HomeMy WebLinkAboutArdaman & Associates - Signed - Exhibit A - FINALAGREEMENT FOR
ENGINEERING SERVICES
TIIIS AGREEMENT is made and entered this .;;}5 •• day of -;f I!,~ 2018, by and
between the CITY OF CAPE CANAVERAL, FLORIDA, a Florida ~nicipal corporation
("City"), located at I 00 Polk A venue, Cape Canaveral, Florida 32920, and ARDAMAN &
ASSOCIATES, INC., a Florida corporation ("Consultant"), whose principal address is 1300 N.
Cocoa Boulevard, Cocoa, Florida 32922.
WITNESSETH:
WHEREAS, the City has a need to obtain engineering services from time to time on an
as-needed, task-oriented basis; and
WHEREAS, the City has followed the selection and negotiation process set forth in the
Florida's Consultants' Competitive Negotiation Act, Section 287.055, Florida Statutes; and
WHEREAS, the Consultant participated in the selection and negotiation process; and
WHEREAS, the Consultant is willing to provide such engineering services to the City
under the tenns and conditions stated herein; and
WHEREAS, the City is willing to place Ardaman & Associates, Inc. on its list of pre-
approved continuing services consultants for the potential of providing engineering services to
the City in the future; and
NOW, THEREFORE, for good and valuable consideration, the receipt and sufficiency
of which is hereby acknowledged, the parties covenant and agree as follows:
1.0 TERM AND DEFINITIONS
I.I Unless sooner tenninated by either Party pursuant to the terms and conditions
herein, this Agreement shall tenninate on tht: fifth (5th) anniversary of the Effective Date. The
Parties shall have the option to extend the tem1 for two (2) additional one (I) year tem1s. Any
such extension shall only be by written amendment to this Agreement executed by both parties
hereto.
1.2 The tt:nns and conditions of any Task Order, as described in Section 2.0 hereof,
shall be as set forth in such Task Order. Any Task in effect at the tennination of this Agn:ement
shall remain in effect until completion of said Task Order, and all of the tenns and conditions of
this Agreement shall survive until completion of all Task Orders.
1.3 Definitions. The following words and phrases used in this Agreement shall have
the following meaning ascribed to them unless the context clearly indicates otherwise:
Agreement for Continuing Engineering Services
City of Cape Canaveral/ Ardaman & Associates, Inc.
Page 1 of 20
d. The undersigned is authorized to execute this Agreement on behalf of the
Consultant and said signature shall bind the Consultant to this Agreement. No further action is
required by the Consultant to enter into this Agreement other than the Consultant's undersigned
representative's execution of the Agreement.
IN WITNESS WHEREOF, the parties hereto caused this Agreement to be executed by
their duly authorized representatives as of the date first written above.
CITY: CONSULT ANT:
CITY OF CAPE CANAVERAL ARDAMAN & ASSOCIATES, INC. Gti-f fo?G2 Sature
Jason P. Manning, PE , Vice President
David L. Greene, City Manager
Print Name Title
ATTEST:
Agreement for Continuing Engineering Services
City of Cape Canaveral / Ardaman & Associates, Inc.
Page 19 of20
TERMS: All invoices are due and payable upon receipt unless other arrangements have been made previously. A finance charge of 1.5%
per month, which is an annual interest rate of 18%, will be paid on all invoices not paid within 30 days. Any attorney's fees or other costs
incurred in collecting any delinquent amount shall be paid by the Client.
*These prices are in effect for work completed through December 31, 2018. This fee schedule will be superseded by the 2019 fee schedule
for work performed after December 31, 2018.
ARDAMAN & ASSOCIATES, INC. 2018* FEE SCHEDULE – CITY OF CAPE CANAVERAL COCOA BRANCH ENGINEERING AND TESTING SERVICES
ENGINEERING
Data Evaluation, Engineering Analysis,
Design, Inspections, Field Monitoring, etc.
Senior Consultant Per Hour $180.00
Senior Engineer Per Hour $170.00
Senior Project Engineer/Hydrogeologist Per Hour $143.00
Threshold Inspector (Professional Engineer) Per Hour $160.00
Project Engineer Per Hour $128.00
Assistant Project Engineer/Hydrogeologist Per Hour $115.00
Staff Engineer/Threshold Field Representative Per Hour $102.00
CONSTRUCTION MONITORING
AND FIELD TESTING
Field Technician/Inspector V/Metals Technician Per Hour $ 79.00
Field Technician/Inspector IV Per Hour $ 72.00
Field Technician III Per Hour $ 60.00
Field Technician II Per Hour $ 54.00
Field Technician I Per Hour $ 49.00
LABORATORY TESTING
Visual Classification and Sample Handling,
Special Laboratory Tests (Leaching Studies,
Slurry Consolidation, etc.)
