HomeMy WebLinkAboutgarcia_civil_contractors_cocc_sidewalk_agmt_202301SMALL SCALE CONSTRUCTION AGREEMENT
(Under $200K)
THIS AGREEMENT is made this iZ� day of cur 2022 by and between the CITY OF
CAPE CANAVE L, a Florida municipal corporation erein referred to as OWNER) and
earC►c, on#n ci-ors. • authorized and duly licensed to do business in the State of
Florida (herein referred to as CONTRACTOR), as follows:
1. DESCRIPTION OF WORK - CONTRACTOR shall perform the work, in accordance with the
Contract Documents for the construction of
t.kl k 1 Cyio�1s 0ncP, rbs/ Are noual pod ctplo �S� & s as set forth in the Scope
of Services, as set forth in the Contract Document described in Section 2 herein ("the Project").
2. CONTRACT DOCUMENTS - The Contract Documents consist of this Agreement Exhibits and
Addendum(s) to the Agreement and any other specifications and scope of services described in
EXHIBIT "A and all Change Orders approved by the City after execution of this Agreement. In
addition, the Engineering Drawings or specifications for City of Cape Canaveral prepared by
N/A (insert N/A if not applicable) shall also be included as part
of the Contract Documents. These Contract Documents are hereby incorporated into this Contract by
this reference. The CONTRACTOR represents and agrees that it has carefully examined and
understands this Agreement and the other Contract Documents, has investigated the nature, locality
and site of the Work and the conditions and difficulties under which it is to be performed and that it
enters into this Agreement on the basis of its own examination, investigation and evaluation of all such
matters and not in reliance upon any opinions or representations of the OWNER, or of any of their
respective officers, agents, servants, or employees. The Contract Documents are complementary, and
what is called for by any one shall be as binding as if called for by all. The intent of the Contract
Documents is to include all labor, materials, equipment, transportation, taxes, fees and incidentals
necessary for the proper and complete execution of the Work for each Project. Materials or Work
described in words which so applied have a well-known technical or trade meaning shall be held to
refer to such recognized standards. Any discrepancies or omissions found in the Contract Documents
shall be reported to the City's Project Manager immediately. The City's Project Manager will clarify
discrepancies or omissions, in writing, within a reasonable time.
3. ORDER OF PRECEDENCE - In case of any inconsistency in any of the documents bearing on
the Agreement between the OWNER and the CONTRACTOR, the inconsistency shall be
resolved by giving precedence in the following order:
a. Change Orders
b. Agreement, Exhibits and Addenda
c. Engineering Plans and Drawings
1
CITY OF CAPE CANAVERAL SMALL SCALE CONSTRUCTION AGREEMENT
Form v 1 2023
[OTHER]
Any inconsistency in the work description shall be clarified by the OWNER and performed by
the CONTRACTOR.
4. AGREEMENT INTERPRETATION - At its discretion, during the course of the work, should any
errors, ambiguities, or discrepancies be found in the Contract Documents, the OWNER at its
sole discretion will interpret the intent of the Contract Documents and the CONTRACTOR
hereby agrees to abide by the OWNER's interpretation and agrees to carry out the work in
accordance with the decision of the OWNER.
5. BRAND NAME MATERIALS - Whenever Materials or Equipment are specified or described in
the Contract Documents by using the name of a proprietary item or the name of a particular
Supplier, the naming of the item is intended to establish the type, function and quality required.
The CONTRACTOR will be responsible for all coordination necessary to accommodate the
material, article, or equipment being provided without additional cost to the OWNER. Unless
the name is followed by words indicating that no substitution is permitted, a substitute material,
article, or equipment is allowed if it is reasonably equivalent to the brand name specified and
CONTRACTOR certifies in writing that the proposed substitute will perform adequately the
functions called for by the general design, be similar and of equal substance to that specified
and be suited to the same use and capable of performing the same function as that specified.
The OWNER has full discretion to decide whether a substitute is reasonably equivalent.
CONTRACTOR must notify the OWNER in writing prior to use of the substitute for a specified
brand name and allow the OWNER to make a determination before CONTRACTOR uses the
substitute.
CONTRACT TIME -
a. All provisions regarding Contract Time are essential to the performance of this Contract.
b. The Work shall be completed within S (6Q) calendar days after the
date when the Contract Time begins to run, un otherwise extended by the parties in
writing.
c. The parties acknowledge that the Contract Time provided in this Section includes
consideration of adverse weather conditions common to Central Florida including the
possibility of hurricanes and tropical storms.
7. CONTRACT PRICE, UNIT PRICE CONTRACT - The OWNER will pay the CONTRACTOR in
current funds for the performance of the work in accordance with the Contract Documents,
subject to additions and deductions approved by Change Order, the Total Contract Price of
(1�A re Aoc,s,,u(. 44edrd `free_ and ,J100 Dollars
($ 4s 243 ). CONTRACTOR agrees to accept the Contract Price as full
2
CITY OF CAPE CANAVERAL SMALL SCALE CONSTRUCTION AGREEMENT
compensation for performing all Work, furnishing all Materials, and performing all Work
embraced in the Contract Documents.
The CONTRACTOR acknowledges that CONTRACTOR studied, considered, and included in
CONTRACTOR's Total Bid all costs of any nature relating to: (1) performance of the Work under
Florida weather conditions; (2) applicable law, licensing, and permitting requirements; (3) the
Project site conditions, including but not limited to, subsurface site conditions; (4) the terms
and conditions of the Contract Documents, including, but not limited to, the indemnification
and no damage for delay provisions of the Contract Documents.
The CONTRACTOR acknowledges that performance of the Work may involve significant Work
adjacent to, above, and in close proximity to Underground Facilities including utilities which will
require the support of active utilities, as well as, the scheduling and sequencing of utility
installations, and relocations (temporary and permanent) by CONTRACTOR.
(1) In addition to the acknowledgments previously made, the CONTRACTOR
acknowledges that the CONTRACTOR's Total Bid (original Contract Price) specifically
considered and relied upon CONTRACTOR's own study of Underground Facilities,
utilities in their present, relocated (temporary and permanent) and proposed locations,
and conflicts relating to utilities and Underground Facilities.
(2) The CONTRACTOR acknowledges that CONTRACTOR's Total Bid (original Contract
Price) considered and included all of CONTRACTOR's costs relating to CONTRACTOR's
responsibilities to coordinate and sequence the Work of the CONTRACTOR with the
work of the OWNER, if any, with its own forces, the work of other contractors, if any,
and the work of others at the Project site.
