Loading...
HomeMy WebLinkAboutArdaman & Associates - Signed - Exhibit A - FINALAGREEMENT FOR ENGINEERING SERVICES TIIIS AGREEMENT is made and entered this .;;}5 •• day of -;f I!,~ 2018, by and between the CITY OF CAPE CANAVERAL, FLORIDA, a Florida ~nicipal corporation ("City"), located at I 00 Polk A venue, Cape Canaveral, Florida 32920, and ARDAMAN & ASSOCIATES, INC., a Florida corporation ("Consultant"), whose principal address is 1300 N. Cocoa Boulevard, Cocoa, Florida 32922. WITNESSETH: WHEREAS, the City has a need to obtain engineering services from time to time on an as-needed, task-oriented basis; and WHEREAS, the City has followed the selection and negotiation process set forth in the Florida's Consultants' Competitive Negotiation Act, Section 287.055, Florida Statutes; and WHEREAS, the Consultant participated in the selection and negotiation process; and WHEREAS, the Consultant is willing to provide such engineering services to the City under the tenns and conditions stated herein; and WHEREAS, the City is willing to place Ardaman & Associates, Inc. on its list of pre- approved continuing services consultants for the potential of providing engineering services to the City in the future; and NOW, THEREFORE, for good and valuable consideration, the receipt and sufficiency of which is hereby acknowledged, the parties covenant and agree as follows: 1.0 TERM AND DEFINITIONS I.I Unless sooner tenninated by either Party pursuant to the terms and conditions herein, this Agreement shall tenninate on tht: fifth (5th) anniversary of the Effective Date. The Parties shall have the option to extend the tem1 for two (2) additional one (I) year tem1s. Any such extension shall only be by written amendment to this Agreement executed by both parties hereto. 1.2 The tt:nns and conditions of any Task Order, as described in Section 2.0 hereof, shall be as set forth in such Task Order. Any Task in effect at the tennination of this Agn:ement shall remain in effect until completion of said Task Order, and all of the tenns and conditions of this Agreement shall survive until completion of all Task Orders. 1.3 Definitions. The following words and phrases used in this Agreement shall have the following meaning ascribed to them unless the context clearly indicates otherwise: Agreement for Continuing Engineering Services City of Cape Canaveral/ Ardaman & Associates, Inc. Page 1 of 20 d. The undersigned is authorized to execute this Agreement on behalf of the Consultant and said signature shall bind the Consultant to this Agreement. No further action is required by the Consultant to enter into this Agreement other than the Consultant's undersigned representative's execution of the Agreement. IN WITNESS WHEREOF, the parties hereto caused this Agreement to be executed by their duly authorized representatives as of the date first written above. CITY: CONSULT ANT: CITY OF CAPE CANAVERAL ARDAMAN & ASSOCIATES, INC. Gti-f fo?G2 Sature Jason P. Manning, PE , Vice President David L. Greene, City Manager Print Name Title ATTEST: Agreement for Continuing Engineering Services City of Cape Canaveral / Ardaman & Associates, Inc. Page 19 of20 TERMS: All invoices are due and payable upon receipt unless other arrangements have been made previously. A finance charge of 1.5% per month, which is an annual interest rate of 18%, will be paid on all invoices not paid within 30 days. Any attorney's fees or other costs incurred in collecting any delinquent amount shall be paid by the Client. *These prices are in effect for work completed through December 31, 2018. This fee schedule will be superseded by the 2019 fee schedule for work performed after December 31, 2018. ARDAMAN & ASSOCIATES, INC. 2018* FEE SCHEDULE – CITY OF CAPE CANAVERAL COCOA BRANCH ENGINEERING AND TESTING SERVICES ENGINEERING Data Evaluation, Engineering