HomeMy WebLinkAboutBeachwave Complex - Traffic StudyRef: 3799.01
TECHNICAL MEMORANDUM
To: Dave Menzel, PE
From: R. Sans Lassiter, PE
Date: May 7, 2012
Subject: Beach Wave Complex — Traffic Impact Study
INTRODUCTION
Lassiter Transportation Group, Inc. (LTG) was retained by Extreme Fun, LLC to prepare a Traffic Impact Study
(TIS) for the proposed Beach Wave Complex project which will be located on the west side of Astronaut Boulevard
(SR AlA), just north of W. Central Boulevard in the City of Cape Canaveral. The project is anticipated to be built
out in 2012 and will consist of a 16,880 square foot specialty retail building and an 11,200 square foot pharmacy
with a drive -through. Access to the property will be provided via a full access driveway on Astronaut Boulevard
and an existing full access driveway on W. Central Boulevard. The project location relative to the surround
roadway network is depicted in Figure 1. A site plan prepared by mai Design Build is attached as Exhibit A.
The 5.0 acre property is currently developed with a Family Entertainment Business. The trips p.m. peak -hour
generated by the existing use will be credited against the trips generated by the proposed development in
determining the future impacts.
STUDY AREA
The study area consists of the intersection of Astronaut Boulevard/W. Central Boulevard and the two project
driveways.
EXISTING ROADWAY ANALAYSIS
P.M. peak -hour turning movements were conducted at the intersections of Astronaut Boulevard at W. Central
Boulevard and Astronaut Boulevard at Imperial Boulevard on March 22, 2012. The turning movement count data
is included in Exhibit B with the p.m. peak -hour traffic volumes depicted in Figure 2.
123 Live Oak Ave.
)ayton w Beach, FL 32
Phone ' 86.257, 5 Fax 86, 57.6996
VVVVW.&c: ssitEr r nsporiafion,corn
•
////,' • /
, • /
,„..„
ieff Aui
"."
•
if/4
'••
• I
1
•
„ • ' • • • ,
rCnaverar: SO nCape Tyler Ave
AVS
'• '
,„ • ".•,, ' •
, •
„
,„
•,
• „TajIor
•
•
Scaltop Dr
en-Cheek-DE1-1
Challenger Rd
Atlanti Rd
rE.:cheek Dr Christopher Columbus
JettyDr
!Oki
urge king
Project Location
Tower <I,
14'• ,
Palms
;
f
SeaportShorewoodd
HarborDrOak Ln
•, 'Coral Dr
lvd W
84bcisf31vd
I • .1 I
Blvd E
Surf Dr
er St
Caroline St
shington Ave
amsAve
Ave
Madison-1,PN
onipe::,Q,ve,-1 .„
Site Location & Surrounding
Roadway Network
Project No.: 3799.01
Figure 1
„App
Lassitansportation Group Inc.
Engineering and Planning
123 Live Oak Avenue — Daytona Beach, Florida 32114
Telephone: 386.257.2571 Fax: 386.257.6996 EB# 0009227
"dr' \
.--"-- \
•r \
,F7 \
.•
i
Beach Wave Complex
.
.
.
.
\
.
\
.
\
\
,S
kI NIX
> >� 47 Dig
os ( c
xa \ \''' c.)
5 a
19# Fr
40
,04'•
(\b`s
Beach Wave
Complex
N
A
-41,0.-
NTS
Existing P.M. Peak -Hour Turning
Movements
Lussite4ransportation Group: Inc.
--= �- = Engineering and Planning
Project No.: 3799.01
Figure 2
123 Live Oak Avenue — Daytona Beach, Florida 32114
Telephone: 386.257.2571 Fax: 386.257.6996 EB# 0009227
TECHNICAL MEMORANDUM
May 7, 2012
Page 4
TRIP GENERATION
The total trip generation for the development was determined using the trip generation rates contained in the
Institute of Transportation Engineers (ITE) 8th edition of the Trip Generation Manual. As indicated in Table 1 the
proposed development will generate 178 p.m. peak -hour trips.
