HomeMy WebLinkAboutBLDG PERMIT #9243 (compaction test) 4
•
Glenn Pereno
From: Tim Saunders <tsaunders@dwenet.com>
Sent: Thursday, March 28, 2013 11:28 AM
To: Glenn Pereno
Cc: Dave Menzel
Subject: Beachwave Complex Compaction Test Results
Attachments: Beachwave Complex - Compaction Test Results.pdf
Importance: High
Glenn„
Please find attached the compaction test results for the Beach Wave Complex.
Test results include all compaction test from bottom of de-mucking operations to top of building pad and bottom of footers.
Should you require any additional information, please let me know!
Thank You!
.9-knelno/Sauadere/✓9a/ecI✓fawager
Doug Wilson Enterprises, Inc. ,(JI
Construction Manager/General Contractor
6121 N. Atlantic Ave., Suite 102
Cape Canaveral, FL 32920 9j '43
Office: 321-783-0903 /o�
Fax: 321-783-7941
Cell: 321-403-2461 ( / n
Email: tsaundersdwenet.com
�/
1
gpU N I V E R S A L UES Project No: 0310.1300052.0000
ENGINEERING SCIENCES UES Report No: 23902-1 DT031113
164 Consultants In:Geotechnical Engineering•Environmental Sciences
Geophysical Services•Construction Materials Testing•Threshold Inspection
Building Inspection•Plan Review•Building Code Administration
820 Brevard Avenue • Rockledge,FL • 32955
321.638.0808 Fax:321.638.0978
In-Place Density Test Report
Client: Doug Wilson Enterprises
P.O. Box 865
Cape Canaveral, FL 32920
Project: Beach Wave Store
Central &Astronaut Boulevard, Cape Canaveral, FL
Area Tested: subgrade for proposed footings
Type of Test: Field: ASTM D-6938 Nuclear Gauge Method Date of Test: 3/11/13
Lab: ASTM D-1557
Technician: Joseph Beasley
Requirements: 95% of Proctor maximum dry density. These tests apply to the fill and/or surficial soil conditions only and
do not address the condition of the underlying soils below the tested depths.
Field Dry
Test Test Test Proctor Density Field % Comments
Thickness Moisture
# Location of Test Elev.(FT) (IN) (2) (PCF) % Compaction (3)
1 sw cr.footing 0 12 15354 110.6 8.5 100 A
2 se cr footing 0 12 15354 108.2 9.3 97 A
3 aprox center of a footing 0 12 15354 107.7 8.4 97 A
4 ne cr footing 0 12 15354 106.9 9.1 96 A
5 nw cr footing 0 12 15354 107.9 8.2 97 A
(1) Ref. Datum: 0 = Bottom of Footing (3)Comments Key
(2) A. Compaction meets min. requirements
Proctor Maximum Optimum B.Compaction does not meet min. requirements
# Dry Moisture C. Moisture does not meet requirements
Density Content D. Recompaction required
15354 111.0 12.0
This test was performed without deviation from ASTM procedures.
This report shall not be reproduced,except in full, without the written approval of Universal Engineering Sciences.
lipUNIVERSAL UES Project No: 0310.1300052.0000
ENGINEERING SCIENCES UES Report No: 23733-2DT022713
1640 Consultants In:Geotechnical Engineering•Environmental Sciences
Geophysical Services•Construction Materials Testing•Threshold Inspection
Building Inspection•Plan Review•Building Code Administration
820 Brevard Avenue • Rockledge,FL • 32955
321.638.0808 Fax:321.638.0978
In-Place Density Test Report
Client: Doug Wilson Enterprises
P.O. Box 865
Cape Canaveral, FL 32920
Project: Beach Wave Store
Central &Astronaut Boulevard, Cape Canaveral, FL
Area Tested: fill for bldg. pad
Type of Test: Field: ASTM D-6938 Nuclear Gauge Method Date of Test: 2/27/13
Lab: ASTM D-1557
Technician: Randy Craven
Requirements: 95% of Proctor maximum dry density. These tests apply to the fill and/or surficial soil conditions only and
do not address the condition of the underlying soils below the tested depths.
