Loading...
HomeMy WebLinkAboutCarrigan SFR 615 Manatee Bay Dr. pg 8Cement tile on 5/8' cdx ptywood and 15# f ett 'RUS S 12 re-erfirl.,ineered, wood trusses 6 0 24" w/ 7-ifjui nuit57, 'Hughes' TA20 anchor (uplif t cop. 1000#) �O INSULATION w/ 9-10d nails 77 (min -19 INSULATION p. 10 112H.S. DRYWALL Cu lift ca00#) 2H.S. DPYW�A L or (5/8' REG, DRYWALL) 'HUGHES' TP6 ANCHORS STRAPS 2X6 HORIZONTAL BLOCKING 8' M.ASONRY WALL Vinyl Sof f il 8'x16' ti tet lot ,ck tie loeam -K]TrOr ripi r rr nr i yunrin rr DOJRLE LINTEL COURSE W/ 1-#6 REPAR IN ROTTOM COURES & 1-#6 REBAR IN TOP COURSE CONT, FILLED W/ 3000 PSI PEAROCK Pu4p MI X. #6 VERTICAL REINFORCING SPACED IN ACCORDANCE W/ FLOOR PLAN FILLED Wr/ 3000 PSI GROUT #6 W/ MIN. 30' LAP T.O.B. ELEV _j1'-4'0 AFF DOUBLE LINTEL COURSE W/ 2-#6 REB IN BOTTOM COURES & .1-#6-REBAR IN TOP COURSE CONT. FILLED W/ 3000 PSI PEAROCK PUMP MIX. #6r,, VERTICAL REINFORCING SPACED IN AC -C URDANCE W/ FLOOR PLAN FILLED'W/ 3000 PSI GROUT 46 DOWEL W/ MIN. 30' LAP PROVIDE 4X4 INSPECTION C.O. TIE VERTICAL REINFORCING TO DOWELS rY r. FURR MASONRY WALL. W/1�2 P.T. FURRING R-4.5 FI -FOIL INSULATION AND 112" DRYWALL 3/4', T&G PLYWOOD SUBQGOR FASTEN W/ Sel C014MON *ILS OR 6d ANNULAR OR SPIRAL 'READ NAILS SPACED @ 6' O.C. AT ED AND 6' O.C. INTERMEDIATE. USE PL / 1) ADHESIVE ALL TRUSSES 18,"FL TRUSS, 2-2X6 P.T. LEDER FASTCNED W/ 5/8' X 6' WEDGE. ANCHOOS SPACED 24' O.C. W/ 2', WASHERS ,,_FURR MASONRY WALL W/192 P.T. FURRING R-4.5 FI -FOIL INSULATION AND 112' DRYWALL, 8' MASONRY WALL W, 4" CONC. S4,,AB A • FOOTING PER FUUNDATION PLAN OOTING TYR 2 -STORY MASONRY WALL SECTIO N SPACED @ 32' O.C. C UPLIFT CAP 1475*5w/ 2#6 loars C nt. SHEATHING, FASTENED PLYWOOD SHEATHING IN ACCORDANCE W/ (see eng. note ) ENGINEERING NOTES - --------- 2X6# 2 S,Y.P, SPACED @ 16' O.C. I ' ` '`' 'SIMPSON' MST148 ANCHOR SPRAP FASTENED W/ 48-10d NAILS SPACED 120 152 O.C. AND IF ENDS ------- AND OPENINGS. (UPLIFT CAP. 3450#) LVL BEAM `NOT'E-. ADDIIIIINAL SI -RAP MAY BE ADDED TO OPPOSITE SIDE OF STUD FOR UL VALUE UP TO 6555# COMILIANCE NOTES!wa This plan complies with chapter 16 o� the 1997 SBC for 110 MPH wind toads. ENGINEERING NOTES *The foundation shalt meet all local code requirements. * Reirforcing bars to be grade: 40 with 25' lap minimum. (ASTM A-615), * Coverage, Footings=3 Beams=1.5'. * Stab & foundation concrete to be 3000 psi @ 28 days. 0 Roof sheething is o diaphragm. Use 5/8' 4 -ply nailed with 8d nolts @ 6' throughout, • Ceilings to be 112" structural drywati. • All exterior masonry watts are to be, considered shearwalts. • Exterior frame walls noted to be shear walls have 112'plywood o.r,".DSB on one side nailed with 8dnails 6' through out, • Interior bearing walls shalt be secured w/ 1/2'x6" wedge anchors,i� 2" washers at 24' o.c. EXTERIOR SHEARWALL DETAIL 112 0; f) 1f ANCHOR and CONNECTION SCHEIDULE'._/' Truss to Top & Bottom Bottom Plate Top Plate Plate to Studs to Stab Interior Frome H 2.5 8d -8e* SP4 @ 32' O.C. I/Z" J bolt or Bearing Walls _j 01i