Loading...
HomeMy WebLinkAboutRE Force Main #3 (29)Can you call me about this? <http://www.cityofcapecanaveral.org/> Launch your connection… <https://www.facebook.com/CityofCapeCanaveral> <https://www.instagram.com/cityofcapecanaveral/> <https://www.linkedin.com/company/city-of-cape-canaveral-the> <https://twitter.com/CapeCanaveralFL> From: Jeff Ratliff Sent: Monday, November 13, 2017 1:43 PM To: Todd Morley <T.Morley@cityofcapecanaveral.org> Cc: David Dickey <D.Dickey@cityofcapecanaveral.org>; Joshua Surprenant <J.Surprenant@cityofcapecanaveral.org> Subject: Force Main #3 Todd: Routes as follows: 1). Same as current route. 2). In existing easement on former USA property (deep depth at request of Hermansen). 3). In existing easement on former USA property (shallow depth). Thanks, Jeff From: Todd Morley Sent: Monday, November 13, 2017 10:16 AM To: Jeff Ratliff <J.Ratliff@cityofcapecanaveral.org <mailto:J.Ratliff@cityofcapecanaveral.org> > Cc: David Dickey <D.Dickey@cityofcapecanaveral.org <mailto:D.Dickey@cityofcapecanaveral.org> >; Joshua Surprenant <J.Surprenant@cityofcapecanaveral.org <mailto:J.Surprenant@cityofcapecanaveral.org> > Subject: RE: Cape Canaveral Master Plan - Phase 1 Jeff, Can you provide a map of the three routes? We will want to discuss with DG. Thanks, Todd <http://www.cityofcapecanaveral.org/> Launch your connection… <https://www.facebook.com/CityofCapeCanaveral> <https://www.instagram.com/cityofcapecanaveral/> <https://www.linkedin.com/company/city-of-cape-canaveral-the> <https://twitter.com/CapeCanaveralFL> From: Jeff Ratliff Sent: Monday, November 13, 2017 9:16 AM To: Todd Morley <T.Morley@cityofcapecanaveral.org <mailto:T.Morley@cityofcapecanaveral.org> > Cc: David Dickey <D.Dickey@cityofcapecanaveral.org <mailto:D.Dickey@cityofcapecanaveral.org> >; Joshua Surprenant <J.Surprenant@cityofcapecanaveral.org <mailto:J.Surprenant@cityofcapecanaveral.org> > Subject: RE: Cape Canaveral Master Plan - Phase 1 Todd: We had another issue with