Field Dry
Test Test Test Proctor Density Field "/o Comments
# Thickness Moisture
Location of Test Elev.(FT) (IN) (2) (PCF) % Compaction (3)
4 south west corner of bldg. pad 0 12 15318 104.3 13.9 96 A
5 north west corner of bldg.pad 0 12 15318 103.6 10.7 95 A
6 north east corner of bldg. pad 0 12 15318 104.3 9.9 96 A
7 south east corner of bldg.pad 0 12 15318 104.4 8.9 96 A
8 middle of bldg. pad 0 12 15318 103.4 9.4 95 A
(1) Ref. Datum: 0 = Top of Fill
(3)Comments Key
(2) A. Compaction meets min. requirements
Proctor Maximum Optimum B.Compaction does not meet min. requirements
# Dry Moisture C. Moisture does not meet requirements
Density Content D. Recompaction required
15318 109.0 12.0
This test was performed without deviation from ASTM procedures.
This report shall not be reproduced,except in full, without the written approval of Universal Engineering Sciences.
1
liplJ N I V E R S A L UES Project No: 0310.1300052.0000
ENGINEERING SCIENCES UES Report No: 23734-1 DT 022713
1640 Consultants In:Geotechnical Engineering•Environmental Sciences
Geophysical Services•Construction Materials Testing•Threshold Inspection
Building Inspection•Plan Review•Building Code Administration
820 Brevard Avenue • Rockledge,FL • 32955
321.638.0808 Fax:321.638.0978
In-Place Density Test Report
Client: Doug Wilson Enterprises
P.O. Box 865
Cape Canaveral, FL 32920
Project: Beach Wave Store
Central &Astronaut Boulevard , Cape Canaveral, FL
Area Tested: fill for bldg. pad
y
Type of Test: Field: ASTM D-6938 Nuclear Gauge Method Date of Test: 2/27/13
Lab: ASTM D-1557
Technician: Randy Craven
Requirements: 95% of Proctor maximum dry density. These tests apply to the fill and/or surficial soil conditions only and
do not address the condition of the underlying soils below the tested depths.
Field Dry
Test Test Test Proctor Density Field % Comments
Thickness Moisture
# Location of Test Elev.(FT) (IN) (2) (PCF) % Compaction (3)
1 north west corner of bldg. 7.0 12 15318 103.5 12.4 95 A
2 north west corner of bldg. pad 6.0 12 15318 104.2 12.8 96 A
3 north west corner of bldg. pad 5.0 12 15318 104.6 13.3 96 A
4 north west corner of bldg.pad 4.0 12 15318 104.9 13.6 96 A
5 north west corner of bldg. pad 3.0 12 15318 105.3 14.0 97 A
6 north west corner of bldg. pad 2.0 12 15318 105.8 14.5 97 A
7 north east corner of bldg. pad 7.0 12 15318 104.1 12.2 96 A
8 north east corner of bldg. pad 6.0 12 15318 104.6 12.8 96 A
9 north east corner of bldg. pad 5.0 12 15318 104.9 13.3 96 A
10 north east corner of bldg. pad 4.0 12 15318 105.3 13.6 97 A
(1) Ref. Datum: 0 = Bottom of Excavation (3)Comments Key
(2) A.Compaction meets min. requirements
Proctor Maximum Optimum B. Compaction does not meet min.requirements
# Dry Moisture C. Moisture does not meet requirements
Density Content D. Recompaction required
15318 109.0 12.0
This test was performed without deviation from ASTM procedures.
This report shall not be reproduced,except in full, without the written approval of Universal Engineering Sciences.
UES Project No: 0310.1300052.0000
lip UES DOCS No:
ENGINEERING SCIENCES UES Report No: 23734-1 DT 022713
Consultants In:Geotechnical Engineering•Environmental Sciences
Geophysical Services•Construction Materials Testing•Threshold Inspection
Building Inspection•Plan Review•Building Code Administration
820 13revard Avenue • Rockledge,FL • 32955
321.638.0808 Fax:321.638.0978
In-Place Density Test Report
Client: Doug Wilson Enterprises
P.O. Box 865
Cape Canaveral, FL 32920
Project: Beach Wave Store
Central &Astronaut Boulevard , Cape Canaveral, FL
Area Tested: fill for bldg. pad
Type of Test: Field: ASTM D-6938 Nuclear Gauge Method Date of Test: 2/27/13
Lab: ASTM D-1557
Technician: Randy Craven
Requirements: 95% of Proctor maximum dry density. These tests apply to the fill and/or surficial soil conditions only and
do not address the condition of the underlying soils below the tested depths.
