Loading...
HomeMy WebLinkAboutCode Master Project 1978: Chapter 547: Building Permit Fees§ 547.01 BLDG. PERMIT FEES § 547.01 CHAPTER 547 BUILDING PERMIT FEES Sec. 547.01 Building Permit Fee Schedule. The City of Cape Canaveral, Florida does hereby establish as its schedule for building permits on all construction in the City of Cape Canaveral, Florida, the following fee schedule. (A) Building and Miscellaneous: On all buildings, structures or alter- ations requiring a building permit, a fee shall be paid as required at the time of filing application, as follows: (1) Alterations, remodeling, repairs and moving, in pro- portion to area of building and extent of inspection required, provided the fee shall not exceed one-half of the regular fee for new construction of like classification per $1,000.00 valuation $5.00 Minimum Fee 5.00 (2) Moving of Building *50.00 (3) Demolition *25.00 (4) BUILDING PERMIT FEES SCHEDULE Fee Total Valuation $100.00 and less No fee, unless inspec- tion required, in which case a $5.00 fee for each inspec- tion shall be charged. *Fee Change Ord. 1-76, §1, 24 Feb. 1976. §547.01 BLDG. PERMIT FEES §547.01 Total valuation for residential permit fees shall be based on a value of $20.00 per square foot for all living areas and $10.00 per square foot for garages, base- ments, carports and enclosed pations or porches. (Ord. No. 12-76 §1, 8 June 1976). A building permit fee for commer- cial structures shall be based upon the owner's declared value, as approved by the Building Official. (Ord. No. 1-76 §1, 24 Feb 1976). (5) Signs, per $1,000 valuation $5.00 (6) Block Walls and fences, per $1,000.00 valuation 5.00 (7) Seawall, per $1,000.00 valuation 5.00 (8) Retaining wall, per $1,000.00 valuation 5.00 (9) Well (deep or shallow) 5.00 (10) Certificate of Occu- pancy (replacement or change of use) 5.00 (11) Portable Signs: 1-3 days 2.50 4-7 days 5.00 8-15 days 7.50 16-31 days 15.00 All other permits not listed above, per $1,000.00 valuation 5.00 (12) Plan checking fee 25% of the building fee for checking plans of over $5,000.00 valuation. In the event said plans are reviewed §547.01 BLDG. PERMIT FEES §547.01 by the CIty Engineer, then the provisions of Chapter 547.01 (D) shall prevail in addition to this plan checking fee. (Ord. No. 1-76 §1, 24 Feb. 1976, Ord. No. 13-76 §2, 8 Jun 1976). (B) Plumbing: In addition to any fee or fees charged in subsection (A) above. (1) Minimum permit charge: $5.00 For each plumbing fixture, floor drain or trap (in- cluding water and drainage piping) 1.00 Water closet Laundry Tub Lavatory Drinking Fountain Bathrub Sewer Shower Floor Drain Urinal Catch basin or sump Sink Disposal Unit Grease Trap Dishwasher Service Sink Washing Machine Trailler Connec- tion For installation alteration or repair of water piping and/or water treating equipment 3.00 For repair or alteration of drainage or vent piping 3.00 (2) A charge of five dollars shall be made for reinspec- tion of plumbing installa- tion. 5.00 §547.01 BLDG. PERMIT FEES §547.01 $101.00 to $2,000.00 $5.00 per thousand or fraction thereof. $2,001.00 to $15,000.00 $10.00 for the first $2,000.00 plus $3.00 for each additional thousand or fraction thereof, to and includ- ing $15,000.00. $15,001.00 to $50,000.00 $49.00 for the first $15,000.00 plus $2.50 for each additional thousand or fraction thereof, to and includ- ing $50,000.00. $50,001.00 to $100,000.00 $136.50 for the first $50,000.00 plus $2.00 for each additional thousand or fraction thereof, to and includ- ing $100,000.00. $100,001.00 to $500,000.00 $236.50 for the first $100,000.00 plus $1.25 for each additional thousand or fraction thereof, to and includ- ing $500,000.00. $500,001.00 and up $736.50 for the first $500,000.00 plus $.75 for each additional thousand or fraction thereof. (Ord. No. 1-76, §1, 24 Feb 1976). §547.01 BLDG. PERMIT FEES §547.01 (3) Sewer Tap-in Inspection Fee $5.00 (C) Electrical. In addition to any fee, or fees charged in subsection (A) above (1) Minimum electrical permit *5.00 Inspection fee- Residential 3.00 Inspection fee- Com. Bldg. per floor 3.00 Outlets at which current is controlled or consumed for each outlet .10 Each lighting fixture .10 Each outlet controlling window type air condi- tioning .10 Continuous receptacle strip assemblies .10 Each service charge 5.00 Motors or Generators 1 HP thru 10 HP 1.00 Over 10 HP 2.00 Sign outlets per cir- cuit .10 Each Heating Appliance Up to 1 kw .50 Over 1 kw but not over 10 kw 1.00 Over 10 kw 2.00 Electrical water heaters .75 Dishwasher, disposal, etc. .75 X-ray 1.00 §547.01 BLDG. PERMIT FEES §547.02 City Engineer, the actual costs of such review shall be paid by the applicant, whether a building permit is issued or not. The Building Official may require a deposit of estimated cost upon receipt of application for building permit. (Ord. No. 10-74, §1, 7 May 1974). Sec. 547.02 Baluation based on actual construction price. Where construction valuation is required to determine the permit fee, such valuation shall be based upon the actual construction contract price (with satisfactory evidence of same being submitted to the Building Official) or a construction cost estimate made by the Building Official. Except as otherwise provided in Section 547.01 (A) (4) herein. (Ord. No. 15-73, §2, 1 May 1973 a/a/b Ord. No. 1-76, §1, 24 Feb. 1976). §547.01 BLDG. PERMIT FEES §547.01 Electric ranges, each appliance .75 Dental units 2.00 Oil burner units or central A/C units 2.00 Exhaust fans under 1 HP .25 Electric elevators 5.00 Electric Welders 1 HP thru 10 HP 1.00 Over 10 HP 2.00 Electric signs (incandescent) 2.00 Sign flasher 1.00 TIme switch .50 Noon sign each transformer .50 Flood or spotlight, commercial 500 W or more 1.00 Kitche centers to be computed according to above schedule of fees for outlets and appliances. For the inspection of any elec- trical equipment for which no fee is set, $5.00 per hour. (2) Reinspection fees. When extra inspection trips are necessary due to wrong address, second call on condemned work, additional work done after inspec- tion has been made, or work not ready for inspection when called, a charge of five dollars ($5.00) shall be made for each trip. (Ord. No. 15-73, §1, 1 May 1973). (D) Where plans and specifications for construction in the City of Cape Canaveral, Florida are reviewed by the LDR Codification May 1990 §547.01 BUILDING PERMIT & DEVELOPMENT FEES §547.07 CHAPTER 547 BUILDING PERMIT & DEVELOPMENT FEES Sec. 547.01 Building Permit Fee Schedule. The City of Cape Canaveral, Florida does hereby establish a on all construction in the City of Cape Canaveral, Florida. [Ord. No. 1-84, §1, 17 Jan 84] Building Permit and Development Fee Schedule Sec. 547.03 Changes to the Schedule of Fees. The Building Permit and Development Fee Schedule may be amended from time to time, as needed, by Resolution of the City Council. [Ord. No. 1-84, §1, 17 Jan 84] Leo? 62 LDR Codification May 1990 § 547 .01 BUILDING PERMIT AND § 547 .03 DEVELOPMENT FEES CHAPTER 547 BUILDING PERMIT & DEVELOPMENT FEES Sec. 547. 01 Building Permit Fee Schedule. The City of Cape Canaveral, Florida, does hereby establish a Building Permit and Development Fee Schedule on all construction in the City of Cape Canaveral, Florida. [Ord. No. 1-84, §1 , 17 Jan 84] Sec. 547. 03 Changes to the Schedule of Fees. The Building Permit and Development Fee Schedule may be amended from time to time, as needed, by Resolution of the City Council. [Ord. No. 1 -84, §1 , 17 Jan 84 ] CHAPTER REVISED 18 SEP 87 262 § 547 . 01 BUILDING PERMIT & DEVELOPMENT FEES § 547 . 01 CHAPTER 547 BUILDING PERMIT & DEVELOPMENT FEES Sec. 547 . 01 Building Permit Fee Schedule. The City of Cape Canaveral , Florida, does hereby establish as its schedule for building permits on all construction in the City of Cape Canaveral, Florida the following fee schedule. [Ord. No. 1-84, §1, 17 Jan 84; Res. No. 87-41, §1, 18 AUG 87] CHAPTER REVISED 17 JAN 84 [this entire page is crossed out] [this entire page is crossed out] [this entire page is crossed out] [this entire page is crossed out] FILE COPY City of Cape Canaveral 105 POLK AVENUE • P.O. BOX 326 CAPE CANAVERAL, FLORIDA 32920 TELEPHONE 305 783-1100 CITY OF CAPE CANAVERAL TO: Leo Nicholas, City Manager FROM: James Morgan, Building Official DATE: July 14, 1987 SUBJECT: Service fees for permits issued Sir: As per your request, I have reviewed our current permit fee schedule, as outlined in the City Code of Ordinances , Section 547.01 and set forth in the following standard codes as adopted by City Council; ( Standard Building code, Appendix K; Standard Plumbing Code, Appendix C; Standard Gas Code, Appendix C ) : Each of these fees set forth in their respective codes can not be altered prior to the following chain of events ; as per Section 547.15 of the City Code of Ordinances, Title: Changes to the Schedule of Fees . 1 . A resolution of the City Council is needed to amend Chapter 547 of the City Code; in this resolution, it would be necessary to delete the references to Fee schedules in each above listed codes so as not to place each code in conflict with one another and then adopt a standard policy fee which can be amended from time to time, as needed, so outlined in Chapter 547.15 2 . Then a second resolution would be in order amending Chapter 547 of the City Code of Ordinances following the staff review of the new fee schedule as drafted and presented. 3 . The following draft is presented to you in its entirety; repealing of codes and conflicts herein. If you have any questions, please feel free to ask. Respectfully, [signature] James Morgan Building Official JEM: jh BUILDING PERMIT & DEVELOPMENT FEES § 547 .01 CHAPTER 547 BUILDING PERMIT & DEVELOPMENT FEES Sec. 547 .01 Building Permit Fee Schedule. The City of Cape Canaveral, Florida, does hereby establish as its schedule for building permits on all construction in the City of Cape Canaveral, Florida, the fee schedule: (A) Building and Miscellaneous . On all buildings , structures or alterations requiring a building permit , a fee shall be paid as required at the time of filing application as follows : Alterations , remodeling, repairs and moving, in proportion to area of building and extent of inspection required, provided the fee shall not exceed one-half of the regular fee for new construction of like classification. Per $1 , 000 Valuation $ 20 .00 Minimum fee $ 20.00 Moving of Building $ 50.00 Demolition $ 50 .00 BUILDING PERMIT FEE SCHEDULE (AS FOLLOWS): Total Valuation Fee $100 or less No fee, unless inspection required in which case a $ 20.00 fee for each inspection shall be charged. $101 to $2 , 000 $30.00 per thousand or fraction thereof. $2,001 to $15,000.00 $40.00 for the first $2,000 plus $4.00 for each addi- tional thousand or fraction thereof, to and including $15,000. $15,001 to $50,000 $50.00 for the first $15,000 plus $3.75 for each additional thousand or fraction thereof, to and including $50,000. $50,001 to $100,000 $150.00 for the first $50,000 plus $3.50 for each addi- tional thousand or fraction thereof, to and including $100,000 BUILDING PERMIT FEE SCHEDULE (CONT. ) Total Valuation Fee 100,001 to $500 ,000 $250.00 for the first $100, 000 plus $3 .00 for each additional thousand or fraction thereof, to and including $500,000 $500,00 and up $750.00 for the first $500, 000 plus $2 .50 for each additional thousand or fraction thereof. Total valuation for residential permit fees shall be based on a minimum value of $42 .00 per square foot for all living areas and $20.00 per square foot for garages, basements, carports and enclosed patios and porches ; i.e . non-habitable spaces . As per building valuation data supplied by Southern Standard Building Code Congress Annual Report . A building permit fee for commercial structures shall be based upon the owner' s declared value, as approved by the Building Official. Fire alarm systems to include: Class A and B systems per $1,000 valuation $20.00 Block walls and fences per $1,000 valuation $20.00 Seawall with approval of DER per $1,000 valuation $20.00 Retaining Wall Per $1,000 valuation $20.00 Well (deep or shallow) $20.00 All other permits not listed above per $1,000 valuation $20.00 Plan Checking Fee. Fifty percent (50%) of the building fee for checking plans of over $5.000 valuation. In the event said plans are reviewed by the City Engineers, then the provisions of Sec. 547.01 (E) shall prevail, in addition to this plan checking fee. (B) Plumbing. In addition to any fee or fees charged in subsection (A) above: Single family permit charge up to (21) baths $75.00 Plumbing ( cont . ) Multi-family permit charge, per unit up to 1; baths $ 50.00 Hotel/motel permit charge, per unit per 1 bath $ 40.00 Minimum plumbing permit for installation or repairs to any system $ 20.00 Pools Residential or commercial $ 50.00 Sewer tap in inspection fee, per tap in connection $ 15.00 (C) Electrical. In addition to any fee or fees charged in subsection (A) above: Single family, per unit $ 75 .00 Multi-family, per unit $ 50 .00 Hotel/motel, per unit $ 40.00 Minimum electrical permit $ 20 .00 Each service change out or upgrade $ 20 .00 Reinspection fees. When extra inspection trips are necessary due to wrong address , second call on condemned work, additional work done after inspection has been made, or work not ready for inspection when called, a charge of ten dollars ( $10 .00 ) per trade shall be made for each trip. ( D) Mechanical. In addition to any fee or fees charged in subsection (A) above: Permit fees $ 20 .00 For reinspection of mecha- nical installation $ 10.00 (E) Boiler System. In addition to any fee or fees charged in subsection (A) above: Permit fee $ 20.00 For reinspection of installation $ 10.00 ( F) Gas System. In addition to any fee or fees charged in subsection (A) above: Permit fee $ 20 .00 For reinspection of installation $ 10.00 (G) When plans and specifications for construction, in the City of Cape Canaveral, Florida, are reviewed by the City Engineers, then the actual costs of such review shall be paid by the applicant , whether a building permit is issued or not . The Building Official may require a deposit of estimated cost upon receipt of application for building permit . (Ord. No. 1-84 , 1( 1 , 17 Jan 84 ) Change to new adoption of Ordinance 87 . Sec. 547 .03 Valuation based on actual construction price. When construction valuation is required to determine the permit fee, such valuation shall be based upon the actual construction contract price (with satisfactory evidence of same being submitted to the Building Official ) or a construction cost estimate made by the Building Official, except as otherwise provided in Sec .547 .01 (a) , Building Permit Fee Schedule. ) Ord. No. 1-84 , § 1 . 