From: Bill Crowe, P.E. [mailto:bcrowe@portcanaveral.com]
Sent: Friday, March 17, 2017 8:35 AM
To: Jean Abi-Aoun <JAbiAoun@feg-inc.us>
Cc: Daniel Esden <Desden@danielcorporation.com>; Todd Morley
<T.Morley@cityofcapecanaveral.org>; Craig Langley
<clangley@portcanaveral.com>; Robert Musser <bmusser@portcanaveral.com>;
Greg Crawford <GCrawford@feg-inc.us>; Laila Witwicky
<lwitwicky@danielcorporation.com>; glenn@storchlawfirm.com
Subject: RE: Cape Canaveral Hotel Improvements
Jean,
As discussed earlier this week, see the attached RAI / Comment letter
for your use and action in follow up.
Thank you,
Bill
<http://www.portcanaveral.com>
Bill Crowe, P.E.
Senior Director - Facilities, Construction & Engineering
Tel: (321) 783-7831 Ext. 208
bcrowe@portcanaveral.com <mailto:bcrowe@portcanaveral.com> |
www.portcanaveral.com <http://www.portcanaveral.com>
Canaveral Port Authority | 445 Challenger Road | Cape Canaveral | FL |
32920
<http://www.facebook.com/portcanaveral>
<http://www.twitter.com/canaveralport>
<https://www.linkedin.com/company/canaveral-port-authority>
From: Jean Abi-Aoun [mailto:JAbiAoun@feg-inc.us]
Sent: Wednesday, March 1, 2017 3:10 PM
To: Bill Crowe, P.E.
Cc: Daniel Esden; Todd Morley; Craig Langley; Robert Musser; Greg
Crawford; Laila Witwicky
Subject: RE: Cape Canaveral Hotel Improvements
Bill
Thank you for your response. I look forward to hear from you on our
pre-app meeting.
Jean Abi-Aoun, P.E., Vice President, LEED® AP
5127 S. Orange Avenue, Suite 200
Orlando, Florida 32809
Phone: (407) 895-0324
Fax: (407) 895-0325
Email:jabiaoun@feg-inc.us <mailto:fjabiaoun@feg-inc.us>
Web: http://www.feg-inc.us <mailto:fjabiaoun@feg-inc.us>
Disclaimer - All data transmitted with this e-mail is the sole property
of Florida Engineering Group, Inc. (FEG) and is transmitted to you for
your convenience. By using data transmitted with this e-mail, you
assume all liability resulting from its use and release FEG from any
liability of any nature whether expressed or implied. You are advised
to check the transmitted data for virus prior to its use.
<mailto:fjabiaoun@feg-inc.us>
From: Bill Crowe, P.E. [mailto:bcrowe@portcanaveral.com]
Sent: Wednesday, March 01, 2017 2:58 PM
To: Jean Abi-Aoun <JAbiAoun@feg-inc.us <mailto:JAbiAoun@feg-inc.us> >
Cc: Daniel Esden <Desden@danielcorporation.com
<mailto:Desden@danielcorporation.com> >; Todd Morley
<T.Morley@cityofcapecanaveral.org
<mailto:T.Morley@cityofcapecanaveral.org> >; Craig Langley
<clangley@portcanaveral.com <mailto:clangley@portcanaveral.com> >;
Robert Musser <bmusser@portcanaveral.com
<mailto:bmusser@portcanaveral.com> >; Greg Crawford
<GCrawford@feg-inc.us <mailto:GCrawford@feg-inc.us> >; Laila Witwicky
<lwitwicky@danielcorporation.com
<mailto:lwitwicky@danielcorporation.com> >
Subject: RE: Cape Canaveral Hotel Improvements
Good afternoon Mr. Abi-Aoun:
We are in receipt of your design documents as requested and your
projected has been entered in the queue for design review. A pre
application meeting will be scheduled with applicable CPA departments in
the coming week or two; the Engineering Dept admin will work with you to
coordinate an acceptable time for this meeting.
