEED COMPACTION RESULTS Rough -Plumbing Inspection I Richard Mihalich Status: Completed Scheduled: 03/10/2021 12:00 AM Comments: AM PLEASE Fee Information Standard Item Standard Item Standard Item Standard Item Standard Item Standard Item Impact State Surcharge Impact Impact Impact Impact Impact Standard Item Impact Standard Item Permit Valuation Fee Plan Review Income New -Electrical -Single Family New -Plumbing New -Mechanical -Residential Fire Plan Review Impact Fee -Concurrency Mngt. Fees 2.5 Percent Impact Fee -Fire/Rescue Impact Fee -General Government Impact Fee -Library Impact Fee -Police Impact Fee -Parks/Recreation Sewer Tap Inspection Impact Fee -Sewer Certificate Of Occupancy Result: Completed: Approved 06/18/2021 09:31 AM Approved 05/13/2021 08:49 AM Approved 03/23/202111:13 AM Approved 03/22/2021 09:34 AM Approved 03/10/202110:03 AM 175,000.00 175,000.00 1.00 2.50 1.00 37.50 1.00 1.00 74.39 1.00 1.00 1.00 1.00 1.00 1.00 1.00 943.50 471.75 110.00 175.00 85.00 37.50 100.00 45.01 74.39 105.71 80.03 128.29 151.55 25.00 1,348.80 50.00 :Residential New Construction Permit I P21-0274 Property Information 24-37-23-CG-53-10 314 FILLMORE AVE Subdivision: cape canaveral FL, 32920 Lot: Block: Name Information Owner: WITTEKIND ENTERPRISES INC; ABELES, RONALD; BABER E Phone: Occupant: Phone: Applicant: Contractor: Licensee: ABC Concrete Inc ABC Concrete Inc Andre Miguel Baez 10/20/2020 08/31/2024 Phone: Phone: Phone: (321) 454-4240 (321) 454-4240 (321) 454-4240 License Issued: License Expires: Permit Information Date Issued: 03/09/2021 Date Expires: 01/10/2023 Status: FINALED Work Description: new construction -2 story town homes Stipulations: Final -Building Inspection I Richard Mihalich Status: Completed Result: Approved Scheduled: 07/14/2022 12:00 AM Completed: 07/14/2022 03:03 PM Comments: Scheduling Comment AM Inspection Notes Items needed and discussed at meeeting: Power not on, cannot check electrical. Ron to advise when this is ready. Plumbing 95% complete. AC's not complete, need completed and started. Misc Finishes in units not complete (kithen and bath misc trims) Inspection Notes Ron is to advise the bldg dept. when the svstems are complete and functioning, so we can complete the inspections. Conditional CO Issued Need to Correct 2nd Floor Bedroom Window Elevation. R310.2.2 Need to Submit As Built w/ Setback Dimensions. Pre-Power Inspection I Richard Mihalich Status: Completed Scheduled: 06/09/2022 12:00 AM Comments: Inspection Notes Am inspection for all 4 buildings Prepower Form Recieved 6-10-22 Inspection Completed On Site 6-9-22 Driveway/Walks Inspection I Michael German Status: Completed Scheduled: 04/13/2022 12:00 AM Comments: INSPECTION LIMITS Driveway Apron Sidewalk Driveway Inspection I Michael German Status: Completed Scheduled: 04/12/2022 12:00 AM Comments: Result: Completed: Result: Completed: Result: Completed: Inspection Notes Sidewalk Pre-Pour Approved, Need to See Apron Pre-Pour. Approved 06/09/2022 10:43 AM Approved 04/13/2022 02:35 PM Approved 04/12/2022 02:05 PM Insulation Inspection I Web Inspector Status: canceled Scheduled: 11/16/2021 12:00 AM Comments: Scheduling Comment Drywall screw inspection Drywall Screw Inspection I Michael German Status: Completed Scheduled: 11/16/202112:00 AM Conversion Comment No Conversion Comments Insulation Inspection I Michael German Status: Completed Scheduled: 10/26/2021 12:00 AM Comments: Replace polyiso at plumbing installation areas. Foam voids around windows and doors. Rough -Mechanical