Laboratory Technician V Per Hour $ 79.00
Laboratory Technician IV Per Hour $ 72.00
Laboratory Technician III Per Hour $ 60.00
Laboratory Technician II Per Hour $ 54.00
Laboratory Technician I Per Hour $ 49.00
SUPPORT PERSONNEL
Engineering Designer V Per Hour $ 85.00
Engineering Designer III Per Hour $ 73.00
Engineering Designer I Per Hour $ 67.00
Technical Draftsman III Per Hour $ 65.00
Technical Draftsman I Per Hour $ 55.00
Technical Secretary Per Hour $ 56.00
MISCELLANEOUS EXPENSES
Outside Services and Expenses Per Job At Cost + 15%
Printing and Reproduction Per Job At Cost + 15%
Copying Per Page $ 0.21
Mileage (Automobile) Per Mile $ 0.63
Mileage (Truck) Per Mile $ 0.91
TERMS: All invoices are due and payable upon receipt unless other arrangements have been made previously. A finance charge of 1.5% per
month, which is an annual interest rate of 18%, will be paid on all invoices not paid within 30 days. Any attorney's fees or other costs incurred in
collecting any delinquent amount shall be paid by the Client. *These prices are in effect for work completed through December 31, 2018. This fee schedule will be superseded by the 2019 fee schedule for work performed after December 31, 2018.
ARDAMAN & ASSOCIATES, INC. 2018* FEE SCHEDULE – CITY OF CAPE CANAVERAL COCOA BRANCH SUBSURFACE FIELD EXPLORATION
MOBILIZATION
Mobilization and Demobilization
• Men and Equipment Per Rig-Hour $211.00
• Mileage - Rig Per Rig-Mile $ 1.02
• Mileage - Truck Per Truck-Mile $ 0.89
• Portable Barge Per Job $6,000.00 min.
STANDARD DRILLING
Auger Borings (4-inch) Per Lineal Foot $ 11.70
Wash Borings - Cuttings Only (up to 3 inch)
• Soil drilling Per Lineal Foot $ 9.80
• Rock drilling Per Lineal Foot $ 13.25
Standard Penetration Test (SPT) Borings
(ASTM D-1586) in soil (N-values <50): • from surface to 25 feet Per Lineal Foot $ 15.50 • from 25 feet to 50 feet Per Lineal Foot $ 16.50 • from 50 feet to 100 feet Per Lineal Foot $ 18.50 • from 100 feet to 125 feet Per Lineal Foot $ 24.10 • from 125 feet to 150 feet Per Lineal Foot $ 33.40
Standard Penetration Test (SPT) Borings in
high resistance soil/rock (N-values >50) Add'l Price Per LF $ 5.15
Furnish, Install, and Remove Casing (up to 4-inch): • from surface to 50 feet Per Lineal Foot $ 10.30 • from 50 feet to 100 feet Per Lineal Foot $ 12.80 • from 100 feet to 150 feet Per Lineal Foot $ 15.90
Drilling (Time Basis)/2 man-crew Per Crew-Hour $ 206.00
Drilling (Time Basis)/3 man-crew Per Crew-Hour $ 237.00
Support Water Truck (Time Basis) Per Day $ 190.00
Rock Coring (N or H size)
• from surface to 50 feet Per Lineal Foot $ 41.20
• from 50 feet to 100 feet Per Lineal Foot $ 45.30
• from 100 feet to 150 feet Per Lineal Foot $ 48.45
Field Permeability Per Test $ 320.00
Mud Bug Vehicle Per Lineal Foot Standard Rates x 1.1
Barge Drilling Per Lineal Foot Standard Rates x 1.5
SAMPLING
Additional SPT Sampling: • from 10 feet to 25 feet Per Additional Sample $ 33.00 • from 25 feet to 50 feet Per Additional Sample $ 36.00 • from 50 feet to 100 feet Per Additional Sample $ 40.00 • from 100 feet to 125 feet Per Additional Sample $ 44.00 • from 125 feet to 150 feet Per Additional Sample $ 56.00
Undisturbed Samples: • Shelby Tube Per Sample $ 188.00
• Fixed-Piston Shelby, Osterberg, Pitcher Per Sample $ 195.00
SOUNDINGS
Electric Dutch Cone Soundings Per Lineal Foot $ 14.30