Payments will be made to the CONTRACTOR for actual quantities installed on the basis
of the Schedule of Unit Prices included as a part of the Bid, which shall be as fully a part
of the Contract as if attached or repeated herein. Where the Contract Documents
provide for Unit Price Work, the Contract Price stated in the Agreement will include for
all Unit Price Work an amount equal to the sum of the Unit Prices for each item of Unit
Price Work times the estimated quantity of each item as indicated in the Contract
Documents. Each Unit Price will be deemed to include an amount considered by
CONTRACTOR to be adequate to cover all costs, including supplemental and
administrative costs, and profit.
8. TERMINATION; DEFAULT BY CONTRACTOR AND OWNER'S REMEDIES - The OWNER
reserves the right to revoke and terminate this Agreement and rescind all rights and privileges
associated with this Agreement, without penalty, for convenience. Further, the OWNER
reserves the right to revoke and terminate this Agreement in the following circumstances, each
of which shall represent a default and breach of this Agreement:
3
CITY OF CAPE CANAVERAL SMALL SCALE CONSTRUCTION AGREEMENT
Form v 1 2023
a. CONTRACTOR defaults in the performance of any material covenant or condition of
this Agreement and does not cure such other default within seven (7) calendar days after
written notice from the OWNER specifying the default complained of, unless, however, the
nature of the default is such that it cannot, in the exercise of reasonable diligence, be
remedied within seven (7) calendar days, in which case the CONTRACTOR shall have such
time as is reasonably necessary to remedy the default, provided the CONTRACTOR
promptly takes and diligently and continuously pursues such actions as are necessary
therefore; or
b. CONTRACTOR is adjudicated bankrupt or makes any assignment for the benefit of
creditors or CONTRACTOR becomes insolvent, or is unable or unwilling to pay its debts; or
c. CONTRACTOR has acted negligently, as defined by general and applicable law, in
performing the Work hereunder; or
d. CONTRACTOR has committed any act of fraud upon the OWNER; or
e. CONTRACTOR has made a material misrepresentation of fact to the OWNER while
performing its obligations under this Agreement; or
f. CONTRACTOR is experiencing a labor dispute, which threatens to have a substantial,
adverse impact upon performance of this Agreement without prejudice to any other right,
or remedy OWNER may have under this Agreement.
In the event of an uncured default by CONTRACTOR, the OWNER shall have the right to
exercise any other remedy the OWNER may have by operation of law, without limitation, and
without any further demand or notice. In the event of such termination, OWNER shall be liable
only for the payment of all unpaid charges, determined in accordance with the provisions of
this Agreement, for Work properly performed prior to the effective date of termination, which
may be a set-off to Owner's damages.
9. FORCE MAJEURE - Any delay or failure of either party in the performance of its required
obligations hereunder shall be excused if and to the extent caused by acts of God; fire; flood;
windstorm; explosion; riot; war; sabotage; strikes (except involving CONTRACTOR's labor force);
extraordinary breakdown of or damage to OWNER 's affiliates' generating plants, their
equipment, or facilities; court injunction or order; federal and/or state law or regulation; or order
by any regulatory agency; ; provided that prompt notice of such delay is given by such party to
the other and each of the parties hereunto shall be diligent in attempting to remove such cause
or causes.
10. SEVERABILITY - In the event any portion or part thereof of this Agreement is deemed invalid,
against public policy, void, or otherwise unenforceable by a court of law, the validity and
enforceability of the remaining parts of this Agreement shall otherwise be fully enforceable
4
CITY OF CAPE CANAVERAL SMALL SCALE CONSTRUCTION AGREEMENT
f orm.v: 2 73
11. PAYMENTS: DUE DATE FOR PAYMENTS; SUBMITTAL OF PAYMENT REQUESTS - One
lump sum payment will be made by Owner at such time CONTRACTOR completes the Work
required under the Contract Documents and submits a written payment invoice However,
upon written request by CONTRACTOR, OWNER may agree, in writing, to make progress
payments on account of the contract price to CONTRACTOR, on the basis of application for
payments submitted to the OWNER or OWNER's Project Manager, by CONTRACTOR as the
work progresses, and in accordance with the Contract Documents.
Final payment or progress payments may be withheld if:
a. Work is found defective and not remedied;
b. Another contractor is damaged by an act for which CONTRACTOR is responsible; or
c. In the opinion of the OWNER that CONTRACTOR's work is not progressing
satisfactorily.
Payment is due 25 business days after the date on which the payment request or invoice is
stamped as received as provided in s. 218.74(1), Florida Statutes, except to the extent that the
payment request or invoice does not meet contract requirements. The CONTRACTOR may send
OWNER an overdue notice. If the payment request or invoice is not rejected within 4 business
days after delivery of the overdue notice, the payment request or invoice shall be deemed
accepted, except for any portion of the payment request or invoice that is inaccurate or
misleading. If an agent need not approve the payment request or invoice submitted by
CONTRACTOR, payment is due 20 business days after the date on which the payment request
or invoice is stamped as received as provided in s. 218.74(1), Florida Statutes, except to the
extent that the payment request or invoice does not meet contract requirements. If OWNER
disputes a portion of a payment request or an invoice, the undisputed portion shall be timely
paid. OWNER shall reject payment requests or invoices in accordance with the procedure
established in s. 218.735, Florida Statutes.
OWNER hereby identifies the C:/- [INSERT INDIVIDUAL AGENT OR CITY
DEPARTMENT] as the agent or office to-�ivhich the CONTRACTOR must submit payment
requests or invoices to OWNER.
12. FINAL PAYMENT; CHANGE ORDERS - If OWNER agrees to pay progress payments to
CONTRACTOR, OWNER shall withhold up to 5% of the Contract Price throughout the project
in accordance with the Local Government Prompt Payment Act ("Act"). The retainage amount
withheld may be released with the Final Payment after the issuance of the Final Completion
Certificate. OWNER shall make final payment to CONTRACTOR within thirty (30) days after the
work is fully and properly completed, if the contract has been fully and timely performed, but
subject to the condition that final payment shall not be due until CONTRACTOR has delivered
to OWNER all close-out documentation.
5
CITY OF CAPE CANAVERAL SMALL SCALE CONSTRUCTION AGREEMENT
By making payments OWNER does not waive claims including but not limited to those relating
to:
a. Faulty work appearing after substantial completion has been granted;
b. Work that does not comply with the Contract Documents; or
c. Failure of Contractor to comply with any special guarantees required by the
Contract Documents.