Analysis, Design, Inspections, Field Monitoring, etc. Senior Consultant Per Hour $180.00 Senior Engineer Per Hour $170.00 Senior Project Engineer/Hydrogeologist Per Hour $143.00 Threshold Inspector (Professional Engineer) Per Hour $160.00 Project Engineer Per Hour $128.00 Assistant Project Engineer/Hydrogeologist Per Hour $115.00 Staff Engineer/Threshold Field Representative Per Hour $102.00 CONSTRUCTION MONITORING AND FIELD TESTING Field Technician/Inspector V/Metals Technician Per Hour $ 79.00 Field Technician/Inspector IV Per Hour $ 72.00 Field Technician III Per Hour $ 60.00 Field Technician II Per Hour $ 54.00 Field Technician I Per Hour $ 49.00 LABORATORY TESTING Visual Classification and Sample Handling, Special Laboratory Tests (Leaching Studies, Slurry Consolidation, etc.) Laboratory Technician V Per Hour $ 79.00 Laboratory Technician IV Per Hour $ 72.00 Laboratory Technician III Per Hour $ 60.00 Laboratory Technician II Per Hour $ 54.00 Laboratory Technician I Per Hour $ 49.00 SUPPORT PERSONNEL Engineering Designer V Per Hour $ 85.00 Engineering Designer III Per Hour $ 73.00 Engineering Designer I Per Hour $ 67.00 Technical Draftsman III Per Hour $ 65.00 Technical Draftsman I Per Hour $ 55.00 Technical Secretary Per Hour $ 56.00 MISCELLANEOUS EXPENSES Outside Services and Expenses Per Job At Cost + 15% Printing and Reproduction Per Job At Cost + 15% Copying Per Page $ 0.21 Mileage (Automobile) Per Mile $ 0.63 Mileage (Truck) Per Mile $ 0.91 TERMS: All invoices are due and payable upon receipt unless other arrangements have been made previously. A finance charge of 1.5% per month, which is an annual interest rate of 18%, will be paid on all invoices not paid within 30 days. Any attorney's fees or other costs incurred in collecting any delinquent amount shall be paid by the Client. *These prices are in effect for work completed through December 31, 2018. This fee schedule will be superseded by the 2019 fee schedule for work performed after December 31, 2018. ARDAMAN & ASSOCIATES, INC. 2018* FEE SCHEDULE – CITY OF CAPE CANAVERAL COCOA BRANCH SUBSURFACE FIELD EXPLORATION MOBILIZATION Mobilization and Demobilization • Men and Equipment Per Rig-Hour $211.00 • Mileage - Rig Per Rig-Mile $ 1.02 • Mileage - Truck Per Truck-Mile $ 0.89 • Portable Barge Per Job $6,000.00 min. STANDARD DRILLING Auger Borings (4-inch) Per Lineal Foot $ 11.70 Wash Borings - Cuttings Only (up to 3 inch) • Soil drilling Per Lineal Foot $ 9.80 • Rock drilling Per Lineal Foot $ 13.25 Standard Penetration Test (SPT) Borings (ASTM D-1586) in soil (N-values <50): • from surface to 25 feet Per Lineal Foot $ 15.50 • from 25 feet to 50 feet Per Lineal Foot $ 16.50 • from 50 feet to 100 feet Per Lineal Foot $ 18.50 • from 100 feet to 125 feet Per Lineal Foot $ 24.10 • from 125 feet to 150 feet Per Lineal Foot $ 33.40 Standard Penetration Test (SPT) Borings in high resistance soil/rock (N-values >50) Add'l Price Per LF $ 5.15 Furnish, Install, and Remove Casing (up to 4-inch): • from surface to 50 feet Per Lineal Foot $ 10.30 • from 50 feet to 100 feet Per Lineal Foot $ 12.80 • from 100 feet to 150 feet Per Lineal Foot $ 15.90 Drilling (Time Basis)/2 man-crew Per Crew-Hour $ 206.00 Drilling (Time Basis)/3 man-crew Per Crew-Hour $ 237.00 Support Water Truck (Time Basis) Per Day $ 190.00 Rock Coring (N or H size) • from surface to 50 feet Per Lineal Foot $ 41.20 • from 50 feet to 100 feet Per Lineal Foot $ 45.30 • from 100 feet to 150 feet Per Lineal Foot $ 48.45 Field Permeability Per Test $ 320.00 Mud Bug Vehicle Per Lineal Foot Standard Rates x 1.1 Barge Drilling Per Lineal Foot Standard Rates x 1.5 SAMPLING Additional SPT Sampling: • from 10 feet to 25 feet Per Additional Sample $ 33.00 • from 25 feet to 50 feet Per Additional Sample $ 36.00 • from 50 feet to 100 feet Per Additional Sample $ 40.00 • from 100 feet to 125 feet Per Additional Sample $ 44.00 • from 125 feet to 150 feet Per Additional Sample $ 56.00 Undisturbed Samples: • Shelby Tube Per Sample $ 188.00 • Fixed-Piston Shelby, Osterberg, Pitcher Per Sample $ 195.00 SOUNDINGS Electric Dutch Cone Soundings Per Lineal Foot $ 14.30 Piezocone Soundings Per Lineal Foot $ 16.00 Muck Probing/Clay Sampling Per Crew Hour $ 173.00 Electric Dutch Cone Soundings Per Crew Hour $ 221.00 Piezocone/Piezoprobe Soundings (Time Basis) Per Crew Hour $ 232.00 Piezoprobe Dissipation Monitoring Per Crew Hour $ 188.00 OTHER CHARGES Clearing Difficult Access, Hole Location and Set-Up Per Crew-Hour $ 200.00 Standby Time Per Crew-Hour $ 200.00 Piezometer and Well Installation (plus materials) Per Crew-Hour $ 200.00 Bore Hole Grouting and Sealing (plus materials) Per Crew-Hour $ 200.00 Well Clearing/Sensitivity/Water Level Per Crew-Hour $ 178.00 Air Boat Use Per Day $ 509.00 Instrumentation Unit Use Per Day $ 340.00 Lodging and Subsistence Per Crewman-Day $ 129.00 Double Ring Infiltrometer Per Test $ 602.00 Materials Per Job At Cost + 15% TERMS: All invoices are due and payable upon receipt unless other arrangements have been made previously. A finance charge of 1.5% per month, which is an annual interest rate of 18%, will be paid on all invoices not paid within 30 days. Any attorney's fees or other costs incurred in collecting any delinquent amount shall be paid by the Client. *These prices are in effect for work completed through December 31, 2018. This fee schedule will be superseded by the 2019 fee schedule for work performed after December 31, 2018. ARDAMAN & ASSOCIATES, INC. 2018* FEE SCHEDULE – CITY OF CAPE CANAVERAL COCOA BRANCH SUBSURFACE FIELD EXPLORATION (Page Two) GENERAL FIELD EQUIPMENT Data Logger Per Day $ 427.00 Organic Vapor Analyzer (MiniRAE 2000) Per Day $ 125.00 Photo Ionization Detector (Photovac Tip) Per Day $ 185.00 Methane Detector Per Day $ 148.00 Explosimeter Per Day $ 93.00 Generator Per Day $ 153.00 Steam Cleaner Per Day $ 153.00 Surveying Equipment (Water Table Elevations) Per Day $ 79.00 Centrifugal Development Pump Per Day $ 69.00 Submersible Development Pump Per Day $ 170.00 Peristaltic Purging Pump Per Day $ 69.00 Magnetometer Per Day $ 69.00 Sensitivity Test Equipment Per Day $ 69.00 Product/Water Interface Probe Per Day $ 90.00 pH/Conductivity Meter Per Day $ 39.00 Turbidity Meter Per Day $ 79.00 Dissolved Oxygen Meter Per Day $ 127.00 Water Level Indicator Per Day $ 30.00 Bailer Usage (Stainless Steel or Teflon- Per Each) Per Day $ 32.00 Concrete Saw Per Day $ 150.00 Vibration Monitor Per Day $ 297.00 EXPENDABLE SUPPLIES High Capacity (1 or 0.45 micron) Filter Each $ 33.00 Disposable Teflon Bailer Each $ 30.00 Disposable Polyethylene Bailer Each $ 24.00 Disposable Free Product Bailer Each $ 32.00 Isopropyl Alcohol (decontamination) Per Gallon $ 25.00 Deionized Water (decontamination) Per Five Gallons $ 21.00 16 oz. Soil Jars (soil headspace analysis) Per Box of 12 $ 22.00 Tygon Tubing Per Foot $ 3.35 Polyethylene Tubing Per Foot $ 0.89 55-gallon Drum Each $ 106.00 GEOPHYSICAL EQUIPMENT Geonics EM 34-3 Per Day $ 318.00 AGI Sting R1-IP Per Day $ 297.00 SPECIAL DRILLING/SOUNDING Prices for special drilling (barge drilling; air boat sampling; amphibious drilling; NQ wire line coring; large diameter borings; drilling in corrosive, contaminated or hazardous materials; drilling at great depths; installing large diameter temporary casing; etc.), field vane testing, and other specialized sampling or field tests will be determined per project. Work performed over water will be at 1.5 times the above unit prices. INSTRUMENTATION Prices for installation of monitor wells, inclinometers and settlement devices and prices for performing field permeability and packer tests will be determined per project. TERMS: All invoices are due and payable upon receipt unless other arrangements have been made previously. A finance charge of 1.5% per month, which is an annual interest rate of 18%, will be paid on all invoices not paid within 30 days. Any attorney's fees or other costs incurred in collecting any delinquent amount shall be paid by the Client. *These prices are in effect for work completed through December 31, 2018. This fee schedule will be superseded by the 2019 fee schedule for work performed after December 31, 2018. ARDAMAN & ASSOCIATES, INC. 2018* FEE SCHEDULE – CITY OF CAPE CANAVERAL COCOA BRANCH SUBSURFACE FIELD EXPLORATION (Page Three) OTHER RELATED DRILLING CHARGES Support Water Truck Per Day $ 193.00 Drumming Contaminated Soil/Drilling Fluids In 55 gallon drums (Disposal not included) Per Drum $ 153.00 Drum Disposal Per Drum Varies Visqueen (100 feet by 20 feet) Per Roll $ 103.00 MONITORING WELL INSTALLATION Temporary 2-inch PVC Wellpoint (Piezometer) Per Foot $ 28.00 2-inch PVC Per Foot $ 42.00 4-inch PVC Per Foot $ 54.00 NOTE: Double cased deep monitoring well (above cost x 2) VAULT/PAD INSTALLATION - MONITORING WELLS Well Size Vault Size 2" 8" circular w/pad $ 340.00 4" 12" circular w/pad $ 450.00 2" or 4" Above ground riser w/pad $ 340.00 RECOVERY WELL INSTALLATION 4-inch PVC Per Foot $ 111.00 6-inch PVC Per Foot $ 141.00 8-inch PVC Per Foot $ 200.00 VAULT/PAD INSTALLATION - RECOVERY WELLS Well Size Vault Size 4" 24" square w/pad $ 793.00 6" 24" square w/pad $ 906.00 8" 36" square w/pad $1,200.00 DIRECT PUSH GROUNDWATER SAMPLING Direct Push Sampler (minimum 1 day) Per Hour $ 386.00 FIELD TESTING SERVICES Slug Injection/Withdrawal Permeability Test Each $ 397.00 Double Ring Infiltrometer Test (ASTM D-3385-75) Each $ 605.00 SPECIAL DRILLING/SOUNDING Prices for special drilling (barge drilling; air boat sampling; amphibious drilling; NQ wire line coring; large diameter borings; drilling in corrosive, contaminated or hazardous materials; drilling at great depths; installing large diameter temporary casing; etc.), field vane testing, and other specialized sampling or field tests will be determined per project. INSTRUMENTATION Prices for installation of monitor wells, inclinometers and settlement devices and prices for performing field permeability and packer tests will be determined per project. TERMS: All invoices are due and payable upon receipt unless other arrangements have been made previously. A finance charge of 1.5% per month, which is an annual interest rate of 18%, will be paid on all invoices not paid within 30 days. Any attorney's fees or other costs incurred in collecting any delinquent amount shall be paid by the Client. *These prices are in effect for work completed through December 31, 2018. This fee schedule will be superseded by the 2019 fee schedule for work performed after December 31, 2018. ARDAMAN & ASSOCIATES, INC. 2018* FEE SCHEDULE – CITY OF CAPE CANAVERAL COCOA BRANCH LABORATORY SOIL TESTING SERVICES CLASSIFICATION TESTS Moisture Content (ASTM D-2216) Each $ 21.00 Organic Content • Loss on Ignition (ASTM D-2974) Each $ 41.00 • Wet Combustion (AASHTO T-194) Each $119.00 Unit Weight/Classification (Undisturbed Sample) Each $ 66.00 Grain Size Distribution • Sieve Analysis (ASTM D-421, D-422) Each $ 58.00 • Percent Fines (ASTM D-1140) Each $ 41.00 • Hydrometer Analysis (ASTM D-422) Each $118.00 Atterberg Limits (ASTM D-4318) • Plasticity Index Less than 150% Per Set $115.00 • Plasticity Index Greater than 150% Add'l Per Set $ 75.00 Shrinkage Limit (ASTM D-4943) Each $ 88.00 Specific Gravity (ASTM D-854) Each $ 99.00 Marsh Funnel Viscosity Each $ 31.00 Los Angeles Abrasion Each $386.00 Soundness - Sodium Sieve Size $103.00* Soundness - Magnesium Sieve Size $103.00* (*plus material supply charges) COMPACTION TESTS Standard (ASTM D-698) or Modified