This meeting will be preliminary in nature and will be an opportunity
for various port stake holders to gain a better understanding of the
planned development. As has been communicated previously, we are in the
process completing a potable water and traffic capacity study for the
south side of the Port from SR-A1A to Jetty Park along existing George
King Blvd. These modeling efforts will incorporate planned future
expansion at the Port to determine the baseline for available capacity.
The draft results of the potable water study are expected in mid to late
April 2017 and the draft results of the traffic study are expected in
mid May. The potential impacts of the proposed development will be
evaluated and defined in these studies. The Port Authority’s
concurrence regarding certain aspects of the development that impact the
Port will be based on reasonable confirmation of the impacts.
Please stand by for scheduling of the pre application meeting.
Thank you,
Bill
<http://www.portcanaveral.com>
Bill Crowe, P.E.
Senior Director - Facilities, Construction & Engineering
Tel: (321) 783-7831 Ext. 208
bcrowe@portcanaveral.com <mailto:bcrowe@portcanaveral.com> |
www.portcanaveral.com <http://www.portcanaveral.com>
Canaveral Port Authority | 445 Challenger Road | Cape Canaveral | FL |
32920
<http://www.facebook.com/portcanaveral>
<http://www.twitter.com/canaveralport>
<https://www.linkedin.com/company/canaveral-port-authority>
Under Florida Statute 668.6076, electronic mail addresses are public
records. If you do not want your electronic mail address released in
response to a public records request as provided in Florida Statute 119,
do not send electronic mail to this entity. Instead, contact this office
by telephone or in writing.
This electronic mail contains information which may be privileged,
confidential, or otherwise protected from disclosure. It is intended
only for the individual(s) named. If you are not an addressee; any
disclosure, copy, distribution, or use of the contents of this
electronic mail is prohibited. If you have received this electronic mail
in error, please notify the sender by reply electronic mail or at the
telephone number listed above and destroy the original message and all
copies.Rev.100507a
From: Jean Abi-Aoun [mailto:JAbiAoun@feg-inc.us]
Sent: Wednesday, March 1, 2017 1:31 PM
To: Bill Crowe, P.E.
Cc: Daniel Esden; Todd Morley; Craig Langley; Robert Musser; Greg
Crawford; Laila Witwicky
Subject: RE: Cape Canaveral Hotel Improvements
Bill
I am following up on my email from February 24. Since I did not hear
from you about our meeting today, please let me know if we can meet this
Friday.
Thanks
Jean Abi-Aoun, P.E., Vice President, LEED® AP
5127 S. Orange Avenue, Suite 200
Orlando, Florida 32809
Phone: (407) 895-0324
Fax: (407) 895-0325
Email:jabiaoun@feg-inc.us <mailto:fjabiaoun@feg-inc.us>
Web: http://www.feg-inc.us <mailto:fjabiaoun@feg-inc.us>
Disclaimer - All data transmitted with this e-mail is the sole property
of Florida Engineering Group, Inc. (FEG) and is transmitted to you for
your convenience. By using data transmitted with this e-mail, you
assume all liability resulting from its use and release FEG from any
liability of any nature whether expressed or implied. You are advised
to check the transmitted data for virus prior to its use.
<mailto:fjabiaoun@feg-inc.us>
From: Jean Abi-Aoun
Sent: Friday, February 24, 2017 11:09 AM
To: 'Bill Crowe, P.E.' <bcrowe@portcanaveral.com
<mailto:bcrowe@portcanaveral.com> >
Cc: 'Daniel Esden' <Desden@danielcorporation.com
<mailto:Desden@danielcorporation.com> >; 'Todd Morley'
<T.Morley@cityofcapecanaveral.org
<mailto:T.Morley@cityofcapecanaveral.org> >; 'Craig Langley'
<clangley@portcanaveral.com <mailto:clangley@portcanaveral.com> >;
'Robert Musser' <bmusser@portcanaveral.com
<mailto:bmusser@portcanaveral.com> >; Greg Crawford
<GCrawford@feg-inc.us <mailto:GCrawford@feg-inc.us> >; 'Laila Witwicky'
<lwitwicky@danielcorporation.com
<mailto:lwitwicky@danielcorporation.com> >
Subject: RE: Cape Canaveral Hotel Improvements
Hi Bill;
As a follow up to my voice message, I wanted to check on the review
status of our project and find out if we can meet on Wednesday of next
week. I am open at any time if this works for you. If not please let
me know what would be convenient for you.