Progress payments may be withheld if Work is found defective and not remedied; or in
the opinion of the OWNER, CONTRACTOR'S work is not progressing satisfactorily. Further,
The City, by written change order and without invalidating the Agreement, may order extra
Work or make changes by altering, adding to, or deducting from the Work, the contract
sum being adjusted accordingly. Additional time required for any change in Work must
be included with the requested Change Order.
In giving instructions, the City's Project Manager will have authority to make minor
changes in the Work, not involving extra cost or time, and not inconsistent with the
purpose of the Work, but otherwise, except in an emergency endangering life or property,
no extra work or change will be made unless it goes through the City's written Change
Order process and is approved by the City, and no claim for an addition to the contract
sum or time will be valid unless so ordered in writing.
The value of any such extra Work or change will be determined in one or more of the
following ways:
1. By mutual acceptance of a lump sum.
2. By unit prices named in the contract or subsequently agreed upon.
3. By cost and percentage or by cost and a fixed fee.
If none of the above methods is agreed upon, the CONTRACTOR, provided it receives an
order as above, shall proceed with the work. In such case and also under case (3) above,
the CONTRACTOR shall keep and present in such form as the City's Project Manager may
direct, a correct account of the actual cost of labor and materials, substantiated by back-
up documentation. In any case, the City's Project Manager will certify to the amount,
including reasonable allowances for overhead and profit, due to the CONTRACTOR.
Pending final determination of value, payments on account of changes will be made on
the City's Project Manager's estimate. Furthermore, if the CONTRACTOR claims that any
instructions by drawings or otherwise involve extra cost under the Contract Documents, it
shall give the City written notice thereof within ten (10) days after the receipt of such
instructions, and in any event before proceeding to execute the work, except in emergency
endangering life or property, and the procedure shall then be as provided above under
this section. Claims will not be processed unless filed in writing before any work has
6
CITY OF CAPE CANAVERAL SMALL SCALE CONSTRUCTION AGREEMENT
commenced. In addition, if the City's Project Manager deems it appropriate the City may
accept defective or incomplete work and an equitable deduction from the Contract Price
will be made therefor by Change Order.
13. DESIGNATION OF PROJECT MANAGER OR ARCHITECT OR LANDSCAPE ARCHITECT:
DUTIES AND AUTHORITY - The duties and authority of the OWNER are as follows:
a. General Administration of Contract. The primary function of the OWNER is to
provide the general administration of the contract. In performance of these duties, Jeff
Ratliff, Capital Projects Director or his authorized representative is the OWNER's Project
Manager during the entire period of construction. The OWNER (CITY) may change the
Project Manager during the term of this contract.
b. Inspections, Opinions, and Progress Reports. The OWNER and its representatives
shall be kept familiar with the progress and quality of the work by CONTRACTOR and may
make periodic visits to the work site. The OWNER will not be responsible for the means of
construction, or for the sequences, methods, and procedures used therein, or for the
CONTRACTOR's failure to perform the work in accordance with the Contract Documents.
c. Access to Worksite for Inspections. The OWNER and its representatives shall be
given free access to the worksite at all times during work preparation and progress. The
Project Manager is not obligated to make exhaustive or continuous on -site inspections to
perform his duties of checking and reporting on work progress, and any such inspections
shall not waive Owner's claim regarding defective work by Contractor. No inspector is
authorized to change any provision of the specifications without written authorization of
the City's Project Manager, nor shall the presence or absence of an inspector relieve the
CONTRACTOR from any requirements of the Contract Documents.
If the specifications, the City's instructions, laws, ordinances, or any public authority, require
any work to be specially tested or approved, the CONTRACTOR shall give the City timely
notice of its readiness for inspection, and of the date fixed for such inspection. Inspections
by the City's Project Manager will be promptly made.
If upon inspection such work is found not in accordance with the Contract Documents, the
CONTRACTOR shall pay such cost, including compensation for professional services, and
an appropriate deductive Change Order shall be issued.
d. Interpretation of Contract Documents: Decisions on Disputes. The OWNER will be
the initial interpreter of the contract document requirements, and make decisions on claims
and disputes between Contractor and Owner.
e. Rejection and Stoppage of Work. The OWNER shall have authority to reject work
which in its opinion does not conform to the Contract Documents, and in this connection
may stop the work or a portion thereof, when necessary.
7
CITY OF CAPE CANAVERAL SMALL SCALE CONSTRUCTION AGREEMENT
Forth v.1.2023
f. Payment Certificates. The OWNER will determine the amounts owing to
CONTRACTOR as the work progresses, based on CONTRACTOR's applications for progress
payments (if agreed to by the OWNER), and OWNER's inspections and observations, and
will issue certificates for progress payments and final payments in accordance with the
terms of the Contract Documents.
g. City Reviews and Status. The City's review, inspection, or approval of any Work,
applications for payment, or other submittals shall be solely for the purpose of determining
whether the same are generally consistent with the City's scope and requirements for the
project. No review, inspection, or approval by the City of such Work or documents shall
relieve the CONTRACTOR of its responsibility for the performance of its obligations under
the Contract Documents or the accuracy, adequacy, fitness, suitability, or coordination of
the Work. Approval by any governmental or other regulatory agency or other governing
body of any Work, design document, or construction document shall not relieve
CONTRACTOR of responsibility for the performance of its obligations under the Contract
Documents. Payment by the City pursuant to the Contract Documents shall not constitute
a waiver of any of the City's rights under the Contract Documents or at law, and
CONTRACTOR expressly accepts the risk that defects in its performance, if any, may not be
discovered until after payment, including final payment, is made by the City.
Notwithstanding the foregoing, prompt written notice shall be given by the City or City
Project Manager to the CONTRACTOR if the City becomes aware of any fault or defect in
the Projects or non-conformance with the Contract Documents. Furthermore, the City shall
not have control or charge of construction means, methods, techniques, sequences, or
procedures, or for safety precautions and programs in connection with the Work, nor shall
the CONTRACTOR, for any of the foregoing purposes, be deemed the agent of the City.
14. PROGRESS MEETINGS —OWNER'S Project Manager may hold periodic progress meetings on
a monthly basis, or more frequently if required by the OWNER, during the term of work entered
into under this Agreement. CONTRACTOR's Project Manager and all other appropriate
personnel shall attend such meetings as designated by the OWNER'S Project Manager.
