HomeMy WebLinkAboutRE Cape Canaveral Hotel Improvements (18)Jean, As discussed earlier this week, see the attached RAI / Comment letter for your use and action in follow up. Thank you, Bill <http://www.portcanaveral.com> Bill Crowe, P.E. Senior Director - Facilities, Construction & Engineering Tel: (321) 783-7831 Ext. 208 bcrowe@portcanaveral.com <mailto:bcrowe@portcanaveral.com> | www.portcanaveral.com <http://www.portcanaveral.com> Canaveral Port Authority | 445 Challenger Road | Cape Canaveral | FL | 32920 <http://www.facebook.com/portcanaveral> <http://www.twitter.com/canaveralport> <https://www.linkedin.com/company/canaveral-port-authority> From: Jean Abi-Aoun [mailto:JAbiAoun@feg-inc.us] Sent: Wednesday, March 1, 2017 3:10 PM To: Bill Crowe, P.E. Cc: Daniel Esden; Todd Morley; Craig Langley; Robert Musser; Greg Crawford; Laila Witwicky Subject: RE: Cape Canaveral Hotel Improvements Bill Thank you for your response. I look forward to hear from you on our pre-app meeting. Jean Abi-Aoun, P.E., Vice President, LEED® AP 5127 S. Orange Avenue, Suite 200 Orlando, Florida 32809 Phone: (407) 895-0324 Fax: (407) 895-0325 Email:jabiaoun@feg-inc.us <mailto:fjabiaoun@feg-inc.us> Web: http://www.feg-inc.us <mailto:fjabiaoun@feg-inc.us> Disclaimer - All data transmitted with this e-mail is the sole property of Florida Engineering Group, Inc. (FEG) and is transmitted to you for your convenience. By using data transmitted with this e-mail, you assume all liability resulting from its use and release FEG from any liability of any nature whether expressed or implied. You are advised to check the transmitted data for virus prior to its use. <mailto:fjabiaoun@feg-inc.us> From: Bill Crowe, P.E. [mailto:bcrowe@portcanaveral.com] Sent: Wednesday, March 01, 2017 2:58 PM To: Jean Abi-Aoun <JAbiAoun@feg-inc.us> Cc: Daniel Esden <Desden@danielcorporation.com>; Todd Morley <T.Morley@cityofcapecanaveral.org>; Craig Langley <clangley@portcanaveral.com>; Robert Musser <bmusser@portcanaveral.com>; Greg Crawford <GCrawford@feg-inc.us>; Laila Witwicky <lwitwicky@danielcorporation.com> Subject: RE: Cape Canaveral Hotel Improvements Good afternoon Mr. Abi-Aoun: We are in receipt of your design documents as requested and your projected has been entered in the queue for design review. A pre application meeting will be scheduled with applicable CPA departments in the coming week or two; the