Field Dry
Test Test Test Proctor Density Field % Comments
Thickness Moisture
# Location of Test Elev.(FT) (IN) (2) (PCF) ,/o Compaction (3)
11 north east corner of bldg. pad 3.0 12 15318 105.8 14.0 97 A
12 north east corner of bldg. pad 2.0 12 15318 105.2 13.5 97 A
13 south east corner of bldg. pad 7.0 12 15318 103.5 9.6 95 A
14 south east corner of bldg. pad 6.0 12 15318 103.9 10.4 95 A
15 south east corner of bldg. pad 5.0 12 15318 104.2 10.6 96 A
16 south east corner of bldg. pad 4.0 12 15318 104.0 11.0 95 A
17 south east corner of bldg. pad 3.0 12 15318 104.8 11.5 96 A
18 south east corner of bldg.pad 2.0 12 15318 105.3 11.9 97 A
19 south west corner of bldg. pad 7.0 12 15318 103.8 12.5 95 A
20 south west corner of bldg. pad 6.0 12 15318 104.4 13.0 96 A
(1) Ref. Datum: 0 = Bottom of Excavation (3)Comments Key
(2) A.Compaction meets min. requirements
Proctor Maximum Optimum B. Compaction does not meet min. requirements
# Dry Moisture C. Moisture does not meet requirements
Density Content D. Recompaction required
15318 109.0 12.0
This test was performed without deviation from ASTM procedures.
This report shall not be reproduced,except in full, without the written approval of Universal Engineering Sciences.
U ES Project No: 0310.1300052.0000
UES DOCS No:qp
ENGINEERING SCIENCES UES Report No: 23734-1 DT022713
%twill Consultants In:Geotechnical Engineering•Environmental Sciences
Geophysical Services•Construction Materials Testing•Threshold Inspection
Building Inspection•Plan Review•Building Code Administration
82013rcvard Avenue • Rockledge,FL • 32955
321.638.0808 Fax:321.638.0978
In-Place Density Test Report
Client: Doug Wilson Enterprises
P.O. Box 865
Cape Canaveral, FL 32920
Project: Beach Wave Store
Central &Astronaut Boulevard , Cape Canaveral, FL
Area Tested: fill for bldg. pad
Type of Test: Field: ASTM D-6938 Nuclear Gauge Method Date of Test: 2/27/13
Lab: ASTM D-1557
Technician: Randy Craven
Requirements: 95% of Proctor maximum dry density. These tests apply to the fill and/or surficial soil conditions only and
do not address the condition of the underlying soils below the tested depths.
Field Dry
Test Test Test Proctor Density Field % Comments
# Thickness Moisture
Location of Test Elev.(FT) (IN) (2) (PCF) % Compaction (3)
21 south west corner of bldg. pad 5.0 12 15318 104.0 13.4 95 A
22 south west corner of bldg. pad 4.0 12 15318 104.9 13.9 96 A
23 south west corner of bldg. pad 3.0 12 15318 105.5 13.3 97 A
24 south west corner of bldg. pad 2.0 12 15318 105.0 14.8 96 A
25 middle of bldg. pad 7.0 12 15318 104.1 11.9 96 A
26 middle of bldg. pad 6.0 12 15318 104.4 12.4 96 A
27 middle of bldg. pad 5.0 12 15318 105.0 12.8 96 A
28 middle of bldg. pad 4.0 12 15318 105.3 13.6 97 A
29 middle of bldg. pad 3.0 12 15318 106.6 14.0 98 A
30 middle of bldg. pad 2.0 12 15318 106.0 13.7 97 A
(1) Ref. Datum: 0 = Bottom of Excavation (3)Comments Key
(2) A. Compaction meets min. requirements
Proctor Maximum Optimum B. Compaction does not meet min. requirements
# Dry Moisture C. Moisture does not meet requirements
Density Content D. Recompaction required
15318 109.0 12.0
This test was performed without deviation from ASTM procedures.
This report shall not be reproduced,except in full, without the written approval of Universal Engineering Sciences.