15. RESPONSIBILITIES OF CONTRACTOR - CONTRACTOR's duties and rights in connection with
the project herein are as follows:
a. Responsibility for Supervision and Construction. CONTRACTOR shall be solely
responsible for all construction under this contract, including the techniques, sequences,
procedures and means, for the coordination of all work. CONTRACTOR shall supervise and
direct the work, and give it all attention necessary for such proper supervision and direction.
b. Discipline and Employment. CONTRACTOR shall maintain at all times strict discipline
among his employees, and he agrees not to employ for work on the project any person
unfit or without sufficient skill to perform the job for which he was employed.
8
CITY OF CAPE CANAVERAL SMALL SCALE CONSTRUCTION AGREEMENT
Form v 12023
c. Furnishing of Labor, Materials, etc. CONTRACTOR shall provide and pay for all labor,
materials and equipment, including tools, construction equipment and machinery, utilities,
including water, transportation, and all other facilities and work necessary for the proper
completion of work on the project in accordance with the Contract Documents.
d. Payment of Taxes: Procurement of Licenses and Permits. CONTRACTOR shall
secure all licenses and permits necessary for proper completion of the work, paying the
fees thereof. CONTRACTOR warrants that it (and subcontractors or tradesmen, if
authorized in the Contract Documents) hold or will secure all trade or professional licenses
required by law for CONTRACTOR to undertake the contract work.
e. Guarantee. The CONTRACTOR shall remove, replace and/or repair at its own
expense and at the convenience of the OWNER any faulty, defective or improper Work,
materials or equipment discovered within one (1) year from the date of the acceptance of
the project as a whole by the Owner or for such longer period as may be provided in the
Contract Documents. Without limiting the generality of the foregoing, the CONTRACTOR
warrants to the OWNER, that all materials and equipment furnished under this Agreement
will be of first class quality and new, unless otherwise required or permitted by the other
Contract Documents, that the Work performed pursuant to this Agreement will be free
from defects and that the Work will strictly conform with the requirements of the Contract
Documents. Work not conforming to such requirements, including substitutions not
properly approved and authorized, shall be considered defective. All warranties contained
in this Agreement and in the Contract Documents shall be in addition to and not in
limitation of all other warranties or remedies required and/or arising pursuant to applicable
law. Furthermore, CONTRACTOR will provide written guarantee for work and materials for
one (1) calendar year after acceptance by OWNER. The one (1) period is not a limitation
upon manufacturer warranties or CONTRACTOR's payment and performance Bond(s).
f. Project Site. The CONTRACTOR shall, among other things, (i) visit and thoroughly
inspect the project site and any structure(s) or other man-made features to be modified
and become familiar with local conditions under which the project will be constructed and
operated; (ii) if applicable, familiarize itself with the survey, including the location of all
existing buildings, utilities, conditions, streets, equipment, components, and other
attributes having or likely to have an impact on the project; (iii) familiarize itself with the
City's layout and design requirements, conceptual design objectives, and budget for the
project; (iv) familiarize itself with pertinent Project dates, including the Project Schedule; (v)
review and analyze all project geotechnical, hazardous substances, structural, chemical,
electrical, mechanical, and construction materials tests, investigations, and
recommendations; and (vi) gather any other information necessary for a thorough
understanding of the project. If the project involve modifications to any existing structure(s)
or other man-made feature(s) on the project site, the CONTRACTOR shall also review all
as -built and record drawings, plans, and specifications of adjacent work which the
CONTRACTOR requests from the City , and shall thoroughly inspect the existing structure(s)
and man-made feature(s) to identify existing deficiencies and ascertain the specific
9
CITY OF CAPE CANAVERAL SMALL SCALE CONSTRUCTION AGREEMENT
Form v L2023
locations of pertinent structural components. Claims by the CONTRACTOR resulting from
its failure to familiarize itself with the project site or pertinent documents shall be deemed
waived.
16. ASSIGNMENT - CONTRACTOR shall not assign this Agreement, or any rights or any monies
due or to become due hereunder without the prior, written consent of the OWNER.
a. CONTRACTOR shall be fully responsible to OWNER for all acts and/or omissions
performed by its subcontractors.
b. If CONTRACTOR, prior to the commencement of any Work subcontracts any part of
this Agreement by the subcontractor, CONTRACTOR shall require the subcontractor to
provide OWNER and its affiliates with insurance coverage as set forth by the OWNER.
17. THIRD PARTY RIGHTS - Nothing in this Agreement shall be construed to give any rights or
benefits to anyone other than OWNER and CONTRACTOR.
18. PROHIBITION AGAINST CONTINGENT FEES - CONTRACTOR warrants that it has not
employed or retained any company or person, other than a bona fide employee working solely
for the CONTRACTOR, to solicit or secure this Agreement, and that it has not paid or agreed to
pay any person, company, corporation, individual, or firm, other than a bona fide employee
working solely for the CONTRACTOR, any fee, commission, percentage, gift, or other
consideration contingent upon or resulting from the award or making of this Agreement.
19. NO JOINT VENTURE - Nothing herein shall be deemed to create a joint venture or principal -
agent relationship between the parties and neither party is authorized to, nor shall either party
act toward third persons or the public in any manner which would indicate any such relationship
with the other party.
20. INDEMNIFICATION — CONTRACTOR shall indemnify and hold harmless the OWNER, its
officers, employees, agents, engineer, and city attorneys (individually and in their official
capacity, from liability, losses, damages, and costs, including, but not limited to, reasonable
attorney's fees, to the extent caused by the negligence, recklessness or intentional wrongful
misconduct of CONTRACTOR and persons employed or utilized by CONTRACTOR in the
performance of this Agreement.
CONTRACTOR specifically assumes potential liability for actions brought by
CONTRACTOR'S own employees against the OWNER and, solely for the purpose of this
indemnification and defense, CONTRACTOR specifically waives its entitlement, if any, to
immunity under Section 440.11, Florida Statutes. This waiver has been specifically and
mutually negotiated by the parties.
10
CITY OF CAPE CANAVERAL SMALL SCALE CONSTRUCTION AGREEMENT
The indemnification provided above shall obligate the CONTRACTOR to defend at its own
expense or to provide for such defense, at the option of the OWNER, as the case may be, of
any and all claims of liability and all suits and actions of every name and description that may
be brought against the OWNER or its officers, employees, and city attorneys which may covered
by this indemnification. In all events the OWNER and its officers, employees, engineer, and city
attorneys shall be permitted to choose legal counsel of its sole choice, the fees for which shall
be reasonable and subject to and included with this indemnification provided herein.