Engineering Dept admin will work with you to coordinate an acceptable time for this meeting. This meeting will be preliminary in nature and will be an opportunity for various port stake holders to gain a better understanding of the planned development. As has been communicated previously, we are in the process completing a potable water and traffic capacity study for the south side of the Port from SR-A1A to Jetty Park along existing George King Blvd. These modeling efforts will incorporate planned future expansion at the Port to determine the baseline for available capacity. The draft results of the potable water study are expected in mid to late April 2017 and the draft results of the traffic study are expected in mid May. The potential impacts of the proposed development will be evaluated and defined in these studies. The Port Authority’s concurrence regarding certain aspects of the development that impact the Port will be based on reasonable confirmation of the impacts. Please stand by for scheduling of the pre application meeting. Thank you, Bill <http://www.portcanaveral.com> Bill Crowe, P.E. Senior Director - Facilities, Construction & Engineering Tel: (321) 783-7831 Ext. 208 bcrowe@portcanaveral.com <mailto:bcrowe@portcanaveral.com> | www.portcanaveral.com <http://www.portcanaveral.com> Canaveral Port Authority | 445 Challenger Road | Cape Canaveral | FL | 32920 <http://www.facebook.com/portcanaveral> <http://www.twitter.com/canaveralport> <https://www.linkedin.com/company/canaveral-port-authority> Under Florida Statute 668.6076, electronic mail addresses are public records. If you do not want your electronic mail address released in response to a public records request as provided in Florida Statute 119, do not send electronic mail to this entity. Instead, contact this office by telephone or in writing. This electronic mail contains information which may be privileged, confidential, or otherwise protected from disclosure. It is intended only for the individual(s) named. If you are not an addressee; any disclosure, copy, distribution, or use of the contents of this electronic mail is prohibited. If you have received this electronic mail in error, please notify the sender by reply electronic mail or at the telephone number listed above and destroy the original message and all copies.Rev.100507a From: Jean Abi-Aoun [mailto:JAbiAoun@feg-inc.us] Sent: Wednesday, March 1, 2017 1:31 PM To: Bill Crowe, P.E. Cc: Daniel Esden; Todd Morley; Craig Langley; Robert Musser; Greg Crawford; Laila Witwicky Subject: RE: Cape Canaveral Hotel Improvements Bill I am following up on my email from February 24. Since I did not hear from you about our meeting today, please let me know if we can meet this Friday. Thanks Jean Abi-Aoun, P.E., Vice President, LEED® AP 5127 S. Orange Avenue, Suite 200 Orlando, Florida 32809 Phone: (407) 895-0324 Fax: (407) 895-0325 Email:jabiaoun@feg-inc.us <mailto:fjabiaoun@feg-inc.us> Web: http://www.feg-inc.us <mailto:fjabiaoun@feg-inc.us> Disclaimer - All data transmitted with this e-mail is the sole property of Florida Engineering Group, Inc. (FEG) and is transmitted to you for your convenience. By using data transmitted with this e-mail, you assume all liability resulting from its use and release FEG from any liability of any nature whether expressed or implied. You are advised to check the transmitted data for virus prior to its use. <mailto:fjabiaoun@feg-inc.us> From: Jean Abi-Aoun Sent: Friday, February 24, 2017 11:09 AM To: 'Bill Crowe, P.E.' <bcrowe@portcanaveral.com <mailto:bcrowe@portcanaveral.com> > Cc: 'Daniel Esden' <Desden@danielcorporation.com <mailto:Desden@danielcorporation.com> >; 'Todd Morley' <T.Morley@cityofcapecanaveral.org <mailto:T.Morley@cityofcapecanaveral.org> >; 'Craig Langley' <clangley@portcanaveral.com <mailto:clangley@portcanaveral.com> >; 'Robert Musser' <bmusser@portcanaveral.com <mailto:bmusser@portcanaveral.com> >; Greg Crawford <GCrawford@feg-inc.us <mailto:GCrawford@feg-inc.us> >; 'Laila Witwicky' <lwitwicky@danielcorporation.com <mailto:lwitwicky@danielcorporation.com> > Subject: RE: Cape Canaveral Hotel Improvements Hi Bill; As a follow up to my voice message, I wanted to check on the review status of our project and find out if we can meet on Wednesday of next week. I am open at any time if this works for you. If not please let me know what would be convenient for you. I appreciate your prompt attention to this matter. Sincerely Jean Abi-Aoun, P.E., Vice President, LEED® AP 5127 S. Orange Avenue, Suite 200 Orlando, Florida 32809 Phone: (407) 895-0324 Fax: (407) 895-0325 Email:jabiaoun@feg-inc.us <mailto:fjabiaoun@feg-inc.us> Web: http://www.feg-inc.us <mailto:fjabiaoun@feg-inc.us> Disclaimer - All data transmitted with this e-mail is the sole property of