Force Main #3 over the weekend. We need to determine a route for the replacement force main so that we can move forward with design and installation this budget year – there are three options depending on the property owners. Thanks, Jeff From: Jeff Ratliff Sent: Thursday, November 09, 2017 11:05 AM To: Todd Morley <T.Morley@cityofcapecanaveral.org <mailto:T.Morley@cityofcapecanaveral.org> > Cc: David Dickey <D.Dickey@cityofcapecanaveral.org <mailto:D.Dickey@cityofcapecanaveral.org> >; Joshua Surprenant <J.Surprenant@cityofcapecanaveral.org <mailto:J.Surprenant@cityofcapecanaveral.org> > Subject: FW: Cape Canaveral Master Plan - Phase 1 Todd: We may want to meet about this project (see below). We have budget this year to replace the force main – a PO has already been issued for design. We can’t wait a few years for a possible traffic light/driveway. Thanks, Jeff From: Tom Hermansen [mailto:tomh@oceanpartnerscb.com] Sent: Monday, November 06, 2017 7:35 PM To: Jeff Ratliff <J.Ratliff@cityofcapecanaveral.org <mailto:J.Ratliff@cityofcapecanaveral.org> >; David Dickey <D.Dickey@cityofcapecanaveral.org <mailto:D.Dickey@cityofcapecanaveral.org> > Cc: Mary Finneran <M.Finneran@cityofcapecanaveral.org <mailto:M.Finneran@cityofcapecanaveral.org> >; Allewelt Wayne <wallewelt@maidesignbuild.com <mailto:wallewelt@maidesignbuild.com> >; Baugher Bob <bbaugher@cocoabeachsurf.com <mailto:bbaugher@cocoabeachsurf.com> >; Patrice Huffman <P.Huffman@cityofcapecanaveral.org <mailto:P.Huffman@cityofcapecanaveral.org> >; Cole Oliver <jcoliver3@gmail.com <mailto:jcoliver3@gmail.com> >; Todd Morley <T.Morley@cityofcapecanaveral.org <mailto:T.Morley@cityofcapecanaveral.org> > Subject: Re: Cape Canaveral Master Plan - Phase 1 Jeff Can we get together to discussion this request. We have been in discussions w David and Todd about jointly applying to FDOT for a light at the Thurm intersection. If we were to be successful in that attempt it would impact the location of this easement. We need