In consideration of the CONTRACTOR's indemnity obligations, the parties allocate ONE
PERCENT (1%) OF THE CONTRACT SUM as specific consideration for CONTRACTOR's
indemnification of OWNER and that the specific consideration is included in the original
Contract Price allocated by CONTRACTOR among all pay items - receipt of which is
acknowledged.
The indemnity provisions set forth in this Paragraph shall survive termination of this Agreement.
21. SAFETY - CONTRACTOR shall be solely and absolutely responsible and assume all liability for
the safety and supervision of its principals, employees, contractors, and agents while
performing work provided hereunder. More specifically, the CONTRACTOR shall be responsible
for initiating, maintaining, and supervising all safety precautions and programs in connection
with the Work. The CONTRACTOR shall take all necessary precautions for the safety of, and
shall provide the necessary protection to prevent damage, injury, or loss to:
1. All employees on the project site and other persons who may be affected thereby.
2. All the Work and all materials or equipment to be incorporated therein, whether in
storage on or off the project site.
3. Other property at the project site or adjacent thereto.
CONTRACTOR shall comply with all applicable Federal Occupational Safety and Health
Administration (OSHA) and Florida Department of Transportation safety standards and shall
assure and monitor the compliance of its Subcontractors with those same standards.
Further, CONTRACTOR shall work in compliance with the OSHA Hazardous Communication
Standard and Florida Department of Environmental Protection guidelines, and shall supply all
information about hazardous chemical being brought onto City property as required by any
applicable City Safety and Loss Control Program.
22. CORPORATE REPRESENTATIONS BY CONTRACTOR - CONTRACTOR hereby represents and
warrants to the OWNER the following:
a. CONTRACTOR is duly registered and licensed to do business in the State of Florida and
is in good standing under the laws of Florida, and is duly qualified and authorized to carry
on the functions and operations set forth in this Agreement.
11
CITY OF CAPE CANAVERAL SMALL SCALE CONSTRUCTION AGREEMENT
b. The undersigned signatory for CONTRACTOR has the power, authority, and the legal
right to enter into and perform the obligations set forth in this Agreement and all
applicable exhibits thereto, and the execution, delivery, and performance hereof by
CONTRACTOR has been duly authorized by the board of directors and/or president of
CONTRACTOR. In support of said representation, CONTRACTOR agrees to provide a copy
to the OWNER of a corporate certificate of good standing provided by the State of Florida
prior to the execution of this Agreement.
c. CONTRACTOR is duly licensed under all local, state and federal laws to provide the work
stated in paragraph 1.0 herein. In support of said representation, CONTRACTOR agrees to
provide a copy of all said licenses to the OWNER prior to the execution of this Agreement.
23. BOND - CONTRACTOR shall not be required to provide payment and performance bonds
because the contract amount is Tess than $200,000; however, prior to receiving final payment
hereunder shall be required to provide certification from all laborers, materialmen, and
subcontractors that such laborers, materialmen, and subcontractors have no claims against
CONTRACTOR resulting from completion of the Work required by this Agreement. The
CONTRACTOR shall provide a certified list of all subcontractors, laborers, and material suppliers
to the OWNER within twenty (20) days of receiving the Notice to Proceed with the work, if
any. This list shall be updated thereafter as necessary with a certified statement that the list
and its updates include the names and addresses of all of those subcontractors, laborers, and
material suppliers furnishing labor and/or material for the work.
24. INSURANCE - During the term of this Agreement, CONTRACTOR shall be responsible for
providing the types of insurance and limits of liability as set forth under this Paragraph unless
a lesser amount of coverage is agreed to by the City Manager, in writing. Additionally, all
independent contractors or agents employed by CONTRACTOR to perform any Work
hereunder shall fully comply with the insurance provisions contained in these Contract
Documents.
a. The CONTRACTOR shall maintain comprehensive general liability insurance in the
minimum amount of $1,000,000 as the combined single limit for each occurrence to protect
the CONTRACTOR from claims of property damages which may arise from any Work
performed under this Agreement whether such Work are performed by the CONTRACTOR
or by anyone directly employed by or contracting with the CONTRACTOR.
b. The CONTRACTOR shall maintain comprehensive automobile liability insurance in the
minimum amount of $500,000 combined single limit bodily injury and minimum $500,000
property damage as the combined single limit for each occurrence to protect the
CONTRACTOR from claims for damages for bodily injury, including wrongful death, as well
as from claims from property damage, which may arise from the ownership, use, or
maintenance of owned and non -owned automobiles, including rented automobiles
whether such operations be by the CONTRACTOR or by anyone directly or indirectly
employed by the CONTRACTOR.
12
CITY OF CAPE CANAVERAL SMALL SCALE CONSTRUCTION AGREEMENT
c. The CONTRACTOR shall maintain, during the life of this Agreement, adequate Workers'
Compensation Insurance in at least such amounts as are required by law.
Current, valid insurance policies meeting the requirements herein identified shall be
maintained during the term of this Agreement A copy of a current Certificate of Insurance
shall be provided to the OWNER by CONTRACTOR upon the Effective Date of this
Agreement which satisfied the insurance requirements of this Paragraph 25. Renewal
certificates shall be sent to the OWNER 30 days prior to any expiration date. There shall also
be a 30-day advance written notification to the OWNER in the event of cancellation or
modification of any stipulated insurance coverage. The OWNER and its engineer shall be
an additional named insured on all stipulated insurance policies as its interest may
appear, from time to time, excluding worker's compensation and professional
liability policies.
Insurance covering the specified additional insureds shall be primary insurance, and all
other insurance carried by the additional insured shall be excess insurance; and with respect
to workers' compensation and employer's liability, comprehensive automobile liability,
commercial general liability, and umbrella liability insurance, CONTRACTOR shall require
CONTRACTOR's insurance carriers to waive all rights of subrogation against OWNER and
its engineer, the engineer's consultants, and their respective officers, directors, partners,
employees and agents.
Each policy shall contain a cross liability or severability of interest clause or endorsement.
25. MEDIATION/VENUE - The parties agree that should any dispute arise between them
regarding the terms or performance of this Agreement, both parties will participate in
mediation. The parties agree to equally share the cost of the mediator. Should the parties fail
to resolve their differences through mediation, then any cause of action filed hereunder shall
be filed in the Circuit or County Court for BREVARD County, Florida.