Table 1
P.M. Peak -Hour Trip Generation — Proposed Use
Beach Wave Complex
Time
Period
Land Use
ITE
Code
Trip Generation
Equation
Size
(ksf)
Total
Trips
Percent
Enter
Percent
Exit
Trips
Enter
Trips
Exit
P.M.
Peak-
Hour
Retail
814
T=2.40(X 2 .48
16.88
62
44%
56%
27
35
_§..pfcialty
Pharmacy with
Drive -Through
881
T=10.35(X)
1 .2
116
50%
50%
58
58
Totals:
178
85
93
Source: 1TE, Trip Generation, 8" Edition
The trip generation for the existing use of the 5.0 acre property as a Multipurpose Recreational Facility, which is
defined in the ITE Trip Generation Manual as a facility containing two or more of the following land uses combined
at one site: miniature golf, batting cages, video arcade, bumber boats, go-carts and golf driving ranges, was
determined using the trip generation rates contained in the ITE 8th edition of the IripGeneration Manual. As
indicated in Table 2 the proposed development will generate 178 p.m. peak -hour trips.
Table 2
P.M. Peak -Hour Trip Generation — Existing Use
Beach Wave Complex
Time
Period
Land Use
ITE
Code
Trip Generation
Equation
Size
(acres)
Total
Trips
Percent
Enter
Percent
Exit
Trips
Enter
Trips
Exit
P.M.
Peak-
Hour
Multipurpose
Recreational
FacilitA_
435
T=5,77(X)
5.0
30
50°/0
50%
15
15
Source: 1TE, Trip Generation, 8 Edition
The trips generated for the existing use were credited against the trips generated for the proposed use to
determine the total new net trips associated with the proposed development. As indicated in Table 3, the
proposed Beach Wave Complex will generate 148 new external p.m. peak -hour trips.
Table 3
Net New Peak -Hour Trips
Beach Wave Complex
P.M. Peak -Hour Trips
Total
Enter
Exit
Proposed
Use
178
85
93
Existing
Use
30
15
15
New Net
Trips
148
70
78
nsport don Group, inc.
Zngineering and Plumy g
TECHNICAL MEMORANDUM
May 7, 2012
Page 5
TRIP DISTRIBUTION
The process of determining the directional flow of traffic associated with a new development is called trip
distribution. The Central Florida Regional Planning Model, developed for use in forecasting future travel patterns,
was used to determine the trip distribution for this project. The process required editing the regional network to
add one traffic analysis zone (TAZ) to represent the location of the project and its general orientation to the
adjacent road network. The next step involved converting the land use data to socio-economic (S/E) data which
the model uses in trip generation and distribution. The model structure was then run which resulted in producing
trip productions and attractions (trip generation) which were then matched with complementary attractions and
productions according to statistically determined trip lengths by trip purpose. The model results were manually
modified to more accurately reflect the existing connection that the TAZ and associated land uses west of the
proposed project has to the roadway network. The resulting model distribution is depicted in Figure 3 with the
model plots (depicting the manual modification) included in Exhibit C.
TRIP ASSIGNMENT
The final step in the analysis was to assign the net new project traffic to the road network. Figure 4 graphically
depicts the p.m. peak -hour traffic assignment for the development.
SITE ACCESS EVALUATION
The 2012 build -out traffic volumes, which consist of existing and the Beach Wave project traffic, were assigned to
the driveways and study area intersection. Under build -out conditions, the proposed project will be accessible via
an existing driveway on W. Central Boulevard and a proposed driveway on Astronaut Boulevard, opposite Imperial
Boulevard.
TURN LANE ANALYSIS
Anticipated volumes for the build -out scenario at the proposed unrestricted access driveways on Astronaut
Boulevard and W Central Boulevard were compared against NCHRP Report 457 warrant criteria to determine the
need for turn lanes at each of the driveways.
