HomeMy WebLinkAboutDrawingsDavid:
These should be the only drawings you need for Friday. The (1)
engineering drawing which shows the end of the existing sewer line
behind Homewood Suites and (2) Holiday Inn drawing showing the proposed
force main.
Thanks,
<http://www.cityofcapecanaveral.org/>
Jeff Ratliff
Capital Projects Director
J.Ratliff@cityofcapecanaveral.org
<mailto:J.Ratliff@cityofcapecanaveral.org>
321-868-1223 / 321-868-1248 fax
100 Polk Avenue - P.O. Box 326
Cape Canaveral, FL 32920
www.CityofCapeCanaveral.org <http://www.CityofCapeCanaveral.org>
Launch your connection…
<https://www.facebook.com/CityofCapeCanaveral>
<https://www.instagram.com/cityofcapecanaveral/>
<https://www.linkedin.com/company/city-of-cape-canaveral-the%20https:/tw
itter.com/CapeCanaveralFL> <https://twitter.com/capecanaveralfl>
Florida has a very broad public records law. As a result, any written
communication created or received by the City of Cape Canaveral
officials and employees will be made available to the public and/or
media upon request, unless otherwise exempt. Under Florida Law, email
addresses are public records. If you do not want your email address
released in response to a public-records request, do not send electronic
email to this entity. Instead, contact our office by phone or in writing