26. GOVERNING LAW & VENUE - This Agreement is made and shall be interpreted, construed,
governed, and enforced in accordance with the laws of the State of Florida. Venue for any state
action or litigation shall be BREVARD County, Florida. Venue for any federal action or litigation
shall be Orlando, Florida.
27. ATTORNEY'S FEES - Should either party bring an action to enforce any of the terms of this
Agreement, each party shall bear its own costs and expenses of such action including, but not
limited to, reasonable attorney's fees, whether at settlement, trial or on appeal.
28. NOTICES - Any notice or approval under this Contract shall be sent, postage prepaid, to the
applicable party at the address shown on the first page of this Contract.
13
CITY OF CAPE CANAVERAL SMALL SCALE CONSTRUCTION AGREEMENT
Form r 1 2023
29. WORK IS A PRIVATE UNDERTAKING - With regard to any and all Work performed
hereunder, it is specifically understood and agreed to by and between the parties hereto that
the contractual relationship between the OWNER and CONTRACTOR is such that the
CONTRACTOR is an independent contractor and not an agent of the OWNER. The
CONTRACTOR, its contractors, partners, agents, and their employees are independent
contractors and not employees of the OWNER. Nothing in this Agreement shall be interpreted
to establish any relationship other than that of an independent contractor, between the
OWNER, on one hand, and the CONTRACTOR, its contractors, partners, employees, or agents,
during or after the performance of the Work under this Agreement.
30. DOCUMENTS - Public Records: It is hereby specifically agreed that any record, document,
computerized information and program, audio or video tape, photograph, or other writing of
the CONTRACTOR and its independent contractors and associates related, directly or indirectly,
to this Agreement, may be deemed to be a Public Record whether in the possession or control
of the OWNER or the CONTRACTOR. Said record, document, computerized information and
program, audio or video tape, photograph, or other writing of the CONTRACTOR is subject to
the provisions of Chapter 119, Florida Statutes, and may not be destroyed without the specific
written approval of the OWNER's City Manager. Upon request by the OWNER, the
CONTRACTOR shall promptly supply copies of said public records to the OWNER. All books,
cards, registers, receipts, documents, and other papers in connection with this Agreement shall
at any and all reasonable times during the normal working hours of the CONTRACTOR be open
and freely exhibited to the OWNER for the purpose of examination and/or audit. Failure by
CONTRACTOR to grant such access and comply with public records laws and/or requests shall
be grounds for immediate unilateral cancellation of this Agreement by the OWNER upon
delivery of a written notice of cancellation. If CONTRACTOR fails to comply with this Section,
and the OWNER must enforce this Section, or the OWNER suffers a third party award of
attorney's fees and/or damages for violating Chapter 119, Florida Statutes, due to
CONTRACTOR's failure to comply with this Section, the OWNER shall collect from
CONTRACTOR prevailing party attorney's fees and costs, and any damages incurred by the City,
for enforcing this Section against CONTRACTOR. And, if applicable, the OWNER shall also be
entitled to reimbursement of all attorneys' fees and damages which the OWNER had to pay a
third party because of the CONTRACTOR's failure to comply with this Section. The terms and
conditions set forth in this Section shall survive the termination of this Agreement.
The CONTRACTOR acknowledges that the OWNER is a Florida municipal corporation and
subject to the Florida Public Records Law. CONTRACTOR agrees that to the extent any
document produced by CONTRACTOR under this Agreement constitutes a Public Record;
CONTRACTOR shall comply with the Florida Public Records Law.
IF THE CONTRACTOR HAS QUESTIONS REGARDING THE APPLICATION OF CHAPTER
119, FLORIDA STATUTES, TO THE CONTRACTOR'S DUTY TO PROVIDE PUBLIC RECORDS
RELATING TO THIS AGREEMENT, CONTACT THE CUSTODIAN OF PUBLIC RECORDS, THE
CITY CLERK, AT (321) 868-1220, ext. 202, mgoforth@cityofcapecanaveral.org, Mia
Goforth, City Clerk's Office, 100 Polk Avenue, Cape Canaveral, Florida 32920.
14
CITY OF CAPE CANAVERAL SMALL SCALE CONSTRUCTION AGREEMENT
Farm v 1 2023
31. SOVEREIGN IMMUNITY - The OWNER intends to avail itself of the benefits of Section 768.28,
Florida Statutes and any other statutes and common law governing sovereign immunity to the
fullest extent possible. Neither this provision nor any other provision of this Agreement shall
be construed as a waiver of the OWNER's right to sovereign immunity under Section 768.28,
Florida Statutes, or other limitations imposed on the OWNER's potential liability under state or
federal law. CONTRACTOR agrees that OWNER shall not be liable under this Agreement for
punitive damages or interest for the period before judgment. Further, OWNER shall not be
liable for any claim or judgment, or portion thereof, to any one person for over two hundred
thousand dollars ($200,000.00), or any claim or judgment, or portion thereof, which, when
totaled with all other claims or judgments paid by the State or its agencies and subdivisions
arising out of the same incident or occurrence, exceeds three hundred thousand dollars
($300,000.00). Nothing in this Agreement is intended to inure to the benefit of any third party
for the purpose of allowing any claim which would otherwise be barred under the doctrine of
sovereign immunity or by operation of law. This paragraph shall survive termination of this
Ag reement.
32. HEADINGS - Paragraph headings are for the convenience of the parties only and are not to be
construed as part of this Agreement.
33. INTEGRATION; MODIFICATION - The drafting, execution, and delivery of this Agreement by
the Parties has been induced by no representations, statements, warranties, or agreements
other than those expressed herein. This Agreement embodies the entire understanding of the
parties, and there are no further or other agreements or understandings, written or oral, in
effect between the parties relating to the subject matter hereof unless expressly referred to
herein. Modifications of this Agreement shall only be made in writing signed by both parties.
34. WAIVER AND ELECTION OF REMEDIES - Waiver by either party of any terms, or provision of
this Agreement shall not be considered a waiver of that term, condition, or provision in the
future. No waiver, consent, or modification of any of the provisions of this Agreement shall be
binding unless in writing and signed by a duly authorized representative of each party hereto.
This Agreement may be executed in any number of counterparts, each of which when so
executed and delivered shall be considered an original agreement; but such counterparts shall
together constitute but one and the same instrument.
35. DRAFTING - OWNER and CONTRACTOR each represent that they have both shared equally
in drafting this Agreement and no party shall be favored or disfavored regarding the
interpretation of this Agreement in the event of a dispute between the parties.