Proctor (ASTM D-1557) Per Test $103.00 Maximum-Minimum Density (ASTM D-4253, D-4254) Per Set $118.00 Limerock Bearing Ratio Per Test $350.00 CONSOLIDATION TESTS Incremental Consolidation Test (ASTM D-2435) • Up to Ten Load-Unload Increments Per Test $615.00 • More than Ten Load-Unload Increments Per Add'l Increment $ 53.00 Constant Rate of Strain Consolidation Test (ASTM D-4186) Each $674.00 PERMEABILITY TESTS Permeability Test on Sand Each $160.00 Permeability Test on Fine Grained Soil • k >10-8cm/sec Each $307.00 • k <10-8cm/sec Each $450.00 Permeation with Fluids Other Than Water Add'l Per Test $193.00 STRENGTH TESTS Strength Index Tests (Torvane, Penetrometer, etc.) Each $ 9.45 Vane Shear Test Each $ 26.00 Unconfined Compression Test (ASTM D-2166) • Strength Only Each $ 57.00 • With Stress-Strain Curve Each $107.00 Triaxial Tests: • Unconsolidated-Undrained (ASTM D-2850) Each $244.00 • Unconsolidated-Undrained (with pore pressure response) Each $560.00 • Consolidated-Undrained (with pore pressure measurement) Each $560.00 • Consolidated-Drained on Sands Each $450.00 • Consolidated-Drained on Fine Grained Soils Each $582.00 • Use of Fluids Other Than Water Add'l Per Test $193.00 Direct Shear Tests (Coarse Grained Soils) • Conventional 2.3" Box Shear Per Normal Load $302.00 • With Stress Reversals Per Normal Load $450.00 • Geosynthetics Per Normal Load $313.00 • Conventional 12" Box Shear Per Normal Load $395.00 Angle of Repose Each $ 56.00 Split Tensile for Rock Cores Each $150.00 SAMPLE PREPARATION AND SPECIAL TESTS Preparation of Laboratory Samples for Testing (e.g., sedimented or compacted) will be charged at $32.00 per sample. Prices for Visual Classification, for Special Sample Preparation, for Special Laboratory Tests (Slurry Consolidation, Leaching Tests, Settling Tests, etc.), and for testing contaminated soils or hazardous materials will be determined per project based upon technician man-hours and other considerations. In addition, a daily charge of $19.00 per day will be assessed for special long-term laboratory tests (i.e., slurry consolidation, leaching tests, etc.). TERMS: All invoices are due and payable upon receipt unless other arrangements have been made previously. A finance charge of 1.5% per month, which is an annual interest rate of 18%, will be paid on all invoices not paid within 30 days. Any attorney's fees or other costs incurred in collecting any delinquent amount shall be paid by the Client. *These prices are in effect for work completed through December 31, 2018. This fee schedule will be superseded by the 2019 fee schedule for work performed after December 31, 2018. ARDAMAN & ASSOCIATES, INC. 2018* FEE SCHEDULE – CITY OF CAPE CANAVERAL COCOA BRANCH LABORATORY CHEMICAL & GEOSYNTHETIC TESTING SERVICES CHEMICAL TESTS pH (FM5-550) Each $ 14.00 Specific Conductance (FM3-D 1125) Each $ 14.00 Fluoride Each $ 25.00 Sulfate (FM5-553) Each $ 45.00 Chloride (FM5-552) Each $ 45.00 Soil pH (FM5-550) Each $ 45.00 Soil Specific Conductance Each $ 48.00 Soil Resistivity (ASTM G-57 or FM5-551) Each $ 51.00 Carbonate Content (ASTM D 4373) Each $121.00 Water Corrosivity Series (FM5-550,552,553, FM3-D 1125) Each $111.00 Soil Corrosivity Series (FM5-550, 551, 552, 553) Each $185.00 GEOSYNTHETICS Geomembrane Thickness • ASTM D-1593 Per Sample $ 34.00 • ASTM D-751, D-5199 or D-5994 Per Sample $ 19.00 Geomembrane Density (ASTM D-792) Per Sample $ 36.00 Geomembrane Tensile Strength (ASTM D-638), Machine and Transverse Direction Per Set $ 90.00 Geomembrane Tear Resistance (ASTM D-1004), Machine and Transverse Direction Per Set $ 77.00 Weld Peel and Shear (ASTM D-413, D-882) • 5 Peel and 5 Shear Specimens Per Set $ 52.00 • 10 Peel & 5 Shear Specimens Per Set $ 77.00 • 75.00With Load-Deformation Curve Per Set $ 87.00 Geotextile Grab Tensile Strength (ASTM D-4632) Per