HomeMy WebLinkAboutcocc_resolution_no_2019-05_20190521RESOLUTION NO. 2019-05
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF CAPE
CANAVERAL, BREVARD COUNTY, FLORIDA; AMENDING
APPENDIX B, SCHEDULE OF FEES OF THE CITY CODE
RELATED TO ASSESSMENT OF ZONING, BUILDING AND
OTHER PERMIT FEES; PROVIDING FOR THE REPEAL OF PRIOR
INCONSISTENT RESOLUTIONS, INCORPORATION INTO THE
CODE, SEVERABILITY AND AN EFFECTIVE DATE.
WHEREAS, the City of Cape Canaveral is granted the authority, under Section 2(b),
Article VIII, of the State Constitution, to exercise any power for municipal purposes, except when
expressly prohibited by law; and
WHEREAS, the City Council desires to accomplish a more accurate realization of project
value in the process of assessing permit fees for development activity; and
WHEREAS, the City Council desires to update its permit application fees to more
efficiently recover the costs associated with providing zoning, building and code enforcement
services, and
WHEREAS, the City Council believes updating the City's permit application fees will
more accurately reflect the cost of providing these services and reduce the financial burden placed
upon the General Fund; and
WHEREAS, the City Council finds this Resolution to be in the best interest of the public
health, safety and welfare of the citizens of Cape Canaveral.
NOW, THEREFORE, BE IT DULY RESOLVED BY THE CITY COUNCIL OF
THE CITY OF CAPE CANAVERAL, BREVARD COUNTY, FLORIDA, AS FOLLOWS:
Section 1. Recitals. The foregoing recitals are deemed true and correct and are incorporated
herein by this reference as part of this Resolution.
Section 2. Adoption of Amendment to Appendix B, Schedule of Fees. The City Council
hereby adopts a revised Appendix B, Schedule of Fees, as more specifically set forth in EXHIBIT
"A," which is hereby deemed fully incorporated herein by this reference.
Note: (underlined type indicates additions and strikeout type indicates deletions, while asterisks
(* * *) indicate a deletion from the text existing in Appendix B. It is intended that the text in
Appendix B denoted by the asterisks shall remain unchanged from the language existing prior to
adoption of this Resolution).
Section 3. Repeal of Prior Inconsistent Resolutions. All prior inconsistent resolutions
adopted by the City Council are hereby expressly repealed to the extent of the conflict.
City of Cape Canaveral
Resolution No. 2019-05
Page 1 of 2
Section 4. Incorporation Into Appendix B, Schedule of Fees. This Resolution and
EXHIBIT "A" attached hereto shall be incorporated into Appendix B, Schedule of Fees, to the City
of Cape Canaveral City Code and any section or paragraph, number or letter and any heading may
be changed or modified as necessary to effectuate the foregoing. Grammatical, typographical and
like errors may be corrected and additions, alterations and omissions, not affecting the construction
or meaning of this Resolution and the City Code may be freely made.
Section 5. Severability. If any section, clause, phrase, word or provision is for any reason
held invalid or unconstitutional by a court of competent jurisdiction, whether for substantive or
procedural reasons, such portion shall be deemed a separate, distinct and independent provision,
and such holding shall not affect the validity of the remaining portions of this Resolution.
Section 6. Effective Date. This Resolution shall become effective immediately.
ADOPTED at a Regular Meeting of the City Council of the City of Cape Canaveral, Florida,
assembled this 21st day of May, 2019.
_—p� .� A\:0; yea,
ATTEST:
Mia Goforth,( -CMC;
City Clerk
Mike Brown, Mayor Pro Tem
Name FOR AGAINST
Mike Brown x
Bob Hoog Absent
Wes Morrison R
Approved as to legal form and sufficiency
for the C of Cape Canaveral only by: Rocky Randels Second
Anthony A. Garganese, City Attorney
Angela Raymond Motion
City of Cape Canaveral
Resolution No. 2019-05
Page 2 of 2
Resolution No. 2019-05
EXHIBIT "A"
APPENDIX B - SCHEDULE OF FEESW
Printed herein are the fees, rates and charges established by resolution of the city council.