Piezocone Soundings Per Lineal Foot $ 16.00
Muck Probing/Clay Sampling Per Crew Hour $ 173.00
Electric Dutch Cone Soundings Per Crew Hour $ 221.00
Piezocone/Piezoprobe Soundings (Time Basis) Per Crew Hour $ 232.00
Piezoprobe Dissipation Monitoring Per Crew Hour $ 188.00
OTHER CHARGES
Clearing Difficult Access, Hole Location and Set-Up Per Crew-Hour $ 200.00
Standby Time Per Crew-Hour $ 200.00
Piezometer and Well Installation (plus materials) Per Crew-Hour $ 200.00
Bore Hole Grouting and Sealing (plus materials) Per Crew-Hour $ 200.00
Well Clearing/Sensitivity/Water Level Per Crew-Hour $ 178.00
Air Boat Use Per Day $ 509.00
Instrumentation Unit Use Per Day $ 340.00
Lodging and Subsistence Per Crewman-Day $ 129.00
Double Ring Infiltrometer Per Test $ 602.00
Materials Per Job At Cost + 15%
TERMS: All invoices are due and payable upon receipt unless other arrangements have been made previously. A finance charge of 1.5%
per month, which is an annual interest rate of 18%, will be paid on all invoices not paid within 30 days. Any attorney's fees or other costs incurred in collecting any delinquent amount shall be paid by the Client. *These prices are in effect for work completed through December 31, 2018. This fee schedule will be superseded by the 2019 fee schedule for work performed after December 31, 2018.
ARDAMAN & ASSOCIATES, INC. 2018* FEE SCHEDULE – CITY OF CAPE CANAVERAL COCOA BRANCH SUBSURFACE FIELD EXPLORATION (Page Two)
GENERAL FIELD EQUIPMENT
Data Logger Per Day $ 427.00
Organic Vapor Analyzer (MiniRAE 2000) Per Day $ 125.00
Photo Ionization Detector (Photovac Tip) Per Day $ 185.00
Methane Detector Per Day $ 148.00
Explosimeter Per Day $ 93.00
Generator Per Day $ 153.00
Steam Cleaner Per Day $ 153.00
Surveying Equipment (Water Table Elevations) Per Day $ 79.00
Centrifugal Development Pump Per Day $ 69.00
Submersible Development Pump Per Day $ 170.00
Peristaltic Purging Pump Per Day $ 69.00
Magnetometer Per Day $ 69.00
Sensitivity Test Equipment Per Day $ 69.00
Product/Water Interface Probe Per Day $ 90.00
pH/Conductivity Meter Per Day $ 39.00
Turbidity Meter Per Day $ 79.00
Dissolved Oxygen Meter Per Day $ 127.00
Water Level Indicator Per Day $ 30.00
Bailer Usage (Stainless Steel or Teflon- Per Each) Per Day $ 32.00
Concrete Saw Per Day $ 150.00
Vibration Monitor Per Day $ 297.00
EXPENDABLE SUPPLIES
High Capacity (1 or 0.45 micron) Filter Each $ 33.00
Disposable Teflon Bailer Each $ 30.00
Disposable Polyethylene Bailer Each $ 24.00
Disposable Free Product Bailer Each $ 32.00
Isopropyl Alcohol (decontamination) Per Gallon $ 25.00
Deionized Water (decontamination) Per Five Gallons $ 21.00
16 oz. Soil Jars (soil headspace analysis) Per Box of 12 $ 22.00
Tygon Tubing Per Foot $ 3.35
Polyethylene Tubing Per Foot $ 0.89
55-gallon Drum Each $ 106.00
GEOPHYSICAL EQUIPMENT
Geonics EM 34-3 Per Day $ 318.00
AGI Sting R1-IP Per Day $ 297.00
SPECIAL DRILLING/SOUNDING
Prices for special drilling (barge drilling; air boat sampling; amphibious drilling; NQ wire line coring; large diameter
borings; drilling in corrosive, contaminated or hazardous materials; drilling at great depths; installing large diameter
temporary casing; etc.), field vane testing, and other specialized sampling or field tests will be determined per
project. Work performed over water will be at 1.5 times the above unit prices.