17 Jan 84 ) Sec. 547 .05 Site Plan Review Fee Schedule. The fee schedule for site plan review shall be: 1 , 2 , and 3 residential units $ 25 .00 4 or more residential units $ 25 .00 plus $5 .00 per unit , not to exceed $500.00 Commercial Structures Per acre of land or portion thereof - $ 100 .00 Sec. 547 .07 Expiration of Site Plans . All site plans shall expire in six ( 6 ) months from final approval of the Planning and Zoning Board, unless the building permit is issued. Site plans shall only be valid for this time period and for the term of the building permit . (Ord. No. 1-84 , § 1 , 17 Jan 84 ) Sec. 547 .11 Resubmissions of Site Plans . Changes to originally approved site plans shall be charged at a rate equal to fifty percent ( 50% ) of the original fee. (Ord. No. 1-84 , § 1 , 17 Jan 84 ) Sec . 547 . 11 Replat/Subdivision of Land Fee Schedule . The City of Cape Canaveral, Florida, does hereby establish as its schedule for review of replat/subdivision of land within the City of Cape Canaveral, the following: Replat/Subdivision of Land $25 . 00 for the first three lots , plus $5 .00 each additional lot , not to exceed $500 .00 ( Ord. 1-84 , § 1 , 17 Jan 84 ) Sec . 547 . 13 Resubmission of Replats/Subdivision of Land. Changes to originally approved Replats/Subdivision of Land shall be charged at a rate equal to fifty percent ( 500 ) of the original fee . (Ord. No . 1-84 , § 1 , 17 Jan 84 ) Sec . 547 . 15 Changes to the Schedule of Fees . Any of the fees established by this Chapter may be amended, from time to time , as needed, by Resolution of the City Council. (Ord . No. 1-84 , § 1 , 17 Jan 84 ) City of Cape Canaveral 105 POLK AVENUE • CAPE CANAVERAL, FLORIDA 32920 P.O. BOX 326 TELEPHONE 305 783-1100 CITY OF CAPE CANAVERAL August 30, 1984 MEMORANDUM TO: MAYOR AND CITY COUNCIL FROM: CITY MANAGER RE: BUILDING PERMIT AND DEVELOPMENT FEES In order to update the City' s Building Permit fee structure, we are proposing that the Chapter 547 be amended. The Southern Building Code Congress International publishes a report entitled "Building Valuation Data" which provides the average per square foot cost for various types of construction. This data is used by Building Officials to analyze costs of projects, and for calculating building permit fees. The City currently has established a value lower than that found in the Building Valuation Data document. The attached amendment to Chapter 547 allows for adoption of the "Building Valuation Data" schedule as the basis for determining valuation of projects. This will bring us into conformity with other jurisdictions in the County. [signature] Frederick C. Nutt FCN:ab Attachment ATTACHMENT TO WORKSHOP MINUTES OF 8-30-84 Building Valuation Data The following Building Valuation Data represents the average costs for most buildings and is presented as a service to our members. These unit costs include the total developer's cost to design, inspect and construct the building and appurtenances. Special site conditions, and architectural or structural extras may require adjustments to the average costs listed here. It should be noted that these values are based on national aver- ages and may change from day to day. Type of Con- struction Type Type Type Type IV Type V Type VI Occupancy I II III 1-Hour Unprotected 1-Hour Unprotected 1-Hour Unprotected Apartment (R) 48.50 45.50 43.00 43.00 40.50 41.50 38.50 36.00 33.00 Automobile Parking Structure (S) 33.00 30.00 27.50 27.50 25.50 27.00 24.50 26.00 24.50 Church (A) 55.00 52.00 46.50 44.50 41.50 44.50 41.00 39.00 36.50 Covalescent (I) ' 66.00 62.50 55.00 55.00 52.00 53.00 NP 46.50 NP Dwelling(R) 53.50 51.00 48.50 46.00 43.50 43.50 41.00 41.00 38.50 Educational (E) 54.50 51.00 46.00 46.00 43.50 46.50 43.50 43.50 41.00 Factory-Industrial (F) 33.00 30.00 25.50 25.50 23.00 25.00 22.50 23.00 19.00 Hazardous (H) 28.00 25.50 23.00 23.00 20.00 23.00 20.00 NP NP Hospital (I) 94.00 90.50 88.00 88.00 85.50 83.00 NP 70.50 NP Hotel (R) 52.50 50.00 44.50 43.50 40.50 43.00 39.50 43.00 39.50 Office (B) 57.00 53.50 47.50 43.00 39.50 42.00 39.50 42.00 39.50 Private Garage And/Or Shed (S) 26.00 23.00 20.50 20.50 19.00 20.50 19.00 20.00 18.00 Public Garage (S) 33.00 30.50 27.50 24.50 21.50 24.50 21.50 24.50 21.50 Restaurant (A or B) 57.50 55.00 50.00 48.50 46.00 48.50 46.00 48.50 45.50 Retail Store (M) 44.50 42.00 36.00 34.50 31.50 34.00 30.50 33.00 30.00 Service Station (B) 53.00 50.00 45.50 44.50 42.00 44.00 41.50 38.50 37.00 Theater (A) 62.00 59.00 48.50 46.00 44.00 46.00 43.50 46.00 43.50 Warehouse (S) 27.00 24.50 21.50 21.50 19.00 21.50 19.00 21.50 19.00 Notes: 1. NP-Not permitted by code 2. Apartment Basement $20.50/sq. ft. Dwelling Basement $15.50/sq. ft. 3. Sprinklers$1.50/sq. ft. 32 Southern Building,June/July 1984 PROPOSED CHANGES TO CHAPTER 547 Replace the present wording: "Total valuation for residential permit fees shall be based on a value of $35 . 00 per square foot for all living areas and $15 . 00 per square foot for garages, basements, carports , and enclosed patios and porches . A building permit fee for commercial structures shall be based upon the owner ' s declared value, as approved by the Building Official. " with the following : "Total valuation for permit fees shall be based on a value per square foot as most recently published by the Southern Building Code Congress International and titled "Building Valuation Data. " MICROFILMED 4-15-85 RESOLUTION NO. 84-36 A RESOLUTION ADOPTING THE BUILDING VALUATION DATA, WHICH IS PUBLISHED BY THE SOUTHERN BUILDING CODE CONGRESS INTERNATIONAL, AS THE FEE SCHEDULE FOR BUILDING AND DEVELOPMENT FEES FOR THE CITY OF CAPE CANAVERAL, FLORIDA; PROVIDING AN EFFECTIVE DATE. WHEREAS , the Building and Development fees established by Chapter 547 of the City of Cape Canaveral , Florida , Code of Ordinances may be amended by Resolution of the City Council; and WHEREAS, it has been determined that the Building Permit Fee Schedule should be changed; NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Cape Canaveral , Florida , as follows : SECTION 1 . The most recent "Building Valuation Data" published by the Southern Building Code Congress International is hereby adopted as the fee schedule for Building Permit and Development Fees for the City of Cape Canaveral , Florida. SECTION 2 . This Resolution shall become effective immediately upon its adoption. ADOPTED by the City Council of the City of Cape Canaveral, Florida , this 4th day of September , 1984. [signature] MAYOR ATTEST: [signature] ACTING CITY CLERK Approved as to Form: [signature] City Attorney NAME YES NO CALVERT YES FISCHETTI YES NICHOLAS YES RUTHERFORD YES WINCHESTER YES History File Chapter 547 MICROFILMED JUNE 89 RESOLUTION NO. 87-41 A RESOLUTION INCREASING THE MINIMUM BUILDING PERMIT FEES FOR THE CITY OF CAPE CANAVERAL, FLORIDA; PROVIDING AN EFFECTIVE DATE. WHEREAS, the Building and Development Fees established by Chapter 547 of the Code of Ordinances of the City of Cape Canaveral, Florida, may be amended by Resolution of the City Council; and WHEREAS, it has been determined that the Building Permit Fee Schedule should be revised; NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Cape Canaveral, Florida, as follows: SECTION 1. The Building Permit Fees set forth in Chapter 547 of the Code of Ordinances are hereby repealed in their entirety and replaced with the following: A. BUILDING PERMIT AND MISCELLANEOUS FEES. On all buildings, structures or alterations requiring a building permit, a fee as set forth below, shall be paid at the time of filing application: 1. New Construction: Total Valuation Fee $100 or Less No fee, unless inspection required, in which case a $20. 00 fee for each inspection shall be charged. $101 to 2 , 000 $20. 00 per thousand or fraction thereof. $2 , 001 to $15, 000 $40. 00 for the first $2,000 plus $5.00 for each additional thousand or fraction thereof, to and including $15, 000. $15, 001 to $50, 000 $105.00 for the first $15,000 plus $4.00 for each additional thousand or fraction thereof, to and including $50,000. $50, 001 to $100, 000 $245.00 for the first $50,000 plus $3 .00 for each additional thousand or fraction thereof, to and including $100, 000. $100, 001 to $500, 000 $395.00 for the first $100,000 plus $2.00 for each additional thousand or fraction thereof, to and including $500,000. $500, 000 and Up $1,195.00 for the first $500,000 plus $1.50 for each thousand or fraction thereof. Total valuation for residential permit fees shall be based on a value of $45.00 per square foot for all living areas and $21. 00 per square foot for garages, basements, carports and enclosed patios and porches. RESOLUTION NO. 87-41 PAGE 1 OF 4 MICROFILMED JUNE 89 When construction valuation is required to determine the permit fee, such valuation shall be based upon the actual construction contract price (with satisfactory evidence of same being submitted to the Building Official ) or a construction cost estimate made by the Building Official, except as otherwise provided in section (A) above. 2. Remodeling, Alterations, Additions, Repairs: In proportion to area of building and extent of inspection required, provided the fee shall not exceed one-half of the regular fee for new construction of like classification: Per $1, 000 Valuation $20. 00 Minimum Fee $20. 00 3 . Commercial Structures: A building permit fee for commerical structures shall be based upon the Owner 's declared value, as approved by the Building Official. 4 . Miscellaneous: Block Walls and Fences $20. 00 Per $1, 000 valuation Seawall $20. 00 Per $1, 000 valuation Retaining Wall $20. 00 Per $1, 000 valuation Well (deep or shallow) $20. 00 Moving of Building $75. 00 Demolition of Building $50. 00 Certificate of Occupancy $20. 00 (Replacement or change of use) All other permits not listed above $20. 00 Per $1, 000 valuation B. PLUMBING. In addition to any fee or fees charged in section (A) above: 1. New Construction: Single Family $40. 00 Per Bath or portion thereof Duplex, Triplex and Multi-Family Per Bath or portion thereof $40. 00 Hotel/Motel , per Unit $40. 00 2. Remodeling, Alterations, Additions, Repairs: Minimum plumbing permit $20. 00 Each plumbing fixture, floor drain or trap ( including water and drainage piping) $ 2. 00 Water Closet Lavatory Bathtub Shower Catch Basin or Sump Trailer Connection RESOLUTION NO. 87-41 PAGE 2 OF 4 MICROFILMED JUNE 89 Disposal Unit Grease Trap Laundry Tub Drinking Fountain Service Sink Dishwasher Sewer Floor Drain Urinal Sink Washing Machine Installation, alteration or repair of water piping and/or water treating equipment $20. 00 Repair or alteration of drainage or vent piping $20. 00 Pools, Residential or Commercial $20. 00 Sewer Tap-In Inspection Fee $25. 00 C. ELECTRICAL. In addition to any fees charged in section (A) above: 1. New Construction: Single Family, per unit $50. 00 Multi-Family, per unit $40. 00 Hotel/Motel, per unit $35. 00 2 . Remodeling, Alterations, Additions, Repairs: Minimum Electrical Permit $20. 00 Each service charge up to 200 AMPS $20. 00 For each 100 AMP or fraction thereof $10. 00 Motors or Generators 1/3 HP thru 10 HP $ 2. 00 Over 10 HP $ 3 . 00 Sign Outlets, per circuit, per sign $10. 00 Each Heating Appliance Up to 1 KW $ 1. 00 Over 1 KW but not over 10 KW $ 2. 00 Over 10 KW $ 3. 00 Electrical water heaters $ 2. 00 Dishwasher, disposal, etc. $ 2. 00 Electric ranges, each appliance $ 2. 00 Oil burner units or central AC units $20. 00 Electric elevators $20. 00 Electric signs, per sign $20. 