HomeMy WebLinkAboutFW SR A1A (8)Bob,
FYI –
Todd
<http://www.cityofcapecanaveral.org/>
Launch your connection…
<https://www.facebook.com/CityofCapeCanaveral>
<https://www.instagram.com/cityofcapecanaveral/>
<https://www.linkedin.com/company/city-of-cape-canaveral-the>
<https://twitter.com/CapeCanaveralFL>
From: Sanders, Michael [mailto:Michael.Sanders@dot.state.fl.us]
Sent: Thursday, September 28, 2017 1:54 PM
To: Gillette, Georganna <Georganna.Gillette@brevardfl.gov>
Cc: Taylor, Janna <Janna.Taylor@dot.state.fl.us>; Todd Morley
<T.Morley@cityofcapecanaveral.org>; Pamulapati, Suraj
<Suraj.Pamulapati@dot.state.fl.us>; Hassan, Mo
<Mo.Hassan@dot.state.fl.us>
Subject: RE: SR A1A
Georganna:
First let me apologize for the delay if this was in our court for a
response. If I understand, the proposal is to realign the existing
driveway on the east side of SR A1A to create a plus intersection with
Thurm Blvd and install a traffic signal. The proposed improvements are
to support proposed/approved development at the intersection.
The good news is that the spacing of this intersection would appear to
be a location where signalization could be pursued, although it is just
short of our signal spacing standards of ¼-mile. A signal warrant
analysis would need to be completed showing that the existing and/or
proposed level of demand meets signal warrant thresholds. The driveway
on the east side of the roadway appears to be a private connection,
therefore the realignment would need to be completed by permit. Also, if
private development is creating the need for signalization, the
developer(s) are normally responsible for the cost of design and
installation. Moving forward, the next step would appear to be for the
property owners to schedule a meeting with our local operations unit to
discuss permitting requirements.
Sincerely,
Michael Sanders, P.E.
Assistant District Traffic Operations Engineer
District Five
Florida Department of Transportation
719 S Woodland Blvd
DeLand FL 32720
386-943-5339
From: Gillette, Georganna [mailto:Georganna.Gillette@brevardfl.gov]
Sent: Wednesday, September 27, 2017 3:31 PM
To: Sanders, Michael
Cc: Taylor, Janna; t.morley@cityofcapecanaveral.org
<mailto:t.morley@cityofcapecanaveral.org>
Subject: FW: SR A1A
Importance: High
Hi Michael!
Is there someone in your group taking a look at this proposal / concept
for a signal and realignment at A1A and Thurm Blvd for the City of Cape
Canaveral? We think it would improve traffic movement, but I’m not
completely sure of all the approvals that it would need to go through.
Any guidance would be much appreciated.
From: Todd Morley [mailto:T.Morley@cityofcapecanaveral.org]
Sent: Monday, September 25, 2017 11:14 AM
To: Gillette, Georganna
Subject: FW: SR A1A
Good morning Georganna,
Can you take a look at the attached concept and give some guidance on
how we could proceed?
We are interested in a potential lighted intersection and alignment
project at Thurm Blvd.
Thanks,
Todd
<http://www.cityofcapecanaveral.org/>
Launch your connection…
<https://www.facebook.com/CityofCapeCanaveral>
<https://www.instagram.com/cityofcapecanaveral/>
<https://www.linkedin.com/company/city-of-cape-canaveral-the>
<https://twitter.com/CapeCanaveralFL>
From: Davis, Todd [mailto:Todd.Davis@dot.state.fl.us]
Sent: Saturday, July 08, 2017 12:48 PM
To: Todd Morley <T.Morley@cityofcapecanaveral.org
<mailto:T.Morley@cityofcapecanaveral.org> >
Subject: Re: SR A1A
Good afternoon Todd!
I apologize for the delay in response, as I am transitioning out as
in-house consultant and back to my company.
However, regarding your request, I have forwarded the email to Traffic
Operations for their review. As it would be an operations review, rather
than planning.
In the future, it would be beneficial to include Heather Garcia
(heather.garcia@dot.state.fl.us <mailto:heather.garcia@dot.state.fl.us>
) and Mike Sanders (michael.sanders@dot.state.fl.us
<mailto:michael.sanders@dot.state.fl.us> ) on future
emails/correspondence. You could also email me directly at
tsdavis@vhb.com <mailto:tsdavis@vhb.com> , as these emails go directly
to my phone. Including these email addresses would eliminate any future
delays in response.
I hope you have a great weekend and will let you know what I hear back
from Traffic Ops.
Lastly, I will be out this week on vacation; however will have Mike
forward you any questions/comments if they may arise.
