HomeMy WebLinkAboutRE Daniel Corp (51)DG,
I will send today – thanks.
TM
<http://www.cityofcapecanaveral.org/>
Launch your connection…
<https://www.facebook.com/CityofCapeCanaveral>
<https://www.instagram.com/cityofcapecanaveral/>
<https://www.linkedin.com/company/city-of-cape-canaveral-the>
<https://twitter.com/CapeCanaveralFL>
From: David Greene
Sent: Friday, December 02, 2016 5:12 PM
To: Todd Morley <T.Morley@cityofcapecanaveral.org>
Subject: RE: Daniel Corp
Todd,
It is ok.dg
From: Todd Morley
Sent: Friday, December 02, 2016 5:02 PM
To: David Greene <D.Greene@cityofcapecanaveral.org
<mailto:D.Greene@cityofcapecanaveral.org> >
Subject: FW: Daniel Corp
David,
Revised per our conversation.
Todd
Dear Council Member,
The Daniel Corporation from Orlando is pursuing an option to construct
a 125-room Holiday Inn Hotel on a 2.5 acre parcel in the C1 Commercial
District near the Fire Department on Challenger Road (see the attached
aerial and site plan). The developer has requested to meet with each
Council Member, individually, to discuss the project.
Background:
The site is located within the City’s Economic Opportunity Overlay
District (EOOD). Access is required from Columbia Blvd. in Port
Canaveral because the property has no frontage on A1A.
The City Code requires that a hotel be constructed with a minimum of
150 rooms. This requirement was put in place to ensure that our hotels
were of high quality and well capitalized. The Code also requires a
minimum of 5 acres for a hotel project.
However, in 2012, the City adopted the EOOD in order to:
* Enhance the A1A corridor’s identity,
* Promote a pedestrian-friendly environment,
* Capitalize on our proximity to Port Canaveral,
* Proactively create economically diverse development projects on
underutilized land.
Among other things, the EOOD eliminated the minimum 5 acre requirement
and created a Planned Development (PD) Process which is defined as: A
designed development where the regulations of the underlying zone in
which the development is situated are waived to allow flexibility and
creative initiative in site, building design and location in accordance
with the approved plan and imposed general requirements.
This creates a scenario where a hotel could have less than 150 rooms if
approved as a Planned Development (PD) by the City Council.
Here is the operative language from the EOOD:
Sec. 110-627. - Project size.
(1) All uses within a project shall be sized to provide sufficient
building setback and to encourage a pedestrian-oriented environment.
a. All uses shall have a minimum lot size consistent with the area
required to meet the building setback, lot coverage and development
standards of the underlying zoning district.
b. There shall be no minimum lot size for hotel development within the
District. However, there shall be a minimum of 150 units that must be
constructed at the same time.
c. Building setback, lot coverage and developments that are
inconsistent with these requirements may be approved pursuant to a
planned development (PD) approved by the city council on a case-by-case
basis.
The project is early in the submittal process and the City’s and Port’s
comments to date have been limited to the attached conceptual site
layout. They include:
* Sewer service would be required to come from the West side of
SR A1A in a new utility easement under the highway. FDOT cannot grant an
easement to a private owner, so the easement would be in the name of the
City. To limit our exposure to the sewer line’s
maintenance/replacement/etc. we would need perpetual bonding from the
hotel owner and assigns/successors until such a time that a more
preferable sewer service is available.
* Port comments – see attached.
Staff will attend to assist with any questions that may come up during
the meetings.