INSTRUMENTATION
Prices for installation of monitor wells, inclinometers and settlement devices and prices for performing field
permeability and packer tests will be determined per project.
TERMS: All invoices are due and payable upon receipt unless other arrangements have been made previously. A finance charge of 1.5%
per month, which is an annual interest rate of 18%, will be paid on all invoices not paid within 30 days. Any attorney's fees or other costs incurred in collecting any delinquent amount shall be paid by the Client. *These prices are in effect for work completed through December 31, 2018. This fee schedule will be superseded by the 2019 fee schedule for work performed after December 31, 2018.
ARDAMAN & ASSOCIATES, INC. 2018* FEE SCHEDULE – CITY OF CAPE CANAVERAL COCOA BRANCH SUBSURFACE FIELD EXPLORATION (Page Three)
OTHER RELATED DRILLING CHARGES
Support Water Truck Per Day $ 193.00
Drumming Contaminated Soil/Drilling Fluids
In 55 gallon drums (Disposal not included) Per Drum $ 153.00
Drum Disposal Per Drum Varies
Visqueen (100 feet by 20 feet) Per Roll $ 103.00
MONITORING WELL INSTALLATION
Temporary 2-inch PVC Wellpoint (Piezometer) Per Foot $ 28.00
2-inch PVC Per Foot $ 42.00
4-inch PVC Per Foot $ 54.00
NOTE: Double cased deep monitoring well (above cost x 2)
VAULT/PAD INSTALLATION - MONITORING WELLS
Well Size Vault Size
2" 8" circular w/pad $ 340.00
4" 12" circular w/pad $ 450.00
2" or 4" Above ground riser w/pad $ 340.00
RECOVERY WELL INSTALLATION
4-inch PVC Per Foot $ 111.00
6-inch PVC Per Foot $ 141.00
8-inch PVC Per Foot $ 200.00
VAULT/PAD INSTALLATION - RECOVERY WELLS
Well Size Vault Size
4" 24" square w/pad $ 793.00
6" 24" square w/pad $ 906.00
8" 36" square w/pad $1,200.00
DIRECT PUSH GROUNDWATER SAMPLING
Direct Push Sampler (minimum 1 day) Per Hour $ 386.00
FIELD TESTING SERVICES
Slug Injection/Withdrawal Permeability Test Each $ 397.00
Double Ring Infiltrometer Test (ASTM D-3385-75) Each $ 605.00
SPECIAL DRILLING/SOUNDING
Prices for special drilling (barge drilling; air boat sampling; amphibious drilling; NQ wire line coring; large diameter
borings; drilling in corrosive, contaminated or hazardous materials; drilling at great depths; installing large diameter
temporary casing; etc.), field vane testing, and other specialized sampling or field tests will be determined per project.
INSTRUMENTATION
Prices for installation of monitor wells, inclinometers and settlement devices and prices for performing field permeability
and packer tests will be determined per project.
TERMS: All invoices are due and payable upon receipt unless other arrangements have been made previously. A finance charge of 1.5%
per month, which is an annual interest rate of 18%, will be paid on all invoices not paid within 30 days. Any attorney's fees or other costs incurred in collecting any delinquent amount shall be paid by the Client. *These prices are in effect for work completed through December 31, 2018. This fee schedule will be superseded by the 2019 fee schedule for work performed after December 31, 2018.