Inspection I Richard Mihalich Status: Completed Scheduled: 09/20/2021 12:00 AM Comments: AM PLEASE Rough -Electrical Inspection I Richard Mihalich Status: Completed Scheduled: 09/20/202112:00 AM Comments: AM PLEASE Rough -Plumbing Inspection I Richard Mihalich Status: Completed Scheduled: 09/20/202112:00 AM Comments: AM PLEASE Framing Inspection I Richard Mihalich Status: Completed Scheduled: 08/04/2021 12:00 AM Conversion Comment No Conversion Comments Framing Inspection I Michael German Status: Completed Scheduled: 07/27/202112:00 AM Comments: Scheduling Comment am 2ND FLOOR ROOF TRUSS INSPECTION ONLY Dry-In/Flashing Inspection I Richard Mihalich Status: Scheduled: Comments: Completed 07/23/2021 12:00 AM Scheduling Comment AM Framing Inspection I Michael German Status: Completed Scheduled: 07/22/202112:00 AM Result: canceled Completed: 11/15/2021 02:04 PM Result: Approved Completed: 11/16/2021 01:50 PM Result: Completed: Result: Completed: Result: Completed: Result: Completed: Result: Completed: Result: Completed: Result: Completed: Result: Completed: Partially Approved 10/26/202111:27 AM Approved 09/20/2021 08:34 AM Approved 09/20/2021 08:34 AM Approved 09/20/2021 08:34 AM Approved 08/04/2021 09:21 AM Approved 07/27/2021 02:46 PM Approved 07/23/2021 09:26 AM Disapproved 07/22/2021 03:11 PM Comments: Scheduling Comment am TRUSS PACKAGE NOT ON SITE, WINDOWS AND DOORS NOT INSTALLED Roof/Sidewall Sheating Inspection I Michael German Status: Completed Result: Approved Scheduled: 07/14/202112:00 AM Completed: 07/14/2021 02:32 PM Comments: AM PLEASE. SOMEONE WILL BE ON SITE FROM 8 AM TO NOON Roof/Sidewall Sheating Inspection I Richard Mihalich Status: canceled Result: canceled Scheduled: 07/13/202112:00 AM Completed: 07/13/2021 09:13 AM Comments: AM PLEASE PROVIDE AN AFFIDAVIT PLEASE PROVIDE A COMPLETED ROOF AND SHEATHING AFFIDAVIT FOR THIS INSPECTION Framing Inspection I Richard Mihalich Status: Completed Scheduled: 07/06/202112:00 AM Comments: Scheduling Comment Bottom Plate Tiedown Framing Inspection I Derek Yossifon Status: Completed Scheduled: 07/06/202112:00 AM Comments: Drywall screw IST LA YER OF FIREWALL AT THE TRUSSES Lintel Inspection I Richard Mihalich Status: Completed Scheduled: 06/18/2021 12:00 AM Comments: Scheduling Comment AM Lintel Inspection I Richard Mihalich Status: Completed Scheduled: 05/13/2021 12:00 AM Comments: AM PLEASE SLAB Inspection I Richard Mihalich Status: Scheduled: Comments: Completed 03/22/2021 12:00 AM Scheduling Comment AM INSPECTION LIMITS 1. NEED FORMBOARD SURVEY Result: Completed: Result: Completed: Result: Completed: Result: Completed: Result: Completed: 2. NEED TERMITE TREATMENT CERTIFICATION 3. NEED COMPACTION RESULTS Rough -Plumbing Inspection I Richard Mihalich Status: Completed Result: Scheduled: 03/10/2021 12:00 AM Completed: Comments: AM PLEASE Fee Information Approved 07/06/2021 08:27 AM Approved 07/06/202112:19 PM Approved 06/18/2021 09:31 AM Approved 05/13/2021 08:48 AM Approved 03/22/2021 09:34 AM Approved 03/10/202110:03 AM Standard Item Permit Valuation Fee 175,000.00 943.50 Standard Item Plan Review Income 175,000.00 471.75 Standard Item New -Electrical -Single Family 1.00 110.00 Standard Item New -Mechanical -Residential 1.00 85.00 Standard Item New -Plumbing 2.50 175.00 Standard Item Fire Plan Review 37.50 37.50 Impact Impact Fee -Concurrency Mngt. Fees 1.00 100.00 State Surcharge 2.5 Percent 1.00 45.01 Impact Impact Fee -Fire/Rescue 74.39 74.39 Impact Impact Fee -Library 1.00 80.03 Impact Impact Fee -General