to plan accordingly if any changes are required. Tom C Hermansen Managing Partner / President Ocean Partners Hospitality, LLLP c: 941-587-2808 e: TomH@oceanpartnrscb.com <mailto:HR@oceanpartnrscb.com> a: 3425 North Atlantic Ave Cocoa Beach, FL 32931 <x-apple-data-detectors://3/1> On Nov 6, 2017, at 15:41, Jeff Ratliff <J.Ratliff@cityofcapecanaveral.org <mailto:J.Ratliff@cityofcapecanaveral.org> > wrote: Tom: Please see attached. At your earliest convenience, we would also like to discuss the City easement through your property located at 8550 Astronaut Boulevard. If you recall, we expanded this easement many years ago for the future installation of Force Main No. 3. At the time, you had requested that we install the force main at least 15 feet in depth. However, we would ask that you reconsider this requirement so that the replacement force main can be installed at a depth of 4-6 feet. Installation of the force main at a depth of 15 feet or more would make any future repairs virtually impossible whereas repairs could be easily made if the force main were only 4-6 feet deep. Thanks for your consideration, Jeff Ratliff Capital Projects Director From: Tom Hermansen [mailto:tomh@oceanpartnerscb.com] Sent: Tuesday, October 17, 2017 1:42 PM To: Jeff Ratliff <J.Ratliff@cityofcapecanaveral.org <mailto:J.Ratliff@cityofcapecanaveral.org> >; Mary Finneran <M.Finneran@cityofcapecanaveral.org <mailto:M.Finneran@cityofcapecanaveral.org> > Cc: Allewelt Wayne <wallewelt@maidesignbuild.com <mailto:wallewelt@maidesignbuild.com> >; Baugher Bob <bbaugher@cocoabeachsurf.com <mailto:bbaugher@cocoabeachsurf.com> > Subject: Cape Canaveral Master Plan - Phase 1 Jeff Trying to complete the requirements for the City’s concurrency review and need the following form filled out by someone in your department. Can you please assist. The application is for Phase 1 to include 2 hotels (151 rooms each). Please call if you need any additional information to what was included in the Site Plan