Please let me know if you have availability on these dates:
Monday, December 5th
Tuesday, December 6th, or
Wednesday, December 7th
Thank you,
Todd
<http://www.cityofcapecanaveral.org/>
Launch your connection…
<https://www.facebook.com/CityofCapeCanaveral>
<https://www.instagram.com/cityofcapecanaveral/>
<https://www.linkedin.com/company/city-of-cape-canaveral-the>
<https://twitter.com/CapeCanaveralFL>
Florida has a very broad public records law. As a result, any written
communication created or received by the City of Cape Canaveral
officials and employees will be made available to the public and/or
media upon request, unless otherwise exempt. Under Florida Law, email
addresses are public records. If you do not want your email address
released in response to a public-records request, do not send electronic
email to this entity. Instead, contact our office by phone or in writing
Florida has a very broad public records law. As a result, any written
communication created or received by the City of Cape Canaveral
officials and employees will be made available to the public and/or
media upon request, unless otherwise exempt. Under Florida Law, email
addresses are public records. If you do not want your email address
released in response to a public-records request, do not send electronic
email to this entity. Instead, contact our office by phone or in writing
Florida has a very broad public records law. As a result, any written
communication created or received by the City of Cape Canaveral
officials and employees will be made available to the public and/or
media upon request, unless otherwise exempt. Under Florida Law, email
addresses are public records. If you do not want your email address
released in response to a public-records request, do not send electronic
email to this entity. Instead, contact our office by phone or in writing
‰屻尪瑨汭慴㥧′⼼㹩屽瑨汭瑲屽瑨汭瑲て挠湯敮瑣潩൮笊⩜桜浴瑬条㐸☠㠣㌲㬰屽瑨汭瑲❜㔸桜浴牬晴‰屻尪瑨汭慴㡧‴渦獢㭰屽瑨汭瑲❜ち桜浴牬晴‰ഠ笊⩜桜浴瑬条㔱‶⼼灳湡紾桜浴牬晴素桜浴牬晴‰屻尪瑨汭慴㡧‴愼栠敲㵦栢瑴獰⼺眯睷昮捡扥潯潣⽭楃祴景慃数慃慮敶慲≬紾桜浴牬晴笠晜敩摬屻尪汦楤獮筴奈䕐䱒义⁋栢瑴獰⼺眯睷昮捡扥潯潣⽭楃祴景慃数慃慮敶慲≬絽屻汦牤汳屴晣就汵尠瑨汭瑲てഠ笊⩜桜浴瑬条㐱‸猼慰
瑳汹㵥昢湯楳敺ㄺ⸰瀰㭴潣潬㩲汢敵琻硥敤潣慲楴湯渺湯≥紾桜浴牬晴笠桜浴牬晴‰屻尪瑨汭慴㡧‴椼杭戠牯敤㵲〢•楷瑤㵨㈢∴栠楥桧㵴㈢∴椠㵤弢へ〰弰ㅩ㌰∳猠捲∽楣㩤浩条づ㠰瀮杮䐱㐲䍃⸰䐱㜷䘵〸•污㵴䘢≂紾屻尪瑨汭慴ㅧ㘵㰠猯慰㹮屽瑨汭瑲屽瑨汭瑲て尠瑨汭瑲屽瑨汭瑲て尠瑨汭瑲屽瑨汭瑲てഠ笊⩜桜浴瑬条㈹㰠愯紾屻尪瑨汭慴㡧‴愼栠敲㵦栢瑴獰⼺眯睷椮獮慴牧浡挮浯振瑩潹捦灡捥湡癡牥污∯紾桜浴牬晴笠晜敩
摬屻尪汦楤獮筴奈䕐䱒义⁋栢瑴獰⼺眯睷椮獮慴牧浡挮浯振瑩潹捦灡捥湡癡牥污∯絽屻汦牤汳屴晣就汵尠瑨汭瑲てഠ笊⩜桜浴瑬条㐱‸猼慰瑳汹㵥昢湯楳敺ㄺ⸰瀰㭴潣潬㩲汢敵琻硥敤潣慲楴湯渺湯≥紾桜浴牬晴笠桜浴牬晴‰屻尪瑨汭慴㡧‴椼杭戠牯敤㵲〢•楷瑤㵨㈢∴栠楥桧㵴㈢∴椠㵤弢へ〰弰ㅩ㌰∲猠捲∽楣㩤浩条づ㤰瀮杮䐱㐲䍃⸰䐱㜷䘵〸•污㵴䤢≇紾屻尪瑨汭慴ㅧ㘵㰠猯慰㹮屽瑨汭瑲屽瑨汭瑲て尠瑨汭瑲屽瑨汭瑲て尠瑨汭瑲
屽瑨汭瑲てഠ笊⩜桜浴瑬条㈹㰠愯紾屻尪瑨汭慴㡧‴愼栠敲㵦栢瑴獰⼺眯睷氮湩敫楤潣⽭潣灭湡⽹楣祴漭ⵦ慣数挭湡癡牥污琭敨㸢屽瑨汭瑲屻楦汥筤⩜晜摬湩瑳䡻偙剅䥌䭎∠瑨灴㩳⼯睷楬歮摥湩挮浯振浯慰祮振瑩景挭灡ⵥ慣慮敶慲桴≥絽屻汦牤汳屴晣就汵尠瑨汭瑲てഠ笊⩜桜浴瑬条㐱‸猼慰瑳汹㵥昢湯楳敺ㄺ⸰瀰㭴潣潬㩲汢敵琻硥敤潣慲楴湯渺湯≥紾桜浴牬晴笠桜浴牬晴‰屻尪瑨汭慴㡧‴椼杭戠牯敤㵲〢•楷瑤㵨㈢∴栠楥桧
㵴㈢∴椠㵤弢へ〰弰ㅩ㌰∱猠捲∽楣㩤浩条づ〱瀮杮䐱㐲䍃⸰䐱㜷䘵〸•污㵴䰢≉紾屻尪瑨汭慴ㅧ㘵㰠猯慰㹮屽瑨汭瑲屽瑨汭瑲て尠瑨汭瑲屽瑨汭瑲て尠瑨汭瑲屽瑨汭瑲てഠ笊⩜桜浴瑬条㈹㰠愯紾屻尪瑨汭慴㡧‴愼栠敲㵦栢瑴獰⼺琯楷瑴牥挮浯䌯灡䍥湡癡牥污䱆㸢屽瑨汭瑲屻楦汥筤⩜晜摬湩瑳䡻偙剅䥌䭎∠瑨灴㩳⼯睴瑩整潣⽭慃数慃慮敶慲䙬≌絽屻汦牤汳屴晣就汵尠瑨汭瑲てഠ笊⩜桜浴瑬条㐱‸猼慰瑳汹㵥昢湯楳敺ㄺ⸰瀰㭴潣