00 D. MECHANICAL. In addition to any fees charged in section (A) above: Fees per Section 106, Standard Mechanical Code, minimum $20. 00 E. PLAN CHECKING FEE. Fifty-percent ( 50% ) of the building fee for checking plans of over $5, 000 valuation. When plans and specifications for construction are reviewed by the City Engineer, then the actual costs of such review shall be paid by RESOLUTION NO. 87-41 PAGE 3 OF 4 MICROFILMED JUNE 89 the applicant, in addition to the Plan Checking Fee, whether a building permit is issued or not. The Building Official may require a deposit of estimated cost for Engineer ' s fees upon receipt of application for building permit. F. REINSPECTION FEES. When extra inspection trips are necessary due to wrong address, second call on condemned work, additional work done after inspection has been made, or work not ready for inspection when called, a charge of ten dollars ( $10. 00 ) shall be made for each trip. G. SITE PLANS. 1. Fee Schedule. The fee schedule for Site Plan Review shall be: 1, 2 & 3 Residential Units $25 . 00 4 or More Residential Units . . $25. 00 plus $5. 00 per unit, not to exceed $500. 00 Commercial Structures Per Acre of land or portion thereof $100. 00 2 . Expiration of Site Plans. All site plans shall expire in six (6 ) months from final approval of the Planning and Zoning Board, unless the Building permit is issued. Site Plans shall only be valid for this time period and for the term of the Building Permit. 3 . Resubmission. Changes to originally approved site plans shall be charged at a rate equal to fifty percent ( 50% ) of the original fee. H. REPLAT/SUBDIVISION OF LAND. 1. Fee Schedule. The fee schedule for review of Replat/Subdivision of land shall be: $25. 00 for first three lots, plus $5. 00 each additional lot, not to exceed $500. 00 2 . Resubmission. Changes to originally approved Replats/Subdivision of Land shall be charged at a rate equal to fifty percent ( 50% ) of the original fee. SECTION 2. This Resolution shall become effective immediately upon its adoption. ADOPTED BY the City Council of the City of Cape Canaveral, Florida, this 18th day of August , 1987. [signature] Mayor Pro Tem ATTEST: [signature] City Clerk APPROVED AS TO FORM: [signature] City Attorney (Deputy) NAME YES NO HOOG YES KIDD YES LEE Absent MARCHETTI Absent MURPHY YES RESOLUTION NO. 87-41 PAGE 4 OF 4 Adopted on Res #87.41 City Clerk PROPOSED § 547 . 01 BUILDING PERMIT & DEVELOPMENT FEES § 547. 01 CHAPTER 547 BUILDING PERMIT & DEVELOPMENT FEES Sec. 547 . 01 Building Permit Fee Schedule. The City of Cape Canaveral, Florida, does hereby establish as its schedule for building permits on all construction in the City of Cape Canaveral, Florida, the following fee schedule: (A) BUILDING AND MISCELLANEOUS. On all buildings, structures or alterations requiring a building permit, a fee shall be paid as required at the time of filing application as follows: (1) ALTERATIONS, REMODELING, REPAIRS AND MOVING, in proportion to area of building and extent of inspection required, provided the fee shall not exceed one-half of the regular fee for new construction of like classification Per $1, 000 Valuation $ 20 . 00 Minimum Fee 20 . 00 Moving of Building 75. 00 Demolition 50 . 00 (2) BUILDING PERMIT FEE SCHEDULE - NEW (AS FOLLOWS) : Total Valuation Fee $100 or less No fee, unless inspection required, in which case a $20 . 00 fee for each inspection shall be charged. $101 to $2 , 000 $20 . 00 per thousand or fraction thereof. $2 , 001 to $15, 000 $40 . 00 for the first $2, 000 plus $5. 00 for each additional thousand or fraction thereof, to and including $15 , 000 . $15, 001 to $50 , 000 $105 . 00 for the first $15 , 000 plus $4. 00 for each additional thousand or fraction thereof, to and in- cluding $50 , 000. $50 , 001 to $100 , 000 $245 . 00 for the first $50 , 000 plus $3. 00 for each additional thousand or fraction thereof, to and in- cluding $100 , 000 . § 547.01 BUILDING PERMIT & DEVELOPMENT FEES § 547.01 BUILDING PERMIT FEE SCHEDULE (CONT) Total Valuation Fee $100,001 to $500,000 $395.00 for the first $100,000 plus $2.00 for each additional thousand or fraction thereof, to and including $500,000. $500,000 and up $1,195.00 for the first $500,000 plus $1.50 for each additional thousand or fraction thereof. Total valuation for residential permit fees shall be based on a value of $45.00 per square foot for all living areas and $21.00 per square foot for garages, basements, carports and enclosed patios and porches. (3) COMMERCIAL STRUCTURES: A building permit fee for commercial structures shall be based upon the owner's declared value, as approved by the Building Official. Block Walls and Fences Per $1,000 valuation Seawall Per $1,000 valuation Retaining Wall Per $1,000 valuation $ 20.00 20.00 20.00 Well (deep or shallow) 20.00 Certificate of Occupancy (replacement or change of use) 20.00 All other permits not listed above Per $1,000 valuation 20.00 (4) PLAN CHECKING FEE - Fifty percent (50%) of the building fee for checking plans of over $5,000 valuation. In the event said plans are reviewed by the City Engineer, then the provisions of Sec. 547.01(E) shall prevail, in addition to this plan checking fee. (B) PLUMBING, NEW CONSTRUCTION. In addition to any fee or fees charged in subsection (A) above: Single Family permit charge Per Bath or portion of Bath $ 40.00 § 547.01 BUILDING PERMIT & DEVELOPMENT FEES § 547.01 PLUMBING (CONT) Duplex, Triplex and Multi -family: permit charge per Bath or portion of Bath Hotel/Motel permit charge, per unit REMODELING, ALTERATIONS, ADDITIONAL REPAIRS: Minimum plumbing permit For each plumbing fixture, floor drain or trap (including water and drainage piping): Water Closet Lavatory Bathtub Shower Disposal Unit Grease Trap Laundry Tub Drinking Fountain Sewer Floor Drain Catch Baisin or Sump Trailer Connection For installation, alteration or repair or water piping and/or water treating equipment For repair or alteration of drainage or vent piping $ 40.00 For reinspection of plumbing installation Pools - Residential or Commercial Sewer Tap -in Inspection Fee (C) ELECTRICAL. In addition to any fee or fees in subsection (A) above: Single Family, per unit Multi -Family, per unit Hotel/Motel, per unit REMODELING, ALTERATIONS, ADDITIONS, REPAIRS: Minimum Electrical Permit Each service charge up to 200 AMPS For each 100 AMP or a fraction thereof Motors or Generators 1/3 HP thru 10 HP Over 10 HP 40.00 20.00 2.00 Urinal Sink Service Sink Dishwasher Washing Machine 20.00 20.00 10.00 20.00 25.00 charged 50.00 40.00 35.00 20.00 20.00 10.00 2.00 3.00 § 547.01 BUILDING PERMIT & DEVELOPMENT FEES § 547.03 ELECTRICAL (CONT) Sign Outlets, per cuit, per sign 10.00 Each Heating Appliance Up to 1 kw Over 1 kw but not over 10 kw Over 10 kw Electrical water heaters Dishwasher, disposal, etc. Electric ranges, each appliance Oil burner units or central A/C units Electric Elevators Electric Signs, per sign 1.00 2.00 3.00 2.00 2.00 2.00 20.00 20.00 20.00 Reinspection Fees. When extra inspection trips are necessary due to wrong address, second call on condemned work, additional work done after inspection has been made, or work not ready for inspection when called, a charge of ten dollars ($10.00) shall be made for each trip. (D) MECHANICAL. In addition to any fee or fees charged in subsection (A) above: Fees per Section 106, Standard Mechanical Code, Minimum $20.00 For reinspection of mechanical installation 10.00 (E) When plans and specifications for construction in the City of Cape Canaveral, Florida, are reviewed by the City Engineer, then the actual costs of such review shall be paid by the applicant, whether a building permit is issued or not. The Building Official may require a deposit of estimated cost upon receipt of application for building permit. [Ord. No. 1-84, § 1, 17 Jan 84] Sec. 547.03 Valuation Based On Actual Construction Price. When construction valuation is required to determine the permit fee, such valuation shall be based upon the actual construction contract price (with satisfactory evidence of same being submitted to the Building Official) or a construction cost estimate made by the Building Official, except as otherwise provided in Sec. 547.01(A), Building Permit Fee Schedule. [Ord. No. 1-84, § 1, 17 Jan 84] § 547 . 05 BUILDING PERMIT & DEVELOPMENT FEES § 547. 15 Sec. 547 . 05 Site Plan Review Fee Schedule. The Fee Schedule for Site plan Review shall be: 1, 2 & 3 Residential Units - $25. 00 4 or more Residential Units- $25. 00 plus $5. 00 per unit, not to exceed $500. 00 Commercial Structures Per Acre of land or portion thereof - $100. 00 [Ord. No. 1-84, § 1, 17 Jan 84] Sec. 547 . 07 Expiration of Site Plans. All site plans shall expire in six (6) months from final approval of the Planning and Zoning Board, unless the Building Permit is issued. Site Plans shall only be valid for this time period and for the term of the Building Permit. [Ord. No. 1-84, § 1, 17 Jan 84] Sec. 547 . 09 Resubmission of Site Plans . Changes to originally approved site plans shall be charged at a rate equal to fifty percent (500) of the original fee. [Ord. No. 1-84 , § 1, 17 Jan 84] Sec. 547. 11 Replat/Subdivision of Land Fee Schedule. The City of Cape Canaveral, Florida, does hereby establish as its schedule for review of replat/subdivision of land within the City of Cape Canaveral, the following: Replat/Subdivision of Land - $25. 00 for first three lots, plus $5. 00 each additional lot, not to exceed $500 . 00 [Ord. No. 1-84, § 1, 17 Jan 84] Sec. 547 . 13 Resubmission of Replats/Subdivision of Land. Changes to originally approved Replats/Subdivision of Land shall be charged at a rate equal to fifty percent (50%) of the original fee. [Ord. No. 1-84 , § 1, 17 Jan 84] Sec. 547 . 15 Changes to the Schedule of Fees. Any of the fees established by this Chapter may be amended, from time to time, as needed, by Resolution of the City Council. [Oor. No. 1-84 , § 1, 17 Jan 84] City of Cape Canaveral 105 POLK AVENUE • P.O. BOX 326 CAPE CANAVERAL, FLORIDA 32920 TELEPHONE 305 783-1100 CITY OF CAPE CANAVERAL TO: Leo Nicholas , City Manager FROM: James Morgan, Building Official DATE: July 14 , 1987 SUBJECT: Service fees for permits issued Sir: As per your request, I have reviewed our current permit fee schedule, as outlined in the City Code of Ordinances, Section 547.01 and set forth in the following standard codes as adopted by City Council; (Standard Building code, Appendix K; Standard Plumbing Code, Appendix C; Standard Gas Code, Appendix C) : Each of these fees set forth in their respective codes can not be altered prior to the following chain of events; as per Section 547.15 of the City Code of Ordinances, Title: Changes to the Schedule of Fees. 1 . A resolution of the City Council is needed to amend Chapter 547 of the City Code; in this resolution, it would be necessary to delete the references to Fee schedules in each above listed codes so as not to place each code in conflict with one another and then adopt a standard policy fee which can be amended from time to time , as needed, so outlined in Chapter 547.15 2 . Then a second resolution would be in order amending Chapter 547 of the City Code of Ordinances following the staff review of the new fee schedule as drafted and presented. 3 . The following draft is presented to you in its entirety; repealing of codes and conflicts herein. If you have any questions , please feel free to ask. Respectfully, James Morgan Building Official JEM: jh BUILDING PERMIT & DEVELOPMENT FEES § 547 .01 CHAPTER 547 BUILDING PERMIT & DEVELOPMENT FEES Sec. 547 .01 Building Permit Fee Schedule. The City of Cape Canaveral, Florida, does hereby establish as its schedule for building permits on all construction in the City of Cape Canaveral, Florida, the fee schedule: (A) Building and Miscellaneous . On all buildings , structures or alterations requiring a building permit , a fee shall be paid as required at the time of filing application as follows : Alterations , remodeling, repairs and moving, in proportion to area of building and extent of inspection required, provided the fee shall not exceed one-half of the regular fee for new construction of like classification. Per $1 , 000 Valuation $ 20.00 Minimum fee $ 20.00 Moving of Building $ 50.00 Demolition $ 50.00 BUILDING PERMIT FEE SCHEDULE (AS FOLLOWS): Total Valuation Fee $100 or less No fee, unless inspection required in which case a $ 20. 00 fee for each inspection shall be charged. $101 to $2 , 000 $30.00 per thousand or fraction thereof . $2 , 001 to $15, 000 . 00 $40.00 for the first $2 , 000 plus $4 .00 for each addi- tional thousand or fraction thereof, to and including $15 , 000 . $15, 001 to $50, 000 $50.00 for the first $15, 000 plus $3 . 75 for each additional thousand or fraction thereof, to and including $50, 000 . $50 , 001 to $100 , 000 $150 .00 for the first $50, 000 plus $3 . 