Florida Engineering Group, Inc. (FEG) and is transmitted to you for your convenience. By using data transmitted with this e-mail, you assume all liability resulting from its use and release FEG from any liability of any nature whether expressed or implied. You are advised to check the transmitted data for virus prior to its use. <mailto:fjabiaoun@feg-inc.us> From: Jean Abi-Aoun Sent: Wednesday, February 22, 2017 7:11 PM To: 'Bill Crowe, P.E.' <bcrowe@portcanaveral.com <mailto:bcrowe@portcanaveral.com> > Cc: Daniel Esden <Desden@danielcorporation.com <mailto:Desden@danielcorporation.com> >; Todd Morley <T.Morley@cityofcapecanaveral.org <mailto:T.Morley@cityofcapecanaveral.org> >; Craig Langley <clangley@portcanaveral.com <mailto:clangley@portcanaveral.com> >; Robert Musser <bmusser@portcanaveral.com <mailto:bmusser@portcanaveral.com> >; Greg Crawford <GCrawford@feg-inc.us <mailto:GCrawford@feg-inc.us> >; 'Laila Witwicky' <lwitwicky@danielcorporation.com <mailto:lwitwicky@danielcorporation.com> > Subject: RE: Cape Canaveral Hotel Improvements Hi Bill; Per your request, I have enclosed a package that entails a narrative of the proposed improvements, Site Geometry Plan, Paving and Drainage Plan and a Utility Plan. I have also enclosed a copy of the traffic study which we have performed for this project. The enclosed information should prove helpful in clarifying the items you have raised in your email below. As far as the traffic results, the traffic generated from our hotel project does not require any offsite improvements. With respect to the utilities both the City of Cape Canaveral, who is the reclaim and sewer utility provider, and the City of Cocoa, who is the water utility provider, have indicated they have the capacity to serve our project. As a clarification to the proposed water line extension along Columbia Road, the proposed 12 inch main extension will be a public main owned by City of Cocoa and it will become a private line downstream of the double detector check valve at our property boundary. My understanding from communicating with the City of Cocoa that the City owns the water system and has a blanket easement covering the Canaveral Port Authority property. Bill, I would greatly appreciate it, if you can review the enclosed information as soon as possible and if you like for us to meet with you to provide you with additional information or