36. NOTICE - Any notices required to be given by the terms of this Agreement shall be delivered
by hand or mailed, certified mail, return receipt requested, postage prepaid to:
For CONTRACTOR:
15
CITY OF CAPE CANAVERAL SMALL SCALE CONSTRUCTION AGREEMENT
Fcrm v 12023
Company Name: Garcia Civil Contractors
Attn: Eduardo Garcia
Address: 3361 Rouse Road Suite 130
Orlando, FL 32817
Phone: 407-580-6051
Fax:
For OWNER:
City of Cape Canaveral
Attn: City Manager
100 Polk Avenue
Cape Canaveral, Florida
321-868-1220
Either party may change the notice address by providing the other party written notice of the
change. Any Notice given as provided herein shall be deemed received as follows: if delivered
by personal service, on the date so delivered; if delivered to an overnight courier service, on the
business day immediately following delivery to such service; and if mailed, on the third business
day after mailing.
37. CONFLICT OF INTEREST.
a. The CONTRACTOR agrees that it will not engage in any action that would create a conflict of
interest in the performance of its obligations pursuant to this Contract with the OWNER or
which would violate or cause others to violate the provisions of Part III, Chapter 112, Florida
Statutes, relating to ethics in government and the OWNER's Personnel Policies.
b. The CONTRACTOR hereby certifies that no officer, agent or employee of the OWNER has
any material interest (as defined in Section 112.312 (15), Florida Statutes, as over five percent
(5%) either directly or indirectly, in the business of the CONTRACTOR to be conducted here,
and that no such person shall have any such interest at any time during the term of this
CONTRACT.
c. Pursuant to Section 216.347, Florida Statutes, the CONTRACTOR hereby agrees that monies
received from the OWNER pursuant to this Agreement will not be used for the purpose of
lobbying the Legislature or any other State or Federal Agency.
38. ADDITIONAL ASSURANCES.
a. No principal (which includes officers, directors, or executive) or individual holding
a professional license and performing Work under this Agreement is presently debarred,
suspended, proposed for debarment, declared ineligible or voluntarily excluded from
16
CITY OF CAPE CANAVERAL SMALL SCALE CONSTRUCTION AGREEMENT
: 2C23
participation in any Work required by this Agreement by any Federal, State, or local
governmental commission, department, corporation, subdivision, or agency;
b. No principal (which includes officers, directors, or executive), individual holding a
professional license and performing Work under this Agreement, employee, or agent has
employed or otherwise provided compensation to, any employee or officer of the OWNER;
and
c. No principal (which includes officers, directors, or executive), individual holding a
professional license and performing Work under this Agreement, employee or agent has
willfully offered an employee or officer of the OWNER any pecuniary or other benefit with
the intent to influence the employee or officer's official action or judgment.
39. E-VERIFY - Pursuant to section 448.095, Florida Statutes, beginning January 1, 2021, any City
contractors shall register with and use the U.S. Department of Homeland Security's E-
Verify system, https://e-verify.uscis.gov/emp, to verify the work authorization status of all
employees hired on and after January 1, 2021. City Contractors must provide evidence of
compliance with section 448.095, Florida Statutes. Evidence shall consist of an affidavit from the
Contractor stating all employees hired on and after January 1, 2021 have had their work
authorization status verified through the E-Verify system and a copy of their proof of
registration in the E-Verify system. Failure to comply with this provision will be a material breach
of the contract, and shall result in the immediate termination of the contract without penalty to
the City. The City Contractor shall be liable for all costs incurred by the City securing a
replacement contract, including but not limited to, any increased costs for the same services,
any costs due to delay, and rebidding costs, if applicable. If the City Contractor utilizes
Subcontractors the following shall apply.
a. Contractor shall also require all subcontractors performing work under the Agreement
to use the E-Verify system for any employees they may hire during the term of the
Agreement.
b. Contractor shall obtain from all such subcontractors an affidavit stating the
subcontractor does not employ, contract with, or subcontract with an unauthorized
alien, as defined in section 448.095, Florida Statutes.
c. Contractor shall provide a copy of all subcontractor affidavits to the City upon receipt
and shall maintain a copy for the duration of the Agreement.
IN WITNESS WHEREOF, the parties have hereunto set their hands and seal on the date first
above written.
17
CITY OF CAPE CANAVERAL SMALL SCALE CONSTRUCTION AGREEMENT
Form v 1 2023
Cif.
ATTEST:
PQ� r;,ANAYtC „,it•f
.
DAN,a /slew:
Mia Goforth, City Clerk
STATE OF
COUNTY OF/
,— e
CITY OF CAPE CANAVERAL
By:�
Todtf Morley, City M nag r
Date:
CONTRACTOR
By:
Print na"e
\ CFw 5
_ trrcco—f_ "_- r J P464°ef
The foregoing instrument was acknowledged before me by means of (physical presence or
(� online notarization, his % day of - t, ui,e,)2023, by Jrut-c 4 , the
Dr-r,--ne of n,p-c'4 Cc••c1 ee-trni14wlio is personally known to me or who
produce � -_ d ' 1-- as identification ancl_wh_o did take an oath.
7-1
(Notary Public ignature)
PABLO HENRIOUEZ
Notary Public, State of Florida
Commission# GG 307355
My comm. expires May 21, 2023
(Print Name)
Notary Public, State of
Commission No.:
My Commission Expires:
18
CITY OF CAPE CANAVERAL SMALL SCALE CONSTRUCTION AGREEMENT
Forme 12023
EXHIBIT A
Specifications and Scope of Services
Subject: Approve proposal for construction of sidewalks and driveway aprons in the amount of $95,293
with Garcia Civil Contractors.
Department: Capital Projects
Summary: At the 2022 City Council Retreat, a Sidewalk Completion Plan, conceived by Council Member
Willis, was presented. The scope includes finishing a complete sidewalk on one side of every street in the
City. Both Council Members Willis and Kellum, along with Staff, met with several residents to gather
community feedback in the various projects' streets.
As a result of this community feedback, certain streets are not included in the scope of the project because
of respondent objections to sidewalks being constructed. Those streets are:
• Long Point Road,
• Oak Lane, and
• The entire Harbor Heights subdivision
Also excluded from the scope are the Presidential streets. Sidewalks in the Presidential Streets will be
included in the Presidential Streets Master Plan and will be installed at a later date.
The work will consist of constructing sidewalks on one side of each street, and, as necessary, constructing
driveway aprons and curbs. Certain portions of existing sidewalks will be removed and reconstructed as
necessary for ADA compliance.
