Loading...
HomeMy WebLinkAboutcocc_resolution_no_2019-05_20190521RESOLUTION NO. 2019-05 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF CAPE CANAVERAL, BREVARD COUNTY, FLORIDA; AMENDING APPENDIX B, SCHEDULE OF FEES OF THE CITY CODE RELATED TO ASSESSMENT OF ZONING, BUILDING AND OTHER PERMIT FEES; PROVIDING FOR THE REPEAL OF PRIOR INCONSISTENT RESOLUTIONS, INCORPORATION INTO THE CODE, SEVERABILITY AND AN EFFECTIVE DATE. WHEREAS, the City of Cape Canaveral is granted the authority, under Section 2(b), Article VIII, of the State Constitution, to exercise any power for municipal purposes, except when expressly prohibited by law; and WHEREAS, the City Council desires to accomplish a more accurate realization of project value in the process of assessing permit fees for development activity; and WHEREAS, the City Council desires to update its permit application fees to more efficiently recover the costs associated with providing zoning, building and code enforcement services, and WHEREAS, the City Council believes updating the City's permit application fees will more accurately reflect the cost of providing these services and reduce the financial burden placed upon the General Fund; and WHEREAS, the City Council finds this Resolution to be in the best interest of the public health, safety and welfare of the citizens of Cape Canaveral. NOW, THEREFORE, BE IT DULY RESOLVED BY THE CITY COUNCIL OF THE CITY OF CAPE CANAVERAL, BREVARD COUNTY, FLORIDA, AS FOLLOWS: Section 1. Recitals. The foregoing recitals are deemed true and correct and are incorporated herein by this reference as part of this Resolution. Section 2. Adoption of Amendment to Appendix B, Schedule of Fees. The City Council hereby adopts a revised Appendix B, Schedule of Fees, as more specifically set forth in EXHIBIT "A," which is hereby deemed fully incorporated herein by this reference. Note: (underlined type indicates additions and strikeout type indicates deletions, while asterisks (* * *) indicate a deletion from the text existing in Appendix B. It is intended that the text in Appendix B denoted by the asterisks shall remain unchanged from the language existing prior to adoption of this Resolution). Section 3. Repeal of Prior Inconsistent Resolutions. All prior inconsistent resolutions adopted by the City Council are hereby expressly repealed to the extent of the conflict. City of Cape Canaveral Resolution No. 2019-05 Page 1 of 2 Section 4. Incorporation Into Appendix B, Schedule of Fees. This Resolution and EXHIBIT "A" attached hereto shall be incorporated into Appendix B, Schedule of Fees, to the City of Cape Canaveral City Code and any section or paragraph, number or letter and any heading may be changed or modified as necessary to effectuate the foregoing. Grammatical, typographical and like errors may be corrected and additions, alterations and omissions, not affecting the construction or meaning of this Resolution and the City Code may be freely made. Section 5. Severability. If any section, clause, phrase, word or provision is for any reason held invalid or unconstitutional by a court of competent jurisdiction, whether for substantive or procedural reasons, such portion shall be deemed a separate, distinct and independent provision, and such holding shall not affect the validity of the remaining portions of this Resolution. Section 6. Effective Date. This Resolution shall become effective immediately. ADOPTED at a Regular Meeting of the City Council of the City of Cape Canaveral, Florida, assembled this 21st day of May, 2019. _—p� .