Government 1.00 105.71 Impact Impact Fee -Parks/Recreation 1.00 151.55 Impact Impact Fee -Police 1.00 128.29 Standard Item Sewer Tap Inspection 1.00 25.00 Impact Impact Fee -Sewer 1.00 1,348.80 Standard Item Certificate Of Occupancy 1.00 50.00 !,Building Permit I Pl0-1455 Property Information 24-37-23-CG-53-10 306 FILLMORE AVE Subdivision: cape canaveral FL, 32920 Lot: Block: Name Information Owner: WITTEKIND ENTERPRISES INC; ABELES, RONALD; PARASM Phone: Occupant: Applicant: Contractor: Licensee: ABC Concrete Inc ABC Concrete Inc Andre Miguel Baez License Issued: 10/20/2020 License Expires: 08/31/2024 Permit Information Date Issued: 03/09/2021 Work Description: New construction 2 story town homes Stipulations: Final -Building Inspection I Michael German Status: Completed Scheduled: 10/06/2022 12:00 AM Comments: Scheduling Comment AM Date Expires: 04/04/2023 Final -Electrical Inspection I Michael German Status: Completed Scheduled: 10/06/2022 12:00 AM Conversion Comment No Conversion Comments Final -Mechanical Inspection I Michael German Status: Completed Scheduled: 10/06/2022 12:00 AM Conversion Comment No Conversion Comments Final -Plumbing Inspection I Michael German Status: Completed Scheduled: 10/06/2022 12:00 AM Conversion Comment No Conversion Comments Final -Building Inspection I JPI Status: Completed Scheduled: 09/30/2022 12:00 AM Comments: Scheduling Comment AM Phone: Phone: Phone: Phone: (321) 454-4240 (321) 454-4240 (321) 454-4240 Status: FINALED Result: Completed: Result: Completed: Result: Completed: Result: Completed: Result: Completed: Approved 10/06/2022 11:12 AM Approved 10/06/2022 11: 11 AM Approved 10/06/2022 11:11 AM Approved 10/06/2022 11:11 AM Disapproved 10/03/2022 10:58 AM I identified the following reasons to Disapprove: 1.FBCB 107.3.1 seal all unused outdoor penetrations (e.g. old condensate etc) against pest intrusion OR properly terminate any outdoor piping. 2. FBCR 318.5: condensate egress should point down, provide sufficient depth P trap. 3. FBCR M1411.8 Refrigerant valves must have locked refrigerant caps. 4. FBCP 305.1 "corrosion of pipes": copper and other metal pipe (e.g. hose bibs) must be isolated from stucco and other concrete (max thickness 0.010 inches, e.g. tape) 5. NEC 250.53(A)(2) 2nd ground electrode required min 6 ft apart. 6. FBCB 107.3.1, FBCR 302.11 Seal AH duct to unconditioned attic. 7. FBCB 107.3.1 AC vent register missing. 8. NEC 362.48 dryer receptacle unfinished. Pre-Power Inspection I Richard Mihalich Status: Completed Scheduled: 06/09/2022 12:00 AM Comments: Inspection Notes Am inspection for all 4 buildings Prepower Form Recieved 6-10-22 Inspection Completed On Site 6-9-22 Driveway/Walks Inspection I Michael German Status: Completed Scheduled: 04/13/2022 12:00 AM Comments: INSPECTION LIMITS Driveway Apron Sidewalk Driveway Inspection I Michael German Status: Completed Scheduled: 04/12/2022 12:00 AM Comments: Result: Completed: Result: Completed: Result: Completed: Inspection Notes Sidewalk Pre-Pour Approved, Need to See Apron Pre-Pour. Insulation Inspection I Web Inspector Status: Canceled Scheduled: 11/16/202112:00 AM Comments: Scheduling Comment Drywall screw inspection Drywall screw Inspection I Michael German Status: Scheduled: Completed 11/16/2021 12:00 AM Conversion Comment No Conversion Comments Insulation Inspection I Michael German Status: Completed Scheduled: 10/26/202112:00 AM Comments: Replace polyiso at plumbing installation areas. Foam voids around windows and doors. STUCCO-LATH