package. Tom C. Hermansen - President 3425 N. Atlantic Avenue | Cocoa Beach, FL 32931 Cell 941.587.2808 | Email: TomH@OceanPartnersCB.com <mailto:TomH@oceanpartnerscb.com> Ocean Partners Associates, LLLP dba Marriott Courtyard & Hampton Inn - Cocoa Beach Ocean Partners Hospitality, LLLP dba Best Western Oceanfront & Days Inn - Cocoa Beach Florida has a very broad public records law. As a result, any written communication created or received by the City of Cape Canaveral officials and employees will be made available to the public and/or media upon request, unless otherwise exempt. Under Florida Law, email addresses are public records. If you do not want your email address released in response to a public-records request, do not send electronic email to this entity. Instead, contact our office by phone or in writing Florida has a very broad public records law. As a result, any written communication created or received by the City of Cape Canaveral officials and employees will be made available to the public and/or media upon request, unless otherwise exempt. Under Florida Law, email addresses are public records. If you do not want your email address released in response to a public-records request, do not send electronic email to this entity. Instead, contact our office by phone or in writing <Radisson Master Plan.pdf> <15 FOOT EASEMENT 7-31-12.pdf> Florida has a very broad public records law. As a result, any written communication created or received by the City of Cape Canaveral officials and employees will be made available to the public and/or media upon request, unless otherwise exempt. Under Florida Law, email addresses are public records. If you do not want your email address released in response to a public-records request, do not send electronic email to this entity. Instead, contact our office by phone or in writing Florida has a very broad public records law. As a result, any written communication created or received by the City of Cape Canaveral