I appreciate your prompt attention to this matter.
Sincerely
Jean Abi-Aoun, P.E., Vice President, LEED® AP
5127 S. Orange Avenue, Suite 200
Orlando, Florida 32809
Phone: (407) 895-0324
Fax: (407) 895-0325
Email:jabiaoun@feg-inc.us <mailto:fjabiaoun@feg-inc.us>
Web: http://www.feg-inc.us <mailto:fjabiaoun@feg-inc.us>
Disclaimer - All data transmitted with this e-mail is the sole property
of Florida Engineering Group, Inc. (FEG) and is transmitted to you for
your convenience. By using data transmitted with this e-mail, you
assume all liability resulting from its use and release FEG from any
liability of any nature whether expressed or implied. You are advised
to check the transmitted data for virus prior to its use.
<mailto:fjabiaoun@feg-inc.us>
From: Jean Abi-Aoun
Sent: Wednesday, February 22, 2017 7:11 PM
To: 'Bill Crowe, P.E.' <bcrowe@portcanaveral.com
<mailto:bcrowe@portcanaveral.com> >
Cc: Daniel Esden <Desden@danielcorporation.com
<mailto:Desden@danielcorporation.com> >; Todd Morley
<T.Morley@cityofcapecanaveral.org
<mailto:T.Morley@cityofcapecanaveral.org> >; Craig Langley
<clangley@portcanaveral.com <mailto:clangley@portcanaveral.com> >;
Robert Musser <bmusser@portcanaveral.com
<mailto:bmusser@portcanaveral.com> >; Greg Crawford
<GCrawford@feg-inc.us <mailto:GCrawford@feg-inc.us> >; 'Laila Witwicky'
<lwitwicky@danielcorporation.com
<mailto:lwitwicky@danielcorporation.com> >
Subject: RE: Cape Canaveral Hotel Improvements
Hi Bill;
Per your request, I have enclosed a package that entails a narrative of
the proposed improvements, Site Geometry Plan, Paving and Drainage Plan
and a Utility Plan. I have also enclosed a copy of the traffic study
which we have performed for this project.
The enclosed information should prove helpful in clarifying the items
you have raised in your email below. As far as the traffic results, the
traffic generated from our hotel project does not require any offsite
improvements. With respect to the utilities both the City of Cape
Canaveral, who is the reclaim and sewer utility provider, and the City
of Cocoa, who is the water utility provider, have indicated they have
the capacity to serve our project.
As a clarification to the proposed water line extension along Columbia
Road, the proposed 12 inch main extension will be a public main owned by
City of Cocoa and it will become a private line downstream of the double
detector check valve at our property boundary. My understanding from
communicating with the City of Cocoa that the City owns the water system
and has a blanket easement covering the Canaveral Port Authority
property.
Bill, I would greatly appreciate it, if you can review the enclosed
information as soon as possible and if you like for us to meet with you
to provide you with additional information or clarification we will be
more than happy to do so in order to keep our zoning application moving
forward with the City.
I look forward to hearing from you.