Inspection I Michael German Status: Completed Scheduled: 10/07/202112:00 AM Conversion Comment No Conversion Comments Rough -Mechanical Inspection I Richard Mihalich Status: Completed Scheduled: 09/20/202112:00 AM Comments: AM PLEASE Rough -Electrical Inspection I Richard Mihalich Status: Completed Scheduled: 09/20/2021 12:00 AM Conversion Comment No Conversion Comments Rough -Plumbing Inspection I Richard Mihalich Status: Completed Scheduled: 09/20/2021 12:00 AM Result: Completed: Result: Completed: Result: Completed: Result: Completed: Result: Completed: Result: Completed: Result: Completed: Approved 06/09/2022 10:43 AM Approved 04/13/2022 02:34 PM Approved 04/12/2022 02:04 PM Canceled 11/15/2021 02:03 PM Approved 11/16/2021 01:49 PM Partially Approved 10/26/202111:28 AM Approved 10/07/202111:15 AM Approved 09/20/2021 08:33 AM Approved 09/20/2021 08:34 AM Approved 09/20/2021 08:33 AM Conversion Comment No Conversion Comments Framing Inspection I Richard Mihalich Status: Completed Scheduled: 08/04/2021 12:00 AM Conversion Comment No Conversion Comments Framing Inspection I Michael German Status: Completed Scheduled: 07/27/202112:00 AM Comments: Scheduling Comment am 2ND FLOOR ROOF TRUSS INSPECTION ONLY Dry-In/Flashing Inspection I Richard Mihalich Status: Completed Scheduled: 07/23/202112:00 AM Comments: Scheduling Comment AM Framing Inspection I Michael German Status: Completed Scheduled: 07/22/202112:00 AM Comments: Scheduling Comment AM Result: Approved Completed: 08/04/2021 09:22 AM Result: Approved Completed: 07/27/2021 02:46 PM Result: Completed: Result: Completed: Approved 07/23/2021 09:25 AM Disapproved 07/22/2021 03:11 PM TRUSS PACKAGE NOT ON SITE, WINDOWS AND DOORS NOT INSTALLED Roof/Sidewall Sheating Inspection I Michael German Status: Completed Result: Approved Scheduled: 07/14/2021 12:00 AM Completed: 07/14/2021 02:33 PM Comments: AM PLEASE. SOMEONE WILL BE AVAILABLE ON SITE FROM 8 AM TO NOON Roof/Sidewall Sheating Inspection I Richard Mihalich Status: canceled Result: Canceled Scheduled: 07/13/202112:00 AM Completed: 07/13/2021 09:13 AM Comments: AM PLEASE PROVID AN AFFIDAVIT PLEASE PROVIDE A COMPLETED ROOF AND SHEATHING AFFIDAVIT FOR THIS INSPECTION Framing Inspection I Richard Mihalich Status: Completed Result: Approved Scheduled: 07/06/202112:00 AM Completed: 07/06/2021 08:27 AM Comments: Scheduling Comment Bottom Plate Tiedown Framing Inspection I Derek Yossifon Status: Completed Result: Approved Scheduled: 07/06/202112:00 AM Completed: 07/06/2021 12:21 PM Comments: Drywall screw IST LAYER OF FIREWALL AT THE TRUSSES Lintel Inspection I Richard Mihalich Status: Completed Result: Approved Scheduled: 06/18/202112:00 AM Completed: 06/18/2021 09:31 AM Comments: Scheduling Comment AM please Lintel Inspection I Richard Mihalich Status: Completed Result: Scheduled: 05/13/202112:00 AM Completed: Comments: AM PLEASE SOIL lREATMENT Inspection I Michael German Status: Completed Result: Scheduled: 03/23/2021 12:00 AM Completed: Conversion Comment No Conversion Comments SLAB Inspection I Richard Mihalich Status: Completed Result: Scheduled: 03/22/202112:00 AM Completed: Comments: INSPECTION LIMITS 1. NEED FORMBOARD SURVEY 2. NEED TERMITE lREATMENT CERTIFICATION 3. NEED COMPACTION RESULTS Rough ·• Plumbing Inspection I Richard Mihalich Status: Completed Scheduled: 03/10/2021 12:00 AM Comments: AM PLEASE 'Fee Information Standard Item Standard Item Standard Item Standard Item Standard Item Standard Item Impact State Surcharge Impact Impact Impact Impact Impact