Loading...
HomeMy WebLinkAboutRE Beach Wave (7)Tim: Talked with David, good to go on the Fire Resistant sheathing. In addition, fire and building plan review; revision, is not complete. Staff will contact your office when ready. Respectfully, Glenn Pereno, Building Official Community & Economic Development Department City of Cape Canaveral 7510 N. Atlantic Ave. P.O. Box 326 Cape Canaveral, FL 32920 (321) 868-1222 x12 (321) 868-1247 (fax) g.pereno@cityofcapecanaveral.org <mailto:g.pereno@cityofcapecanaveral.org> www.cityofcapecanaveral.org <http://www.cityofcapecanaveral.org/> "What a Man does for himself dies with him, but what a Man does for his community Lives forever" Author Unknown From: Tim Saunders [mailto:tsaunders@dwenet.com] Sent: Tuesday, March 12, 2013 11:11 AM To: Dave Menzel; Glenn Pereno Cc: Mosh Gal Subject: RE: Beach Wave Importance: High Glenn, Have you answered this question from Dave Menzel below? Thank You! Timothy J. Saunders / Project Manager Doug Wilson Enterprises, Inc. Construction Manager / General Contractor 6121 N. Atlantic Ave., Suite 102 Cape Canaveral, FL 32920 Office: 321-783-0903 Fax: 321-783-7941 Cell: 321-403-2461 Email: tsaunders@dwenet.com <mailto:tsaunders@dwenet.com> ________________________________ From: Dave Menzel [mailto:dmenzel@maidesignbuild.com] Sent: Tuesday, March 05, 2013 12:15 PM To: 'Glenn Pereno' Cc: Tim Saunders; 'Mosh Gal' Subject: Beach Wave Glenn, I called last week and left message. this is a follow up to that call. General contractor would like to use fire retardant plywood in lieu of metal deck on the copula roofs so he can secure the concrete tile. Per FBC 2007 which we fall under for this project: Section 603.1.- 1 - 1.3 fire retardant wood roof construction is permitted. Can you please review and approve and we will provided revised plan. Thanks, _________________________________ David T. Menzel, President mai DESIGN BUILD Suite B Melbourne, FL 32904 (321) 757-3034 www.maidesignbuild.com <http://www.maidesignbuild.com/>