Loading...
HomeMy WebLinkAboutCity Eng. Approval Ltr. MGF - 6-13-2019 II JOHN A.PEKAR,P.E.,LLC Civil Engineering/Consulting 102 Columbia Drive Suite 207 Cape Canaveral,FL 32920 Office Phone:321-613-2959 Cell Phone: 321-288-1040 johnpekarpe@gmail.com airak„.4 aaekayfs' Roni Flowe ronifowe!(Dgmail.com Office Manager Cell Phone: 321-403-9899 June 13,2019 TO: David Dickey; Patsy Huffman FROM: John Pekar, PE SUBJECT: Multi-Generational Center We have reviewed the written responses and proposed plan updates by Allen Engineering dated June 12, 2019, concerning our questions on the multi-generational facility site plan. With the exception of comment number 7,which questioned the finished floor elevation of the plans, Engineeringsite updated Allen proposed restroom,we recommend City approval theof p for the multi-generational facility. For comment number 7, it is requested that the sidewalk ADA criteria be revisited by Allen Engineering to see if the restroom floor can be raised even two inches. If this is not possible, Allen Engineering can provide the swale perimeter grading plan for the building,which they will support. With either option for comment number 7,this will recommend approval of the site plan. Sincerely, John A.Pekar, P.E. Consulting Engineer JAP:rmf