ARDAMAN & ASSOCIATES, INC. 2018* FEE SCHEDULE – CITY OF CAPE CANAVERAL COCOA BRANCH LABORATORY SOIL TESTING SERVICES
CLASSIFICATION TESTS
Moisture Content (ASTM D-2216) Each $ 21.00
Organic Content
• Loss on Ignition (ASTM D-2974) Each $ 41.00 • Wet Combustion (AASHTO T-194) Each $119.00
Unit Weight/Classification (Undisturbed Sample) Each $ 66.00
Grain Size Distribution • Sieve Analysis (ASTM D-421, D-422) Each $ 58.00
• Percent Fines (ASTM D-1140) Each $ 41.00
• Hydrometer Analysis (ASTM D-422) Each $118.00
Atterberg Limits (ASTM D-4318) • Plasticity Index Less than 150% Per Set $115.00 • Plasticity Index Greater than 150% Add'l Per Set $ 75.00
Shrinkage Limit (ASTM D-4943) Each $ 88.00
Specific Gravity (ASTM D-854) Each $ 99.00
Marsh Funnel Viscosity Each $ 31.00
Los Angeles Abrasion Each $386.00
Soundness - Sodium Sieve Size $103.00*
Soundness - Magnesium Sieve Size $103.00*
(*plus material supply charges)
COMPACTION TESTS
Standard (ASTM D-698) or Modified Proctor (ASTM D-1557) Per Test $103.00
Maximum-Minimum Density (ASTM D-4253, D-4254) Per Set $118.00
Limerock Bearing Ratio Per Test $350.00
CONSOLIDATION TESTS
Incremental Consolidation Test (ASTM D-2435) • Up to Ten Load-Unload Increments Per Test $615.00
• More than Ten Load-Unload Increments Per Add'l Increment $ 53.00
Constant Rate of Strain Consolidation Test (ASTM D-4186) Each $674.00
PERMEABILITY TESTS
Permeability Test on Sand Each $160.00
Permeability Test on Fine Grained Soil • k >10-8cm/sec Each $307.00 • k <10-8cm/sec Each $450.00
Permeation with Fluids Other Than Water Add'l Per Test $193.00
STRENGTH TESTS Strength Index Tests (Torvane, Penetrometer, etc.) Each $ 9.45
Vane Shear Test Each $ 26.00
Unconfined Compression Test (ASTM D-2166) • Strength Only Each $ 57.00 • With Stress-Strain Curve Each $107.00
Triaxial Tests: • Unconsolidated-Undrained (ASTM D-2850) Each $244.00 • Unconsolidated-Undrained (with pore pressure response) Each $560.00 • Consolidated-Undrained (with pore pressure measurement) Each $560.00 • Consolidated-Drained on Sands Each $450.00 • Consolidated-Drained on Fine Grained Soils Each $582.00 • Use of Fluids Other Than Water Add'l Per Test $193.00
Direct Shear Tests (Coarse Grained Soils) • Conventional 2.3" Box Shear Per Normal Load $302.00 • With Stress Reversals Per Normal Load $450.00 • Geosynthetics Per Normal Load $313.00 • Conventional 12" Box Shear Per Normal Load $395.00 Angle of Repose Each $ 56.00
Split Tensile for Rock Cores Each $150.00
SAMPLE PREPARATION AND SPECIAL TESTS
Preparation of Laboratory Samples for Testing (e.g., sedimented or compacted) will be charged at $32.00 per sample. Prices for Visual
Classification, for Special Sample Preparation, for Special Laboratory Tests (Slurry Consolidation, Leaching Tests, Settling Tests, etc.), and
for testing contaminated soils or hazardous materials will be determined per project based upon technician man-hours and other
considerations. In addition, a daily charge of $19.00 per day will be assessed for special long-term laboratory tests (i.e., slurry consolidation,
leaching tests, etc.).
TERMS: All invoices are due and payable upon receipt unless other arrangements have been made previously. A finance charge of 1.5%
per month, which is an annual interest rate of 18%, will be paid on all invoices not paid within 30 days. Any attorney's fees or other costs incurred in collecting any delinquent amount shall be paid by the Client. *These prices are in effect for work completed through December 31, 2018. This fee schedule will be superseded by the 2019 fee schedule for work performed after December 31, 2018.