Regards
Jean Abi-Aoun, P.E., Vice President, LEED® AP
5127 S. Orange Avenue, Suite 200
Orlando, Florida 32809
Phone: (407) 895-0324
Fax: (407) 895-0325
Email:jabiaoun@feg-inc.us <mailto:fjabiaoun@feg-inc.us>
Web: http://www.feg-inc.us <mailto:fjabiaoun@feg-inc.us>
Disclaimer - All data transmitted with this e-mail is the sole property
of Florida Engineering Group, Inc. (FEG) and is transmitted to you for
your convenience. By using data transmitted with this e-mail, you
assume all liability resulting from its use and release FEG from any
liability of any nature whether expressed or implied. You are advised
to check the transmitted data for virus prior to its use.
<mailto:fjabiaoun@feg-inc.us>
From: Bill Crowe, P.E. [mailto:bcrowe@portcanaveral.com]
Sent: Tuesday, November 29, 2016 10:35 AM
To: Jean Abi-Aoun <JAbiAoun@feg-inc.us <mailto:JAbiAoun@feg-inc.us> >
Cc: Daniel Esden <Desden@danielcorporation.com
<mailto:Desden@danielcorporation.com> >; Todd Morley
<T.Morley@cityofcapecanaveral.org
<mailto:T.Morley@cityofcapecanaveral.org> >; Craig Langley
<clangley@portcanaveral.com <mailto:clangley@portcanaveral.com> >;
Robert Musser <bmusser@portcanaveral.com
<mailto:bmusser@portcanaveral.com> >
Subject: RE: Cape Canaveral Hotel - Water Line Extension
Mr. Abi-Aoun,
Thank you for your inquiry. Per your email below, I understand that a
proposed hotel development wishes to tie in to utility infrastructure on
or through CPA-owned property. I am aware that the subject parcel on
which the hotel development is proposed currently holds access rights to
Port property; however, to my knowledge this access does not currently
extend rights for utility service.
The design engineer of record shall submit the following documents in
order to review the traffic impacts for a driveway connection permit:
* Overall project site plan
* Written narrative of the development
* Detailed design plans of the proposed driveway connection and
all improvements contemplated on Port property
* If stormwater facilities are planned on Port-owned lands; proof
of SJRWMD or FDEP Concurrence is required
* Trip generation report inclusive of narrative
Based on the nature of this development, the requirement for the
following “off site” improvements will be evaluated by CPA. If
required, the design and implementation of such improvements will be the
responsibility of the developer:
* Improvement / widening of Columbia Drive from the point of
connection to George King Blvd. inclusive of a dedicated turn lane where
required and a pedestrian walkway
* Resulting modifications to the signalized intersection at
Columbia Drive and George King Blvd
* Emergency only signalization at the existing CFR fire station on
Columbia Drive
The developer should be aware that the adjacent CFR facility contains
an active vessel and vertical structure fire-fighting trainer facility.
When activated, the live fire from this facility will produce wafting
smoke that, depending on prevailing winds, may not be contained within
the property limits.
The on-Port potable water supply network is currently being evaluated
with respect to the port-wide Master plan update which has, in-turn,
identified several significant projects involving the need for potable
water supply. At this time, the use of Port-constructed potable water
capacity is not authorized. Please advise if you should have further
questions.
Regards,
Bill
__________________________________________________
Bill Crowe, P.E.
Sr. Director – Facilities, Construction & Engineering
Canaveral Port Authority
445 Challenger Road
Ste 301
Cape Canaveral, Florida 32920
t. 1+ (321) 783-7831, Ext. 208
f. 1+ (321) 783-1063
Become a fan, follow us on...