50 for each addi- tional thousand or fraction thereof, to and including $100 , 000 BUILDING PERMIT FEE SCHEDULE (CONT. ) Total Valuation Fee 100,001 to $500,000 $250 .00 for the first $100 , 000 plus $3 .00 for each additional thousand or fraction thereof, to and including $500 , 000 $500,00 and up $750 .00 for the first $500, 000 plus $2 .50 for each additional thousand or fraction thereof. Total valuation for residential permit fees shall be based on a minimum value of $42 .00 per square foot for all living areas and $20 .00 per square foot for garages , basements, carports and enclosed patios and porches ; i.e . non-habitable spaces . As per building valuation data supplied by Southern Standard Building Code Congress Annual Report . A building permit fee for commercial structures shall be based upon the owner' s declared value, as approved by the Building Official. Fire alarm systems to include: Class A and B systems per $1 , 000 valuation $20.00 Block walls and fences per $1 , 000 valuation $20.00 Seawall with approval of DER per $1 , 000 valuation $20.00 Retaining Wall Per $1 , 000 valuation $20.00 Well (deep or shallow) $20.00 All other permits not listed above per $1 , 000 valuation $20.00 Plan Checking Fee. Fifty percent ( 50% ) of the building fee for checking plans of over $5 .000 valuation . In the event said plans are reviewed by the City Engineers , then the provisions of Sec. 547 .01 ( E) shall prevail, in addition to this plan checking fee. ( B) Plumbing. In addition to any fee or fees charged in subsection (A) above : Single family permit charge up to (21/2) baths $75 .00 Plumbing ( cont . ) Multi-family permit charge, per unit up to 14, baths $ 50 .00 Hotel/motel permit charge, per unit per 1 bath $ 40 .00 Minimum plumbing permit for installation or repairs to any system $ 20 .00 Pools Residential or commercial $ 50 .00 Sewer tap in inspection fee, per tap in connection $ 15. 00 (C) Electrical. In addition to any fee or fees charged in subsection (A) above: Single family, per unit $ 75 .00 Multi-family, per unit $ 50.00 Hotel/motel, per unit $ 40 .00 Minimum electrical permit $ 20 .00 Each service change out or upgrade $ 20 .00 Reinspection fees . When extra inspection trips are necessary due to wrong address , second call on condemned work, additional work done after inspection has been made, or work not ready for inspection when called, a charge of ten dollars ( $10 .00 ) per trade shall be made for each trip. ( D) Mechanical. In addition to any fee or fees charged in subsection (A) above : Permit fees $ 20 .00 For reinspection of mecha- nical installation $ 10 .00 (E) Boiler System. In addition to any fee or fees charged in subsection (A) above : Permit fee $ 20 .00 For reinspection of installation $ 10 . 00 ( F) Gas System. In addition to any fee or fees charged in subsection (A) above: Permit fee $ 20 .00 For reinspection of installation $ 10 .00 ( G) When plans and specifications for construction, in the City of Cape Canaveral, Florida, are reviewed by the City Engineers , then the actual costs of such review shall be paid by the applicant , whether a building permit is issued or not . The Building Official may require a deposit of estimated cost upon receipt of application for building permit . (Ord. No. 1-84 , ¶ 1 , 17 Jan 84 ) Change to new adoption of Ordinance 87 . Sec. 547 .03 Valuation based on actual construction price. When construction valuation is required to determine the permit fee, such valuation shall be based upon the actual construction contract price (with satisfactory evidence of same being submitted to the Building Official ) or a construction cost estimate made by the Building Official, except as otherwise provided in Sec.547 . 01 (a) , Building Permit Fee Schedule. ) Ord. No. 1-84 , § 1 . 17 Jan 84 ) Sec. 547 .05 Site Plan Review Fee Schedule. The fee schedule for site plan review shall be: 1 , 2 , and 3 residential units $ 25 .00 4 or more residential units $ 25 .00 plus $5 .00 per unit , not to exceed $500 .00 Commercial Structures Per acre of land or portion thereof - $ 100 .00 Sec. 547 .07 Expiration of Site Plans . All site plans shall expire in six ( 6 ) months from final approval of the Planning and Zoning Board, unless the building permit is issued . Site plans shall only be valid for this time period and for the term of the building permit . ( Ord. No. 1-84 , § 1 , 17 Jan 84 ) Sec. 547 . 11 Resubmissions of Site Plans . Changes to originally approved site plans shall be charged at a rate equal to fifty percent ( 500 ) of the original fee. ( Ord. No. 1-84 , § 1 , 17 Jan 84 ) Sec. 547 . 11 Replat/Subdivision of Land Fee Schedule. The City of Cape Canaveral, Florida, does hereby establish as its schedule for review of replat/subdivision of land within the City of Cape Canaveral, the following: Replat/Subdivision of Land $25 . 00 for the first three lots, plus $5 .00 each additional lot , not to exceed $500 .00 (Ord. 1-84 , § 1 , 17 Jan 84 ) Sec. 547 . 13 Resubmission of Replats/Subdivision of Land. Changes to originally approved Replats/Subdivision of Land shall be charged at a rate equal to fifty percent ( 50% ) of the original fee . (Ord. No. 1-84 ,. § 1 , 17 Jan 84 ) Sec. 547 . 15 Changes to the Schedule of Fees . Any of the fees established by this Chapter may be amended, from time to time , as needed, by Resolution of the City Council. (Ord. No. 1-84, § 1 , 17 Jan 84) § 547 . 01 BUILDING PERMIT & DEVELOPMENT FEES § 547 . 01 CHAPTER 547 BUILDING PERMIT & DEVELOPMENT FEES Sec. 547 . 01 Building Permit Fee Schedule . The City of Cape Canaveral , Florida, does hereby establish as its schedule for building permits on all construction in the City of Cape Canaveral , Florida, the following fee schedule: (A) Building and Miscellaneous. On all buildings , structures or alterations requiring a building permit, a fee shall be paid as required at the time of filing appli- cation as follows : Alterations , remodeling, repairs and moving, in proportion to area of building and extent of inspection required, provided the fee shall not exceed one-half of the regular fee for new con- struction of like classification Per $1 , 000 Valuation $ 5 . 00 Minimum Fee 5 . 00 Moving of Building 50 . 00 Demolition 25 . 00 BUILDING PERMIT FEE SCHEDULE (AS FOLLOWS) : Total Valuation Fee $100 or less No fee, unless inspection required in which case a $5 . 00 fee for each inspection shall be charged. $101 to $2 , 000 $5 . 00 per thousand or fraction thereof . $2 , 001 to $15 , 000 $10 . 00 for the first $2 ,000 plus $3 . 00 for each additional thousand or fraction thereof , to and including $15 , 000 . $15 , 001 to $50 ,000 $49 . 00 for the first $15 ,000 plus $2 . 50 for each additional thousand or fraction thereof , to and including $50 , 000 . $50 , 001 to $100 ,000 $136 . 50 for the first $50 , 000 plus $2 . 00 for each additional thousand or fraction thereof , to and including $100 , 000 . CHAPTER REVISED 17 JAN 84 § 547 . 01 BUILDING PERMIT & DEVELOPMENT FEES § 547 . 01 BUILDING PERMIT FEE SCHEDULE (CONT) Total Valuation Fee $100 ,001 to $500 ,000 $236 .50 for the first $100 ,000 plus $1 . 25 for each additional thousand or fraction thereof , to and including $500 ,000 . $500 ,000 and up $736 .50 for the first $500,000 plus $. 75 for each additional thousand or fraction thereof . Block Walls and Fences Per $1 ,000 valuation $ 5. 00 Seawall Per $1 ,000 valuation 5.00 Retaining Wall Per $1,000 valuation 5 . 00 Well (deep or shallow) 5 . 00 Certificate of Occupancy (replacement or change of use) 5. 00 All other permits not listed above Per $1,000 valuation 5 . 00 Plan Checking Fee - Fifty percent (50%) of the building fee for checking plans of over $5 ,000 valuation. In the event said plans are reviewed by the City Engineer, then the provisions of Sec. 547 . 01 (E) shall pre- vail , in addition to this plan checking fee. (B) Plumbing. In addition to any fee or fees charged in subsection (A) above: Single family permit charge (21 baths) 35 . 00 CHAPTER REVISED 17 JAN 84 § 547.01 BUILDING PERMIT & DEVELOPMENT FEES § 547.01 Plumbing (cont) Multi-family permit charge , per unit (12 baths) $ 25 . 00 Hotel/Motel permit charge , per unit (1 bath) 20 . 00 Minimum plumbing permit 10 . 00 For each plumbing fixture , floor drain or trap (including water and drainage piping) : 2 . 00 Water Closet Laundry Tub Urinal Lavatory Drinking Fountain Sink Bathtub Sewer Service Sink Shower Floor Drain Dishwasher Disposal Unit Catch Basin or Sump Washing Machine Grease Trap Trailer Connection For installation, alteration or repair of water piping and/or water treating equipment 5 . 00 For repair or alteration of drainage or vent piping 5 . 00 For reinspection of plumbing installation 10 . 00 Pools - Residential or Commercial 10 . 00 Sewer Tap-in Inspection Fee 15 . 00 (C) Electrical . In addition to any fee or fees charged in subsection (A) above : Single family, per unit 50 . 00 Multi-family, per unit 40 . 00 Hotel/Motel , per unit 35 . 00 Minimum Electrical Permit 10 . 00 Outlets at which current is controlled or consumed, per each outlet . 20 Each lighting fixture . 20 Each outlet controlling window type air conditioner . 20 Continuous receptacle strip assemblies .20 Each service charge 10 . 00 Motors or Generators 1 HP thru 10 HP 2 . 00 Over 10 HP 3 . 00 CHAPTER REVISED 17 JAN 84 §547.01 BUILDING PERMIT & DEVELOPMENT FEES §547.03 Electrical (cont) Sign Outlets, per circuit Per Sign $ 10.00 Each Heating Appliance Up to 1 kw 1.00 Over 1 kw but not over 10 kw (with A/C) Over 10 kw (with A/C) Electrical water heaters 2.00 Dishwasher, disposal, etc. 2.00 Electric ranges, each appliance 2.00 Oil burner units or central A/C units 10. 00 Exhaust fans under 1 HP .50 Electric Elevators 10.00 Electric Signs (incandescent) Per Sign 10.00 Reinspection Fees . When extra inspection trips are necessary due to wrong address , second call on condemned work, additional work done after inspection has been made, or work not ready for inspection when called, a charge of ten dollars ($10 . 00) shall be made for each trip. (D) Mechanical . In addition to any fee or fees charged in subsection (A) above: Fees per Section 106 , Standard Mechanical Code For reinspection of mechanical installation 10 .00 (E) When plans and specifications for construction in the City of Cape Canaveral, Florida, are reviewed by the City Engineer, then the actual costs of such review shall be paid by the applicant, whether a building permit is issued or not. The Building Official may require a deposit of estimated cost upon receipt of application for building permit. [Ord. No. 1-84 , § 1 , 17 Jan 84] Sec. 547 . 03 Valuation based on actual construction price. When construction valuation is required to determine the permit fee, such valuation shall be based upon the actual constrcution contract price (with satis- factory evidence of same being submitted to the Building Official) or a construction cost estimate made by the Building Official , except as otherwise provided in Sec . 547 . 01 (A) , Building Permit Fee Schedule. [Ord. No. 1-84 , § 1 , 17 Jan 84] CHAPTER REVISED 17 JAN 84 266 § 547 .05 BUILDING PERMIT & DEVELOPMENT FEES § 547 .15 Sec. 547 . 05 Site Plan Review Fee Schedule. The Fee Schedule for Site Plan Review shall be: 1, 2 & 3 Residential Units - $25 . 00 4 or more Residential Units - $25 . 00 plus $5 .00 per unit, not to exceed $500. 00 Commercial Structures Per Acre of land or portion thereof - $100 . 00 [Ord. No. 1-84 , § 1, 17 Jan 84] Sec. 547 . 07 Expiration of Site Plans. All site plans shall expire in six (6) months from final approval of the Planning and Zoning Board, unless the Building Permit is issued. Site Plans shall only be valid for this time period and for the term of the Building Permit. [Ord. No. 1-84 , § 1 , 17 Jan 84] Sec. 547 . 09 Resubmissions of Site Plans . Changes to originally approved site plans shall be charged at a rate equal to fifty percent (50%) of the original fee. [Ord. No. 1-84 , § 1 , 17 Jan 84] Sec. 547 .11 Replat/Subdivision of Land Fee Schedule. The City of Cape Canaveral, Florida, does hereby establish as its schedule for review of replat/subdivision of land within the City of Cape Canaveral, the following: Replat/Subdivision of Land - $25.00 for first three lots , plus $5 .00 each additional lot, not to exceed $500 . 00 [Ord. No. 1-84 , § 1, 17 Jan 84] Sec. 547 .13 Resubmission of Replats/Subdivision of Land. Changes to originally approved Replats/Subdivision of Land shall be charged at a rate equal to fifty percent (50%) of the original fee. [Ord. No. 1-84 , § 1, 17 Jan 84] Sec. 547.15 Changes to the Schedule of Fees. Any of the fees established by this Chapter may be amended, from time to time, as needed, by Resolution of the City Council . [Ord. No. 1-84 , § 1 , 17 Jan 84] CHAPTER REVISED 17 JAN 84 History File Chapter 547 12-1983 From Act. Bldg Off. [signature] RECOMMENDED CHANGES IN FEES Recommended ways to increase fees for Building and Zoning Department and reduce operating costs of Building Department. 1) Site Plan Review A. 1-2-3 Family - $25 .00 . B . 4 or more Family - $25 .00 plus $5 .00 per unit over 3 units, not to exceed $500 .00 . C. Commercial Structures - Per acre of land, or portion thereof - $100 .00 . D. Replat/Subdivision - $25 .00 for first 3 lots, plus $5 .00 each additional lot - Not to exceed $500 .00 . E . Resubmissions - All site plans expire in six months unless building permit (s) obtained. F. Changes to originally approved site plans, replats or subdivisions shall pay a 50% fee . 