HomeMy WebLinkAboutFDEP Report
FLORIDA DEPARTMENT O F
Environmental Protection
Bob Martinez Center
2600 Blair Stone Road
Tallahassee, FL 32399-2400
Ron DeSantis
Governor
Jeanette Nuñez
Lt. Governor
Noah Valenstein
Secretary
March 29, 2019
David Greene
Cape Canaveral, City of
100 Polk Ave
Cape Canaveral, FL 32920
RE: Facility ID: FLR10SP25
Cape Canaveral Multi Generational Facility
County: Brevard
Dear Permittee:
The Florida Department of Environmental Protection has received and processed your
Notice of Intent to Use Generic Permit for Stormwater Discharge from Large and Small
Construction Activities (NOI) and the accompanying processing fee. This letter
acknowledges that:
• your NOI is complete;
• your processing fee is paid-in-full; and
• you are covered under the Generic Permit for Stormwater Discharge from Large and
Small Construction Activities (CGP), DEP Document No. 62-621.300(4)(a).
Your project identification number is FLR10SP25. Please include this number on all
future correspondence to the Department regarding this permit.
This letter is not your permit; however, this letter does serve as verification of permit
coverage. A copy of the permit language is available online or by contacting the NPDES
Stormwater Notices Center.
Facility ID: FLR10SP25
Page 2
March 29, 2019
Your permit coverage becomes effective 3/16/2019 and will expire 3/15/2024. To
terminate your coverage prior to this expiration date, you must file a National Pollutant
Discharge Elimination System (NPDES) Stormwater Notice of Termination, DEP Form
62-621.300(6) (NOT). An NOT must be filed within 14 days of either (a) your final
stabilization of the site or (b) your relinquishment of control of the construction activities
to a new operator. To renew your coverage beyond the expiration date, you must submit
a new NOI and processing fee to the Department no later than two days before coverage
expires.
Until your permit coverage is terminated, modified, or revoked, you are authorized to
discharge stormwater from the construction site referenced in your NOI to surface waters
in accordance with the terms and conditions of the CGP. Some key conditions of the
CGP are:
• implementation of your stormwater pollution prevention plan (SWPPP);
• implementation of appropriate construction best management practices (BMPs);
• conducting and documenting routine inspections; and
• retaining the records required by the permit (including your SWPPP) at the
construction site or the alternate location specified in your NOI.
If you have any questions concerning this acknowledgment letter, please contact the
NPDES Stormwater Notices Center at (866) 336-6312 (toll-free).
Sincerely,
Victoria Robinson
Data Quality Control Specialist
NPDES Stormwater Program
Facility ID: FLR10SP25
Page 3
March 29, 2019
Facility ID: FLR10SP25
Page 4
March 29, 2019
NOTICE OF RIGHTS
This action is final and effective on the date filed with the Clerk of the Department unless a
petition for an administrative hearing is timely filed under Sections 120.569 and 120.57, F.S.,
before the deadline for filing a petition. On the filing of a timely and sufficient petition, this
action will not be final and effective until further order of the Department. Because the
administrative hearing process is designed to formulate final agency action, the hearing process
may result in a modification of the agency action or even denial of the application.
Petition for Administrative Hearing
A person whose substantial interests are affected by the Department’s action may petition for
an administrative proceeding (hearing) under Sections 120.569 and 120.57, F.S. Pursuant to
Rules 28-106.201 and 28-106.301, F.A.C., a petition for an administrative hearing must
contain the following information:
(a) The name and address of each agency affected and each agency’s file or
identification number, if known;
(b) The name, address, and telephone number of the petitioner; the name, address,
and telephone number of the petitioner’s representative, if any, which shall be the
address for service purposes during the course of the proceeding; and an
explanation of how the petitioner’s substantial interests are or will be affected by
the agency determination;
(c) A statement of when and how the petitioner received notice of the agency
decision;
(d) A statement of all disputed issues of material fact. If there are none, the petition
must so indicate;
(e) A concise statement of the ultimate facts alleged, including the specific facts that
the petitioner contends warrant reversal or modification of the agency’s proposed
action;
(f) A statement of the specific rules or statutes that the petitioner contends require
reversal or modification of the agency’s proposed action, including an explanation
of how the alleged facts relate to the specific rules or statutes; and
(g) A statement of the relief sought by the petitioner, stating precisely the action that
the petitioner wishes the agency to take with respect to the agency’s proposed
action.
