HomeMy WebLinkAboutRe Three Parcels (63)Yes. The concepts should include
- new intersection that squares with Thurm
- a generic outparcel for a restaurant size building of 3,500 +/-
square feet with traffic pattern and parking around it
- show that we would eliminate the southern entrance to the Craig Tech
building
- show that Bob would move the CHS entrance so that all traffic would
turn into this complex at the light.
- run the entrance at this light in a reasonable distance to manage
traffic to bobs property and to our property without having the road
actually go anywhere beyond the East side of our new outparcel. This
will take some creative drawing on your part.
We would present to DOT and City the plan you have now (As Is
Condition) and this new Concept condition.
I cant speak for the City but I believe they want a light there and
Todd Morley indicated willingness to help us push for it.
Tom C. Hermansen
941.587.2808 cell
On Dec 7, 2016, at 11:51 AM, Bob Baugher <bbaugher@cocoabeachsurf.com
<mailto:bbaugher@cocoabeachsurf.com> > wrote:
Wayne/Dave: The alignment looks ok, I walked it off.
Dave: You need to do a drawing with an intersection with a
light, not a real detail one but enough to go to FDOT and see what they
think. Or maybe get city to go for us and we just do the work. I
believe Todd wanted to include it the A1A work coming up. Anyhow we
need a concept drawing showing a lighted intersection with west side
stay roughly the same and the east side with a new entrance that splits
both properties (the alignment looks like most of the new intersection
will be on Tom’s side unless FDOT allows us to do an intersection with
an offset in the roads going east/west. I would give up my southern
A1A driveway cut, and I assume Tom would give up the one to the South,
but that is a decision for him and his partners, but to get the light we
need to direct all traffic off both properties to the light. Tom
already sent you a mockup of an out parcel that he wants to incorporate
in this design at the new lighted intersection in his parking lot.
Both west properties will need modifications to their parking lots/site
plan, but we will deal with that after we have a decision on the
feasibility of the light. Any question call me. Bob
** Please note that my email address has changed. My new email
address is bbaugher@cocoabeachsurf.com
<mailto:bbaugher@cocoabeachsurf.com> . Please update your address book
and begin using this new email address. **
Bob Baugher
From: Wayne Allewelt [mailto:wallewelt@maidesignbuild.com]
Sent: Wednesday, December 07, 2016 8:22 AM
To: bbaugher@cocoabeachsurf.com
<mailto:bbaugher@cocoabeachsurf.com>
Cc: Eric Robart; Dave Menzel
Subject: Three Parcels
Bob,
Dave asked me to email you a PDF of the three surveys combined
as requested.
Wayne Allewelt
mai Design Build
395 Stan Drive, Suite B
Melbourne, FL 32904
(321) 757-3034 phone
(321) 757-3088 fax
www.maidesignbuild.com <http://www.maidesignbuild.com/>
Florida has a very broad public records law. As a result, any written
communication created or received by the City of Cape Canaveral
officials and employees will be made available to the public and/or
media upon request, unless otherwise exempt. Under Florida Law, email
addresses are public records. If you do not want your email address
released in response to a public-records request, do not send electronic
email to this entity. Instead, contact our office by phone or in writing