2 . Building Permit Fees A. Refer Ch. 547 (City Code) . 547 .01 (A) (4) Valuation - change residential from $30 .00 to $35 .00 per square foot. 547 .01 (B) (3) Sewer Tap-In Inspection Fee - change inspection fee from $10 .00 to $15 .00 . 547 .01 (C) (2) Electrical - change reinspection fee from $5 .00 to $10 . 00 . 547 .03 (new section) : Subject: Mechanical Fees per section 106 Standard Mechanical Code . Reinspection Fee $10 .00 . B. Plan Check Fee (547 .01 (A) (12) - Increase from 1/4 to 1/2 the Building Permit fee as recommended in Appendix "K" of Southern Standard Building Code. History File 547 advertise ORDINANCE NO. 1-84 AN ORDINANCE AMENDING CODE CHAPTER 547, "BUILDING PERMIT FEES, " BY PROVIDING FOR BUILDING PERMIT FEES, SITE PLAN REVIEW FEES, AND SUBDIVISION OF LAND FEES; REPEALING ALL PORTIONS OF THE CODE IN CONFLICT HEREWITH, PROVIDING AN EFFECTIVE DATE. WHEREAS , development in Cape Canave - as increased administrative expense, and WHEREAS , development should offset this additional expense, NOW, THEREFORE, BE IT RESOLVED by the Ctiy Council of the City of Cape Canaveral, Florida, as follows : SECTION 1 . Code Chapter 547 , "Building Permit Fees" , is hereby deleted in its entirety and replaced with the following Chapter 547 , "Building Permit and Development Fees" : § 547. 01 Building Permit & Development Fees § 547. 01 CHAPTER 547 Sec. 547 . 01 Building Permit Fee Schedule. The City of Cape Canaveral, Florida, does hereby establish as its schedule for building permits on all construction in the City of Cape Canaveral, Florida, the following fee sched- ule. (A) Building and Miscellaneous. On all buildings, structures or alterations requiring a building permit, a fee shall be paid as required at the time of filing application as follows: Alterations, remodeling, repairs and moving, in proportion to area of building and extent of inspection required, provided the fee shall not exceed one-half of the regular fee for new construction of like classifi- cation per $1, 000. 00 valuation $ 5. 00 Minimum Fee 5. 00 Moving of Building 50. 00 Demolition 25.00 BUILDING PERMIT FEE SCHEDULE (as follows): Total Valuation Fees $100. 00 or less No fee, unless inspection required in which case a $5. 00 fee for each inspection shall be charged. $101. 00 to $5. 00 per thousand or fraction $2,000. 00 thereof. $2, 001. 00 to $10. 00 for the first $2, 000. 00 plus $15,000. 00 $3.00 for each additional thousand or fraction thereof, to and including $15,000. 00. $15, 001. 00 to $49. 00 for the first $15, 000. 00 plus $50, 000. 00 $2.50 for each additional thousand or fraction thereof, to and including $50, 000. 00. -1- § 5 4 7 . 01 BUILDING PERMIT FEES § 547. 01 Total Valuation Fees $50, 001 . 00 to $136. 50 for the first $50, 000. 00 plus $100, 000. 00 $2 . 00 for each additional thousand or fraction thereof, to and including $100, 000. 00. $100, 001. 00 to $236. 50 for the first $100 , 000. 00 $500, 000 . 00 plus $1. 25 for each additional thous- and or fraction thereof, to and in- cluding $500, 000. 00 $500, 000. 00 and up $736. 50 for the first $500, 000. 00 plus $. 75 for each additional thous- and or fraction thereof. Total valuation for residential permit fees shall be based on a value of $35.00 per square foot for all living areas and $15. 00 per square foot for garages, basements, carports and enclosed patios and p ches. A building permit fee for commercial structures shall be based upon the owner' s declared value, as approved by the Building Official. Out per H. Keller Block Walls and fences per $1,000 valuation 5.00 Seawall, per $1,000 valuation 5.00 Retaining wall, per $1,000 valuation 5.00 Well (deep or shallow) 5.00 Certificate of Occupancy (replace- ment or change of use) 5.00 Out per City Mgr All other permits, not listed above, per $1,000 valuation 5.00 -2- § 547. 01 BUILDING PERMIT FEES § 547.01 (12) Plan Checking Fee - 50% of the building fee for checking plans of over $5,000.00 valuation. In the event said plans are reviewed by the City Engineer, then the provisions of Sec. 547. 01 (E) shall prevail, in addition to this plan checking fee. (B) Plumbing. In addition to any fee or fees charged in subsection (A) above. feel Single family permit charge (2 1/2 baths) $ 35. 00 Multi-family permit charge per unit (1 1/2 baths) 25. 00 Hotel/Motel permit charge per unit (1 bath). 20.00 Minimum plumbing permit 10.00 For each plumbing fixture, floor drain, or trap (including water and drainage piping) : 2.00 Water Closet Laundry Tub Lavatory Drinking Fountain Bathtub Sewer Shower Floor Drain Urinal Catch Basin or Sump Sink Grease Trap Disposal Unit Service Sink Dishwasher Trailer Connection Washing Machine Pe installation, alteration or repair of water piping and/or water treating equipment 5. 00 For repair or alteration of drainage or vent piping 5.00 For reinspection of plumbing installation 10. 00 Pools - Res./Comm. 10. 00 Sewer Tap-in Inspection Fee $15 . 00 - 3 - § 547. 01 BUILDING PERMIT FEES § 547. 01 (C) Electrical. In addition to any fee or fees charged in subsection (A) above. Single Family per unit $ 50. 00 Multi-Family per unit 40.00 Hotel/Motel per unit 35.00 Minimum Electrical Permit 10.00 Outlets at which current is controlled or consumed, for each outlet .20 Each lighting fixture .20 Each outlet controlling window type air conditioner .20 er Continuous receptacle strip assemblies .20 Each service charge 10.00 Motors or Generators 1 HP thru 10 HP 2.00 Over 10 HP 3.00 Sign Outlets per circuit 10.00 Per Sign Each Heating Appliance up to 1 kw 1.00 Over 1 kw but not over 10 kw With A/C Over 10 kw With A/C Electrical water heaters 2.00 Dishwasher, disposal, etc. 2.00 Electric ranges, each appliance 2. 00 Oil burner units or central A/C units 10. 00 Exhaust fans under 1 HP .50 Electric elevators 10.00 Electric signs (incandescent) 10. 00 Per Sign - 4 - § 547.01 BUILDING PERMIT FEES § 547.02 Reinspection fees. When extra inspection trips are necessary due to wrong address, second call on con- demned work, additional work done after inspection has been made, or work not ready for inspection when called, a charge of ten dollars ($10. 00) shall be made for each trip. (E)(D) Where plans and specifications for construction in the City of Cape Canaveral, Florida, are reviewed by the City Engineer, then the actual costs of such review shall be paid by the applicant, whether a building permit is issued or not. The Building Official may require a de- posit of estimated cost upon receipt of application for building permit. [Ord. No. 15-73, § 1, 1 May 1973; Ord. No. 10-74, § 1, 7 May 1974; Ord. No. 1-76, § 1, 24 Feb. 1976; Ord. No. 12-76, §§ 1, 2, 8 Jun 1976; Ord. No. 2-81, § 1, 3 Mar 1981; Ord. No. 11-81, §§ 1,2, 18 Aug 1981] Sec. 547.42 Valuation based on actual construction price. Where construction valuation is required to de- termine the permit fee, such valuation shall be based upon the actual construction contract price (with satis- factory evidence of same being submitted to the Building Official) or a construction cost estimate made by the Building Official, except as otherwise provided in Section 547. 01 (A) Bldg Permit Fee Schedule. [Ord. No. 15-73, § 2, 1 May 1973; Ord. No. 1-76, § 1, 24 Feb 1976] (D) Mechanical. In addition to any fee or fees charged in subsection (a) above: (1) Fees per Section 106 Standard Mechanical Code. (2) A charge of ten dollars ($10.00) shall be made for reinspection of mechanical installation. - 5 - Sec. 547.05 Site Plan Review Fee Schedule. The Fee Schedule for Site Plan Review shall be: 1 , 2 & 3 Residential Units - $25 . 00 4 or more Residential Units - $25 . 00 plus $5 . 00 per unit, not to exceed $500 .00 . Commercial Structures Per Acre of land or portion thereof - $100 . 00 Sec. 547.07 Expiration of Site Plans . All site plans shall expire in six months from final approval of the Planning & Zoning Board unless Building Permit is obtained. Sec. 547.09 Resubmissions of Site Plans. Changes to originally approved site plans shall be charged at a rate fee equal to 50% of the original fee. Sec. 547.11 Replat/Subdivision of Land Fee Schedule. The City of Cape Canaveral , Florida, does hereby establish as its schedule for review of replat/subdivision of land within the City of Cape Canaveral , Florida, the following: A. Replat/Subdivision of Land - $25 . 00 for first three lots, plus $5 . 00 each additional lot, not to exceed $500 . 00 . Sec. 547.13 Resubmissions of Replats/Subdivision of Land. Changes to on inally approved Replats/Subdivision of Land shall be charged at a rate to 50% of the original fee. Sec. 547.15 Changes to the Schedule of Fees. Any of the fees established in this Chapter may be amended, from time to time , as needed, by Resolution of the City Council. Sec. 547.03 Site Plan Review Fee Schedule. The Fee Schedule for Site Plan Review shall be: A. 1, 2 & 3 Residential Units - $25.00 B. 4 or more Residential Units - $25.00 plus $5.00 per unit, not to exceed $500.00. These fees may be amended from time to time, as is needed by Resolution. C. Commercial Structures Sec. 645.04 Expiration of Site Plans. All site plans shall expire in six months unless building permit(s) is obtained. Sec. 645.07 Resubmissions From Final Approval of P&Z Site Plans. Changes to originally approved site plans shall pay a fee equal to 50% of the original fee. Sec. 645.09 Replat/Subdivision of Land Fee Schedule. The City of Cape Canaveral, Florida, does hereby establish as its schedule for review of replat/subdivision of land within the City of Cape Canaveral, Florida the following: A: Replat/Subdivision of Land - $25.00 for the first three lots, plus $5.00 for each additional lot, not to exceed $500.00 Sec. 645.11 Resubmissions of Replats or Subdivision of Land. Changes to originally approved replats of Subdivision of Land shall pay a fee equal to 50% of the original fee. History File ORDINANCE NO. 1-84 AN ORDINANCE AMENDING CODE CHAPTER 547 , "BUILDING PERMIT FEES," BY PROVIDING FOR BUILDING PERMIT FEES, SITE PLAN REVIEW FEES, AND SUBDIVISION OF LAND FEES; REPEALING ALL PORTIONS OF THE CODE IN CONFLICT HERE- WITH; PROVIDING AN EFFECTIVE DATE. WHEREAS , development in Cape Canaveral has increased adminis- trative expense, and WHEREAS, development should offset this additional expense, NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Cape Canaveral, Florida, as follows : SECTION 1. Code Chapter 547, "Building Permit Fees," is hereby deleted in its entirety and replaced with the following Chapter 547, "Building Permit and Development Fees": CHAPTER 547 BUILDING PERMIT & DEVELOPMENT FEES Sec. 547. 01 Building Permit Fee Schedule. The City of Cape Canaveral , Florida, does hereby establish as its schedule for building permits on all construction in the City of Cape Canaveral , Florida, the following fee schedule: (A) Building and Miscellaneous. On all buildings, structures or alterations requiring a building permit, a fee shall be paid as required at the time of filing application as follows : Alterations , remodeling, repairs and moving, in proportion to area of building and extent of inspection required, provided the fee shall not exceed one-half of the regular fee for new con- struction of like classification Per $1,000 Valuation $5.00 Minimum Fee 5.00 Moving of Building 50.00 Demolition 25.00 BUILDING PERMIT FEE SCHEDULE (AS FOLLOWS): Total Valuation Fee $100 or less No fee , unless inspection required in which case a $5.00 fee for each inspection shall be charged. $101 to $2,000 $5.00 per thousand or fraction thereof. $2,001 to $15,000 $10.00 for the first $2,000 plus $3.00 for each additional thousand or fraction thereof, to and including $15,000 $15,001 to $50,000 $49.00 for the first $15,000 plus $2.50 for each additional thousand or fraction thereof , to and including $50,000 Ord. 1-84 Page 1 of 5 BUILDING PERMIT FEE SCHEDULE (CONT) Total Valuation Fee $50 ,001 to $100 , 000 $136 . 50 for the first $50 ,000 plus $2 . 00 for each additional thousand or fraction thereof , to and including $100 , 000 . $100 ,001 to $500 , 000 $236 . 50 for the first $100 , 000 plus $1 . 25 for each additional thousand or fraction thereof, to and including $500 , 000 . $500 , 000 and up $736 . 50 for the first $500 ,000 plus $. 75 for each additional thousand or fraction thereof. Total valuation for residential permit fees shall be based on a value of $35 . 00 per square foot for all living areas and $15 . 00 per square foot for garages , basements , carports and enclosed patios and porches . A building permit fee for commercial structures shall be based upon the owner' s declared value, as approved by the Building Official Block Walls and Fences Per $1 ,000 valuation $ 5 . 00 Seawall Per $1 ,000 valuation 5 . 00 Retaining Wall Per $1 ,000 valuation 5. 00 Well (deep or shallow) 5 .00 Certificate of Occupancy (replacement or change of use) 5 . 00 All other permits not listed above Per $1 ,000 valuation 5 . 