The purchase will piggyback off of Brevard County's contract for concrete services. Garcia Civil
Contractors has submitted a proposal for the referenced work in the amount of $95,293 (Attachment 2).
Submitting Department Director: Jeff Ratliff
Attachment:
1. Aerial Photo of Work Locations
2. Proposal from Garcia Civil Contractors
Financial Impact: $95,293 for the construction of sidewalks, aprons and the removal/replacement of
existing sidewalks by Garcia Civil Contractors funded by the Community Redevelopment Agency (CRA).
Staff time and effort to prepare this agenda item.
Reviewed by Administrative/Financial
Services Director: John DeLeo
The City Manager recommends the City Council take the following actions:
Approve the proposal for construction of sidewalks, aprons and the removal/replacement of existing
sidewalks in the amount of $95,293 with Garcia Civil Contractors.
Approved by City Manager: Todd Morley
19
CITY OF CAPE CANAVERAL SMALL SCALE CONSTRUCTION AGREEMENT
Form v 1.2023
Aerial Photo of Work Locations
Sidewalks
Driveway Aprons
Sidewalk Aprons
Remove and Replace for ADA Compliance
Attachment 1
DiL -es
dominiu
Torhoutse
. t Oritar. 1 - glfr'T ' •T*-1r1Pwr" ':
k1 . aroline 0
.:- . ii,oildt • IIIMVIIIIIIMIS4 IC 44r
r r v-1.3.44.4„ap,
,-,
erntlilIDA
rie Down
ailfish Ave
r
CANAvERAL
SANDS BAN.
o Rental
ea
gle e ta
Attachment 2
GARCIA,
CIVIL CONTRACTORS
Proposal
December 6, 2022
Submitted To: City of Cape Canaveral
ATTN: Tim Carlisle
Project Name: Non -Presidential Street Sidewalk Improvements
Scope Narrative:
Garcia Civil Contractors is proposing the following scope for the concrete pedestrian access
improvements on the non -presidential streets.
Total Proposal = $ 95,293.00
Please see Spreadsheet attached.
Exclusion/Inclusions/Notes:
• Utility Relocations by others
• Tree Removal by others
• Permits by others
• Payment Term 15 days from the time of approved invoice.
• Staging Area provided by Prime Contractor.
• Survey and Layout by Others.
• Proposal is valid for 60 days.
Looking forward to providing our services and working with the Team.
Thank You
Eduardo Garcia
Principal
Garcia Civil Contractors, LLC - Orlando, Florida — (407) 744-2790
, GARCIA
CIVI1. CONTRACTORS
Location
Brevard Bid Item
Bid Item
UM
Price
Qty
Total
8523 Canaveral Blvd
NA
Clearing and Grubbing
SF
$ 6.00
495
$ 2,970.00
55
Final Grading for sod
SY
$ 15.00
44
$ 660.00
2
Concrete Sidewalk
SY
$ 70.00
55
$ 3,850.00
Total
$ 7,480.00
216 Chandler Ave
NA
Clearing and Grubbing
SF
$ 6.00
1096
$ 6,576.00
2
Concrete Sidewalk
SY
$ 70.00
103
$ 7,210.00
55
Final Grading for Sod
SY
$ 15.00
103
$ 1,545.00
3
Driveway Apron 4x10
SY
$ 260.00
18
$ 4,680.00
Tree Removal by Others
Total
$ 20,011.00
311Surf Dr
NA
Clearing and Grubbing
SF
$ 6.00
504
$ 3,024.00
55
Final Grading for sod
SY
$ 15.00
56
$ 840.00
2
Concrete Sidewalk
SY
$ 70.00
56
$ 3,920.00
Tree Removal by Others
Total
$ 7,784.00
Corner Ridgewood and Surf
NA
Clearing and Grubbing
SF
$ 6.00
784
$ 4,704.00
55
Final Grading for sod
SY
$ 15.00
88
$ 1,320.00
2
Concrete Sidewalk
SY
$ 70.00
88
$ 6,160.00
Tree Removal by Others
Total
$ 12,184.00
Canaveral Beach Blvd & e. Central
NA
Clearing and Grubbing
SF
$ 6.00
784
$ 4,704.00
55
Final Grading for sod
SY
$ 15.00
88
$ 1,320.00
2
Concrete Sidewalk
SY
$ 70.00
88
$ 6,160.00
5
Truncated Domes
SF
$ 45.00
20
$ 900.00
3
12" Conc. Under ADA
SY
$ 260.00
2.5
$ 650.00
2
Ramp
SY
$ 70.00
11
$ 770.00
Tree Removal by Others
Total
$14,504.00
Chandler St & Rosalind Ave
NA
Clearing and Grubbing
SF
$ 6.00
250
$ 1,500.00
55
Final Grading for sod
SY
$ 15.00
10
$ 150.00
2
Concrete Sidewalk
SY
$ 70.00
22
$ 1,540.00
5
Truncated Domes
SF
$ 45.00
120
$ 5,400.00
3
12" Conc. Under ADA
SY
$ 260.00
14
$ 3,640.00
2
Ramp
SY
$ 70.00
20
$ 1,400.00
50
Concrete Removal 6"
SY
$ 25.00
11
$ 275.00
Total
$ 13,905.00
Rosalind Ave
NA
Clearing and Grubbing
SF
$ 6.00
100
$ 600.00
55
Final Grading for sod
SY
$ 15.00
5
$ 75.00
2
Concrete Sidewalk
SY
$ 70.00
11
$ 770.00
5
Truncated Domes
SF
$ 45.00
20
$ 900.00
3
12" Conc. Under ADA
SY
$ 260.00
4
$ 1,040.00
2
Ramp
SY
$ 70.00
10
$ 700.00
Total
$ 4,085.00
Caroline St.
50
Removal of Concrete 6"
SY
$ 25.00
34
$ 850.00
2
Concrete Sidewalk
SY
$ 70.00
17
$ 1,190.00
5
Truncated Domes
SF
$ 45.00
60
$ 2,700.00
3
12" Conc. Under ADA
SY
$ 260.00
10
$ 2,600.00
11
Type D Curb
LF
$ 50.00
Total
60
$ 3,000.00
�$10,340.00
MOT
1
$ 5,000.00
Garcia
Contractors,
LLC - Orlando, Fiona-
(4C7)
74°R°"^^
Total
$ 5,000.00
Grand Total
$95,293.00