clarification we will be more than happy to do so in order to keep our zoning application moving forward with the City. I look forward to hearing from you. Regards Jean Abi-Aoun, P.E., Vice President, LEED® AP 5127 S. Orange Avenue, Suite 200 Orlando, Florida 32809 Phone: (407) 895-0324 Fax: (407) 895-0325 Email:jabiaoun@feg-inc.us <mailto:fjabiaoun@feg-inc.us> Web: http://www.feg-inc.us <mailto:fjabiaoun@feg-inc.us> Disclaimer - All data transmitted with this e-mail is the sole property of Florida Engineering Group, Inc. (FEG) and is transmitted to you for your convenience. By using data transmitted with this e-mail, you assume all liability resulting from its use and release FEG from any liability of any nature whether expressed or implied. You are advised to check the transmitted data for virus prior to its use. <mailto:fjabiaoun@feg-inc.us> From: Bill Crowe, P.E. [mailto:bcrowe@portcanaveral.com] Sent: Tuesday, November 29, 2016 10:35 AM To: Jean Abi-Aoun <JAbiAoun@feg-inc.us <mailto:JAbiAoun@feg-inc.us> > Cc: Daniel Esden <Desden@danielcorporation.com <mailto:Desden@danielcorporation.com> >; Todd Morley <T.Morley@cityofcapecanaveral.org <mailto:T.Morley@cityofcapecanaveral.org> >; Craig Langley <clangley@portcanaveral.com <mailto:clangley@portcanaveral.com> >; Robert Musser <bmusser@portcanaveral.com <mailto:bmusser@portcanaveral.com> > Subject: RE: Cape Canaveral Hotel - Water Line Extension Mr. Abi-Aoun, Thank you for your inquiry. Per your email below, I understand that a proposed hotel development wishes to tie in to utility infrastructure on or through CPA-owned property. I am aware that the subject parcel on which the hotel development is proposed currently holds access rights to Port property; however, to my knowledge this access does not currently extend rights for utility service. The design engineer of record shall submit the following documents in order to review the traffic impacts for a driveway connection permit: * Overall project site plan * Written narrative of the development * Detailed design plans of the proposed driveway connection and all improvements contemplated on Port property * If stormwater facilities are planned on Port-owned lands; proof of SJRWMD or FDEP Concurrence is required * Trip generation report inclusive of narrative Based on the nature of this development, the requirement for the following “off site” improvements will be