00 Plan Checking Fee - 500 of the building fee for checking plans of over $5 , 000 valuation. In the event said plans are reviewed by the City Engineer, then the provisions of Sec. 547 .01 (E) shall prevail, in addition to this plan checking fee. (B) Plumbing. In addition to any fee or fees charged in subsection (A) above : Single family permit charge 35. 00 (2 1/2 baths) Multi-family permit charge, per unit 25 . 00 (12 baths) Hotel/Motel permit charge, per unit 20 . 00 (1 bath) Minimum plumbing permit 10 . 00 For each plumbing fixture , floor drain or trap (including water and drainage piping) : 2 . 00 Water Closet Laundry Tub Urinal Lavatory Drinking Fountain Sink Bathtub Sewer Service Sink Shower Floor. Drain Dishwasher Disposal Unit Catch Basin or Sump Washing Machine Grease Trap Trailer Connection Ord. 1-84 Page 2 of 5 For installation, alteration or repair of water piping and/or water treating equipment $ 5. 00 For repair or alteration of drainage or vent piping 5. 00 For reinspection of plumbing installation 10. 00 Pools - Residential or Commercial 10. 00 Sewer Tap-in Inspection Fee 15. 00 (C) Electrical . In addition to any fee or fees charged in subsection (A) above : Singe Family, per unit 50. 00 Multi-family, per unit 40. 00 Hotel/Motel , per unit 35. 00 Minimum Electrical Permit 10. 00 Outlets at which current is controlled or consumed, per each outlet .20 Each lighting fixture . 20 Each outlet controlling window type air conditioner . 20 Continuous receptacle strip assemblies . 20 Each service charge 10. 00 Motors or Generators 1 HP thru 10 HP 2 . 00 Over 10 HP 3. 00 Sign Outlets, per circuit Per Sign 10. 00 Each Heating Appliance Up to 1 kw 1. 00 Over 1 kw but not over 10 kw (with A/C) Over 10 kw (with A/C) Electrical water heaters 2. 00 Dishwasher, disposal, etc. 2. 00 Electric ranges, each appliance 2. 00 Oil burner units or central A/C units 10. 00 Exhaust fans under 1 HP .50 Electric Elevators 10. 00 Electric Signs (incandescent) Per Sign 10 . 00 Reinspection Fees . When extra inspection trips are necessary due to wrong address , second call on condemned work, additional work done after inspection has been made, or work not ready for inspection when called, a charge of ten dollars ($10 . 00) shall be made for each trip. Ord. 1-84 Page 3 of 5 (D) Mechanical. In addition to any fee or fees charged in subsection (A) above: Fees per Section 106 , Standard Mechanical Code For reinspection of mechanical installation $10 . 00 (E) When plans and specifications for construction in the City of Cape Canaveral , Florida, are reviewed by the City Engineer, then the actual costs of such review shall be paid by the applicant, whether a building permit is issued or not. The Building Official may require a deposit of estimated cost upon receipt of application for building permit. [Ord. No. 1-84, §1, 17 Jan 84] Sec. 547 . 03 Valuation based on actual construction price. Where construction valuation is required to determine the permit fee, such valuation shall be based upon the actual construction contract price (with satisfactory evidence of same being sub- mitted to the Building Official) or a construction cost estimate made by the Building Official, except as otherwise provided in Section 547 .01 (A) , Building Permit Fee Schedule. [Ord. No. 1-84, §1, 17 Jan 84] Sec. 547 .05 Site Plan Review Fee Schedule. The Fee Schedule for Site Plan Review shall be: 1, 2 & 3 Residential Units - $25. 00 4 or more Residential Units - $25 . 00 plus $5. 00 per unit, not to exceed $500.00 Commercial Structures Per Acre of land or portion thereof - $100 . 00 [Ord. No. 1-84, §1, 17 Jan 84] Sec. 547 . 07 Expiration of Site Plans. All site plans shall expire in six (6) months from final approval of the Planning and Zoning Board, unless the Building Permit is issued. Site Plans shall only be valid for this time period and for the term of the Building Permit. [Ord. No. 1-84, §1, 17 Jan 84] Sec. 547 . 09 Resubmissions of Site Plans. Changes to originally approved site plans shall be charged at a rate equal to fifty percent (50%) of the original fee. [Ord. No. 1-84, §1, 17 Jan 84] Sec. 547 .11 Replat/Subdivision of Land Fee Schedule. The City of Cape Canaveral, Florida, does hereby establish as its schedule for review of replat/subdivision of land within the City of Cape Canaveral, the following: Replat/Subdivision of Land - $25 .00 for first three lots , plus $5 .00 each additional lot, not to exceed $500.00 [Ord. No. 1-84, §1, 17 Jan 84] Sec. 547 . 13 Resubmission of Replats/Subdivision of Land. Changes to originally approved Replats/Subdivision of Land shall be charged at a rate equal to fifty percent (50%) of the original fee. [Ord. No. 1-84, §1, 17 Jan 84] Sec. 547 .15 Changes to the Schedule of Fees . Any of the fees established by this Chapter may be amended, from time to time , as needed, by Resolution of the City Council. [Ord. No. 1-84, §1, 17 Jan 84] SECTION 2 . All portions of the City Code in conflict herewith are hereby repealed. SECTION 3 . This Ordinance shall take effect immediately upon its adoption. Ord. No. 1-84 Page 4 of 5 ADOPTED this 17 day of January , 1984. [signature] Mayor ATTEST: [signature & seal] City Clerk Approved as to Form: [signature] City Attorney PERMISSION TO ADVERTISE: 12-20-83 First Reading: 1-3-84 Posted: 12-21-83 Advertised: 12-29-83 Second Reading: 1-17-84 NAME YES NO CALVERT YES FISCHETTI YES NICHOLAS YES RUTHERFORD YES WINCHESTER YES Ord. No. 1-84 Page 5 of 5 ORDINANCE NO. 11-81 Jan Codified Aug 1981 AN ORDINANCE AMENDING CHAPTER 547, BUILDING PERMIT FEES, BY AMENDING THE SCHEDULE OF FEES CHARGED FOR PLUMBING PERMIT CHARGES, CHARGES FOR MINIMUM ELEC- TRICAL PERMIT, AND ELECTRICAL SERVICE CHARGES; REPEALING ALL ORDINANCES OR SECTIONS OF THE CODE IN CONFLICT HEREWITH; PROVIDING FOR AN EFFECTIVE DATE. BE IT ORDAINED by the City Council of the City of Cape Canaveral, Florida, as follows: SECTION 1. Section 547.01 (B) "Plumbing" is hereby deleted in its entirety and the following section is substituted therefore: (B) Plumbing: In addition to any fee or fees charged in subsection (A) above. (1) Single family permit charge (22 baths) $35.00 Multi-family permit charge per unit (11/2 baths) $25.00 Hotel/Motel permit charge per unit (1 bath) $20.00 Minimum plumbing permit: $10.00 For each plumbing fixture, floor drain or trap (including water and drainage piping) $2.00 Water closet Laundry Tub Lavatory Drinking Fountain Bathtub Sewer Shower Floor Drain Urinal Catch Basin or Sump Sink Grease Trap Disposal Unit Service Sink Dishwasher Trailer Connection Washing Machine For installation alteration or repair of water piping and/or water treating equipment $ 5.00 For repair or alteration of drainage or vent piping $ 5.00 (2) A charge of ten dollars shall be made for reinspection of plumbing installation $10.00 Pools - Res./Comm. $10.00 (3) Sewer Tap-in Inspection Fee $10.00 SECTION 2. Section 547.01 (C) "Electrical" is hereby deleted in its entirety and the following section is substituted therefore: (C) Electrical: In addition to any fee, or fees charged in subsection (A) above. (1) Single Family per unit $50.00 Multi-family per unit $40.00 Hotel/Motel per unit $35.00 Minimum Electrical permit $10.00 Outlets at which current is controlled or consumed for each outlet $ .20 Each lighting fixture $ .20 Each outlet controlling window type air conditioning $ .20 Continuous receptacle strip assemblies $ .20 Each service charge $10.00 Motors or Generators 1HP thru 10HP $ 2.00 Over 10 HP $ 3.00 Sign Outlets per circuit $10.00 per sign Each Heating Appliance Up to 1 kw $ 1.00 Over 1 kw but not over 10 kw with A/C Over 10 kw with A/C Electrical water heaters $ 2.00 Dishwasher, disposal, etc. $ 2.00 Electric ranges, each appliance $ 2.00 Oil burner units or central A/C units $10.00 Exhaust fans under 1 HP $ .50 Electric elevators $10.00 Electric signs (incandescent) $10.00 per sign SECTION 3. All portions of the code in conflict herewith are hereby repealed. SECTION 4. This Ordinance will take effect immediately upon its adoption. ADOPTED by the City Council of the City of Cape Canaveral, Florida, this 18 day of August , 1981. [signature] MAYOR ATTEST: [signature & seal] City Clerk APPROVED AS TO FORM: [signature] City Attorney NAME YES NO BOYD YES CALVERT YES LEE YES MURPHY YES RUTHERFORD YES First Reading: 8-4-81 Posted: 8-5-81 Advertised: 8-10-81 Second Reading: 8-18-81 ORDINANCE NO. 11-81 Page 2 of 2 Joe Fratt See Next pg. of Code Book Codified 8-81 done Hold Typing up to [llegible] passed 11-81 ORDINANCE NO. 2-81 AN ORDINANCE AMENDING CHAPTER 547 BUILDING PERMIT FEES , AS AMENDED, BY AMENDING T E BUILDING PERMIT FEE SCHEDULE, BY AMENDING THE VALUATION FOR RESI- DENTIAL BUILDING PERMIT FEES; REPEALING ALL SECTIONS OF THE CITY CODE IN CONFLICT THEREWITH; PROVIDING AN EFFECTIVE DATE. BE IT ORDAINED by the City Council of the City of Cape Canaveral, Florida, as follows : SECTION 1 . CHAPTER 547 , Building Permit Fees, of the Code of the City of Cape Canaveral, Florida, is hereby amended as follows : (1) Section 547 . 01 (A) (4) is amended by the deletion of the following paragraph, following the Building Permit Fee Schedule: "Total valuation for residential permit fees shall be based on a value of $20. 00 per square foot for all living areas and $10 . 00 per square foot for garages, basements, carports and enclosed patios or porches,. " and the following new paragraph substituted therefor: "Total valuation for residential permit fees shall be based on a value of $30.00 per square foot for all living areas and $15.00 per square foot for garages, basements, carports and enclosed patios and porches. " SECTION 2. All parts of the Code of the City of Cape Canaveral which arein .conflict herewith are hereby repealed. SECTION 3. This ordinance shall become effective immediately upon its adoption. ADOPTED by the City Council of the City of Cape Canaveral, Florida, this 3 day of March , 1981. [signature] Mayor ATTEST: [signature & seal] City Clerk Approved as to form: [signature] City Attorney NAME YES NO BOYD YES CALVERT YES LEE YES MURPHY YES RUTHERFORD YES First Reading: 2-17-81 Posted: 2-18-81 Advertised: 2-23-81 Second Reading: 3-3-81 Chap 547 ** AMENDED ON 2ND READING May 1 1973 Amended 10-74 Amended 1-76 Amended 12-76 ORDINANCE NO. 15-73 (AS AMENDED) AN ORDINANCE ESTABLISHING FEES AND BUIL NG PERMITS ON ALL CONSTRUCTION IN THE CITY LIMITS' OF THE CITY OF CAPE CANAVERAL, FLORIDA; REVOK- ING ALL ORDINANCES OR PARTS OF ORDINANCES IN CONFLICT HEREWITH; PROVIDING AN EFFECTIVE DATE. BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF CAPE CANAVERAL, FLORIDA, ,AS FOLLOWS: SECTION 1. Building Permit Fee Schedule: The City of Cape Canaveral, Florida, does hereby establish as its schedule for building permits on all construction in the City of Cape Canaveral, Florida, the following fee schedule, to-wit: A. Building and miscellaneous: On all buildings, structures or alterations requiring a building permit, a fee shall be paid as required at the time of filing application, as follows: (a) Alterations, remodeling, repairs and moving, in proportion to area of building and extent of inspection required, provided the fee shall not exceed one-half (1/2) of the regular fee for new construction of like classification, per $1, 000.00 valuation $ 5. 00 Minimum fee 5.00 (b) Moving of building 20.00 1-76 (c) Demolition 25.00 1-76 (d) Building, per square foot .04 add see 1-76 (e) Signs, per $1,000.00 valuation 5.00 *13-76 (f) Swimming pool, per $1, 000.00 valuation 5.00 (g) Block walls and fences, per $1, valuation 5.00 (h) Seawall, per $1, 000. 00 valuation 5.00 (i) Retaining wall, per $1, 000.00 valuation 5. 00 (j) Well (deep or shallow) 5.00 (k) Certificate of occupancy (replacement OR change of use) 5. 00 (1) Portable signs: 1 - 3 days 2.50 4 - 7 days 5.00 8 - 15 days 7. 50 16 - 31 days 15. 00 All other permits not listed above, per $1, 000. 00 valuation 5. 00 B. Plumbing: (IN ADDITION TO ANY FEE OR FEES CHARGED IN SECTION 1, PARAGRAPH A) Minimum permit charge $ 3. 00 For each plumbing fixture, floor drain or trap (including water and drainage piping) 1. 00 Water closet Laundry tub Lavatory Drinking fountain Bathtub Sewer Shower Floor drain Urinal Catch basin or sump *([illegible text]) Page 1 of 3 (ORD. 15-73) Sink Grease trap Disposal unit Service sink Dish washer Trailer connection Washing machine For installation, alteration or repair of water piping and/or water treating equipment $1.00 For repair or alteration of drainage or vent piping 1.00 (b) A charge of-two dollars and fifty cents ($2.50), shall be made for re-inspection of plumbing installation. (c) Sewer Tap-in Inspection fee 5.00 C. Electrical: **(IN ADDITION TO ANY FEE OR FEES CHARGED IN SECTION 1, (a) PARAGRAPH A)** Minimum electrical permit $ 3. 00 Inspection fee - Residential 3. 00 Inspection fee - Comm. Bldg. per floor 3. 00 Outlets at which current is controlled or consumed - For each outlet . 10 Each lighting fixture . 10 Each outlet controlling window type air conditioning . 10 Continuous receptacle strip assemblies . 10 Each service change 3. 