Impact Standard Item Standard Item Permit Valuation Fee Plan Review Income New -Electrical -Single Family New -Plumbing New -Mechanical -Residential Fire Plan Review Impact Fee -Concurrency Mngt. Fees 2.5 Percent Impact Fee -Fire/Rescue Impact Fee -General Government Impact Fee -Library Impact Fee -Parks/Recreation Impact Fee -Police Impact Fee -Sewer Sewer Tap Inspection Certificate Of Occupancy Result: Completed: Approved 05/13/2021 08:50 AM Approved 03/23/202111:15 AM Approved 03/22/2021 09:33 AM Approved 03/10/2021 10:04 AM 17S,00O.00 175,000.00 1.00 2.50 1.00 37.50 1.00 1.00 74.39 105.71 80.03 151.55 128.29 1,348.80 1.00 1.00 943.50 471.75 110.00 175.00 85.00 37.50 100.00 45.01 74.39 105.71 80.03 151.55 128.29 1,348.80 25.00 50.00 LR,esidential New Construction Permit I P21-0275 .Property Information 24-37-23-CG-53-10 1·Name Information Owner: Occupant: Applicant: Contractor: Licensee: License Issued: License Expires: Permit Information 316 FILLMORE AVE Subdivision: cape canaveral FL, 32920 Lot: WTTTEKIND ENTERPRISES INC; ABELES, RONALD; BABER E Phone: ABC Concrete Inc ABC Concrete Inc Andre Miguel Baez 10/20/2020 08/31/2024 Phone: Phone: Phone: Phone: AVON BY THE SEA 10, 11, 12 Block: (321) 454-4240 (321) 454-4240 (321) 454-4240 Date Issued: 03/09/2021 Date Expires: 01/10/2023 Status: FINALED Work Description: NEW CONSTRUCTION -2 story town homes Stipulations: Final -Building Inspection I Michael German Status: Completed Result: Approved Scheduled: 07/14/2022 12:00 AM Completed: 07/14/2022 04:39 PM Comments: Scheduling Comment Inspection Notes AM Items needed and discussed at meeeting: Power not on, cannot check electrical. Ron to advise when this is ready. Plumbing 95% complete. AC's not complete, need completed and started. Misc Finishes in units not complete (kithen and bath misc trims) 53 Inspection Notes Ron is to advise the bldg dept. when the systems are complete and functioning, so we can complete the inspections. Conditional CO Issued Need to Correct 2nd Floor Bedroom Window Elevation. R310.2.2 Need to Submit As Built w/ Setback Dimensions. Pre-Power Inspection I Richard Mihalich Status: Completed Scheduled: 06/09/2022 12:00 AM Comments: Inspection Notes Am inspection for all 4 buildings Prepower Form Recieved 6-10-22 Inspection Completed On Site 6-9-22 Driveway/Walks Inspection I Michael German Status: Completed Scheduled: 04/13/2022 12:00 AM Comments: INSPECTION LIMITS Driveway Apron Sidewalk Driveway Inspection I Michael German Status: Completed Scheduled: 04/12/2022 12:00 AM Comments: Result: Completed: Result: Completed: Result: Completed: Inspection Notes Sidewalk Pre-Pour Approved, Need to See Apron Pre-Pour. Approved 06/09/2022 10:43 AM Approved 04/13/2022 02:36 PM Approved 04/12/2022 02:07 PM Insulation Inspection I Web Inspector Status: canceled Scheduled: 11/16/2021 12:00 AM Comments: Scheduling Comment Drywall screw inspection Drywall Screw Inspection I Michael German Status: Completed Scheduled: 11/16/2021 12:00 AM Conversion Comment No Conversion Comments Insulation Inspection I Michael German Status: Completed Scheduled: 10/26/2021 12:00 AM Comments: Replace polyiso at plumbing installation areas. Foam voids around windows and doors. Rough -Mechanical Inspection I Richard Mihalich Status: Completed Scheduled: 09/20/2021 12:00 AM Comments: AM PLEASE Rough -Electrical Inspection I Richard Mihalich Status: Completed Scheduled: 09/20/2021 12:00 AM Conversion Comment No Conversion Comments Rough -Plumbing Inspection I Richard Mihalich