<https://urldefense.proofpoint.com/v2/url?u=http-3A__www.facebook.com_po
rtcanaveral&d=CwMGaQ&c=cUkzcZGZt-E3UgRE832-4A&r=XI269c7cundDsy2kwNHd7rwg
7EsBSNfYnLX097rvSfY&m=buiLbIE4QC1AhfKyG4jzXwF2_bIvXgHSe13Bbnb4uMU&s=GGo5
aLCQz4CLQJkyEPWkxXH2i7QIPHSk6VJjaSHuBv4&e=>
<https://urldefense.proofpoint.com/v2/url?u=http-3A__twitter.com_canaver
alport&d=CwMGaQ&c=cUkzcZGZt-E3UgRE832-4A&r=XI269c7cundDsy2kwNHd7rwg7EsBS
NfYnLX097rvSfY&m=buiLbIE4QC1AhfKyG4jzXwF2_bIvXgHSe13Bbnb4uMU&s=KUD1qycjX
GeuZb0DVAS6uFjQTAEZpvJZy_x516Efe_0&e=>
facebook.com/portcanaveral
<https://urldefense.proofpoint.com/v2/url?u=http-3A__www.facebook.com_po
rtcanaveral&d=CwMGaQ&c=cUkzcZGZt-E3UgRE832-4A&r=XI269c7cundDsy2kwNHd7rwg
7EsBSNfYnLX097rvSfY&m=buiLbIE4QC1AhfKyG4jzXwF2_bIvXgHSe13Bbnb4uMU&s=GGo5
aLCQz4CLQJkyEPWkxXH2i7QIPHSk6VJjaSHuBv4&e=>
twitter.com/canaveralport
<https://urldefense.proofpoint.com/v2/url?u=http-3A__www.twitter.com_can
averalport&d=CwMGaQ&c=cUkzcZGZt-E3UgRE832-4A&r=XI269c7cundDsy2kwNHd7rwg7
EsBSNfYnLX097rvSfY&m=buiLbIE4QC1AhfKyG4jzXwF2_bIvXgHSe13Bbnb4uMU&s=M0crd
R2B_yxX_e2BxUQI4nWbDxLyPfZH5AA-dySJHYg&e=>
From: Jean Abi-Aoun [mailto:JAbiAoun@feg-inc.us]
Sent: Monday, November 28, 2016 8:15 PM
To: Bill Crowe, P.E.
Cc: Daniel Esden; Todd Morley
Subject: Cape Canaveral Hotel - Water Line Extension
Hi Bill;
I hope all is well.
My name is Jean Abi-Aoun and I am the civil engineer working on the
Cape Canaveral Hotel to be developed by the Daniel Corporation located
at the south end of Columbia Road across from the fire Station as shown
on the enclosed aerial layout exhibit. As we continue to develop our
design work, it appears that the existing 6 inch water main along
Columbia Road south of Atlantis Road, as shown on the City of Cocoa
Water Map, will have to be upsized to a 12 inch water main to serve
the potable and fire flow requirements for the proposed hotel.
Bill, the proposed water main will tie-in to the existing 12 inch water
main at Atlantis Road and extend to the hotel site. This work should
have minimum effects on the surrounding area given it will be completed
at the west side of a dead end street. As such, we wanted to inform
the Port Authority of such endeavor. Please let me know if you have
any questions at this stage or if we need to further coordinate these
efforts with you or just submit to the City of Cocoa and City of Cape
Canaveral for review of the offsite water main work and approval.
I look forward to hearing from you. I copied Todd Morley from the City
of Cape Canaveral on this email.
Best Regards
Jean Abi-Aoun, P.E., Vice President, LEED® AP
5127 S. Orange Avenue, Suite 200
Orlando, Florida 32809
Phone: (407) 895-0324
Fax: (407) 895-0325
Email:jabiaoun@feg-inc.us <mailto:fjabiaoun@feg-inc.us>
Web: http://www.feg-inc.us <mailto:fjabiaoun@feg-inc.us>
Disclaimer - All data transmitted with this e-mail is the sole property
of Florida Engineering Group, Inc. (FEG) and is transmitted to you for
your convenience. By using data transmitted with this e-mail, you
assume all liability resulting from its use and release FEG from any
liability of any nature whether expressed or implied. You are advised
to check the transmitted data for virus prior to its use.
