HomeMy WebLinkAboutCity Eng. Approval Ltr. MGF - 6-13-2019 II JOHN A.PEKAR,P.E.,LLC
Civil Engineering/Consulting
102 Columbia Drive
Suite 207
Cape Canaveral,FL 32920
Office Phone:321-613-2959
Cell Phone: 321-288-1040
johnpekarpe@gmail.com
airak„.4 aaekayfs' Roni Flowe ronifowe!(Dgmail.com
Office Manager Cell Phone: 321-403-9899
June 13,2019
TO: David Dickey; Patsy Huffman
FROM: John Pekar, PE
SUBJECT: Multi-Generational Center
We have reviewed the written responses and proposed plan updates by Allen Engineering dated
June 12, 2019, concerning our questions on the multi-generational facility site plan.
With the exception of comment number 7,which questioned the finished floor elevation of the
plans,
Engineeringsite
updated Allen
proposed restroom,we recommend City approval theof p
for the multi-generational facility.
For comment number 7, it is requested that the sidewalk ADA criteria be revisited by Allen
Engineering to see if the restroom floor can be raised even two inches. If this is not possible,
Allen Engineering can provide the swale perimeter grading plan for the building,which they will
support.
With either option for comment number 7,this will recommend approval of the site plan.
Sincerely,
John A.Pekar, P.E.
Consulting Engineer
JAP:rmf