wedge anchor U Z CP) @ 32' o.c. Non -Bearing Simpson H3 sp4/6 @32' o.c, 1/2' J bot t or wall @ porch 8d fill holes 10d -6e*. wedge anchor (1I LJ LJ @ 32' o.c. Wait Parallel Prov;de 2x4 blocking between trusses @ 32' to Trusses o.c. and nail top plate to blocking w/ 2-16d nails each block. Framed Watt Dbl 2xs 0 ends connected wl 112' x 8' wedge to Blockwatt anchors or 112' anchor bolts spaced no greater than 2'-0' o.c. Hip Jacks and ETA 12 10d - 5ea min. (715 lbs) short Trusses to Lintel, Trusses HETA 20 10d-12 ea. strap, (1490 lbs) Girders/ Beans 2 ea. HETA 20 (or equot) 10d-12 ea (2980 lbs) Heavy Girders 2 ea. HETA 24 (or equal) 10d-16 ea. (3750 lb) Conventional -7,11 LSTA 12 10d - 12 ea. One strap across ridge., Frame VQ[tey One strap from rafter end to truss below, Set thru aecking. 2 x 6 P.T. 41/20 wedge anchors or 'J' bolts embedded garage Door 6' into telt pour on each side of Garage Doo" Bucks Li All Locations Use 2' washers on oil anchor bolts and wedge,,, 00 wedge anchors. 1-112' truss nails on all Li connectors into 2x4 members INOTE-CONNECTORS LISTED ARE SIWSON NOTE: IN LOCATIONS WHERE TRUSSES ARE PERPINDICULAR TO THE WALL USE SIMPSON VB5 ANCHORS @ EACH FLOOR TRUSS FASTEN TO BOTTOM PLATE OF WALL ABOVE USE 16-N54A FASTENERS (UPLIFT CAP. 2020# EA ANCHOR) TP -4 ANCHOR SPACED @ 320 2"X4' FRAMED WALL SPACED @ 16' O.C.W 12" drywatl on 3/4"P.T.furring strips spaced @ 16' o.c. w/ fi-Foil insulation 5/8' stucco finish Downpour cells w/1#6- rebar (see eng. notes for spacing) 4' cont, stab w/ 6x6 #10 w.w. mesh on Emil visqueen., --compacted, pretreated soil --,12 x 16 Footing wl 2#5 bars continous 'SMPSON' H3 ANCHOR FASTEN W/ 4-8d NAILS EA. MEMBER @ EA TRUSS J "Hughes" TAD anchor w/ 9-1001 io)a�ls (uplift Cap.,4000#) T WOOD TRUSSES @ 2'-0' O.C. 8'X 16' LINTEL BLOCK COURSE W/ TWO #6 BARS 8' X 8' PRECAST LINTEL ONE #6 BAR FILLED SOLID W/ 3000 PSI GROUT 2' X 6' P.T.ANCHORED W/ 1/2'DIA, X 6 112" J BOLT WASHER AND NUT SPACED 2'-0' O.C. T Y P. SET P.T. PLATE IN A BED OF SEALANT FOR FUME BARRIER TP -4 ANCHOR 1/2X6' J ANCHOR BOLTS SPACED @ 32 SPACED @ 32' O.C. MAX. (SEE E G NOTES, FOR ALT.) 40 X 4. INSPECTI CLEAN-OUT T SLOPE is 13f Ml.RE' [IN - 4 FOOTING PER FOUNDATION PLAN FRAME GARAGE WALL F-2 STEP FOOTING DETAIL_ GARAGE DOOR SECTION SUM MOO i 1—a P.41 <I z cy) 0 Ln, C/) z L 1 <z LJLJ LL a: 07 i _j 01i LJ > < z U U Z CP) Li M CL_ CL > z c) C:) (1I LJ LJ U LJ V) � n Z 0j LIJ Ln Pq - 00 z <t 0i Z (y) L-LjI U I L Li'l C:] 0 LL -,,D Li U 00 Li M 06 06 01i z (y) Z 0-/ E---] LJ E­ Pq z LL_ 0 < <1 Cl/ U Ci/ - CD SUM MOO i 1—a P.41 <I z cy) 0 Ln, C/) z L 1 <z LJLJ LL a: 07 i _j (Y - LJ > < z U Z Li Li M CL_ CL wed 0 c) C:) (1I LJ LJ U � n 0j Ln 0'*) 0i (y) I L Li'l (y) 0 LL -,,D SUM MOO i 1—a P.41 <I z cy) 0 Ln, C/) z L 1 <z LJLJ LL a: 07 i _j < LJ > < z U < (/0 CU (y) Li z < W CK 0j (y) CL wed z ly- (1I LLJ LJ U SUM MOO i 1—a P.41 LJ U Z,> LJ (:::4 L.LjL F ---i � C:j L 1 <z LJLJ LL a: 07 i LIJ ry F-4 >_ < nQ Lij LJ > < z U Q/_ Li G/- Z CL wed (1I U Y_ U