Status: Completed Scheduled: 09/20/2021 12:00 AM Conversion Comment No Conversion Comments Framing Inspection I Richard Mihalich Status: Completed Scheduled: 08/04/2021 12:00 AM Conversion Comment No Conversion Comments Framing Inspection I Michael German Status: Completed Scheduled: 07/27/202112:00 AM Comments: Scheduling Comment am 2ND FLOOR ROOF lRUSS INSPECTION ONLY Dry-In/Flashing Inspection I Richard Mihalich Status: Completed Scheduled: 07/23/202112:00 AM Comments: Scheduling Comment AM Framing Inspection I Michael German Status: Completed Scheduled: 07/22/202112:00 AM Comments: Scheduling Comment AM Result: Completed: Result: Completed: Result: Completed: Result: Completed: Result: Completed: Result: Completed: Result: Completed: Result: Completed: Result: Completed: Result: Completed: canceled 11/15/2021 02:05 PM Approved 11/16/2021 01:49 PM Partially Approved 10/26/202111:26 AM Approved 09/20/2021 08:33 AM Approved 09/20/2021 08:33 AM Approved 09/20/2021 08:33 AM Approved 08/04/2021 09:22 AM Approved 07/27/2021 02:47 PM Approved 07/23/2021 09:26 AM Disapproved 07/22/2021 03:12 PM lRUSS PACKAGE NOT ON SITE, WINDOWS AND DOORS NOT INSTALLED Roof/Sidewall Sheating Inspection I Michael German Status: Completed Result: Approved Scheduled: 07/14/202112:00 AM Completed: 07/14/2021 02:32 PM Comments: AM PLEASE. SOMEONE WILL BE AVAILABLE ON SITE FROM 8 AM TO NOON Roof/Sidewall Sheating Inspection I Richard Mihalich Status: canceled Result: canceled Scheduled: 07/13/202112:00 AM Completed: 07/13/2021 09:12 AM Comments: AM PLEASE PRIVIDE AN AFFIDAVIT PLEASE PROVIDE A COMPLETED ROOF AND SHEATHING AFFIDAVIT FOR THIS INSPECTION Framing Inspection I Richard Mihalich Status: Completed Result: Scheduled: 07/06/202112:00 AM Completed: Comments: Scheduling Comment Bottom Plate Tiedown Framing Inspection I Derek Yossifon Status: Completed Result: Scheduled: 07/06/202112:00 AM Completed: Comments: Drywall screw IST LA YER OF FIREWALL AT THE lRUSSES Lintel Inspection I Richard Mihalich Status: Completed Result: Scheduled: 06/18/2021 12:00 AM Completed: Comments: Scheduling Comment am Lintel Inspection I Richard Mihalich Status: Completed Result: Scheduled: 05/13/2021 12:00 AM Completed: Comments: AM PLEASE SLAB Inspection I Richard Mihalich Status: Completed Result: Scheduled: 03/22/202112:00 AM Completed: Comments: INSPECTION LIMITS 1. NEED FORMBOARD SURVEY 2. NEED TERMITE lREATMENT CERTIFICATION 3. NEED COMPACTION RESULTS Rough -Plumbing Inspection I Richard Mihalich Status: Completed Scheduled: 03/10/202112:00 AM Comments: AM PLEASE Fee Information Standard Item Standard Item Standard Item Permit Valuation Fee Plan Review Income New -Electrical -Single Family Result: Completed: Approved 07/06/2021 08:27 AM Approved 07/06/202112:20 PM Approved 06/18/2021 09:31 AM Approved 05/13/2021 08:49 AM Approved 03/22/2021 09:33 AM Approved 03/10/2021 10:04 AM 175,000.00 175,000.00 1.00 943.50 471.75 110.00 Standard Item New -Plumbing 2.50 175.00 Standard Item New -Mechanical -Residential 1.00 85.00 Standard Item Fire Plan Review 37.50 37.50 Impact Impact Fee -Concurrency Mngt. Fees 1.00 100.00 State Surcharge 2.5 Percent 1.00 45.01 Impact Impact Fee -Fire/Rescue 74.39 74.39 Impact Impact Fee -Library 1.00 80.03 Impact Impact Fee -General Government 1.00 105.71 Impact Impact Fee -Parks/Recreation 1.00 151.55 Impact Impact Fee -Police 1.00 128.29 Impact Impact Fee -Sewer 1.00 1,348.80 Standard Item Sewer Tap Inspection 1.00 25.00 Standard Item Certificate Of Occupancy 1.00 50.00