潬㩲汢敵琻硥敤潣慲楴湯渺湯≥紾桜浴牬晴笠桜浴牬晴‰屻尪瑨汭慴㡧‴椼杭戠牯敤㵲〢•楷瑤㵨㈢∴栠楥桧㵴㈢∴椠㵤弢へ〰弰ㅩ㌰∰猠捲∽楣㩤浩条づㄱ瀮杮䐱㐲䍃⸰䐱㜷䘵〸•污㵴吢≷紾屻尪瑨汭慴ㅧ㘵㰠猯慰㹮屽瑨汭瑲屽瑨汭瑲て尠瑨汭瑲屽瑨汭瑲て尠瑨汭瑲屽瑨汭瑲てഠ笊⩜桜浴瑬条㈹㰠愯紾屻尪瑨汭慴ㅧ㠴㰠灳湡猠祴敬∽潦瑮猭穩㩥〱〮瑰挻汯牯⌺䙆㌳㤹㸢屽瑨汭瑲屻瑨汭瑲てഠ笊⩜桜浴瑬条㐲‴漼瀺紾屻尪瑨汭
慴㉧㈵㰠漯瀺紾屻尪瑨汭慴ㅧ㘵㰠猯慰㹮屽瑨汭瑲屽瑨汭瑲て尠瑨汭瑲屦慰絲桜浴牬晴ര尊瑨汭瑲灜牡桜浴牬晴‰屻尪瑨汭慴㝧′⼼㹰ൽ笊⩜桜浴瑬条‰灜牡素屻尪瑨汭慴㙧‴瀼挠慬獳∽獍乯牯慭≬紾桜浴牬晴笠桜浴牬晴‰屻尪瑨汭慴ㅧ㠴㰠灳湡猠祴敬∽潣潬㩲ㄣㄷㄷ∷紾桜浴牬晴笠桜浴牬晴‰屻尪瑨汭慴㉧㐴㰠㩯㹰ൽ笊⩜桜浴瑬条㐸☠扮灳紻桜浴牬晴尠愧尰瑨汭瑲てഠ笊⩜桜浴瑬条㔲′⼼㩯㹰ൽ笊⩜桜浴瑬条㔱‶⼼灳湡紾桜浴牬
晴素桜浴牬晴‰桜浴牬晴灜牡屽瑨汭瑲て桜浴牬晴尠慰൲尊瑨汭瑲てഠ笊⩜桜浴瑬条㈷㰠瀯紾屻尪瑨汭慴で尠慰ൽ笊⩜桜浴瑬条〱‴⼼楤㹶屽瑨汭瑲屽瑨汭瑲てഠ笊⩜桜浴瑬条‰灜牡素屻尪瑨汭慴㙧‴瀼挠慬獳∽獍乯牯慭≬紾桜浴牬晴笠桜浴牬晴‰屻尪瑨汭慴ㅧ㠴㰠灳湡猠祴敬∽潦瑮猭穩㩥㈱〮瑰昻湯慦業祬☺畱瑯吻浩獥丠睥删浯湡焦潵㭴猬牥晩挻汯牯⌺㜱㜱㜱㸢屽瑨汭瑲屻㑦尠瑨汭瑲てഠ笊⩜桜浴瑬条㐲‴漼瀺紾屻尪瑨汭慴㡧
‴渦獢㭰屽瑨汭瑲❜ち桜浴牬晴‰屻尪瑨汭慴㉧㈵㰠漯瀺紾屻尪瑨汭慴ㅧ㘵㰠猯慰㹮屽瑨汭瑲屽瑨汭瑲て尠瑨汭瑲屦慰絲桜浴牬晴ര尊瑨汭瑲灜牡桜浴牬晴‰屻尪瑨汭慴㝧′⼼㹰ൽ笊⩜桜浴瑬条‰灜牡素屻尪瑨汭慴㥧‶搼癩紾桜浴牬晴笠桜浴牬晴‰屻尪瑨汭慴で尠慰ൽ笊⩜桜浴瑬条㘹㰠楤⁶瑳汹㵥戢牯敤㩲潮敮戻牯敤潴㩰潳楬䔣䔱䔱‱⸱瀰㭴慰摤湩㩧⸳瀰⁴椰椰椰≮紾桜浴牬晴笠桜浴牬晴‰屻尪瑨汭慴で尠慰ൽ笊
⩜桜浴瑬条㐶㰠⁰汣獡㵳䴢潳潎浲污㸢屽瑨汭瑲屻瑨汭瑲てഠ笊⩜桜浴瑬条㐸㰠㹢屽瑨汭瑲屻桜浴牬晴‰牆浯ഺ笊⩜桜浴瑬条㈹㰠戯紾桜浴牬晴素桜浴牬晴‰䐠癡摩䜠敲湥屻尪瑨汭慴ㅧ㘱㰠牢紾桜浴牬晴尠楬敮桜浴牬晴‰屻尪瑨汭慴㑧尠慰ൽ笊⩜桜浴瑬条㐸㰠㹢屽瑨汭瑲屻桜浴牬晴‰敓瑮ഺ笊⩜桜浴瑬条㈹㰠戯紾桜浴牬晴素桜浴牬晴‰䘠楲慤ⱹ䐠捥浥敢㈰〲㘱㔠ㄺ′䵐屻尪瑨汭慴ㅧ㘱㰠牢紾桜浴牬晴尠楬敮桜浴牬晴‰
屻尪瑨汭慴㑧尠慰ൽ笊⩜桜浴瑬条㐸㰠㹢屽瑨汭瑲屻桜浴牬晴‰潔ഺ笊⩜桜浴瑬条㈹㰠戯紾桜浴牬晴素桜浴牬晴‰吠摯潍汲祥ഠ笊⩜桜浴瑬条㐸☠瑬紻桜浴牬晴㰠桜浴牬晴‰⹔潍汲祥捀瑩潹捦灡捥湡癡牥污漮杲屻尪瑨汭慴㡧‴朦㭴屽瑨汭瑲尾瑨汭瑲てഠ笊⩜桜浴瑬条ㄱ‶戼㹲屽瑨汭瑲汜湩尊瑨汭瑲てഠ笊⩜桜浴瑬条‴灜牡素屻尪瑨汭慴㡧‴戼紾桜浴牬晴笠扜尠瑨汭瑲て匠扵敪瑣ഺ笊⩜桜浴瑬条㈹㰠戯紾桜浴牬晴素桜浴牬晴‰删
㩅䐠湡敩潃灲屻尪瑨汭慴㉧㐴㰠㩯㹰ൽ笊⩜桜浴瑬条㔲′⼼㩯㹰屽瑨汭瑲屦慰絲桜浴牬晴ര尊瑨汭瑲灜牡桜浴牬晴‰屻尪瑨汭慴㝧′⼼㹰ൽ笊⩜桜浴瑬条‰灜牡素屻尪瑨汭慴ㅧ㐰㰠搯癩紾桜浴牬晴素桜浴牬晴‰屻尪瑨汭慴で尠慰ൽ笊⩜桜浴瑬条〱‴⼼楤㹶屽瑨汭瑲屽瑨汭瑲てഠ笊⩜桜浴瑬条‰灜牡素屻尪瑨汭慴㙧‴瀼挠慬獳∽獍乯牯慭≬紾桜浴牬晴笠桜浴牬晴‰屻尪瑨汭慴㉧㐴㰠㩯㹰ൽ笊⩜桜浴瑬条㐸☠扮灳紻桜浴牬晴尠愧