evaluated by CPA. If required, the design and implementation of such improvements will be the responsibility of the developer: * Improvement / widening of Columbia Drive from the point of connection to George King Blvd. inclusive of a dedicated turn lane where required and a pedestrian walkway * Resulting modifications to the signalized intersection at Columbia Drive and George King Blvd * Emergency only signalization at the existing CFR fire station on Columbia Drive The developer should be aware that the adjacent CFR facility contains an active vessel and vertical structure fire-fighting trainer facility. When activated, the live fire from this facility will produce wafting smoke that, depending on prevailing winds, may not be contained within the property limits. The on-Port potable water supply network is currently being evaluated with respect to the port-wide Master plan update which has, in-turn, identified several significant projects involving the need for potable water supply. At this time, the use of Port-constructed potable water capacity is not authorized. Please advise if you should have further questions. Regards, Bill __________________________________________________ Bill Crowe, P.E. Sr. Director – Facilities, Construction & Engineering Canaveral Port Authority 445 Challenger Road Ste 301 Cape Canaveral, Florida 32920 t. 1+ (321) 783-7831, Ext. 208 f. 1+ (321) 783-1063 Become a fan, follow us on... <https://urldefense.proofpoint.com/v2/url?u=http-3A__www.facebook.com_po rtcanaveral&d=CwMGaQ&c=cUkzcZGZt-E3UgRE832-4A&r=XI269c7cundDsy2kwNHd7rwg 7EsBSNfYnLX097rvSfY&m=buiLbIE4QC1AhfKyG4jzXwF2_bIvXgHSe13Bbnb4uMU&s=GGo5 aLCQz4CLQJkyEPWkxXH2i7QIPHSk6VJjaSHuBv4&e=> <https://urldefense.proofpoint.com/v2/url?u=http-3A__twitter.com_canaver alport&d=CwMGaQ&c=cUkzcZGZt-E3UgRE832-4A&r=XI269c7cundDsy2kwNHd7rwg7EsBS NfYnLX097rvSfY&m=buiLbIE4QC1AhfKyG4jzXwF2_bIvXgHSe13Bbnb4uMU&s=KUD1qycjX GeuZb0DVAS6uFjQTAEZpvJZy_x516Efe_0&e=> facebook.com/portcanaveral <https://urldefense.proofpoint.com/v2/url?u=http-3A__www.facebook.com_po rtcanaveral&d=CwMGaQ&c=cUkzcZGZt-E3UgRE832-4A&r=XI269c7cundDsy2kwNHd7rwg 7EsBSNfYnLX097rvSfY&m=buiLbIE4QC1AhfKyG4jzXwF2_bIvXgHSe13Bbnb4uMU&s=GGo5 aLCQz4CLQJkyEPWkxXH2i7QIPHSk6VJjaSHuBv4&e=> twitter.com/canaveralport <https://urldefense.proofpoint.com/v2/url?u=http-3A__www.twitter.com_can averalport&d=CwMGaQ&c=cUkzcZGZt-E3UgRE832-4A&r=XI269c7cundDsy2kwNHd7rwg7 