officials and employees will be made available to the public and/or media upon request, unless otherwise exempt. Under Florida Law, email addresses are public records. If you do not want your email address released in response to a public-records request, do not send electronic email to this entity. Instead, contact our office by phone or in writing Florida has a very broad public records law. As a result, any written communication created or received by the City of Cape Canaveral officials and employees will be made available to the public and/or media upon request, unless otherwise exempt. Under Florida Law, email addresses are public records. If you do not want your email address released in response to a public-records request, do not send electronic email to this entity. Instead, contact our office by phone or in writing Florida has a very broad public records law. As a result, any written communication created or received by the City of Cape Canaveral officials and employees will be made available to the public and/or media upon request, unless otherwise exempt. Under Florida Law, email addresses are public records. If you do not want your email address released in response to a public-records request, do not send electronic email to this entity. Instead, contact our office by phone or in writing Florida has a very broad public records law. As a result, any written communication created or received by the City of Cape Canaveral officials and employees will be made available to the public and/or media upon request, unless otherwise exempt. Under Florida Law, email addresses are public records. If you do not want your email address released in response to a public-records request, do not send electronic email to this entity. Instead, contact our office by phone or in writing ꤀뎐嶤듢ꧻ彉硎뭜﫽坈괾먀꿶떥疴Ƭ�饺켚ꯗ脙⪃䧢䆯⧚퉳굠硷逴볯黗앴ᚃᘸ몦�㶵㈜蹝閾芩赛�콪ꞈ태됔礮�沽澦霨誳墯ߵ恕쥾囓ꁝ腪֪썞ꠖ❱텧둕鎃絶ﻊ⌿拉矽췮ﴶ䝪赙絧삚솕칋⏲⯂ዴ몡ዕ༓皗鑉씹㤂䄵뎆㉰๏霸搇�ᇝ譕砎暴豙纤耝⬵⣤嶸沄琥í肳肰乬⑺之䙙�[䲫흈紡轉쥢㭭嬹❝㼭ৢ㭏粭.