Set $ 87.00 Geotextile Trapezoidal Tear (ASTM D-4533) Per Set $106.00 Geotextile Mass/Unit Area (ASTM D-3776 or D-5261) Per Sample $ 37.00 Geotextile Thickness (ASTM D-1777 or D-5199) Per Sample $ 22.00 SAMPLE PREPARATION AND SPECIAL TESTS Preparation of Samples for Testing (e.g., crushing for carbonate content determination, filtering of clayey soil for chemical tests) will be charged at $34.00 per sample. Prices for other tests on geomembranes and geotextiles will be determined per project based upon technician man-hours and other considerations. TERMS: All invoices are due and payable upon receipt unless other arrangements have been made previously. A finance charge of 1.5% per month, which is an annual interest rate of 18%, will be paid on all invoices not paid within 30 days. Any attorney's fees or other costs incurred in collecting any delinquent amount shall be paid by the Client. *These prices are in effect for work completed through December 31, 2018. This fee schedule will be superseded by the 2019 fee schedule for work performed after December 31, 2018. ARDAMAN & ASSOCIATES, INC. 2018* FEE SCHEDULE – CITY OF CAPE CANAVERAL COCOA BRANCH CONSTRUCTION MATERIALS TESTING AND INSPECTION SERVICES CONCRETE SAMPLING AND TESTING Cylinder samples (up to 5 cylinders per set): molding curing, and strength testing (ASTM C-31 and C-39). Include one slump (ASTM C-143) and one temperature determination. Cylinders shall be left in a place provided by the Contractor, covered with plastic caps and attempts made to provide shade thereon. If temperature of the air is critical to first 24 hours (during field curing), equipment to maintain such controls shall be provided by others. $105.00/set Additional cylinders $20.00/cylinder Technician time due to construction delays portal to portal on the date cylinders are made, per hour $60.00/hour Technician time $60.00/hour Technician time transporting cylinders from site to office if no other work is required $60.00/hour Curing and strength testing samples delivered to our laboratory (ASTM C-39) $24.00 /cylinder Continuous monitoring of concrete placement and/or extra slump and temperature tests, technician time $60.00/hour Slump tests (ASTM C-143) $29.00/test Air Entrainment (ASTM C-173) $36.00/test Unit weight $45.00/test Marsh Funnel Viscosity $35.00/test Mix design $850.00/each Verification of mix design $425.00/each Fineness modules $53.00/each Plant control $71.00/hour Concrete blocks. Strength tests (determined by gross area) $65.00/block Concrete blocks. Absorption and strength tests (net area) $206.00 set of 3 Block Prism Assembly $265.00 set of 3 Flexural Strength Beams (up to 3 beams) $30.00 each additional beam $254.00 set of 3 Test beams made by others $79.00 each Grout Prisms 4/set (blocks supplied by others) $112.00/set Mortar Cubes (up to 6/set) $112.00/set FLOOR FLATNESS Equipment, Technician Time and Final Report $880.00/trip Additional Technician Time $72.00/hour SAMPLING AND TESTING OF IN-PLACE CONCRETE/SOIL CEMENT Coring and testing of cored samples: Technician time (two technicians may be required) $60.00/hour Mobilization of coring equipment With power supplied $88.00/trip Without power supplied $116.00/trip Trimming, capping and strength test (ASTM C-42) $28.00/core Depth measurement $28.00/core Shotcrete panels made by others (panel cores & strength tests) $65.00/each TERMS: All invoices are due and payable upon receipt unless other arrangements have been made previously. A finance charge of 1.5% per month, which is an annual interest rate of 18%, will be paid on all invoices not paid within 30 days. Any attorney's fees or other costs incurred in collecting any delinquent amount shall be paid by the Client. *These prices are in effect for work completed through December 31, 2018. This fee schedule will be superseded