� A\:0; yea, ATTEST: Mia Goforth,( -CMC; City Clerk Mike Brown, Mayor Pro Tem Name FOR AGAINST Mike Brown x Bob Hoog Absent Wes Morrison R Approved as to legal form and sufficiency for the C of Cape Canaveral only by: Rocky Randels Second Anthony A. Garganese, City Attorney Angela Raymond Motion City of Cape Canaveral Resolution No. 2019-05 Page 2 of 2 Resolution No. 2019-05 EXHIBIT "A" APPENDIX B - SCHEDULE OF FEESW Printed herein are the fees, rates and charges established by resolution of the city council. Subpart A. General Ordinances Chapter 70. Taxation Article III. Occupational License Business Tax Local Business Tax Subpart B. Land Development Code Chapter 82. Buildings and Building Regulations Code Section 82-2 (A) Building permit fees. On all buildings, structures or alterations requiring a building permit, a fee set forth below shall be paid at the time the permit is issued: Permit fees by total valuation: Valuation Fee $500.00 or Tess Amount Code Section $501.00 to and including $1,000.00 $65.00$90.00 Business Tax Receipt Application Fee 30.00 70-69 (a) Transfer of license: (1) For transfer of location by same owner 3.00 70-80 (2) For transfer of ownership 3.00 70-80 Subpart B. Land Development Code Chapter 82. Buildings and Building Regulations Code Section 82-2 (A) Building permit fees. On all buildings, structures or alterations requiring a building permit, a fee set forth below shall be paid at the time the permit is issued: Permit fees by total valuation: Valuation Fee $500.00 or Tess $50.00$70.00 $501.00 to and including $1,000.00 $65.00$90.00 $1,001.00 to and $80.00$125.00 Page 1 of 6 Resolution No. 2019-05 EXHIBIT "A" including $2,000.00 $2,001.00 to and including $20,000.00 $100.00$125.00 for the first $2,000.00 and $5.00 for each additional $1,000.00 or fraction thereof to and including $20,000.00 $20,001.00 to $100,000.00 $175.00$215.00 for the first $20,000.00 and $5.00 for each additional $1,000.00 or fraction thereof to and including $100,000.00 $100,001.00 to $500,000.00 $575.00$615.00 for the first $100,000.00 and $4.00 for each additional $1,000.00 or fraction thereof to and including $500,000 $500,001.00 and up $2000$2475.00 for the first $500,000.00 and $3.00 for each additional $1,000.00 or fraction thereof The total valuation for assessment of permit fees shall be based upon the actual contract price or evidence of same submitted with application. The total valuation for assessment of permit fees for new structures shall be based upon the actual construction contract price for the work required to be permitted including the contract price for any new structure(s), with satisfactory evidence of same being submitted to the building official, or a construction cost estimate made by the building official, using the latest valuation data published by the International Code Council (I.C.C.), whichever is greater, except as otherwise provided in this section. In no case shall the valuation be less than that determined by using the latest valuation data published by the I.C.C. (B) Plan checking fee. In addition to any fee or fees charged in subsection (a) above: When the valuation of the proposed construction exceeds $1,000.00 and plans and/or specifications are required to be submitted, a plan checking fee shall be paid at the time the permit is issued. The plan checking fee shall be equal to one-half the building permit fee. Such plan checking fee shall be in addition to the building permit fee. When the valuation of the proposed construction exceeds $500,001.00, a nonrefundable plan review deposit shall be paid at the time of permit application submittal. Such deposit may not exceed the anticipated plan review fee. When a dispute exists in the review of the plans and specifications for construction, the applicant may request a hearing before the construction board of adjustment or its successor. (C) In addition to any fee or fees charged in subsections (A) and (B), a fee set forth below shall be paid at the time the permit is issued. Note: Reroofing, remodeling, alterations, additions and repairs permit fees shall be paid in accordance with subsections (A) and (B) only. Plumbing, new, residential, per bathroom $60.00$70.00 Plumbing, new, hotel/motel, per unit $60-00$70.00 Page 2 of 6 Resolution No. 2019-05 EXHIBIT "A" Plumbing, new, commercial, per bathroom 70.00 $604X470.00 Fire sprinkler permit Sewer tap inspection fee $600$70.00 $50.00 per hour or portion thereof Electrical, new, single-family $100.00$110.00 