Todd Davis
________________________________
From: Todd Morley <T.Morley@cityofcapecanaveral.org
<mailto:T.Morley@cityofcapecanaveral.org> >
Sent: Tuesday, June 27, 2017 2:19:54 PM
To: Davis, Todd
Subject: RE: SR A1A
Hi Todd,
I wanted to circle back with you about the proposed lighted
intersection at Thurm Blvd. and A1A.
Hopefully this can shed a little more light on the matter.
The draft plan is attached.
Please see marked up version below.
All properties are zoned C1 Commercial.
There are two principal owners involved in this initiative: Bob Baugher
and Tom Hermansen. Both are in support of the traffic light.
* Property A:
o Address: 8600 Astronaut Blvd.
o Owner: Astronaut Properties c/o Bob Baugher.
o Lot size: 5.51 acres
o Building size: 64,000 sf.
o Use: Single tenant office building. Currently under refurbishment
for a new tenant.
o Tenant: Comprehensive Health Services (CHS). They will be moving
into their corporate headquarters into the building later this year.
400+ employees.
o Notes: The existing driveway connection to SR A1A would be closed.
A new driveway, to align with Thurm Blvd., would be constructed on
Property B.
* Property B:
o Address: 8550 Astronaut Blvd.
o Owner: Cape Canaveral Joint Venture c/o Tom Hermansen
o Lot size: 12.44 acres
o Building size: 161,000 sf.
o Use: Vacant. Recently used for light manufacturing. The owner
intends to split up into 2 to 4 sections and lease to different tenants
o Notes:
* A new driveway, to align with Thurm Blvd. would be constructed on
this property.
* If a light was installed, owner would seek to develop an outparcel
for a small national/regional chain restaurant on the southeast corner
* Property C:
o Address: 8701 Astronaut Blvd. There are a total of 9 contiguous
parcels, collectively addressed. All are bound by a Development
Agreement with the City of Cape Canaveral as a Port of Call Facility.
o Owners: Astronaut Properties c/o Bob Baugher, Cocoa Beach Motel c/o
Bob Baugher and Robert A. Baugher, Trustee
o Lot Size: approx 20 acres.
o Building Size: Multiple buildings
o Use: Port of Call Facility including Radisson Hotel and Convention
Center.
o Notes: Owner has developed draft plans for up to two additional
hotels on the south side of the Radisson, as well as one or two out
parcels for national/regional tenants on the northwest corner of the
intersection.
We believe a lighted intersection at this location could facilitate
better/safer traffic movement especially considering the increased
traffic flows from the coming CHS workforce and two additional hotels.
Additionally there could be a considerable amount of new commercial
investment along the corridor.
The owners and I will be available to discuss the proposal with FDOT
when appropriate.
Thanks,
Todd
<http://www.cityofcapecanaveral.org/>
Launch your connection…
<https://www.facebook.com/CityofCapeCanaveral>
<https://www.instagram.com/cityofcapecanaveral/>
<https://www.linkedin.com/company/city-of-cape-canaveral-the>
<https://twitter.com/CapeCanaveralFL>
From: Davis, Todd [mailto:Todd.Davis@dot.state.fl.us]
Sent: Thursday, June 01, 2017 8:51 AM
To: Todd Morley <T.Morley@cityofcapecanaveral.org
<mailto:T.Morley@cityofcapecanaveral.org> >
Subject: Re: SR A1A
Good morning Todd!
I just wanted to follow-up with you regarding your below request and
apologize for the delay in response.
Here's what Traffic Ops mentioned:
Do you have the location or the preliminary design plan mentioned? What
type of study is being requested, a SWA or safety study? If they could
provide a little more info, I could offer if it’s something we would
evaluate or if the city should submit by permit.
The gentleman I have been coordinating with is Mike Sanders of the FDOT
D5 Traffic Operations unit.
Thanks,
Todd Davis
________________________________
From: Todd Morley <T.Morley@cityofcapecanaveral.org
<mailto:T.Morley@cityofcapecanaveral.org> >
Sent: Tuesday, May 9, 2017 10:28:55 AM
To: Davis, Todd
Subject: RE: SR A1A
Good morning Todd,
We have received some preliminary private design work for a new
signalized intersection on S.R. A1A in Cape Canaveral. It would combine
two off-intersection A1A access points on the east side of the roadway
into one access point, aligned at the new signalized intersection.
We support it and would like it to be reviewed and approved by FDOT.
I spoke with Bob Kamm at the SCTPO yesterday and he suggested that I
have the City Manager make a request that FDOT perform a Safety Study.
Can you give me any guidance?
Thanks!