A left -turn lane is already provided via the existing bi-directional center turn lane at the Astronaut Boulevard
entrance. A right -turn lane was found to be warranted at this driveway. A right- or left -turn lane was not warranted
at the existing driveway intersecting W. Central Boulevard. The NCHRP turn lane warrant analyses are attached
as Exhibit D. FOOT Standard Index No. 301 was utilized to determine that the required southbound right -turn
deceleration dimension at the project driveway and Astronaut Boulevard using the design speed of 50 mph is 240
feet.
Lass ans,portation Group, Inc.
,!,:ngineering and Planning
D
*46.
,fie,
\�
4.
o46.
ek.
c?
s
4
o
4.
Beach Wave
Complex
N
A
Alpo-
NTS
Project Distribution
Lassxt — ransportation Group, Inc.
---...= Engineering and Planning
Project No.: 3799.01
Figure 3
123 Live Oak Avenue — Daytona Beach, Florida 32114
Telephone: 386.257.2571 Fax: 386.257.6996 EB# 0009227
\0`%6
4
RI( <'''
rt9u
-----7 \ J
51 \ \
-, 'F'' \
) F°\ v.)
��yy d,
7'
•• �Z'1 J ��
„--"--# \ e ‘,
...,o
..-- \
„--- \
7- \
'.,• Beach Wave Complex • �,, 'o ,
•' acP'‘?? ( c
�� ' J
��
7-#. Na \ 4,-\ ,..,.?,
f
• y o
\ 7
f ) j
q % 3x
: `L'``�Y,A1' `), C.
NO
\F."
,09e
,,\1
rj ,tI iN
� G
�4'
�
D� •
LEGEND:
Trips
Traffic
X+(X)=XX
Total
- Project
Existing
P.M. Peak -Hour Project
Traffic
ENTER
EXIT
TOTAL
70
78
148
Beach Wave
Complex
N
NTS
Build -Out P.M. Peak -Hour Turning
Movements
A
Lassit — ansportation Group, Inc.
Engineering and Planning
Project No.: 3799.01
Figure 4
123 Live Oak Avenue — Daytona Beach, Florida 32114
Telephone: 386.257.2571 Fax: 386.257.6996 EB# 0009227
TECHNICAL MEMORANDUM
May 7, 2012
Page 8
CONCLUSION
This study was conducted to evaluate the impact the proposed Beach Wave Complex would have on area
roadways in Brevard County. The results of the study are summarized below:
• The proposed Beach Wave Complex will replace an existing Multipurpose Recreational Facility and is
comprised of a 16,880 square foot specialty retail building and an 11,200 square foot pharmacy with a drive -
through. The proposed Beach Wave Complex will generate a total of 148 net p.m. peak -hour trips.
• Using NCHRP Report 457, a southbound right -turn lane at Astronaut Boulevard and the project driveway was
found to be warranted. Using the deceleration distance obtained from FDOT Standard Index No. 301, the turn
lane length should be 240 feet in length, including the taper.
• It is recommended that the existing median opening on W. Central Boulevard be widened approximately 20
feet on the eastern side of the project driveway to accommodate the left -out movement.
Attachments:
Exhibit A Preliminary Site Plan
Exhibit B — Turning Movement Count Data
Exhibit C CFRPM Model Distribution
Exhibit D NCHRP Report 457 Warrant Study
I affirm, by affixing my signature and seal below, that the findings contained herein are, to my knowledge, accurate
and truthful and were developed using current procedures standard to the practice of professional engineering.
Name: R Sans Lassiter, P.E.
Signature:
Florida PE License No.: 34868
Date: May 7, 2012
Lass
r(flpOrtatOfl
Engineering and Planning
APPENDICES
APPENDIX A
Preliminary Site Plan
XI it
•r•
air •� •r
h�l►ti � � r•�••• i �
1• .• 01
re,011,3. •
•
•••••-(60.
