Talked with David, good to go on the Fire Resistant sheathing. In
addition, fire and building plan review; revision, is not complete.
Staff will contact your office when ready.
Respectfully,
Glenn Pereno, Building Official
Community & Economic Development Department
City of Cape Canaveral
7510 N. Atlantic Ave.
P.O. Box 326 Cape Canaveral, FL 32920
(321) 868-1222 x12 (321) 868-1247 (fax)
g.pereno@cityofcapecanaveral.org
<mailto:g.pereno@cityofcapecanaveral.org>
www.cityofcapecanaveral.org <http://www.cityofcapecanaveral.org/>
"What a Man does for himself dies with him,
but what a Man does for his community Lives forever"
Author Unknown
From: Tim Saunders [mailto:tsaunders@dwenet.com]
Sent: Tuesday, March 12, 2013 11:11 AM
To: Dave Menzel; Glenn Pereno
Cc: Mosh Gal
Subject: RE: Beach Wave
Importance: High
Glenn,
Have you answered this question from Dave Menzel below?
Thank You!
Timothy J. Saunders / Project Manager
Doug Wilson Enterprises, Inc.
Construction Manager / General Contractor
6121 N. Atlantic Ave., Suite 102
Cape Canaveral, FL 32920
Office: 321-783-0903
Fax: 321-783-7941
Cell: 321-403-2461
Email: tsaunders@dwenet.com <mailto:tsaunders@dwenet.com>
________________________________
From: Dave Menzel [mailto:dmenzel@maidesignbuild.com]
Sent: Tuesday, March 05, 2013 12:15 PM
To: 'Glenn Pereno'
Cc: Tim Saunders; 'Mosh Gal'
Subject: Beach Wave
Glenn,
I called last week and left message. this is a follow up to that call.
General contractor would like to use fire retardant plywood in lieu of
metal deck on the copula roofs so he can secure the concrete tile.
Per FBC 2007 which we fall under for this project:
Section 603.1.- 1 - 1.3 fire retardant wood roof construction is
permitted.
Can you please review and approve and we will provided revised plan.
Thanks,
_________________________________
David T. Menzel, President
mai DESIGN BUILD
Suite B
Melbourne, FL 32904
(321) 757-3034
www.maidesignbuild.com <http://www.maidesignbuild.com/>