蓭Ꞵ�䌒蚞뀬遣劗獅�擎贈搸椽脾푥갠瓮꠪㰺吇徽℺惊쳴݁⦱홂俇孢똃龓䁷x煨Е⇉鳓랥擴ꗖ팆핾隩輆コ鄅潝엫�Ṃں ꔹ啒憐ﰵ꧐괎腪֪�唂㹰䛎ꪗ蕋㰢礶럼ㅫ稑ꄢ淍泑㩇ᐺ㜈풔⚬堁뭴攃댵꿉ᆆ颺೟¢螒巆�㕥ᒉ䦊㨌̂⢻鄝鉊ꙣ㨶틯⎀⩐ꉲﱚ荄鎬ᕫ〥⋱䀝岖洴䄙⽣Ⲡ썵㑂쳓⥧旨䈬ꌖⶓÝ戜ຘጹ᜾Ꞑ壘넃햼됞쳾ᬉ೫￸ⓨ❏妧䡖者ꞵ帱꺾떀른ᩑ郓ẓ땔䠮档㯞삎䲊㐺鲳ꊟ㵖탳ࠤ䘠㓢﯇仁Τ鋌쿧㏰靁Ⲭ丳ꥲ갏ิ鼬�滎貿칐צ徘틼䆷襵֪ᚪ媨뗠腥㠪푼뽐텼㝷綔㸷ꎘ횆윤㺌蘆◣雭紺䅎䚵먭配ٱଵ祸枴ᵖ湵沕쟃힥㢩튃⍰㢌獈洔ŀ쒤Ჿ烡狱킅븥 碣ˁ쉐黄딮�钱⡢亀뻲ᄞ惲劜낮疗믈툒逖甔⅋殃刉淁乙凗ଝ匴嗢⮸폸ꊲ뀃㱎ǜॣ㬵幀絡닋�䖒컴퀜鏗㮀殹⁩㑙鐣՝ꉔ꣐�㔸틒䅻ﱚ੒싅ᩂ椫ᣯ뇭ྒʛ涯똓”ℬ錋칼썐ꚓЊ᎒﹔ꮃ㺂冿ᇾ╻綄㑔廙㝛留唴吋倭삵뗋ᕀ놜礘恦㫔닓斬�徚콴ᑓý縴幷ꨨ嫖캥浒劵ㅒლ䬊耸嘢�֤霈棨镦颋�⡆筈뙖ꎝਸ⹢꽊⎡䬁滫␏孤빮礕㑫让涄ᴭ皞昼ꆩ槆黗蒵薭☀뎞闤ﲅ㼥ぁ䩌꒧䥌鎾드喴쓔冷붧ꝥ壮굣甎䈻ภ㬖꿀惝锉䁗輪遼뽞覦칣畖� 酙╗걿騁丱봳趝欲曀댅麖፭⡁ꡛ憇珞齍陧á窄㶎氍揢⹼뵡ዱ鞱㒑沬朋薼㏦孯맦팝ீ缰ᱱ뼰毜몿핼唂吋떚ᕀ鶜卓菃�糽㥫㨺ꉡ啼譔卛苪詥㉜峀틧ℂ扡췈ད뙵ᄎ흌䬝ᙘ溰ډ⎆佡嵭໌Ꙏ畭⑨襋ŕᛰ᜶ᩂ羽돔វಡﰁ碂㒍郇귀 힉ࣩ゗ᴢ痲岈흒ቛ嬗惈䝬�쨂ѡ䉊裼⸧ꣀꛫ⬅ᨫໞ㪦콩様禉薌㶭Ŭ嵕㕧랍绎捤럎䮎촼盪崀㥿�㘕ᶙ峧앻㋂碯닔$遬瞛磃팯틂ꛙ�뤡鸹卡⊏㋸穁붠僎麗囮첧襮︅ⶎ৞㬨ꯪ腪֪ᚪ͸ꁚ츊䧎쾥릨黵஧骉䬮꣍꫋묳 軄ྨႫⲠ劥熨ᕙ䒜厥쇰慆ꗋꙆ함全峾稬䅢ᢀᧀ⬘無ꡩ㍥橜僟ꚑဘ࢟蜼▽᪒钘噒줥ᥦ䥆갃጖葱鶾㟰◈譿⩗⯽튜ℤ酋♿⳧⥀陒楺힀쐥ꎰ⫀ଟੈ㩊褓냩ີ㮋쨋ᔗ뭏턂䰕䁶퇘盷攼啡䉗틠덶⺲잕郚ᑺ―×䯏町쀹铮쥮穂㨸뜜蠨ﰡꗄ衱꫘욡靐㌬觔쭝䷚녴쨃뱷唡倭䂵˕뇏鯀鰞椉舋亶ⱦ홵鳜菺暥甹빵큨虋뱗읗煴䶺澉⣚ࢭ﭅庚몄ꨴ솹넕뭑꼒꯳�⚤ꗚ槪�퀈Ử䴒쁮뀖ꔚ䠔ퟂ욐둄Ⓞ痕鋍烪炴䮵šﬦ膔䁁멎㥠鵽䉍軫頪삄鰥㴭ꞓ忛틪प 㭳딾ꈊԞꏌ窨㹼㩺嵤封ﰍ힌煡᛫业ဓ济㓲쬘亇嚙긅乵姚�쬱擱嬉≏駉늑爴㻏傤≛Ʂ쵸㮓਽합燛꾹ꕡꮧ폪檫ꪁ�ᘬ퍸㎃稧鸶㗛皛埥᧯晐捗뵁哧亥㜭ﱇ뽙巇잓⎭鲒ꚇꊔ뚎�⚉ 碟凑䖺䎠ㄒ聮怜扆႒鋮띎꒚웭哸戎侙母፵▦贷쩘畔葡H沧⦥삆낯֠䖌䮅攼㆚뉩뚞쏅럦飶贃㺥쉚뫘諬ở�瓧ꣀꚼ᳟뚇䅇銸陏鼥ᑏᣓ煚⭱Ⱥ뱏殺뫍ጒ⨸ꉨ峷雱驥ॐ殙鳯쩍䷱鴩充懗㯳꫼鐥탎鎶穧涟瞯户⤅憎ꀚ륦ꬡ姇䂵˕୕ֈ풬䀉ﯛ륿늃粤嵊穾怙鈎왧듿魕場尀ꡲ൦챀ᘊ囱誑휬೸ꆳ꿆툲凮䤌奚䝀⠤ꀂ�竹㊟똓Ὺ↢塃�甮Ѡ㜆㻅끓▏䵄ࠇ�萮᱈흟懶찶䡥╒勱砅軱꒵깾굸⌬鵒꟒௙㬰냩ն罠〭뱖䵠ꬬꖄꔵ㩬履階᎗ 횪㌴놭甭ዋ險漚峹髀㺰�醍橲靅婙櫐⮬헵芇공ᷴ∑㨚幎ⷍ꩙倮䂵˕䁯밋솩ʹ꬀鉶�Ꞵ藕蘧㟈汻�ਲ਼壨骐泚த䚥쮏邌㹺ᓒ䞡퓪킲倀撆安絪直꣎쏽俔ﲹ躪뀰쁸뗍�뛜鬚爐찘뱣煩媦㦨ដ⡉੼ዱкᶜᛀ姯签뾤הּ䙼◷自㮧㥜句㷢ꔻ虚쬰帪ᵶ횒껳�ᙔ맒७㭞椁�ᴡ撢丣⥷侩綖蘒跗鰽央㬲暐礝嵈袶낞ᮌ峦譿⌿趓꟭凌嵭従ꬿڑ쫐悜ރ姸欁ા濊߀ꪐꠖ姥䷠츍闢퀁笵쮆㦪噖姯凮㕍狮频�馧堬薃쥂፛열绂쿓뮇蘽합䰆㩟䡗ꐀᆵ쫢 ꘐ擱◉ⲋວ̯ᖥ푀囥򐈐襴�쭪㚪䙘҈♀鴧䒧ᱨ牖ை䯁⸃梹옍黩ᫌ⤒⊝⯈戡ꊭⲅ邨쒴ᔹ颲㭮�衖Ⅱ原ⵃ᫩Ḵ﴿ꑞ礲﨣ꋟⷻ벯Ҁ鸧嬼왴翁爹䗭◶痡㜑砑ꐦ쒎䶶霕鿴걦㋮⛭즭᫦貕㲅컛햙蕍꺃裻㝢狠裟ꛄ犴劔茶慳篳梻붭䮼몸해唂吋돆鯀䇶ဈ뇠鎩犧駅ᆍ絛泼鵓⬺Ꙓ폛빸蹘⟢헖밆뚿┼隩乚얛洲뜢핃뙾ⱘ욮ᰢ�Ğ歼㷈䬥ŭ짜鹴虶핅蓕㵗➁砊껍頇꘳䧚㔦媁쁘ꉟ説탞鼬��᠋懲䆗䠫裱쯅䀖젶쭥툢쫩륏�厔˱틌駟̵忒�ɘዎ霦Ⱳ┉ ꔻ镙ᚆ귀ᗞ৻糸♉㸇톰㣃壛䬈ଔ芅髥랤鶴�ꂥ໏혴ⷑ脓ꢖ咯곮᝷⋪胦镥貎ᕎⵙ뜑ፑ歷䳋舩뀏䈱⫖俊湒ꮣ뺯탦쀤糬斦ꬷ鯒뱯䳧裵ᚪ媨无୍�诉옆鉻틩姬䬃�↝ி훧ⳛ榗朶嵹◮迤팙炮䀍㰜騰�碍曕䠷宬롂倢聒匮沷呸傂⓶䅵뮚芚鿸宔⽑䈴甝�廄㎀Ⱆ응厛옇ᙘ篗嵆눉兘䎷棬덴薌⬧檡쾓䁌ࢱ뾵�醪隦焆୬瓆ⴖꥯᙻ櫝绱㹃栁俺�ᘅﭱ幼留ꄡ⬫䁟뫃ឰ톙唀텢ꃚ㡫爚ꐏ嚳ㆠ諪淍퓶ⱱ北높╱噋㺩㈜樻牼咭覑蹻滟秆࿗绀 律쒄헺銴쯗䲼讫ⵗ땐핀漂ମ馼駁꼌姺頉滝褟勑ѡ딯挈謺ᕂꅾ脚晙逋Ⲽ뺫ᡬ퐗ﱆî渴ဓҦ䂨뜔鞈ሜ厲ဨ翦╓肋뼪㦋꪿忇螬阐䯅撶逻벹ꝸ璕�䠀ūꋒ埩暋〠墂黉듾�쐙숩秣㲫퍅몫輚ራ똰䷸㦣倆亊�⚭蔲ò䣝ٹ眘녳狕設湤᯦숥龄逽ﲄ홦ሑﻳ漭➢�둝녽膘ɝ띸ह펔팶퀝㐮玤ꯇ茵䛼䔂赑᫬栖ﲮ푈㏛ꈝ獾䛝ꏕ媭檠ꪁ帅୙榼姁ꥂែ섊�둟ﻌ녲㲸�ܨ묭蛜ꖎ쾑䭙꽁䐴ଧጢꊞ첺퐍㜢㰅鏮鲤降ٓ墢딂�峤Ƌ㶏㇪㔽㳳됮唪ࣶ硫㸃ၯ맯䄁朗 ↙夀뗲誦艅롸塈瓚⊽涊챺ྪ殹㋞㷛ᵱﯰלּ죩ᄴᥰ䂵�ऴ䭤�鞸⣷㆛敖ㅂ筓ᮉ뭋ⷋ♼雒볭엟粏囶㙾돳겒8篌㖀劉࿷譣ꎗⵉ穯炉땕핀唂吋槿㞁㠭�ᄨ㷘샸鎏ﶏ繳�熆州穤๏嵸즳輭쨑⟮瀓魶⾮姡ﻍ缅⒟崡�䢁䀸뛚嗴儈ᅠᨡ쳲㭇픺䯸뜮닡ຂᩐႵ䦩撂寕ረ癎㫻ڐʝ뿽磂峓瘗ঝ㻀﯌胞䷋㡈〇⢿쥦铋婎긂욤譕뷳ႛ霏描뽸�聪�◻宷⼍翿㣞헕ᚫ媨檠垁˓橯鹰…訑槝盙�὚�ğ㏁抭ᚱ깽�̢픍⪐璢碡ꥹ੔퉑뒔旲�ၦ㪷 笄όﮠ꭫⵬㏆薝뵋䔇漭ᐤ⑪鲴駴疞䃔ö譵냘௟驀퉷凟싂盧ꏁ뷕箈뷹顗볋⊧艫䝷졢y⬧엯䶛�䅗헹鮼�媮檠ꪁ帅ଡꦼ療ᬸ삎恵㓠萝垝嶻럮誔ꓖ뱅㸛ⵖ뽒換將쀒ᾝᚂ烮Ғ仵㒺ꄟ㓋鉔畼ḧ㝹妪䵻ᷓ頃䎗ꌤ�馸䭖닏꓃ꐫ짹࿾ᬢE엚ᗷ탕垌匷䂵˕୕ⵔ髰삷׿溜�頰б