<mailto:fjabiaoun@feg-inc.us>
Florida has a very broad public records law. As a result, any written
communication created or received by the City of Cape Canaveral
officials and employees will be made available to the public and/or
media upon request, unless otherwise exempt. Under Florida Law, email
addresses are public records. If you do not want your email address
released in response to a public-records request, do not send electronic
email to this entity. Instead, contact our office by phone or in writing
Florida has a very broad public records law. As a result, any written
communication created or received by the City of Cape Canaveral
officials and employees will be made available to the public and/or
media upon request, unless otherwise exempt. Under Florida Law, email
addresses are public records. If you do not want your email address
released in response to a public-records request, do not send electronic
email to this entity. Instead, contact our office by phone or in writing
㌥ᢔ名숴ḷ쫏᤺坬ꯥ擵钡幄頞諔愛뢾爂昑䞳ܡ筀ื윗�ꀽ澌컒ꐗ㢩㱌적뮃Ⴀ롥朊ᅈ섴І䯁䁷쨉౿ݿ灧⭀졐묦홀䄏⎁⅐此憧尅劑̠䋦̆蓌硶鲒신ꨱ⥠࠼녛赟쿲㥉ࡪ숤豆⣾ļ⅟䜋蔬扑鼤罫甏웠瘜ヂ姼ᖬ揷῁枆ᣡҼ鏯牒粔㻀他꽫ゥ庆ゅᘟ竃셨᧸㷚+ᕀ珶嬭ꜽỽ捦⟶홰섯ᠫ㫫즑ቚ쾤ﺰ⿱ⶵ䎬�덣泣ꄚ鸗쭆⒊�敍䍚�〬⹂惈ﳁ샖롦ǁ얜烣鸘⮇蚤遴짗瓇ᴚ枠⛅ꍣㆱῘꖴ痚醌昌롎콅삟瀣㴐虿纱谪양誤鍔ꓥﲙﲘ
㲈﹍媃�⯴鴶낥繣讶잽邾뇄욇탟뒚녻Җ鹫⮈蝙ۀ臨끭瘃⧡ߙ�堢Ꮍ哘汙膿섿氅簊箈쑎☹⊒喰ᬑ졫ꓝ沝蜣ை䘤郎졗崚ᝄ誺팶�筃葩㒪콊诒�쬱�忘Ꮂ旬篶⛶䭻ꄀࡁ鴈盂凡ᕁᕜম⋣ઈ劶‱ᤞ橻㗜庾ퟋ뒪 盁欅᭼⛎ਟ㹰롍䆪써펝뀯揵賢숎墓帻ួ蘠聯�꿃砧㸏⾇㢰繼褳钙戀�鏯�嶑聤鈌뇇凎ᩲࣛ輹Ჳᧇꖮ稾뮣Ǩ衺䄾ᴈ闅飐圁錢攭瘮嬧뵢⃬豻㗽鉻昝㘱绂倧务ቨશ葻炪㡎츯ꬓツ唶ⴼ嫾撼㍈ᣤᤖ蛜톘靋熥
स䊯且鏬쑽ꉄ런㋤�紀窍ቩ┝薻≿렅嘂氠侁쌱멍�苉ᵤ濖椷濡泘ᓶ聫쓗쐭髍⭈薸灃ﱃЍツ戝ㆳײĽ〝㬙簾瓈鍰�ᖁ蔊ᡬᖥヂꏉ⒗픆͆悫劕爊�䰅ⷓ邥�⻳궞辶브⸓嗆�笘洞菮牪㱴踕㺉⟪뉑汢���鉡�᠃ᵋ펳�歱ɼ욇Ⴟ臞塭澃ꂍ牾씾랳�欴ۡ蚝짧ẑ춛卓緽啫䕥鋹ᘻ尭缰奞䥩ꖱջ秹镳췛獭杤칥飊㺙ⴣ铕紲牚扒撂蠴ꌂ訄䪝徽꾐嬬쉖╹芀ⷀ뼂ꌪ纨趪שׁ㍵꩹ඥ�憾魩뒰婍錒լ䥫摔痵⊇죇햺ꑞ㠏鼔纬펤甫졚
駗졩춘⇨㌻᰻䪲닼굓㬈⼜钚Ꝙ藔䬒↊颚撄划⳪➥晊ፕꂝ鲳冕툊찴쵊᱖㕎煋ᓰ陔೧ꪴꭍ亽蹇⤫䥖偝兩ꥁ单먬퐉懩䍔檝쏔鷈㩼徰ᚎ蒏訟ꂙ濅湉婕ᬃ⪼豸痆뎨灾ᙫ伇瀾㚫薇馝㊝썧ߡ櫈귯㍚緯᰾紃幩㾽轜ᾡ⫂�䘲箣幽郅鼲鼉쓕䋼鎊ﱋ撛䄵喩숺ﲛ㚸懙騕췻�뛙젝쩶轡ㅗ㖫訹ᶘ蝍獰짿鬬㖜单᱒ꔵᑎ㨶┽뭏䩴ꮔ뉹蒲ꑧ윬ꄝ䇊㌙⫱Ꜹ�쪅ᰡ䜬簳Ѽ풽屖云ꄵ῎唶㥲執㳅⊓㾇�쨁镎䌒�錧ൻ㟵합兢誋ᛸ혱髡蹢㫕䝿煉豟闚錞ࢌߋ塍
胛늯쬌㙯׳῞䆳㈋샪⼄䭃쫘㸬歹暹ꛤ긚렙馩렫侓뼁췔ꕔ짼ᒿ왓朌ꕇ㉊䎾騝믐諜꼺೬疵ꙹ፰嵉劜푧她贎㑓�ᮔ账噍㲅㏼鯨㖺鑦坰ዪ휢⚫닿�梗V鴷�ꎥ�槢閪ꦖ핼縔穊應আ喇✎텎ǡ趯搪趨珬鬎蛰쾺ᷣ蒢淪絫맑쬎㘀䩝ꔧ鎜ܹ舮瘛䪈⪺�〆殠崅ᣁ崁�ᆔ예蓨ĩ蚾퉒�ꖥ渧䪔뵕㧵밣뾎ﳲዹ콯롱鸨肂退됧櫂燃橘肨汥吏캢傃몂冇螗寶婡榡漨례傊遆娑簐⬈瘐갡ᖦ௰ﶄ毨ﻥ댜듥⫸认쑶쉩郻尭ʀใጬ臎늂豼傿虌ꑆ