S.
02
,4\t,
T;• 6%)%
aka
•
as•
jair
�_ �•alai ,�
•
• 1
� u
$\
km
WIN
Ato
F.
gamig 2
ow Au
oa
r�
`�
�.
2"�
g.
m�
.ter•
MI231*"
RtIg
4 adu
OM
- �..
Ma
I*
q°r
. an
-
-
�.
■I)
_ PM
We
--
-
1an0
EIS
s. a ° _
are
--
e++a
--
ors
maw
'1/41'
mxrard gamy,
A)
.pair
ram
+
.
R'4
i
.,1 if :�
Firm
.r4
-
OG'�i
. �.....-
...
i
inaa die
�•-.
1 ...�
p�,C
a. M olit 4Pr,
�1 L
1.•.
• —.
,.
•�+•11 ]
MO A
" e.
.,17 Ta' N
ar.b .
311 b
�_.
CC X
1"
We
---
2
i�iP
.r-
---
4M .
o uiiszclip
APPENDIX B
Turning Movement Counts
DE -TRAFFIC
PH.386-341-41881FAX.386-749-9561
SR AlA AT WEST CENTRAL BLVD
BREVARD COUNTY, FLORIDA
Groups Printed- Automobiles - Commercial
File Name : AlA at W Central
Site Code : 00000001
Start Date : 3/22/2012
Page No : 1
SR AlA
Southbound
West Central Blvd
Westbound
SR AlA
Northbound
West Central Blvd
Eastbound
Start Time
Left
Thru
Right
App. Total
Left
Thru
Right
App. Total
Left
Thru
Right
App. Total
Left
Thru
Right
App. Total
Int. Total
Factor
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
04:00 PM 31
253
7
291
15
4
34
53
4
214
2
220
5
1
2
8
572
04:15 PM 34
273
8
315
13
3
37
53
9
249
2
260
8
3
5
16
644
04:30 PM 33
281
11
325
13
4
31
48
3
270
4
277
5
1
5
11
661
04:45 PM 27
258
11
296
11
4
24
39
6
259
5
270
4
2
4
10
615
Total 125
1065
37
1227
52
15
126
193
22
992
13
1027
22
7
16
45
2492
05:00 PM
05:15 PM
05:30 PM
05:45 PM
34
26
32
24
247
235
226
189
Total 116 897
Grand Total
Apprch %
Total %
241
10.6
5.2
1962
86.1
42.7
12
11
9
8
293
272
267
221
40 1053
77 2280
3.4
1.7
49.6
12
13
15
11
3
4
6
2
34
26
22
25
49
43
43
38
51 15 107 173
103 30 233 366
28.1 8.2 63.7
2.2 0.7 5.1
8.0
4
5
2
4
236
222
192
160
4
5
4
5
15 810 18
37
2.0
0.8
1802
96.4
39.2
244
232
198
169
843
31 1870
1.7
0.7
40.7
5
4
2
4
15
37
45.7
0.8
1
2
2
1
13
16.0
0.3
2
4
5
4
15
31
38.3
0.7
8
10
9
9
36
81
1.8
SR Al A
Southbound
West Central Blvd
Westbound
SR AlA
Northbound
West Central Blvd
Eastbound
Start Time
_ Left I
Thru Right I App. Total
Left I
Thru I Right! App. Total
Left 1
Thru [ Right 1 App. Total
Left1
Thru 1 Right I App. Total