ARDAMAN & ASSOCIATES, INC. 2018* FEE SCHEDULE – CITY OF CAPE CANAVERAL COCOA BRANCH LABORATORY CHEMICAL & GEOSYNTHETIC
TESTING SERVICES
CHEMICAL TESTS
pH (FM5-550) Each $ 14.00
Specific Conductance (FM3-D 1125) Each $ 14.00
Fluoride Each $ 25.00
Sulfate (FM5-553) Each $ 45.00
Chloride (FM5-552) Each $ 45.00
Soil pH (FM5-550) Each $ 45.00
Soil Specific Conductance Each $ 48.00
Soil Resistivity (ASTM G-57 or FM5-551) Each $ 51.00
Carbonate Content (ASTM D 4373) Each $121.00
Water Corrosivity Series (FM5-550,552,553, FM3-D 1125) Each $111.00
Soil Corrosivity Series (FM5-550, 551, 552, 553) Each $185.00
GEOSYNTHETICS
Geomembrane Thickness
• ASTM D-1593 Per Sample $ 34.00
• ASTM D-751, D-5199 or D-5994 Per Sample $ 19.00
Geomembrane Density (ASTM D-792) Per Sample $ 36.00
Geomembrane Tensile Strength (ASTM D-638), Machine and
Transverse Direction Per Set $ 90.00
Geomembrane Tear Resistance (ASTM D-1004), Machine and
Transverse Direction Per Set $ 77.00
Weld Peel and Shear (ASTM D-413, D-882) • 5 Peel and 5 Shear Specimens Per Set $ 52.00
• 10 Peel & 5 Shear Specimens Per Set $ 77.00
• 75.00With Load-Deformation Curve Per Set $ 87.00
Geotextile Grab Tensile Strength (ASTM D-4632) Per Set $ 87.00
Geotextile Trapezoidal Tear (ASTM D-4533) Per Set $106.00
Geotextile Mass/Unit Area (ASTM D-3776 or D-5261) Per Sample $ 37.00
Geotextile Thickness (ASTM D-1777 or D-5199) Per Sample $ 22.00
SAMPLE PREPARATION AND SPECIAL TESTS
Preparation of Samples for Testing (e.g., crushing for carbonate content determination, filtering of clayey soil for
chemical tests) will be charged at $34.00 per sample. Prices for other tests on geomembranes and geotextiles will
be determined per project based upon technician man-hours and other considerations.
TERMS: All invoices are due and payable upon receipt unless other arrangements have been made previously. A finance charge of 1.5% per month,
which is an annual interest rate of 18%, will be paid on all invoices not paid within 30 days. Any attorney's fees or other costs incurred in collecting any delinquent amount shall be paid by the Client. *These prices are in effect for work completed through December 31, 2018. This fee schedule will be superseded by the 2019 fee schedule for work performed after December 31, 2018.
ARDAMAN & ASSOCIATES, INC. 2018* FEE SCHEDULE – CITY OF CAPE CANAVERAL COCOA BRANCH CONSTRUCTION MATERIALS TESTING AND INSPECTION SERVICES
CONCRETE SAMPLING AND TESTING
Cylinder samples (up to 5 cylinders per set): molding
curing, and strength testing (ASTM C-31 and C-39).
Include one slump (ASTM C-143) and one temperature
determination. Cylinders shall be left in a place
provided by the Contractor, covered with plastic
caps and attempts made to provide shade thereon. If
temperature of the air is critical to first 24 hours (during
field curing), equipment to maintain such
controls shall be provided by others. $105.00/set
Additional cylinders $20.00/cylinder
Technician time due to construction delays portal to
portal on the date cylinders are made, per hour $60.00/hour
Technician time $60.00/hour
Technician time transporting cylinders from site to office
if no other work is required $60.00/hour
Curing and strength testing samples delivered to our
laboratory (ASTM C-39) $24.00 /cylinder
Continuous monitoring of concrete placement and/or
extra slump and temperature tests, technician time $60.00/hour
Slump tests (ASTM C-143) $29.00/test
Air Entrainment (ASTM C-173) $36.00/test
Unit weight $45.00/test
Marsh Funnel Viscosity $35.00/test
Mix design $850.00/each
Verification of mix design $425.00/each
Fineness modules $53.00/each
Plant control $71.00/hour
Concrete blocks. Strength tests (determined by
gross area) $65.00/block
Concrete blocks. Absorption and strength tests
(net area) $206.00 set of 3
Block Prism Assembly $265.00 set of 3
Flexural Strength Beams (up to 3 beams) $30.00 each additional beam $254.00 set of 3
Test beams made by others $79.00 each
Grout Prisms 4/set (blocks supplied by others) $112.00/set
Mortar Cubes (up to 6/set) $112.00/set
FLOOR FLATNESS
Equipment, Technician Time and Final Report $880.00/trip
Additional Technician Time $72.00/hour
SAMPLING AND TESTING OF IN-PLACE CONCRETE/SOIL CEMENT
Coring and testing of cored samples:
Technician time (two technicians may be required) $60.00/hour
Mobilization of coring equipment
With power supplied $88.00/trip
Without power supplied $116.00/trip
Trimming, capping and strength test (ASTM C-42) $28.00/core
Depth measurement $28.00/core
Shotcrete panels made by others (panel cores & strength tests) $65.00/each
TERMS: All invoices are due and payable upon receipt unless other arrangements have been made previously. A finance charge of 1.5%
per month, which is an annual interest rate of 18%, will be paid on all invoices not paid within 30 days. Any attorney's fees or other costs incurred in collecting any delinquent amount shall be paid by the Client. *These prices are in effect for work completed through December 31, 2018. This fee schedule will be superseded by the 2019 fee schedule for work performed after December 31, 2018.