Electrical, new, multifamily, per unit X0$85.00 Electrical, new, hotel/motel, per unit $60:00$70.00 Electrical, new, commercial, per unit $60:00$70.00 Mechanical, new, residential, per unit $00$85.00 Mechanical, new, hotel/motel, per unit $-5000$60.00 Mechanical, new, commercial, per system $50:00$60.00 Well, deep or shallow S-50700$60.00 Moving of building $150:00$160.00 Demolition of building $100:00$110.00 (D) Other fees: Fire alarm permit Per valuation table "A" plus fire department fee calculation Fire sprinkler permit Per valuation table "A" plus fire department fee calculation Preliminary review of construction plans $50.00 per hour or portion thereof Page 3 of 6 Resolution No. 2019-05 EXHIBIT "A" Change of Contractor/Sub-Contractor $30.00 Permit Revision Fee. Minimum half-hour charge $25.00 per half hour Stormwater Review Fee $55.00 per hour Non -Refundable Permit Application Processing Fee $30:09$35.00 Reinspection fee—When extra inspection trips are necessary due to partial inspections, wrong address, second call on rejected or condemned work, additional work done after inspection has been made, or work not ready for inspection when called, a charge of $45.00 shall be paid in advance for each additional inspection or at the discretion of the building official on large projects prior to issuance of a certificate of occupancy or completion $"x$50.00 Certificate of Occupancy $50.00 Failure to Obtain an approved Final Inspection $100:99$110.00 Work started prior to issuance of permit (ref. building code adopted by chapter 82 of this Code) Double Permit Fee Special Inspection (after-hours, weekend, holiday, arranged two days in advance). Minimum four-hour charge for weekends and holidays $50.00 per hour Final Inspection. Fine for failure to obtain a final approved inspection for a permit before it expires. No further permits may be issued to any contractor or permit applicant with an outstanding fine or to any contractor with an expired permit due to failure to obtain a final inspection. $100.00 $110.00 Chapter 94. Signs Amount Code Section (a) Permit fee shall be calculated on actual contract cost using subsection (a) of Chapter 82 of Appendix B Page 4 of 6 Resolution No. 2019-05 * Chapter 98. Subdivisions * EXHIBIT "A" (b) Reinspection fee 45-70g $50.00 94-35 250.00 (c) For commencing work without a permit, all fees shall be double Plat fee schedule. The fee schedule for review of replat/subdivision of land shall be: (d) Temporary off -premises signs and banners and temporary nonresidential signs greater than 12 sq. ft. 50.00 94-81 and 94 - 4(7) * Chapter 98. Subdivisions * Page 5 of 6 Amount Code Section (a) Variance application fee 250.00 98-4 (b) Plat fee schedule. The fee schedule for review of replat/subdivision of land shall be: 98 -53 (1) One, two or three lots 37.50 500.00 (2) Four or more lots X00 600.00 Plus $7.50 per lot, not to exceed $500.00 750.00 (c) Resubmission. Changes to approved replat/subdivision of land shall be charged at a rate equal to 50 percent of the original fee. (d) Lot split 500.00 98-66 (e) Lot line adjustment 250.00 98-67 Page 5 of 6 Resolution No. 2019-05 EXHIBIT "A" Chapter 110. Zoning. * * Page 6 of 6 * Amount Code Section (a) Application for rezoning 750.00 110-92 825.00 (b) Application for proposed amendment to chapter 250.00 110-92 275.00 (c) Application for a special exception or variance 750.00 110-92 825.00 (d) Application for appeal of administrative decision 250.00 110-92 275.00 110- (e) Site plans: 223 (1) Fee schedule. The fee schedule for site plan review shall be: a. One, two and three residential units 750.00 825.00 b. Four or more residential units 0 825.00 c. Commercial structures 750.00 825.00 d. Extension of site plan 4-50,00 165.00 (2) Resubmission. Changes to originally approved site plans shall be charged at a , rate equal to 50 percent of the original fee. (f) Zoning Compliance Letter 50700 55.00 (g) Application for Development Review Committee 250.00 275.00 (h) Fence height exemption filing fee BAO 37.50 110- 470 * * Page 6 of 6 *