Subpart A. General Ordinances
Chapter 70. Taxation
Article III. Occupational License Business Tax Local Business Tax
Subpart B. Land Development Code
Chapter 82. Buildings and Building Regulations
Code Section 82-2
(A) Building permit fees. On all buildings, structures or alterations requiring a building permit, a fee set
forth below shall be paid at the time the permit is issued:
Permit fees by total valuation:
Valuation
Fee
$500.00 or Tess
Amount
Code
Section
$501.00 to and including
$1,000.00
$65.00$90.00
Business Tax Receipt Application Fee
30.00
70-69
(a)
Transfer of license:
(1)
For transfer of location by same owner
3.00
70-80
(2)
For transfer of ownership
3.00
70-80
Subpart B. Land Development Code
Chapter 82. Buildings and Building Regulations
Code Section 82-2
(A) Building permit fees. On all buildings, structures or alterations requiring a building permit, a fee set
forth below shall be paid at the time the permit is issued:
Permit fees by total valuation:
Valuation
Fee
$500.00 or Tess
$50.00$70.00
$501.00 to and including
$1,000.00
$65.00$90.00
$1,001.00 to and
$80.00$125.00
Page 1 of 6
Resolution No. 2019-05
EXHIBIT "A"
including $2,000.00
$2,001.00 to and
including $20,000.00
$100.00$125.00 for the first $2,000.00 and $5.00 for each additional
$1,000.00 or fraction thereof to and including $20,000.00
$20,001.00 to
$100,000.00
$175.00$215.00 for the first $20,000.00 and $5.00 for each additional
$1,000.00 or fraction thereof to and including $100,000.00
$100,001.00 to
$500,000.00
$575.00$615.00 for the first $100,000.00 and $4.00 for each additional
$1,000.00 or fraction thereof to and including $500,000
$500,001.00 and up
$2000$2475.00 for the first $500,000.00 and $3.00 for each additional
$1,000.00 or fraction thereof
The total valuation for assessment of permit fees shall be based upon the actual contract price or
evidence of same submitted with application. The total valuation for assessment of permit fees for
new structures shall be based upon the actual construction contract price for the work required to be
permitted including the contract price for any new structure(s), with satisfactory evidence of same
being submitted to the building official, or a construction cost estimate made by the building official,
using the latest valuation data published by the International Code Council (I.C.C.), whichever is
greater, except as otherwise provided in this section. In no case shall the valuation be less than that
determined by using the latest valuation data published by the I.C.C.
(B) Plan checking fee. In addition to any fee or fees charged in subsection (a) above: When the
valuation of the proposed construction exceeds $1,000.00 and plans and/or specifications are
required to be submitted, a plan checking fee shall be paid at the time the permit is issued.
The plan checking fee shall be equal to one-half the building permit fee. Such plan checking fee shall
be in addition to the building permit fee.
When the valuation of the proposed construction exceeds $500,001.00, a nonrefundable plan review
deposit shall be paid at the time of permit application submittal. Such deposit may not exceed the
anticipated plan review fee.
When a dispute exists in the review of the plans and specifications for construction, the applicant
may request a hearing before the construction board of adjustment or its successor.
(C) In addition to any fee or fees charged in subsections (A) and (B), a fee set forth below shall be paid
at the time the permit is issued. Note: Reroofing, remodeling, alterations, additions and repairs
permit fees shall be paid in accordance with subsections (A) and (B) only.