쓳㣝ﮇ坨徐졡魃涇⾐ࢼ╛藮찌⥽쫪䋅㖨쁬̠秇烖沙�㨠ِ⟚뀂炷ཬ퇦傏껏ᎁ靽ᘋ쩘瀚蒠Ծ衵ꢝ覟弰⧸짎�驃뿧椄둎䑩ୟ韪㵢飭፫ᓻ⏖쌮흱羳玁燤訸ᑸ휉١勹殏력ᢳի̆ᬌ搌ᇏ䮮ꅫ렾ﱰ㞍嬱洈皼賨듗ﴟホ鶎ዽ씶챫▏封츒됉㠃�ၰﳗ⠾�旜齼웬㕚烪Ȑ垈쁲쫱阑吠ꇅ㱒ቅ鈑빆탁䄌옎塜뺀ᢥ쏋۷鹡쐺忳켑읟枘혙绕�Ð慣־በ縚Ი齅䵟�ঙ㪀Ꚗ숽㿒㇔鋺ィ덉펧氂㓹먟ى輞镾ퟞ編�奐湮隌ᴎ꣡桸ⅎ
릢꒶덷ꐗ嫥㠋쬿핖顕컻곱矜丑Ⱄ�嵧뮐ꄇꄌ礏坮뱰뜰ꂻ獻迷Ὰ阐䙀⸆婳撪醋⼋䦬䡏塏褒뎑શ웗䧈ꑣᣝ㕩䘴跪양䣆ㆩㅢ醌욹⥴㉍퍉撥儩⒒⒃呈⤂掽鿓の摱砐覴黲璟ᕼ≐ﱑ哜で甗殹䮉झꮂ噅뮯ᢕ쑉鼷풨㔒伮ꙭ湚앱媌몳赒冽ق⡽簾礣ㆼ熢�縜ᣉ䈆붴爇�菧뺌첚뒚퓪窊럇ﹴ潸듉骸忺岄鶲ൿ�욓䟜岌䛪䑩䚗㒸䮢ި湝窯蹼嵏ী蹭鲏龴뼒ೢᵽ譀䜬ꝭ៣粖䭿莰䃣㵈蒭ꨜ煍凈컻兯뭪裢仂잧�୩蘹㛬去㠉썼䣐ꉚ荅쉓砽�ᐰ隑㫿
豢謡쑸쇆襯져跕輠져㘣裵从肾�Ҩ㺵ㇼ驉袔㇏櫻䰳픽싺饔紐㧤쉈䆻�ꜳ瀡襕쒽嗎憸檸뼺욂饕執玙䕾讞䲫丨橕닁枍缛팠胠ಙ⍫恴腷柅㿡⍻讴豸쵱沪ᦷ䆌ዼ蔐茠荄搘暌ᠧ₅ⲁ납팼棒暺㥝浦崴꺷贴ꅙ㫆缰싞獔鹪픹⻜ව趙냜︕賠寨츛럑�җ懦涔艺눑ᦧ銲綧嫃⼚쵁迊쿦ﳶᘻ席₸뺃稽뇨퇑劍ӻ픞ᵿﰗ欿ᄒ赣褿ー썥䨮湁ᚂ뺐丧逛Ǿ䅪䁈خ옏ɩᆷ鱻ウ�ꜝ쨙윷ũ�伱使ⶨఐ쟉佤䡇�ꖽុ牅黖귮�爭坏咰Ѷͺ旟
鋪㮛㯛띺췉涡궡ꅽ嫖荻놳�틜뗝ⳝꁸ稟Рḁⱄ㇃༄䫴웨/宍僉�ꑖό祀溧ꌡத䯽犑⑸踻藔ᦸ��㢄뚄�䊷�耵ᨓ죿蟫탍⎂慴輤��잠�濾㍝솂組傗䄰같�ꏔ�꾛�抝䳽⎚⾟녻隗衖㚚ⵞ陝諿矇翤《ऀ輯ං攊摮瑳敲浡攍摮扯൪‵‰扯൪㰼䘯汩整⽲汆瑡䑥捥摯⽥敌杮桴㈠㤱㸾瑳敲浡�偔伽ツ�⯳舼鈘䠫僇롵䡃ⴐ맬ⷄꢑ뤓탩使딒ᢇ쭬经콺꧶ᜥ빁㞳䘝ᰘ왙ၬ㠮舺Ճ駖疸鬥݉覐규쑳ꖩ䏁ଢ଼釹玆ᗤ�粂譣棬졌
闹源✇ࢤ騊Ⰶ䈎從硴ᏕⲂ㿄徰䈃突ꛃⷭ䇎搛⍍굂�鈋㿽姟솗歼ﬖ돶ᴺ鄛㞶䷲ὗ慦ᙎ䣅꼈ি搾Ჵ埢ƀ樭ඵ攊摮瑳敲浡攍摮扯൪‶‰扯൪㰼䈯瑩偳牥潃灭湯湥⁴⼸潃潬卲慰散㐠‴‰⽒楆瑬牥䐯呃敄潣敤䠯楥桧⁴〱⼵敌杮桴㠠㔵⼱畓瑢灹⽥浉条⽥祔数堯扏敪瑣圯摩桴㘠㤳㸾瑳敲浡�က䙊䙉Āā怀怀