Loading...
HomeMy WebLinkAboutDrawingsDavid: These should be the only drawings you need for Friday. The (1) engineering drawing which shows the end of the existing sewer line behind Homewood Suites and (2) Holiday Inn drawing showing the proposed force main. Thanks, <http://www.cityofcapecanaveral.org/> Jeff Ratliff Capital Projects Director J.Ratliff@cityofcapecanaveral.org <mailto:J.Ratliff@cityofcapecanaveral.org> 321-868-1223 / 321-868-1248 fax 100 Polk Avenue - P.O. Box 326 Cape Canaveral, FL 32920 www.CityofCapeCanaveral.org <http://www.CityofCapeCanaveral.org> Launch your connection… <https://www.facebook.com/CityofCapeCanaveral> <https://www.instagram.com/cityofcapecanaveral/> <https://www.linkedin.com/company/city-of-cape-canaveral-the%20https:/tw itter.com/CapeCanaveralFL> <https://twitter.com/capecanaveralfl> Florida has a very broad public records law. As a result, any written communication created or received by the City of Cape Canaveral officials and employees will be made available to the public and/or media upon request, unless otherwise exempt. Under Florida Law, email addresses are public records. If you do not want your email address released in response to a public-records request, do not send electronic email to this entity. Instead, contact our office by phone or in writing