The petition must be filed (received by the Clerk) in the Office of General Counsel of the
Department at 3900 Commonwealth Boulevard, Mail Station 35, Tallahassee, Florida
32399-3000, or via electronic correspondence at Agency_Clerk@dep.state.fl.us. Also, a
copy of the petition shall be mailed to the applicant at the address indicated above at the
time of filing.
Time Period for Filing a Petition
In accordance with Rule 62-110.106(3), F.A.C., petitions for an administrative hearing by
the applicant and persons entitled to written notice under Section 120.60(3), F.S., must be
filed within 14 days of receipt of this written notice. Petitions filed by any persons other
than the applicant, and other than those entitled to written notice under Section 120.60(3),
F.S., must be filed within 14 days of publication of the notice or within 14 days of receipt
Facility ID: FLR10SP25
Page 5
March 29, 2019
of the written notice, whichever occurs first. The failure to file a petition within the
appropriate time period shall constitute a waiver of that person's right to request an
administrative determination (hearing) under Sections 120.569 and 120.57, F.S., or to
intervene in this proceeding and participate as a party to it. Any subsequent intervention
(in a proceeding initiated by another party) will be only at the discretion of the presiding
officer upon the filing of a motion in compliance with Rule 28-106.205, F.A.C.
Extension of Time
Under Rule 62-110.106(4), F.A.C., a person whose substantial interests are affected by
the Department’s action may also request an extension of time to file a petition for an
administrative hearing. The Department may, for good cause shown, grant the request for
an extension of time. Requests for extension of time must be filed with the Office of
General Counsel of the Department at 3900 Commonwealth Boulevard, Mail Station 35,
Tallahassee, Florida 32399-3000, or via electronic correspondence at
Agency_Clerk@dep.state.fl.us, before the deadline for filing a petition for an
administrative hearing. A timely request for extension of time shall toll the running of the
time period for filing a petition until the request is acted upon.
Mediation
Mediation is not available in this proceeding.
Judicial Review
Once this decision becomes final, any party to this action has the right to seek judicial
review pursuant to Section 120.68, F.S., by filing a Notice of Appeal pursuant to Florida
Rules of Appellate Procedure 9.110 and 9.190 with the Clerk of the Department in the
Office of General Counsel (Station #35, 3900 Commonwealth Boulevard, Tallahassee,
Florida 32399-3000) and by filing a copy of the Notice of Appeal accompanied by the
applicable filing fees with the appropriate district court of appeal. The notice must be
filed within 30 days from the date this action is filed with the Clerk of the Department.
EXECUTION AND CLERKING
Executed in Tallahassee, Florida.
STATE OF FLORIDA DEPARTMENT OF ENVIRONMENTAL PROTECTION
_________________________________
Borja Crane-Amores
Environmental Administrator
Attachment(s):
1. Acknowledgement Letter
2. Construction Generic Permit
3. Notice of Termination
Facility ID: FLR10SP25
Page 6
March 29, 2019
CERTIFICATE OF SERVICE
The undersigned duly designated deputy clerk hereby certifies that this document and all
attachments were sent on the filing date below to the following listed persons:
Robin Babin, Florida Department of Environmental Protection,
Robin.Babin@floridadep.gov
FILING AND ACKNOWLEDGMENT
FILED, on this date, pursuant to Section 120.52, F. S., with the designated Department
Clerk, receipt of which is hereby acknowledged.
___________ March 29, 2019
Clerk Date