Plumbing, new, residential, per bathroom
$60.00$70.00
Plumbing, new, hotel/motel, per unit
$60-00$70.00
Page 2 of 6
Resolution No. 2019-05
EXHIBIT "A"
Plumbing, new, commercial, per bathroom
70.00
$604X470.00
Fire sprinkler permit
Sewer tap inspection fee
$600$70.00
$50.00 per hour or
portion thereof
Electrical, new, single-family
$100.00$110.00
Electrical, new, multifamily, per unit
X0$85.00
Electrical, new, hotel/motel, per unit
$60:00$70.00
Electrical, new, commercial, per unit
$60:00$70.00
Mechanical, new, residential, per unit
$00$85.00
Mechanical, new, hotel/motel, per unit
$-5000$60.00
Mechanical, new, commercial, per system
$50:00$60.00
Well, deep or shallow
S-50700$60.00
Moving of building
$150:00$160.00
Demolition of building
$100:00$110.00
(D) Other fees:
Fire alarm permit
Per valuation table "A"
plus fire department
fee calculation
Fire sprinkler permit
Per valuation table "A"
plus fire department
fee calculation
Preliminary review of construction plans
$50.00 per hour or
portion thereof
Page 3 of 6
Resolution No. 2019-05
EXHIBIT "A"
Change of Contractor/Sub-Contractor
$30.00
Permit Revision Fee. Minimum half-hour charge
$25.00 per half hour
Stormwater Review Fee
$55.00 per hour
Non -Refundable Permit Application Processing Fee
$30:09$35.00
Reinspection fee—When extra inspection trips are necessary due to partial
inspections, wrong address, second call on rejected or condemned work,
additional work done after inspection has been made, or work not ready for
inspection when called, a charge of $45.00 shall be paid in advance for each
additional inspection or at the discretion of the building official on large
projects prior to issuance of a certificate of occupancy or completion
$"x$50.00
Certificate of Occupancy
$50.00
Failure to Obtain an approved Final Inspection
$100:99$110.00
Work started prior to issuance of permit (ref. building code adopted by
chapter 82 of this Code)
Double Permit Fee
Special Inspection (after-hours, weekend, holiday, arranged two days in
advance). Minimum four-hour charge for weekends and holidays
$50.00 per hour
Final Inspection. Fine for failure to obtain a final approved inspection for a
permit before it expires. No further permits may be issued to any contractor or
permit applicant with an outstanding fine or to any contractor with an expired
permit due to failure to obtain a final inspection.
$100.00 $110.00
Chapter 94. Signs
Amount
Code
Section
(a)
Permit fee shall be calculated on actual contract cost using subsection (a) of
Chapter 82 of Appendix B
Page 4 of 6
Resolution No. 2019-05
*
Chapter 98. Subdivisions
*
EXHIBIT "A"
(b)
Reinspection fee
45-70g
$50.00
94-35
250.00
(c)
For commencing work without a permit, all fees shall be double
Plat fee schedule. The fee schedule for review of replat/subdivision of land shall
be:
(d)
Temporary off -premises signs and banners and temporary nonresidential signs
greater than 12 sq. ft.
50.00
94-81
and 94 -
4(7)
*
Chapter 98. Subdivisions
*
Page 5 of 6
Amount
Code
Section
(a)
Variance application fee
250.00
98-4
(b)
Plat fee schedule. The fee schedule for review of replat/subdivision of land shall
be:
98 -53
(1) One, two or three lots
37.50
500.00
(2) Four or more lots
X00
600.00
Plus $7.50 per lot, not
to exceed $500.00 750.00
(c)
Resubmission. Changes to approved replat/subdivision of land shall be charged at
a rate equal to 50 percent of the original fee.
(d)
Lot split
500.00
98-66
(e)
Lot line adjustment
250.00
98-67
Page 5 of 6
Resolution No. 2019-05
EXHIBIT "A"
Chapter 110. Zoning.
*
*
Page 6 of 6
*
Amount
Code
Section
(a)
Application for rezoning
750.00
110-92
825.00
(b)
Application for proposed amendment to chapter
250.00
110-92
275.00
(c)
Application for a special exception or variance
750.00
110-92
825.00
(d)
Application for appeal of administrative decision
250.00
110-92
275.00
110-
(e)
Site plans:
223
(1)
Fee schedule. The fee schedule for site plan review shall be:
a.
One, two and three residential units
750.00
825.00
b.
Four or more residential units
0
825.00
c.
Commercial structures
750.00
825.00
d.
Extension of site plan
4-50,00
165.00
(2)
Resubmission. Changes to originally approved site plans shall be charged at a ,
rate equal to 50 percent of the original fee.
(f)
Zoning Compliance Letter
50700
55.00
(g)
Application for Development Review Committee
250.00
275.00
(h)
Fence height exemption filing fee
BAO
37.50
110-
470
*
*
Page 6 of 6
*