Peak Hour From 04:00 PM to 06:00 PM - Peak 1 of 1
Intersection 04:15 PM
Volume 128 1059 42
Percent 10.4 86.2 3.4
04:30 Volume 33 281 11
Peak Factor
High Int. 04:30 PM
Volume 33 281
Peak Factor
1229
325
11 325
0.945
49
25.9
13
04:15 PM
13
14
7.4
4
126
66.7
31
189
48
3 37 53
0.892
22
2.1
3
1014
96.5
270
04:30 PM
3 270
15 1051
1.4
4 277
4 277
0.949
22
48.9
5
04:15 PM
8
7
15.6
1
16
35.6
5
45
11
3 5 16
0.703
594
557
517
437
2105
4597
Int. Total
2514
661
0.951
DE -TRAFFIC
P H .385-341-4186/FAX.386-749-9551
SR MA AT WEST CENTRAL BLVD
BREVARD COUNTY, FLORIDA
Groups Printed- Commercial
File Name : AlA at W Central
Site Code : 00000001
Start Date : 3/22/2012
Page No : 2
SR Al A
Southbound
West Central Blvd
Westbound
SR AlA
Northbound
West Central Blvd
Eastbound
Start Time
Left
Thru
Rght
App. Total
Left
Thru
Right
App. Total
Left
Thru
Right
App. Total
Left
Thru
Right
App. Total
Int. Total
Factor
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
04:00 PM 0
04:15 PM 0
04:30 PM 0
04 :45 PM 0
7
4
5
4
0
0
0
0
7
4
5
4
1
0
0
0
0
1
0
0
2
2
0
0
3
3
0
0
0
0
0
0
13
7
9
5
0
0
0
0
13
7
9
5
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
23
14
14
9
Total 0
20
0
20
1
1
4
6
0
34
0
34
0
0
0
0
60
05:00 PM
05:15 PM
05:30 PM
05:45 PM
Total
Grand Total
Apprch %
Total %
0
0
0
0
0
0
0.0
0.0
2
4
5
2
13
33
100.0
34.4
0
0
0
0
0
2
4
5
2
13
0 33
0.0
0.0 34.4
0
0
0
0
0
10.0
1.0
0
0
2
3
30.0
3.1
0
0
1
1
2
1
0
2
1
4
6 10
60.0
6.3 10.4
0
0
0
0
0
0
0.0
0.0
4
6
5
4
19
53
100.0
55.2
0
0
0
0
0
4
6
5
4
19
0 53
0.0
0.0 55.2
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0 0 0 0
0.0 0.0 0.0
0.0 0.0 0.0 0.0
7
10
12
7
36
96
DE -TRAFFIC
P H .386-341-4186/FAX.386-74g-9561
SR Al A AT WEST CENTRAL BLVD
BREVARD COUNTY, FLORIDA
Groups Printed- Peds
File Name
Site Code
Start Date
Page No
Al A at W Central
: 00000001
: 3/22/2012
:3
SR Al A
Southbound
West Central Blvd
Westbound
SR MA
Northbound
West Central Blvd
Eastbound
Start Time
Left
Thru
Right
Peds
App'
Total
Left
Thru
Right
Peds
App'
Total
Left
Thru
Right
Peds
App'
Total
Left
Thru
Right
Peds
App.
Total
Int.