Todd
<http://www.cityofcapecanaveral.org/>
Launch your connection…
<https://www.facebook.com/CityofCapeCanaveral>
<https://www.instagram.com/cityofcapecanaveral/>
<https://www.linkedin.com/company/city-of-cape-canaveral-the>
<https://twitter.com/CapeCanaveralFL>
From: Davis, Todd [mailto:Todd.Davis@dot.state.fl.us]
Sent: Tuesday, August 30, 2016 3:40 PM
To: Todd Morley <T.Morley@cityofcapecanaveral.org
<mailto:T.Morley@cityofcapecanaveral.org> >
Subject: SR A1A
Good afternoon Todd,
I know we have spoken in the past regarding the SR A1A corridor study
and the City’s concerns, but wanted to touch base again and see if there
were any outstanding issues.
I previously coordinated with the Traffic Operations unit a while back
and know some spot speed studies were performed (which I have attached).
However, when I was going through my emails and notes, I was not sure if
I forwarded to you or if you received them from someone else at the
Department. I know you mentioned your main concern was the speed limit
and did not need a formal response, but didn’t know if you received the
attached documents.
Please take a look at them and let me know if you have any questions
and / or comments that I can pass along to the Traffic Operations unit.
Also, please let me know if there are any outstanding concerns the City
may have. The corridor study was completed at the beginning of the year,
but just wanted to circle back with you.
Thanks,
Todd Davis, P.E.
Planning & Corridor Development Project Manager
Vanasse Hangen Brustlin, Inc. (VHB)
In-House Consultant for FDOT – District 5
Phone: 386.943.5422
todd.davis@dot.state.fl.us <mailto:todd.davis@dot.state.fl.us>
Florida has a very broad public records law. As a result, any written
communication created or received by the City of Cape Canaveral
officials and employees will be made available to the public and/or
media upon request, unless otherwise exempt. Under Florida Law, email
addresses are public records. If you do not want your email address
released in response to a public-records request, do not send electronic
email to this entity. Instead, contact our office by phone or in writing
Florida has a very broad public records law. As a result, any written
communication created or received by the City of Cape Canaveral
officials and employees will be made available to the public and/or
media upon request, unless otherwise exempt. Under Florida Law, email
addresses are public records. If you do not want your email address
released in response to a public-records request, do not send electronic
email to this entity. Instead, contact our office by phone or in writing
ﭧ䰿褭㹮닜ࣉ嫬匴퇇皍儔ᑅ䕑儔ᑅ䕑儔ᑅ䕑儔ᑅ䕑儔ᑅ䕑儔ᑅ䕑儔ᑅ䕑儔ᑅ䕑儔ᑅ䕑儔ᑅ䕑儔ᑅ䕑儔ᑅ䕑儔ᑅ䕑儔ᑅ䕑儔ᑅ䕑儔ᑅ䕑儔ᑅ䕑儔ᑅ䕑儔ᑅ䕑儔ᑅ䕑儔ᑅ䕑儔ᑅ䕑儔ᑅ䕑儔ᑅ䕑儔ᑅ䕑儔ᑅ䕑儔ᑅ䕑儔ᑅ䕑儔ᑅ䕑儔ᑅ䕑儔ᑅ䕑儔ᑅ䕑儔ᑅ䕑儔ᑅ�⢊誢ꈨ⢊誢ꈨ玌⢚誢ㄩ珎䕋儔ᑅ䕑儔ᑅ䁑ꈘ⢊誢ꈨ⢊誢ᑅ䕑儔ᑅ�᮹輌窉ࣖ�矛뗾凗ᑅ䕑儔ᑅ䕑儔ᑅ䕑儔ᑅ䕑儔ⅅᣏ됴䕑儔ᑅ䕑㽱搑䨊㲂징Խ᩵荣٬ꭹᒹ̖꒩뻞�瘰蚧봇蜛➭鮘㴙㨅ₓ誌
䤳䙋굇昔⢊邢稐搚ᗎ䴎�㎊݅諚젨㒣䕑儔ᑅ䕑儔ᑅ䕑儔ᑅ䕑儔ᑅ�⢊誢꘨었뉐犡⠺俆凧쵙씵䦲ꬽ죚쑺곬䝒叫䗑儔ᑅ䕑儔ᑅ䕑儔ᑅ䕑儔⍅퍽㹟顸ꃆ�ⷑ煀ᮞ�외⸝魛﹇违홉ఢ酠�묝劁䝰렂糈⹏ꦡ睨콗ⴎ鷦려ﶏﵛ䛎娳ᢾ獽ዄ㟫ÿ鱪盹챖磸緐仯蹛떣﵅鲝씰褿Ⅲ�剔麧ꦇ沯辑䪒꿵ﲓ굝睋ৢ략誽㿆液