EsBSNfYnLX097rvSfY&m=buiLbIE4QC1AhfKyG4jzXwF2_bIvXgHSe13Bbnb4uMU&s=M0crd R2B_yxX_e2BxUQI4nWbDxLyPfZH5AA-dySJHYg&e=> From: Jean Abi-Aoun [mailto:JAbiAoun@feg-inc.us] Sent: Monday, November 28, 2016 8:15 PM To: Bill Crowe, P.E. Cc: Daniel Esden; Todd Morley Subject: Cape Canaveral Hotel - Water Line Extension Hi Bill; I hope all is well. My name is Jean Abi-Aoun and I am the civil engineer working on the Cape Canaveral Hotel to be developed by the Daniel Corporation located at the south end of Columbia Road across from the fire Station as shown on the enclosed aerial layout exhibit. As we continue to develop our design work, it appears that the existing 6 inch water main along Columbia Road south of Atlantis Road, as shown on the City of Cocoa Water Map, will have to be upsized to a 12 inch water main to serve the potable and fire flow requirements for the proposed hotel. Bill, the proposed water main will tie-in to the existing 12 inch water main at Atlantis Road and extend to the hotel site. This work should have minimum effects on the surrounding area given it will be completed at the west side of a dead end street. As such, we wanted to inform the Port Authority of such endeavor. Please let me know if you have any questions at this stage or if we need to further coordinate these efforts with you or just submit to the City of Cocoa and City of Cape Canaveral for review of the offsite water main work and approval. I look forward to hearing from you. I copied Todd Morley from the City of Cape Canaveral on this email. Best Regards Jean Abi-Aoun, P.E., Vice President, LEED® AP 5127 S. Orange Avenue, Suite 200 Orlando, Florida 32809 Phone: (407) 895-0324 Fax: (407) 895-0325 Email:jabiaoun@feg-inc.us <mailto:fjabiaoun@feg-inc.us> Web: http://www.feg-inc.us <mailto:fjabiaoun@feg-inc.us> Disclaimer - All data transmitted with this e-mail is the sole property of Florida Engineering Group, Inc. (FEG) and is transmitted to you for your convenience. By using data transmitted with this e-mail, you assume all liability resulting from its use and release FEG from any liability of any nature whether expressed or implied. You are advised to check the transmitted data for virus prior to its use. <mailto:fjabiaoun@feg-inc.us> Florida has a very broad public records law. As a result, any written communication created or received by the City of Cape Canaveral