Total
Factor
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
04:45 PM
Total
05:00 PM
05:15 PM
05:30 PM
0 0 0 1
0 0 0 1
0
0
0
0
0
0
0
0
0
0
0
1
0
0
1
0 0 0 0
0 0 0 0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0 0 0
0
0 0 0 0
0
0
0
0 0 0
0 0 2
0 0 0
0
0
0
2
0
0 0 0
0 0 0
0
0
0
0
0 0 0 1 1
0 0 0 0 0
0 0 0 1 1
1
1
1
2
2
Total 0 0 0 1
Grand Total
Apprch %
Total %
1 o
0 0 0 2 2
0.0 0.0 0.0 100.0
0.0 0.0 0.0 33.3 33.3
0 0 0 01 0
0 0 0 0 0
0.0 0.0 0.0 0.0
0.0 0.0 0.0 0.0 0.0
0
0.0
0.0
0 0 2 21 0
0
0.0
0.0
0 2
0.0 100.0
0.0 33.3
2
33.3
0
0.0
0.0
0 0
0
0.0
0.0
2 2I 5
0 2
0.0 100.0
0.0 33.3
2
33.3
6
DE -TRAFFIC
P H .386-341-4186/FAX.386-740-9661
SR AlA AT IMPERIAL BLVD
BREVARD COUNTY, FLORIDA
Grouos Printed- Automobiles - Commercial
File Name : AlA at Imperial
Site Code : 00000002
Start Date : 3/22/2012
Page No : 1
SR Al A
Southbound
Imperial Boulevard
Westbound
SR Al A
Northbound
N/A
Eastbound
,
Start Time
Left
Thru
Right
App. Total
Left
Thru
Right
App. Total
Left
Thru
Right
App. Total
Left
Thru
Right
App. Total
Int. Total
Factor
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
04:00PM 6
04:15PM 1
04:30 PM 1
04:45 PM 2
0
0
0
0
0
0
0
0
6
1
1
2
1
1
0
1
0
0
0
0
7
14
6
11
8
15
6
12
0
0
0
0
0
0
0
0
1
0
1
0
1
0
1
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
15
16
8
14
Total 10
0
0
10
3
0
38
41
0
0
2
2
0
0
0
0
53
05:00 PM
05:15 PM
05:30 PM
05:45 PM
Total
Grand Total
Apprch %
Total %
2
4
2
3
11
21
100.0
17.2
0
0
0
0
0
0
0.0
0.0
0
0
0
0
0
0
0.0
0.0
2
4
2
3
11
21
17.2
0
2
0
1
3
6
6.3
4.9
0
0
0
0
0
0
0.0
0.0
16
15
12
9
52
90
93.8
73.8
16
17
12
10
55
96
78.7
0
0
0
0
0
0
0.0
0.0
0
0
0
0
0
0
0.0
0.0
0
1
1
1
3
5
100.0
4.1
0
1
1
1
3
5
4.1
0
0
0
0
0
0
0.0
0.0
0
0
0
0
0
0
0.0
0.0
0
0
0
0
0
0
0.0
0.0
0
0
0
0
0
0
0.0
SR AlA
Southbound
Imperial Boulevard
Westbound
SR Al A
Northbound
N/A
Eastbound
Start Time
Left
Thru i Right i App. Total
Left
Thru 1 Right I App. Total
Left I
Thru I Right I App. Total
Left'
Thru 1 Right I App. Total
Peak Hour From 04:00 PM to 06:00 PM - Peak 1 of 1
Intersection 04:45 PM
Volume 10 0 0
Percent 100.0 0.0 0.0
05:15 Volume 4 0 0
Peak Factor
High Int. 05:15 PM
Volume 4 0 0
Peak Factor
10
4
4
0.625
3
5.3
2
05:15 PM
2
0
0.0
0
54
94.7
15
57
17
0 15 17
0.838
0
0.0
0
0
0.0
0
05:15 PM
0 0
2
100.0
1
1
2
1
1
0.500
o o 0
0.0 0.0 0.0
0 0 0 0
3:45:00 PM
0
18
22
15
14
69
122
Int. Total
69
22
0.784
DE-TRAFF1C
PH.386-341-4186/FAX.386-740-9561
SR AlA AT IMPERIAL BLVD
BREVARD COUNTY, FLORIDA
Groups Printed- Commercial
File Name : Al A at Imperial
Site Code : 00000002
Start Date : 3/22/2012
Page No : 2
SR Al A
Southbound
Imperial Boulevard
Westbound
SR Al A
Northbound
N/A
Eastbound
Start Time
Left
Thru
Right
App. Total
Left
Thru
Right
App. Total
Left
Thru
Right
App. Total
Left
Thru
Right
App. Total
Int. Total
Factor
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
04:00P M 2 0 0 2
04:15 PM 0 0 0 0
0 0 0 0
0 0 1 1
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
2
1
Total
2
0
0
05:30 PM 0 0 0
21 0 0 1
01 0
0 1