ARDAMAN & ASSOCIATES, INC. 2018* FEE SCHEDULE – CITY OF CAPE CANAVERAL COCOA BRANCH CONSTRUCTION MATERIALS TESTING AND INSPECTION SERVICES (Page Two)
Concrete Cover/Reinforcing Steel Location:
Equipment use $146.00/trip
Technician time $72.00/hour
Swiss Hammer
Mobilization of equipment $58.00/trip
Technician time $72.00/hour
SITE PREPARATION PROCEDURES INSPECTION, SAMPLING AND TESTING SERVICES
Monitoring of the removal of deleterious soils or materials
Inspection of placement and compaction of fill material.
Penetrometer tests. Sampling of natural or fill material
Inspection of borrow areas.
Engineering technician $60.00/hour
Senior engineering technician $72.00/hour
Density Tests:
In-situ density tests, nuclear or drive sleeve method
(minimum of four per trip) (local area only) $31.00/test
In-situ density tests, sand cone test
(minimum of three per trip) (local area only) $49.00 test
Engineering technician time $60.00/hour
Sampling of natural or fill material for
laboratory testing; Engineering technician $60.00/hour
SOIL AND ROCK LABORATORY TESTING (sampling charge not included)
Standard (ASTM D-698 or Modified (ASTM D-1557) Proctor $101.00/each
Moisture content (ASTM D-2216) $21.00/each
Limerock Bearing Ratio $350.00/each
Florida Bearing Value (FBV) $81.00/each
Soil cement design $461.00/each
Soil cement field pills (3/set or technician time $48.00/hour) $108.00/each
California Bearing Ratio (CBR) $365.00/each
ASPHALT: FIELD INSPECTION, SAMPLING AND LABORATORY TESTING
Engineering technician time for field sampling $60.00/hour
Coring:
Mobilization of coring equipment:
With power supplied $88.00/trip
Without power supplied $116.00/trip
Certified engineering technician to inspect
preparation of base course/surface installation or plant control $72.00/hour
Asphalt mix design $980.00/design
Marshall Stability and Flow Test (Includes pill densities) $116.00/test
Extraction and gradation tests (sampled hot) $111.00/test
Extraction and gradation tests (sampled from pavement) $122.00/test
Density tests $30.00/test
Depth measurements $23.00/test
Asphalt cores (minimum of three) $52.00/each
TERMS: All invoices are due and payable upon receipt unless other arrangements have been made previously. A finance charge of 1.5%
per month, which is an annual interest rate of 18%, will be paid on all invoices not paid within 30 days. Any attorney's fees or other costs incurred in collecting any delinquent amount shall be paid by the Client. *These prices are in effect for work completed through December 31, 2018. This fee schedule will be superseded by the 2019 fee schedule for work performed after December 31, 2018.
ARDAMAN & ASSOCIATES, INC. 2018* FEE SCHEDULE – CITY OF CAPE CANAVERAL COCOA BRANCH CONSTRUCTION MATERIALS TESTING AND INSPECTION SERVICES (Page Three)
STRUCTURAL STEEL:
Field inspection for visual examination of welds, ultrasonic
testing, dye penetrant, magnetic particle, etc. by Metals technician $79.00/hour
(Equipment charge determined by project)
Bolt Torque $72.00/hour
ROOFING:
Testing of 12 x 12 inch samples (includes technician time for
obtaining samples, testing and report of findings) $451.00/sample
Inspection/Observations during construction $72.00/hour
SPRAYED ON FIREPROOFING:
Depth measurements & sampling $72.00/hour
Adhesion Testing $72.00/hour
Unit Weight (Lab) $69.00/sample
OVERTIME AND HOLIDAY
Charges will be increased 25% for work performed during weekends and official holidays
SUB-CONTRACTING SERVICES
Cost Plus 15%
ENGINEERING CONSULTATION SERVICES
Senior Project Engineer $143.00/hour
Project Engineer $128.00/hour
Assistant Project Engineer $115.00/hour
Senior Engineering Technician $72.00/hour
Engineering Technician $60.00/hour
Technical Draftsman $65.00/hour
Technical Secretary $56.00/hour