by the 2019 fee schedule for work performed after December 31, 2018. ARDAMAN & ASSOCIATES, INC. 2018* FEE SCHEDULE – CITY OF CAPE CANAVERAL COCOA BRANCH CONSTRUCTION MATERIALS TESTING AND INSPECTION SERVICES (Page Two) Concrete Cover/Reinforcing Steel Location: Equipment use $146.00/trip Technician time $72.00/hour Swiss Hammer Mobilization of equipment $58.00/trip Technician time $72.00/hour SITE PREPARATION PROCEDURES INSPECTION, SAMPLING AND TESTING SERVICES Monitoring of the removal of deleterious soils or materials Inspection of placement and compaction of fill material. Penetrometer tests. Sampling of natural or fill material Inspection of borrow areas. Engineering technician $60.00/hour Senior engineering technician $72.00/hour Density Tests: In-situ density tests, nuclear or drive sleeve method (minimum of four per trip) (local area only) $31.00/test In-situ density tests, sand cone test (minimum of three per trip) (local area only) $49.00 test Engineering technician time $60.00/hour Sampling of natural or fill material for laboratory testing; Engineering technician $60.00/hour SOIL AND ROCK LABORATORY TESTING (sampling charge not included) Standard (ASTM D-698 or Modified (ASTM D-1557) Proctor $101.00/each Moisture content (ASTM D-2216) $21.00/each Limerock Bearing Ratio $350.00/each Florida Bearing Value (FBV) $81.00/each Soil cement design $461.00/each Soil cement field pills (3/set or technician time $48.00/hour) $108.00/each California Bearing Ratio (CBR) $365.00/each ASPHALT: FIELD INSPECTION, SAMPLING AND LABORATORY TESTING Engineering technician time for field sampling $60.00/hour Coring: Mobilization of coring equipment: With power supplied $88.00/trip Without power supplied $116.00/trip Certified engineering technician to inspect preparation of base course/surface installation or plant control $72.00/hour Asphalt mix design $980.00/design Marshall Stability and Flow Test (Includes pill densities) $116.00/test Extraction and gradation tests (sampled hot) $111.00/test Extraction and gradation tests (sampled from pavement) $122.00/test Density tests $30.00/test Depth measurements $23.00/test Asphalt cores (minimum of three) $52.00/each TERMS: All invoices are due and payable upon receipt unless other arrangements have been made previously. A finance charge of 1.5% per month, which is an annual interest rate of 18%, will be paid on all invoices not paid within 30 days. Any attorney's fees or other costs incurred in collecting any delinquent amount shall be paid by the Client. *These prices are in effect for work completed through December 31, 2018. This fee schedule will be superseded by the 2019 fee schedule for work performed after December 31, 2018. ARDAMAN & ASSOCIATES, INC. 2018* FEE SCHEDULE – CITY OF CAPE CANAVERAL COCOA BRANCH CONSTRUCTION MATERIALS TESTING AND INSPECTION SERVICES (Page Three) STRUCTURAL STEEL: Field inspection for visual examination of welds, ultrasonic testing, dye penetrant, magnetic particle, etc. by Metals technician $79.00/hour (Equipment charge determined by project) Bolt Torque $72.00/hour ROOFING: Testing of 12 x 12 inch samples (includes technician time for obtaining samples, testing and report of findings) $451.00/sample Inspection/Observations during construction $72.00/hour SPRAYED ON FIREPROOFING: Depth measurements & sampling $72.00/hour Adhesion Testing $72.00/hour Unit Weight (Lab) $69.00/sample OVERTIME AND HOLIDAY Charges will be increased 25% for work performed during weekends and official holidays SUB-CONTRACTING SERVICES Cost Plus 15% ENGINEERING CONSULTATION SERVICES Senior Project Engineer $143.00/hour Project Engineer $128.00/hour Assistant Project Engineer $115.00/hour Senior Engineering Technician $72.00/hour Engineering Technician $60.00/hour Technical Draftsman $65.00/hour Technical Secretary $56.00/hour