00 Motors or Generators 1 HP through 10 HP 1.00 Over 10 HP 2. 00 Sign outlets per circuit . 10 Each Heating Appliance Up to 1 KW .50 Over 1 KW but not over 10 KW 1. 00 Over 10 KW 3. 00 Electrical water heaters . 75 Dishwasher, disposal, etc. .75 X-ray 1. 00 Electric ranges, each appliance .75 Dental units 2. 00 Oil burner units or central A/C units 2. 00 Exhaust fans under 1 HP .25 Electric elevators 5. 00 Electric Welders 1 HP through 10 HP 1. 00 Over 10 HP 2. 00 Electric signs (incandescent) 2.00 Sign flasher. 1. 00 Time switch .50 Neon Sign Each tran .50 Flood or spot light, commercial 500 W or more 1.00 Kitchen centers to be computed according to above schedule of fees for outlets and appliances.. For the inspection of any electrical equipment for which no fee is set $5. 00 per hr. (b) Re-inspection fees. When extra inspection trips are necessary due to any one of the following reasons, a charge of five dollars ($5. 00) shall be made for each trip: Page 2 of 3 (ORD . 15 - (1) Wrong address. (2) Second call on condemned work. (3) Additie•nal work done after inspection has been made. (4) Work not ready for inspection when called. Sec. 577.02. Where construction valuation is required to determine the permit fee, such valuation shall be based upon the actual I construction contract price (with satisfactory evidence of same being submitted to the Building Official) or a construction cost estimate made by the Building Official. add 1-76 SECTION 3. All Ordinances or parts of Ordinances in conflict herewith are hereby repealed. SECTION 4. This Ordinance shall become effective immediately upon its adoption, ADOPTED by the City Council of the City of Cape Canaveral, Florida, the 1ST day of MAY, 1973. [signature] Mayor Attest: [signature & seal] City Clerk Approved as to form: [signature] City Attorney First Reading: APRIL 17, 1973 Posted: APRIL 18, 1973 Second reading: MAY 1, 1973 Page 3 of 3 (ORD. 15-73) Done CHap 547 ORDINANCE NO. 1-76 AN ORDINANCE AMENDING CHAPTER 547,' BUILDING PERMIT FEES, BY AMENDING THE SCHEDULE OF FEES CHARGED FOR DEMOLITION OF A BUILDING OR BUILD- INGS, PLUMBING PERMIT CHARGES, CHARGES FOR MINIMUM ELECTRICAL PERMIT, AND ELECTRICAL SERVICE CHANGES; REPEALING ALL ORDINANCES OR SECTIONS OF THE CODE OF THE CITY OF CAPE CANAVERAL WHICH ARE IN CONFLICT HEREWITH; PROVIDING AN EFFECTIVE DATE. BE IT ORDAINED by the City Council of the City of Cape Canaveral, Florida, as follows: SECTION 1. Chapter 547, Building Permit Fees of the Code of the City of Cape Canaveral, Florida, is hereby amended as follows: (1) Section 547. 01 (A)(2) Moving of building fee is increased, from $10. 00 to $50.00. ok on new sheet (2) Section 547. 01 (A)(3) Demolition fee is changed from $10. 00 to $25.00. ok on new sheet (3) Section 547. 01 (A)(4) Building per square foot is changed from 4 cents to the following schedule: BUILDING PERMIT FEES SCHEDULE Total Valuation Fee $100.00 and less No fee, unless inspection required, in which case a $5.00 fee for each in- spection shall be charged. $101.00 to $2,000.00 $5.00 per thousand or fraction thereof. $2001.00 to $15,000.00 $10.00 for the first $2,000.00 plus $3.00 for each additional thousand or fraction thereof, to and including $15,000.00. $15,001.00 to $50,000.00 $49.00 for the first $15,000.00 plus $2.50 for each additional thousand or fraction thereof, to and including $50,000.00. $50,001. 00 to $100,000.00 $136.50 for the first $50,000.00 plus $2.00 for each additional thousand or fraction thereof, to and including $100,000.00. $100,001.00 to $500,000.00 $236.50 for the first $100,000.00 plus $1.25 for each additional thousand or fraction thereof, to and including $500,000.00. $500,001.00 and up $736.50 for the first $500,000.00 plus $. 75 for each additional thousand or fraction thereof. To be auut Add new paragraph from 12-76 add 12-76 Total valuation for residential building permit fees shall be based on a value of $20.00 per square foot. A building permit fee for commercial structures shall be based upon the owner's declared value, as approved by the Building Official. (4) Section 547.01(A) is amended by the addition of a new sub- paragraph 13, to read as follows: (13) Plan checking fee 25% of the building fee for checking plans of over $5,000.00 valuation. *In the event said plans are reviewed by the City Engineer, then the provisions of Chapter 547.01 (D) shall prevail in addition to this plan checking fee. (5) Section 547.01(B)(1) Plumbing, is amended by increasing the minimum permit charge from $3.00 to $5.00. The fee for installation, alteration or repair of water piping and/or water treating equipment is increased from $1.00 to $3.00. The fee for repair or alternation of drainage ovent piping is changed from $1.00 to $3.00. (6) Section 547.01 (B)(2) is amended by increasing the charge for reinspection of plumbing installation from $2.50 to $5.00. ok (7) Section 547.01(C) Electrical, is amended by increasing the minimum electrical permit from $3.00 to $5.00 and by in- creasing the fee for each service charge from $3.00 to $5.00. ok (8) Section 547.02, Valuation based on actual construction price. add is amended by the addition of the following clause: "Except as otherwise provided in Section 547.01(A)(4) herein." ok SECTION 2. All ordinances or parts of ordinances, or sections of the Code of the City of Cape Canaveral, which are in conflict herewith are hereby repealed. SECTION 3. This ordinance shall become effective immediately upon its adoption. ADOPTED by the City Council of the City of Cape Canaveral, Florida this 24th day of February, 1976. [signature] Mayor Attest: [signature] City Clerk Approved as to form: [signature] City Attorney FIRST READING: 2-3-76 POSTED: 2-5-76 ADVERTISED: 2-8-76 SECOND READING: 2-24-76 NAME YES NO ABS MACLAY YES NICHOLAS YES RHAME YES SALVAGGIO YES THURM YES *Amended at Second Reading. ORDINANCE 1-76 PAGE 2 OF 2 ORDINANCE NO. 1-76 ok extra copy BE IT ORDAINED by the City Coundl of the City of Cape Canaveral, Florida, as follows: SECTION 1. Chapter 547, Building Permit Fees of the Code of the City of Cape Canaveral, Florida, is hereby amended as follows: (1) Section 547.01 (A)(2) Moving of building fee is increased from $10.00 to $50.00. ok (2) Section 547.01 (A)(3) Demolition fee is changed from $10.00 to $25.00. ok (3) Section 547.01 (A)(4) Building per square foot is changed from 4 cents to the following schedule: BUILDING PERMIT FEES SCHEDULE Total Valuation Fee $100. 00 and less No fee, unless inspection required, in which case a $5.00 fee for each in- spection shall be charged. $101. 00 to $2, 000. 00 $5. 00 per thousand or fraction thereof. $2001. 00 to $15, 000. 00 $10. 00 for the first $2,000. 00 plus $3. 00 for each additional thousand or fraction thereof, to and including $15, 000. 00. $15, 001. 00 to $50, 000. 00 $49.00 for the first $15,000. 00 plus $2.50 for each additional thousand or fraction thereof, to and including $50, 000. 00. $50, 001. 00 to $100, 000. 00 $136.50 for the first $50,000. 00 plus $2. 00 for each additional thousand or fraction thereof, to and including $100, 000. 00. $100, 001. 00 to $500, 000. 00 $236.50 for the first $100,000. 00 plus $1.25 for each additional thousand or fraction thereof, to and iilcludin $500, 000. 00. $500, 001. 00 and up $736.50 for the first $500,000. 00plus $. 75 for each additional thousand or fraction thereof. add new paragraph from 12-76 Total valuation for residential building permit fees shall be based on a- value of $20.'00 per square foot. A building permit fee for commercial structures shall be based upon the owner's declared value, as approved by the Building Official. (4) Section 547. 01(A) is amended by the addition of a new sub- paragraph 13, to read as follows: new (13) Plan checking fee 25% of the building fee for checking plans of over $5,000.0 valuation. In the event said plans are reviewed by the City Engineer, then the provisions of Chapter 547.01 (D) shall prevail in addition to this plan checking fee. ection 547. 01(B)(1) Plumbing, is amended by increasing the minimum permit charge from $3. 00 to $5.00. The fee for installation, alteration or repair of water piping and/or water treating equipment is increased from $1. 00 to $3. 00. The fee for repair or alteration of drainage or vent piping is changed from $1. 00 to $3. 00. ok (6) Section 547.01(B)(2) is amended by increasing the charge for reinspection of plumbing installation from $2.50 to ok $5.00. ok (7) Section 547.01(C) Electrical, is amended by increasing the ok minimum electrical permit from $3. 00 to $5. 00 and by in- creasing the fee for each service change from $3.00 to add Jack $5.00. add this (8) Section 547.02. Valuation based on actual construction price, is amended by the addition of the following clause: "Except as otherwise provided in Section 547. 01(A)(4) herein." SECTION 2. All ordinances or parts of ordinances, or sections of the Code of the City of Cape Canaveral, which are in conflict herewith are hereby repealed. SECTION 3. This ordinance shall become effective imeediately upon its adoption. ADOPTED by the City Council of the City of Cape Canaveral, Florida, this 24th day of February, 1976. [signature] Mayor Attest: [signature] City Clerk Approved as to form: [signature] City Attorney FIRST READING: 2-3-76 POSTED: 2-5-76 ADVERTISED: 2-8-76 SECOND READING: 2-24-76 *Amended at Second Reading. NAME YES NO ABS MACLAY YES NICHOLAS YES RHAME YES SALVAGGIO YES THURM YES ORDINANCE 1-76 PAGE 2 OF 2 ORDINANCE NO. 12-76 AN ORDINANCE AMENDING CHAPTER 547, BUILDING PERMIT FEES, AS AMENDED, BY AMENDING-Tilt BUILDING PERMIT FEE SCHEDULE, BY AMENDING THE VALUATION FOR RESIDENTIAL BUILDING PERMIT FEES; REPEALING ALL SECTIONS OF THE CITY CODE IN CONFLICT THEREWITH; PROVIDING AN EFFECTIVE DATE. BE IT ORDAINED by the City Council of the City of Cape Canaveral, Florida, as follows : SECTION 1. Chapter 547, Building Permit Fees, of the Code of the City of Cape Canaveral, Florida, is hereby amended as follows : (1) Section 547. 01 (A) (4) is amended by the deletion of following paragraph, following the Building Permit Fee Schedule : "Total valuation for residential building permit fees shall be based on the value of $20. 00 per square foot." and the following new paragraph substituted therefor: "Total valuation for residential permit fees shall be based on a value of $20. 00 per square foot for all living areas and $10.00 per square foot for garages, basements, car ports and enclosed patios or porches." SECTION 2. All parts of the Code of the City of Cape Canaveral which are in conflict herewith are hereby repealed. SECTION 3. This ordinance shall become effective immediately upon its adoption. ADOPTED by the City Council of the City of Cape Canaveral, Florida, this 8 day of June, 1976. [signature] Mayor Attest: [signature] City Clerk Approved as to form: [signature] City Attorney NAME YES NO ABS MACLAY [didn't vote] NICHOLAS YES RHAME YES SALVAGGIO YES THURM YES Chap 547 17-71 as amended 10-72 15-73 a/a/b 10-74 amend 12-76 1-76 Code ORDINANCE NO. 10-74 AN ORDINANCE AMENDING ORDINANCE NO, 15-73, AMENDED, BY REQUIRING ALL APPLICANTS FOR BUILD- ING PERMITS TO PAY FOR COST OF REVIEW BY CITY ENGINEER. OF APPLICANT'S PLANS AND SPECIFICATIONS; PROVIDING AN EFFECTIVE DATE. BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF CAPE CANAVERAL, FLORIDA, AS FOLLOWS: SECTION 1. Ordinance No. 15-73, as amended, Establishing Fees and Building Permits on Construction in the City of Cape Canaveral, Florida, is hereby amended by the addition of the following sub-section D. to Section 1 thereof: In Code Book make sure 547.0 "D" yes 7/26/78 "D. Where plans and specifications for construction in the ity of Cape Canaveral, Florida, are reviewed by the City Engineer, the actual costs of such review shall be paid by the applicant, whether a building permit is issued or not. The Building Official may require a deposit of estimated cost upon receipt of application for building permit." ok SECTION 2. This Ordinance shall become effective immediately upon its adoption by the City Council of the City of Cape Canaveral, Florida. ADOPTED by the City Council of the City of Cape Canaveral, Florida, this 7TH day of MAY , 1974. [signature] Mayor Attest: [signature & seal] City Clerk Approved as to form: [signature] City Attorney NAME YES NO ABS MACLAY YES RHAME YES GRAEDE YES SALVAGGIO YES THURM YES FIRST READING: 4/2/74 ADVERTISED: 4/8/74 POSTED: 4/17/74 SECOND READING: 5/7/74 8 Jun 1976 ORDINANCE NO. 13-76 AN ORDINANCE ADOPTING THE SOUTHERN STANDARD SWIMMING POOL CODE; REPEALING PROVISION FOR SWIMMING POOL BUILDING PERMIT FEES IN CHAPTER 547 OF THE CITY CODE; REPEALING ALL PORTIONS OF THE CODE IN CONFLICT THEREWITH; PROVIDING AN EFFECTIVE DATE. BE IT ORDAINED by the City Council of the City of Cape Canaveral, Florida, as follows : SECTION I. There is hereby established Chapter 627 entitled "Southern Standard Swimming Pool Code", to be incor- porated into the Code of the City of Cape Canaveral, Florida, as follows : .Chapter 627 Standard Swimming Pool Code A. 627. 