officials and employees will be made available to the public and/or media upon request, unless otherwise exempt. Under Florida Law, email addresses are public records. If you do not want your email address released in response to a public-records request, do not send electronic email to this entity. Instead, contact our office by phone or in writing 䗈�ぶ簰ꚛ�빢笜只༯᧷ˮ奂뷱釕䧐Ѕꯥႛ䨏�ꙋ㕃滽鬊钒돏ጟ佚ૈ읐豬劔ൽ࿸䣒폇鵳绐웻ᄑ౶ᦳ�ᛸ顚祠㮌焀搓ഫ뼆꒣쇫왦滙�տໍ붒纳䈧Ꝿ ̄ం∀ߨ෧攊摮瑳敲浡攍摮扯൪″‰扯൪㰼䘯汩整⽲汆瑡䑥捥摯⽥敌杮桴ㄠ㸷猾牴慥൭栊髞胀ᨂౠ€᠒ᄁ਍湥獤牴慥൭湥潤橢㐍〠漠橢㰍⼼楆瑬牥䘯慬整敄潣敤䰯湥瑧⁨㘳㘹䰯湥瑧ㅨ㔠㈹㸴猾牴慥൭栊欸呴驅啟�璀ࡂ聹줥鴤⼇輡꒞逎ႆි㩴ఏତ頡�Ⰼ㘣榒ཇ㪸 谫ྃ癠ᶼ㫌鴐鱱噳㵷鎲ꎝ곌Ȋ燁圑뤥헻ፍ﷙귬ꪫ痛Ѓ鈀`찘嬮ﯠ⟅傫⋲�彠岯�适t桑槫볟̊搰缢붸뾫蝭�耩ᖴ㽨ᇔ됊�ƒἙ뼢θ⤅�ㄏీ맹鬝퇝벴駱ó䛴睗逰쵩ʴ䃌�㦽潰촏ⰲa僗漠氉딎轙֟h됫൬공൴ȿ涰葀䧗䐄쒐엇㢅�昄ꁇꚍ㌥⑑ᢔ名숴ḷ쫏᤺坬ꯥ擵钡幄頞諔愛뢾爂昑䞳ܡ筀ื윗�ꀽ澌컒ꐗ㢩㱌적뮃Ⴀ롥朊ᅈ섴І䯁䁷쨉౿ݿ灧⭀졐묦홀੾䄏⎁⅐此憧尅劑̠䋦̆蓌硶鲒신ꨱ⥠࠼녛赟쿲㥉 ࡪ숤豆⣾ļ⅟䜋蔬扑鼤罫甏웠瘜ヂ姼ᖬ揷῁枆ᣡҼ鏯牒粔㻀他꽫ゥ庆ゅᘟ竃셨᏶᧸㷚+ᕀ珶嬭꧛ꜽỽ捦⟶홰섯ᠫ㫫즑ቚ쾤ﺰ⿱ⶵ৚䎬�덣泣ꄚ鸗쭆⒊�敍䍚�〬⹂惈ﳁ샖롦ǁ얜烣鸘⮇蚤遴짗瓇ᴚ枠⛅ꍣㆱῘꖴ痚醌昌롎콅삟瀣㴐虿纱谪양誤鍔ꓥﲙﲘ㲈﹍媃�⯴鴶낥繣讶잽邾뇄욇탟뒚녻Җ鹫⮈蝙ۀ臨끭瘃⧡ߙ�堢Ꮍ哘汙膿섿氅簊箈쑎☹⊒喰ᬑ⁩졫ꓝ沝蜣ை䘤郎졗崚ᝄ૓誺팶�筃葩㒪콊诒�쬱�忘Ꮂ旬篶⛶䭻ꄀࡁ鴈 盂凡ᕁ⃾ᕜম⋣ઈ劶‱ᤞ橻㗜庾ퟋ뒪 盁欅᭼⛎ਟ㹰롍䆪써펝뀯揵賢숎墓帻ួ蘠聯�꿃෠୸砧㸏⾇㢰繼褳钙戀�鏯�嶑聤鈌뇇凎ᩲࣛ輹Ჳᧇꖮ稾뮣Ǩ衺䄾ᴈ闅飐圁錢攭瘮嬧뵢⃬豻㗽鉻昝㘱绂倧务ቨશ葻炪㡎츯ꬓツ唶ⴼ嫾撼㍈ᣤᤖ蛜톘靋熥स䊯且鏬쑽ꉄ런㋤�紀窍ቩ┝薻≿렅嘂氠侁쌱멍�苉ᵤ濖椷濡泘ᓶ聫쓗쐭髍⭈薸灃ﱃЍツ戝౔ㆳײĽ〝㬙簾瓈鍰�ᖁ蔊ᡬᖥヂꏉ⒗픆͆悫劕爊�䰅ⷓ邥‏�⻳궞辶 브⸓嗆�笘洞菮牪㱴踕㺉⟪뉑汢���鉡�᠃ᵋ펳�歱೴ɼ욇Ⴟ臞塭澃ꂍ牾씾랳�欴ۡ蚝짧ẑ춛卓緽啫䕥鋹ᘻ尭缰奞䥩ꖱջ秹镳췛獭杤칥飊㺙ⴣ铕紲牚扒撂蠴ꌂ訄䪝徽꫽꾐嬬쉖╹芀ⷀ뼂ꌪ纨趪שׁ㍵꩹ඥ�憾魩뒰婍錒լ䥫摔痵⊇죇햺ꑞ㠏鼔纬펤甫졚駗졩춘⇨㌻᰻䪲닼굓㬈໽⼜钚Ꝙ藔䬒↊颚撄划⳪➥晊ፕꂝ鲳冕툊찴쵊᱖㕎煋ᓰ陔೧ꪴꭍ亽蹇⤫䥖偝兩ꥁ单먬퐉懩䍔檝쏔鷈㩼徰ᚎ蒏訟ꂙ濅湉婕ᬃ⪼豸୔痆뎨灾ᙫ伇瀾㚫薇馝㊝ 썧ߡ櫈귯㍚緯᰾紃幩㾽轜ᾡ⫂�䘲箣幽郅鼲鼉쓕䋼鎊ﱋ撛䄵喩숺ﲛ㚸懙騕췻�뛙젝쩶轡ㅗ㖫訹ᶘ蝍獰짿鬬㖜单᱒ꔵᑎ㨶┽⑎뭏࢕䩴ꮔ뉹蒲ꑧ윬ꄝ䇊㌙⫱Ꜹ�쪅ᰡ䜬簳Ѽ풽屖云ꄵ῎唶㥲執㳅⊓㾇�쨁὇镎䌒�錧ൻ㟵합兢誋ᛸ혱髡蹢㫕䝿煉豟闚錞ࢌߋ塍胛늯쬌㙯׳῞䆳㈋샪⼄䭃჎쫘㸬歹暹ꛤ긚렙馩렫侓뼁췔ꕔ짼ᒿ왓朌ꕇ㉊䎾騝믐諜꼺೬疵ꙹ፰嵉劜푧她贎㑓�ᮔ账噍㲅㏼鯨㖺鑦坰ዪ휢⚫닿�梗V鴷�ꎥ�槢閪ꦖ핼縔 穊應আ喇᝙✎텎ǡ趯搪趨珬鬎蛰쾺ᷣ蒢淪絫맑쬎㘀䩝ꔧ鎜ܹ舮瘛䪈⪺�〆殠崅ᣁ崁�ᆔ예蓨꓌ĩ蚾퉒�ꖥ渧䪔뵕㧵밣뾎ﳲዹ콯롱鸨肂退됧櫂燃橘肨汥吏캢傃몂冇螗寶婡榡漨례傊遆娑簐⬈瘐갡ᖦ௰ﶄ毨ﻥ댜듥⫸认쑶쉩郻尭ʀใጬ臎늂豼傿虌ꑆ쓳⃻㣝ﮇ坨徐졡魃㆏涇⾐ࢼ╛藮찌⥽쫪䋅㖨쁬᝸̠秇烖沙�㨠ِ⟚뀂炷ཬ퇦傏껏ᎁ靽ᘋ쩘瀚蒠Ծ衵ꢝ覟弰⧸짎�驃뿧椄둎䑩ୟ韪㵢飭፫ᓻ⏖쌮흱羳玁燤訸ᑸ៭휉١勹殏력ᢳի̆ ᬌ搌ᇏ䮮ꅫ렾ﱰ㞍嬱洈皼賨듗ﴟホ鶎ዽ씶챫⹡▏封츒૑됉㠃�ၰﳗ⠾�旜齼웬㕚烪Ȑ垈쁲쫱阑吠ꇅ㱒ቅ鈑빆탁䄌옎塜뺀ᢥ쏋۷鹡쐺忳켑읟枘혙绕�Ð慣־በ縚Ი齅䵟�ঙ㪀Ꚗ숽৆਌㿒㇔鋺ィ덉펧氂㓹먟ى輞镾ퟞ編�奐湮隌ᴎ꣡桸ⅎ릢꒶덷ꐗ嫥㠋쬿핖顕컻곱矜丑Ⱄ�嵧뮐ꄇꄌ礏坮뱰뜰ꂻ獻迷Ὰ阐䙀⸆婳撪醋⼋䦬䡏塏褒뎑શ웗䧈ꑣᣝ㕩䘴跪양䣆ㆩㅢ醌욹⥴㉍퍉撥儩⒒⒃呈⤂꘽掽鿓の摱砐覴黲璟ᕼ≐ﱑ哜 で甗殹䮉झꮂ噅뮯ᢕ쑉鼷풨㔒׍伮ꙭ湚앱媌몳赒冽ق⡽簾礣ㆼ熢�縜ᣉ䈆붴爇�菧뺌첚뒚퓪窊럇ﹴ潸﫹듉﫜骸忺岄鶲ൿ�욓䟜岌䛪䑩䚗㒸䮢ި湝窯蹼嵏ী蹭鲏龴뼒ೢ﷕ᵽ譀䜬ꝭ៣粖䭿莰䃣㵈蒭ꨜ煍凈컻兯뭪裢仂잧�୩蘹㛬去㠉썼䣐ꉚ荅쉓砽�ᐰ隑㫿豢謡쑸쇆襯져跕輠져㘣᫚裵从肾�Ҩ㺵ㇼ驉袔㇏櫻䰳픽싺饔紐•㧤쉈䆻�ꜳ瀡襕쒽嗎憸檸뼺욂饕執玙䕾讞䲫丨橕닁枍缛팠胠ಙ⍫恴⴨腷柅㿡⍻讴豸쵱沪ᦷ䆌ዼ蔐茠荄搘 暌ᠧ₅ⲁ납팼棒暺㥝浦崴꺷贴ꅙ㫆缰싞獔鹪픹⻜ව趙냜︕賠寨츛럑�җ懦涔艺눑ᦧ銲綧嫃⼚⺚쵁迊쿦ﳶᘻ席₸뺃稽뇨퇑໇劍ӻ픞ᵿﰗ欿ᄒ赣褿ー﷤썥௄䨮湁ᚂ뺐丧逛Ǿ䅪䁈خ옏ɩᆷ鱻ウ�ꜝ쨙윷ũ﷩�伱使ⶨఐ쟉佤䡇�ꖽុ牅黖귮�爭坏咰Ѷͺ旟鋪㮛㯛띺췉涡궡ꅽ嫖荻놳�틜뗝ⳝꁸ稟Рḁⱄ㇃༄䫴웨/宍僉�ꑖό祀溧ꌡத䯽犑￀⑸踻藔ᦸ��⹴㢄뚄�䊷�耵ᨓ죿蟫탍⎂慴輤��஑잠�濾㍝솂組傗䄰같 �ꏔ�꾛�抝䳽⎚⾟녻隗衖㚚ⵞ陝諿矇翤《ऀ輯ං攊摮瑳敲浡攍摮扯൪‵‰扯൪㰼䘯汩整⽲汆瑡䑥捥摯⽥敌杮桴㈠㤱㸾瑳敲浡਍�偔伽ツ�⯳舼鈘䠫僇롵䡃ⴐ맬ⷄꢑ뤓탩使딒ᢇ쭬经콺꧶ᜥ빁㞳䘝ᰘ왙⿙ၬ㠮舺Ճ駖疸鬥݉覐규쑳ꖩ䏁ଢ଼釹玆ᗤ﩮﻾�粂譣棬졌闹源✇ࢤ騊Ⰶ䈎從硴ᏕⲂ㿄徰䈃突ꛃⷭ䇎搛⍍굂�鈋㿽姟솗歼ﬖ돶ᴺ鄛㞶䷲ὗ慦ᙎ䣅꼈ি搾Ჵ埢ƀ樭ඵ攊摮瑳敲浡攍摮扯൪‶‰扯൪㰼䈯瑩偳牥潃灭湯湥⁴⼸潃潬卲慰散㐠 ‴‰⽒楆瑬牥䐯呃敄潣敤䠯楥桧⁴〱⼵敌杮桴㠠㔵⼱畓瑢灹⽥浉条⽥祔数堯扏敪瑣圯摩桴㘠㤳㸾瑳敲浡਍�က䙊䙉Āā怀怀