HomeMy WebLinkAboutKitchen ImprovementsCITY OF CAPE CANAVERAL
DOCUMENT COVER SHEET
BOX #: 2
Item #3 — Radisson Resort; Kitchen Improvements
2 pages
UPON RETURN OF PAPER ORIGINALS FROM MCCI, add to file name:
G�ILI�UG, PLAN - bkMc�LITIDN
ORemove Ceiling This Area
ORemove & Relocate Exhaust, Duct Through Roof
Relocate Existing Power
r- - -
--�
L— — —
-�
FLOOR PLAQ.- D�MOLITIOQ
Ol Remove Floor As Needed To Replace & Add Floor Drains. Connect To
Existing Floor Drain & Vent Stack. Recess Slab For Thin Set: & Slope To Drain
2O Remove Equipment
3O Relocate Dishwasher, See New Floor Plan, Connect To Existing Water Line
& Drain Line. Relocate Power
Remove Wall
Remove Door
�6 Repair Existing Clogged Floor Drain
/4l�
ecal® : %VO7-6,0
drawn : BIAS:
checked : lJ77Vl
approved - ,!DTII?
date : g,16.00
Job no.
,1.
z;
y+Y,
o
Z
.
Z
a
m
G�ILI�UG, PLAN - bkMc�LITIDN
ORemove Ceiling This Area
ORemove & Relocate Exhaust, Duct Through Roof
Relocate Existing Power
r- - -
--�
L— — —
-�
FLOOR PLAQ.- D�MOLITIOQ
Ol Remove Floor As Needed To Replace & Add Floor Drains. Connect To
Existing Floor Drain & Vent Stack. Recess Slab For Thin Set: & Slope To Drain
2O Remove Equipment
3O Relocate Dishwasher, See New Floor Plan, Connect To Existing Water Line
& Drain Line. Relocate Power
Remove Wall
Remove Door
�6 Repair Existing Clogged Floor Drain
/4l�
ecal® : %VO7-6,0
drawn : BIAS:
checked : lJ77Vl
approved - ,!DTII?
date : g,16.00
Job no.
--PAC) d asoN
C�NVE��i"IOIJ
-- f�4t11NCa l�oT.�s
T f,:'�
P�d\/E MF:: -N T 3
1�. New Freezer - 3m, 208 V, 30 A: Panel A; Circuits 19, 21, 23
20 New Cooler - 3o, 208 V, 30 A: Panel A; Circuits 7, 9, 11
O3 Existing Hot Water Heaters
O New Mixer - 3s, 480 V, 15 A: Panel MSB; Circuit 18
5� New Convection Oven - 3o, 208 V, 70 A: panel A ; Circuits 2, 4, 6
6O Freezer & Cooler Disconnects
Y
M11011111111111111uml 111
PLAU — �,LDJS50k�
KITCHEKI
AP P R G 2 5 2000
n / •�;
MAIEnglneers Arthitteft
� Yp sum Yp Board
10 3 5/s 2Z QA Metal Stud Wall With �/s Type X G
Each Side To Underside Roof Deck # 1 HR)
8�.
Repaint Wall
ISSUEO FOR
of (UL -
�2. '/z" Air Space
9�.
Replace Ceiling Grid At Disturbed Area
CONSTRUC
ION
�3 Hand Sink With Soap Dispenser
10.
Relocate Ice Machine To New Location.
Relocate Power - Use Existing Circuit
DATE �Y -
ONew Floor Drain, Repair & Slope Floor As Required
11.
Relocate Switches to Existing Walls l'or Convenience
�5 Relocate Electrical Panel To This Wall
12.
Relocation Of Fire Sprinkler I leads To Be Provided By
New 2X4 Lay -In Flourescent Light, Use Existing Circuit
A Licensed Fire Sprinkler C- N +v%
Relocate Shunt Trip For Exhaust Hood
O
scat® A10775 b
drawn : 13MS
checkad e t,)ilkl
approved : D7"M
data :
job no.
SHEET NO. '
®