1
0
0
11 0 0
0
0
0I 0 0 0 0I 3
01 0 0 0 0I 1
Total 0 0 0
Grand Total
Apprch %
Total %
2
100.0
50.0
01 0
0 0 2
0.0 0.0
0.0 0.0 50.0
0 1
1I o 0
0 0 2 2
0.0 0.0 100.0
0.0 0.0 50.0 50.0
0
0.0
0.0
0.0
0.0
0 0I 0 0 0 01 1
0 0
0.0
0.0
0
0.0
0 0 0 0
0.0 0.0 0.0
0.0 0.0 0.0 0.0
4
DE -TRAFFIC
P H .386-341-4186/FAX.386-746-9561
SR MA AT IMPERIAL BLVD
BREVARD COUNTY, FLORIDA
G rouas Printed- Peds
File Name : AlA at Imperial
Site Code : 00000002
Start Date : 3/22/2012
Page No : 3
SR AlA
Southbound
Imperial Boulevard
Westbound
SR Al A
Northbound
N/A
Eastbound
Start Time
Left
Thru
Right
Peds
App'
Total
Left
Thru
Right
Peds
App'
Total
Left
Thru
Right
Peds
API/Left
Total
Thru
Right
Peds
App.
Total
Int.
Total
Factor
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
04:45 PM
Total
05:00 PM
05:15 PM
0 0 0 1
0 0 0 1
0 0 0 0
0 0 0 1
0
1
0 0 0 0
0 0 0 0
0oI
0 0 0 0 0
0 0 0 0 0
0 0 0 1
0 0 0 1
0 0 0 1
0 0 0 0
1
1
1
0
0 0 0 0
0 0 0 0
0
0
2
2
0 0 0 0 0 1
0 0 0 0 0 1
Total 0 0 0 1
Grand Total
Apprch %
Total %
11 0
0 0 0 2 2
0.0 0.0 0.0 100.0
0.0 0.0 0.0 50.0 50.0
0 0 0 01 o
0 0 0 0 0
0.0 0.0 0.0 0.0
0.0 0.0 0.0 0.0 0.0
0 0 1
0 0 0 2
0.0 0.0 0.0 100.0
0.0 0.0 0.0 50.0
11 0
2
50.0
0
0.0
0.0
0 0 0 0I 2
0
0.0
0.0
0 0 0
0.0
0.0
0.0
0.0 0.0
4
111,11,1,1,1,1,1,1,1,1,1,1,i1,1,1,1,1,1,1,1,11
111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111110000mmwmommun
11111,,11111111111111111111)111111111 1111111111111111111 111111 1111111 1,111,1,1,1,1,1,1,1,1111111111111111111,11111111111111111111111111111111111111111111111111111,1,1111111111111111111111111111111111111111111111,11111111111111111111 111111111111111111111
1 1'1'1'1'1'1'1'1'1'1'1'1'1'11'1'1' 11111111
11' 1111 111111111II11111II1I111I1111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111 III
mm1111111))),1,1,11,11111111,11,11111111111111111!Illmmmmmmmmommmmmmmmmmmmmmmmmmmmmmmmmmmmml
1111111111111111111111111111111111111
01,1,11 M11,1,MMI,I,MIlmmmmmm11111111
111 J11)11111111111111111111111,11,1,11111
111111111111111111111111
11111111111111111111111111111111
111111111111111111111111111111111111111111111111000001
•
SR Al A NB Approach to West Central Blvd
„„„
West Central Blvd EB Approach to SR Al A
299 Mcgregor Rd. DeLand, FL 32720
111111111111111111111111111111111111111111111111111111111111111111111111111111111111JJJJ
11111111ffiffiffiffiffiww-11010
11111111 11111111,101i
1 11111111 1111111111 11111111
SR Al A SB Approach to West Central Blvd
1110011,,11, V10001011V000000000000000000000000001001
11111111111111111111111c111111111111111111111111111111111111111101111111!111111111111111111111111ili111111111111111111111111111111111111111111111111111111
Itli:
,, 11
‘ Ili )
'111,
' lilltif 1 /11#111'
)
(
Kel e or\ NI 1
1,11111Pi) igin I, ,
,ffe
aiLiI ivoyhoo0000100001101fil (
11111111111111"'"
11111'111111111111111111111111111111111111111111111111111111':'
1111
1111111111111111111111111
11111111ft 111111111111111111111111110111111111111111111111111111111111,vjmjjj,111111 null
eit1re4"1"4" 10101014.