01 Standard Swimming Pool Code Adopted. For the purpose of establishing rules and regulations to control the construction of swimming pools in the City of Cape Canaveral, Florida, that certain standard code known as the Southern Standard Swim- ming Pool Code, 1974 Edition, and all future editions and amendments as promulgated by the Southern Building Code Congress , of which not less than three copies have been or are now on file in the office of the City Clerk, are hereby adopted as fully as if the same was herein set forth verbatim. From the effective date of this ordinance, the provisions thereof shall be controlling in the construction of all swimming pools within the cor- porate limits of the City of Cape Canaveral, Florida. B. 627. 02 Penalties. Any and all persons who shall violate any provisions of this chapter, tr shall fail to comply therewith, or who shall violate or fail to comply with any order or regulation made _ thereunder, or who shall construct a swimming pool in violation of any detailed statement or specifica- tion or plan submitted and approved thereunder, or any certificate or permit issued, shall severally for each and every such violation and non-compliance respectively, be punished as provided in Section 801. 01. * SECTION 2 . Permit Fees for swimming pool construction shall be as set forth in the Swimming Pool Code as herein adopted. *Amended on First Reading CHAP 547 **AMENDED ON 2ND READING MAY 1, 1973 Sec. 547.01: Building Permit Fee Schedule. The City of Cape Canaveral, Florida, does hereby establish as its schedule for building permits on all construction in the City of Cape Canaveral, Florida, the following fee schedule. (A), Building and miscellaneous: On all buildings, structures or alterations requiring a building permit, a fee shall be paid as required at the time of filing application, as follows: (1) Alterations, remodeling, repairs and moving, in proportion to area of building and extent of inspection required, provided the fee shall not exceed one-half (1/2) of the regular fee for new construction of like classification, per $1, 000. 00 valuation $5.00 Minimum fee 5.00 (2) Moving of building 10.00 (3) Demolition 10.00 (4) Building, per square foot .04 (5) Signs, per $1,000.00 valuation 5.00 (6) Swimming pool, per $1,000.00 valuation 5.00 (7) Block walls and fences, per $1, 000.00 valuation 5.00 (8) Seawall, per $1,000.00 valuation 5.00 (9) Retaining wall, per $1,000.00 valuation 5.00 (10) Well (deep or shallow) 5.00 (11) Certificate of occupancy (replacement OR change of use) 5.00 (12) Portable signs: 1 - 3 days 2.50 4 - 7 days 5.00 8 - 15 days 7.50 16 - 31 days 15.00 All other permits not listed above, per $1, 000. 00 valuation 5.00 (B) Plumbing. IN ADDITION TO ANY FEE ABOVE, OR FEES CHARGED IN SUBSECTION, (A) (1) Minimum permit charge $3.00 For each plumbing fixture, floor drain or trap (including water and drainage piping) 1.00 Water closet Laundry tub Lavatory Drinking fountain Bathtub Sewer Shower Floor drain Urinal Catch basin or sump Page 1 of 3 (ORD. 15-73) Sink Grease trap Disposal unit Service sink Dish washer Trailer connection Washing machine For installation, alteration or repair of water piping and/or water treating equipment $ 1.00 For repair or alteration of drainage or vent piping 1.00 (2) A charge of two dollars and fifty cents ($2.50), shall be made for re-inspection of plumbing installation. (3) Sewer Tap-in Inspection fee 5. 00 C Electrical IN ADDITION TO ANY FEE ABOVE, OR FEES CHARGED IN Sub-Section (A). (1) Minimum electrical permit $ 3.00 Inspection fee - Residential 3. 00 Inspection fee - Comm. Bldg. per floor 3.00 Outlets at which current is controlled or consumed - For each outlet . 10 Each lighting fixture . 10 Each outlet controlling window type air conditioning . 10 Continuous receptacle strip assemblies . 10 Each service change 3.00 Motors or Generators 1 HP through 10 HP 1. 00 Over 10 HP 2. 00 Sign outlets per circuit . 10 Each Heating Appliance Up to 1 KW .50 Over 1 KW but not over 10 KW 1. 00 Over 10 KW 3. 00 Electrical water heaters .75 Dishwasher, disposal, etc. .75 X-ray 1. 00 Electric ranges, each appliance .75 Dental units 2.00 Oil burner units or central A/C units 2. 00 Exhaust fans under 1 HP .25 Electric elevators 5.00 Electric Welders 1 HP through 10 HP 1. 00 Over 10 HP 2. 00 Electric signs (incandescent) 2. 00 Sign flasher 1. 00 Time switch .50 Neon Sign Each transformer . 50 Flood or spot light, commercial 500 W or more 1. 00 Kitchen centers to be computed according to above schedule of fees for outlets and appliances. For the inspection of any electrical equipment for which no fee is set $5. 00 per hr. (4) Re-inspection fees. When extra inspection trips are necessary due to WRONG ADDRSSS, SECOND CALL ON CONDEMNED WORK, ADDITIONAL WORK DONE AFTER INSPECTION WAS BEEN MADE OR WORK NOT READY FOR INSPECTION WHEN CALLED, a charge of give follars ($5.00) shall be made for each trip. [Ord. No. 15-73, §1, 1 MAY 1973] Page 2 of 3 (ORD. 15-73 Sec. 547.02. VALUATION BASIS ON ACTUAL CONSTRUCTION PRICE. Where construction valuation is required to determine the permit fee, such valuation shall be based upon the actual construction contract price (with satisfactory evidence of same being submitted to the Building Official) or a construction cost estimate made by the Building Official. [Ord. No. 15-73, §2, 1 MAY, 1973] Page 3 of 3. (ORD. 15-73) Chap 547 ORDINANCE NO. 10-74 AN ORDINANCE AMENDING ORDINANCE NO. 15-73, AS AMENDED, BY REQUIRING ALL APPLICANTS FOR BUILD- ING PERMITS TO PAY FOR COST OF REVIEW BY CITY ENGINEER, OF APPLICANT'S PLANS AND SPECIFICATIONS; PROVIDING AN EFFECTIVE DATE. BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF CAPE CANAVERAL, FLORIDA, AS FOLLOWS: SECTION 1. Ordinance No. 15-73, as amended, Establishing Fees and Building Permits on Construction in the City of Cape Canaveral. Florida, is hereby amended by the addition of the following sub-section D. to Section 1 thereof: "D. Where plans and specifications for construction in the City of Cape Canaveral, Florida, are reviewed by the City Engineer, the actual costs of such review shall be paid by the applicant, whether a building permit is issued or not. The Building Official may require a deposit of estimated cost upon receipt of application for building permit. " SECTION 2. This Ordinance shall become effective immediately upon its adoption by the City Council of the City of Cape Canaveral, Florida. ADOPTED by the City Council of the City of Cape Canaveral, Florida, this 7TH day of May , 1974. [signature] Mayor Attest: [signature & seal] City Clerk Approved as to form: [signature] City Attorney NAME YES NO ABS MACLAY YES RHAME YES GRAEFE YES SALVAGGIO YES THURM YES FIRST READING: 4/2/74 ADVERTISED: 4/8/74 POSTED: 4/17/74 SECOND READING: 5/7/74 § 547. 0.1 BLDG. PERMIT FEES § 547.01 Electric ranges, each appliance . 75 Dental units 2.00 Oil burner units or central A/C units 2. 00 Exhaust fans under 1 HP . 25 Electric elevators 5. 00 Electric Welders 1 HP thru 10 HP 1.00 Over 10 HP 2. 00 Electric signs (incandescent) 2. 00 Sign flasher 1. 00 Time switch . 50 Neon sign each transformer .50 Flood or spotlight , commercial 500 W or more 1.00 Kitchen centers to be computed according to above schedule of fees for outlets and appliances. For the inspection of any elec- trical equipment for which no fee is set , $5 . 00 per hour . (2) Reinspection fees. When extra inspection trips are necessary due to wrong address , second call on condemned work, additional work done after inspec- tion has been made, or work not ready for inspection when called , a charge of five dollars ($5. 00) shall be made for each trip. (Ord. No . 15-73 , § 1, 1 May 1973) (D) Where plans and specifications for construction in the City of Cape Canaveral, Florida, are reviewed by the 347-6B § 547 . 01 BLDG. PERMIT FEES § 547. 01 CHAPTER 547 BUILDING PERMIT FEES Sec. 547 . 01 Building Permit Fee Schedule. The City of Cape Canaveral, Florida, does hereby establish as its schedule for building permits on all construction in the City of Cape Canaveral, Florida, the following fee schedule. (A) Building and Miscellaneous : On all buildings , structures or alter- ations requiring a building permit , a fee shall be paid as required at the time of filing application, as follows: (1) Alterations , remodeling , repairs and moving, in pro- portion to area of building and extent of inspection required, provided the fee shall not exceed one-half of the regular fee for new construction of like classification per $1,000.00 valuation $5. 00 Minimum Fee 5. 00 (2) Moving of Building *50.00 (3) Demolition *25. 00 (4) BUILDING PERMIT FEES SCHEDULE Fee Total Valuation $100.00 and less No fee, unless inspec- tion required, in which case a $5. 00 fee for each inspec- tion shall be charged. *Fee Change Ord. 1-76, § 1, 24 Feb. 1976. § 547 . 01 BLDG. PERMIT FEES § 547. 01 Total valuation for residential permit fees shall be based on a value of $20.00 per square foot for all living areas and $10.00 per square foot for garages, base- ments, carports and enclosed pations or porches. (Ord. No. 12-76 §1, 8 June 1976.) A building permit fee for commer- cial structures shall be based upon the owner's declared value, as approved by the Building Official. (Ord. No. 1-76 §1, 24 Feb 1976). (5) Signs, per $1,000 valuation $5.00 (6) Block Walls and fences, per $1,000.00 valuation 5.00 (7) Seawall, per $1,000.00 valuation 5.00 (8) Retaining wall, per $1,000.00 valuation 5.00 (9) Well (deep or shallow) 5.00 (10) Certificate of Occu- pancy (replacement or change of use) 5.00 (11) Portable Signs: 1 - 3 days 2.50 4 - 7 days 5.00 8 - 15 days 7.50 16 - 31 days 15.00 All other permits not listed above, per $1,000.00 valuation 5.00 (12) Plan checking fee 25% of the building fee for checking plans of over $5,000.00 valuation. In the event said plans are reviewed 547-FF 547-3F § 547.01 BLDG. PERMIT FEES § 547 . 01 by the City Engineer , then the provisions of Chapter 547 . 01 (D) shall prevail in addition to this plan checking fee. (Ord. No. 1-76 § 1 , 24 Feb . 1976 , Ord. No. 13-76 § 2 , 8 Jun 1976) . (B) Plumbing: In addition to any fee or fees charged in subsection (A) above. (1) Minimum permit charge: $5.00 For each plumbing fixture, floor drain or trap (in- cluding water and drainage piping) Water closet Laundry Tub Lavatory Drinking Fountain Bathtub Sewer Shower Floor Drain Urinal Catch basin or Sink sump Disposal Unit Grease Trap Dishwasher Service Sink Washing Machine Trailer connec- tion For installation alteration or repair of water piping and/or water treating equipment 3. 00 For repair or alteration of drainage or vent piping 3. 00 (2) A charge of five dollars shall be made for reinspec- tion of plumbing installa- tion. 5. 00 § 547.01 BLDG. PERMIT FEES § 547.01 $101.00 to $2,000.00 $5.00 per thousand or fraction thereof. $2,001.00 to $15,000.00 $10.00 for the first $2,000.00 plus $3.00 for each additional thousand or fraction thereof, to and includ- ing $15,000.00. $15,001.00 to $50,000.00 $49.00 for the first $15,000.00 plus $2.50 for each additional thousand or fraction thereof, to and includ- ing $50,000.00. $50,001.00 to $100,000.00 $136.50 for the first $50,000.00 plus $2.00 for each additional thousand or fraction thereof, to and includ- ing $100,000.00. $100,001.00 to $500,000.00 $236.50 for the first $100,000.00 plus $1.25 for each additional thousand or fraction thereof, to and includ- ing $500,000.00 $500,001.00 and up $736.50 for the first $500,000.00 plus $.75 for each additional thousand or fraction thereof. (Ord. No. 1-76, §1, 24 Feb 1976). 547-4B [illegible text] § 547 . 01 BLDG. PERMIT FEES § 547 .01 (3) Sewer Tap-in Inspection Fee $5. 00 (C) Electrical. In addition to any fee, or fees charged in subsection (A) above (1) Minimum electrical permit *5. 00 Inspection fee - Residential 3. 00 Inspection fee - Com. Bldg . per floor 3. 00 Outlets at which current is controlled or consumed for each outlet . 10 Each lighting fixture .10 Each outlet controlling window type air condi- tioning .10 Continuous receptacle strip assemblies .10 Each service charge 5.00 Motors or Generators 1 HP thru 10 HP 1.00 Over 10 HP 2.00 Sign outlets per cir- cuit .10 Each Heating Appliance Up to 1 kw .50 Over 1 kw but not over 10 kw 1. 00 Over 10 kw 2. 00 Electrical water heaters . 75 Dishwasher, disposal, etc. .75 X-ray 1.00 § 547.01 BLDG. PERMIT FEES § 547 . 02 City Engineer, the actual costs of such review shall be paid by the applicant, whether a building permit is issued or not. The Building Official may require a deposit of estimated cost upon receipt of application for building permit. (Ord. No. 10-74, §1, 7 May 1974). Sec. 547.02 Valuation based on actual construction price. Where construction valuation is required to determine the permit fee, such valuation shall be based upon the actual construction contract price (with satisfactory evidence of same being submitted to the Building Official) or a construction cost estimate mad by the Building Official. Except as otherwise provided in Section 547.01 (A) (4) herein. (Ord. No. 15-73, §2, 1 May 1973 a/a/b Ord. No. 1-76, §1, 24 Feb. 1976).