Blvd WB Approach to SR Al A
SR A 1 A NB Approach to Imperial Blvd
mperial Blvd WB Approach to SR A l A
SR Al A SB Approach to Imperial Blvd
Pictures of Locations
www.de-traffic.com
299 Mcgregor Rd. DeLand, FL 32720
Telephone: (386) 341-4186
Brevard bounty
Prod ect
Number: L2004-307
Page
Number:
APPENDIX C
CFRMP Model Distribution
19
16
Relocate Centroid Connector
from here
to here
.A I,
Beach Wave
Complex
ILIA I!
NTS
C.)
CFRMP Modified
Model Distribution
Project No.: 3799.01
Exhibit: C
La , it a
sportation Group, Inc.
Engineering and Planning
123 Live Oak Avenue * Daytona Beach, Florida 32114
Telephone: 386.257.2571 Fax: 386.257.6996 EB# 0009227
APPENDIX D
NCHRP Report 457 Warrant Study
Astronaut Boulevard at Project Drive
Figure 2 - 6. Guideline for determining the need for a major -road right -turn bay at a two-way stop -controlled intersection.
INPUT
Roadway geometry:
4-lane roadway fl
Variable
Value
Major -road speed, mph:
Major -road volume (one direction), veh/h:
wwil
Right -turn volume, veh/h:
...
OUTPUT
Variable
Value
Limiting right -turn volume, veh/h:
20
Guidance for determining the need for a major -road
right -turn bay for a 4-lane roadway:
Add right -turn hay.
140
[Add right - turn bay
120
>
ac 100
:1 80
60
C
40
20
N, NININN
Ce
0 -
200 400 600 800 1000 1200 1400 1600
Major -Road Volume (one direction), veh/h
W. Central Boulevard at Project Driveway
Figure 2 - 5. Guideline for determining the need for a major -road left -turn bay at a two-way stop -controlled intersection.
2-lane roadway (English)
INPUT
Variable
85th percentile speed, mph:
Percent of left -turns in advancing volume (VA %:
Advancing volume (VA), veh/h:
Opposing volume (V0), vehfh:
OUTPUT
Value
Variable
Value
Limiting advancing volume (VA), vehih:
549
Guidance for determining the need for a major -road left -turn bay:
Left -turn treatment NOT warranted.
CALIBRATION CONSTANTS
Variable
Average time for making left -turn, s:
Critical headway, s:
Average time for left -turn vehicle to clear the advancing lane, s:
Value
Opposing Volume
800
700
600
500
400
300
200
100
0-
0
Left -turn treatment
warranted.
Left -turn
treatment not
wapr nted.
100 200 300 400 500 600 700
Advancing Volume (VA), velith
W Central Boulevard at Project Drive
Figure 2 - 6. Guideline for determining the need for a major -road right -turn bay at a two-way stop -controlled intersection.
INPUT
Roadway geometry:
4-lane roadway
Variable
Value
Major -road speed, mph:
MOO
Major -road volume (one direction), vehih:
Right -turn volume, veh/h:
1111
OUTPUT
Variable
Value
Limiting right -turn volume, veh/h:
6128396
Guidance for determining the need for a major -road
right -turn bay for a 4-lane roadway:
Do NOT add right -turn bay.
Right -Turn Volume, veh
140
120
100
80
60 -
40
20
0
200 400 600 800 1000 1200 1400 1600
Major -Road Volume (one direction), veh/h