尰瑨汭瑲てഠ笊⩜桜浴瑬条㔲′⼼㩯㹰屽瑨汭瑲屦慰絲桜浴牬晴ര尊瑨汭瑲灜牡桜浴牬晴‰屻尪瑨汭慴㝧′⼼㹰ൽ笊⩜桜浴瑬条‰灜牡素屻尪瑨汭慴㙧‴瀼挠慬獳∽獍乯牯慭≬紾桜浴牬晴笠桜浴牬晴‰屻尪瑨汭慴ㅧ㠴㰠灳湡猠祴敬∽潣潬㩲ㄣ㑆㜹≄紾桜浴牬晴笠桜浴牬晴‰潔摤ബ笊⩜桜浴瑬条㐲‴漼瀺紾屻尪瑨汭慴㉧㈵㰠漯瀺紾屻尪瑨汭慴ㅧ㘵㰠猯慰㹮屽瑨汭瑲屽瑨汭瑲て尠瑨汭瑲屦慰絲桜浴牬晴ര尊瑨汭瑲灜牡桜浴牬晴‰
屻尪瑨汭慴㝧′⼼㹰ൽ笊⩜桜浴瑬条‰灜牡素屻尪瑨汭慴㙧‴瀼挠慬獳∽獍乯牯慭≬紾桜浴牬晴笠桜浴牬晴‰屻尪瑨汭慴ㅧ㠴㰠灳湡猠祴敬∽潣潬㩲ㄣ㑆㜹≄紾桜浴牬晴笠桜浴牬晴‰瑉椠歯搮൧笊⩜桜浴瑬条㐲‴漼瀺紾屻尪瑨汭慴㉧㈵㰠漯瀺紾屻尪瑨汭慴ㅧ㘵㰠猯慰㹮屽瑨汭瑲屽瑨汭瑲て尠瑨汭瑲屦慰絲桜浴牬晴ര尊瑨汭瑲灜牡桜浴牬晴‰屻尪瑨汭慴㝧′⼼㹰ൽ笊⩜桜浴瑬条‰灜牡素屻尪瑨汭慴㙧‴瀼挠慬獳∽獍乯牯慭≬紾桜
浴牬晴笠桜浴牬晴‰屻尪瑨汭慴ㅧ㠴㰠灳湡猠祴敬∽潣潬㩲ㄣ㑆㜹≄紾桜浴牬晴笠桜浴牬晴‰屻尪瑨汭慴㉧㐴㰠㩯㹰ൽ笊⩜桜浴瑬条㐸☠扮灳紻桜浴牬晴尠愧尰瑨汭瑲てഠ笊⩜桜浴瑬条㔲′⼼㩯㹰ൽ笊⩜桜浴瑬条㔱‶⼼灳湡紾桜浴牬晴素桜浴牬晴‰桜浴牬晴灜牡屽瑨汭瑲て桜浴牬晴尠慰൲尊瑨汭瑲てഠ笊⩜桜浴瑬条㈷㰠瀯紾屻尪瑨汭慴で尠慰ൽ笊⩜桜浴瑬条㘹㰠楤㹶屽瑨汭瑲屻瑨汭瑲てഠ笊⩜桜浴瑬条‰灜牡素屻尪瑨汭慴㥧‶搼癩猠
祴敬∽潢摲牥渺湯㭥潢摲牥琭灯猺汯摩⌠ㅅㅅㅅㄠ〮瑰瀻摡楤杮㌺〮瑰〠湩〠湩〠湩㸢屽瑨汭瑲屻瑨汭瑲てഠ笊⩜桜浴瑬条‰灜牡素屻尪瑨汭慴㙧‴瀼挠慬獳∽獍乯牯慭≬紾桜浴牬晴笠桜浴牬晴‰屻尪瑨汭慴㡧‴戼紾桜浴牬晴笠扜尠瑨汭瑲て䘠潲㩭屻尪瑨汭慴㥧′⼼㹢屽瑨汭瑲屽瑨汭瑲て†潔摤䴠牯ׅ쀀ﴑBᇸᖷᖵ
From: Joshua Surprenant
Sent: Monday, October 03, 2016 10:53 AM
To: Todd Morley <T.Morley@cityofcapecanaveral.org>
Subject: FW: Cocoa Beach bike share...
Todd,
How do we get time with Tom and Bob about the bikeshare?
Joshua
From: David Greene
Sent: Friday, September 23, 2016 7:00 PM
To: Joshua Surprenant <J.Surprenant@cityofcapecanaveral.org
<mailto:J.Surprenant@cityofcapecanaveral.org> >
Subject: RE: Cocoa Beach bike share...
Let's express our strong interest...See if you can figure out how we
are going to do that! Let's visit on Tuesday. David
-------- Original message --------
From: Joshua Surprenant <J.Surprenant@cityofcapecanaveral.org
<mailto:J.Surprenant@cityofcapecanaveral.org> >
Date: 9/23/16 6:44 PM (GMT-05:00)
To: Todd Morley <T.Morley@cityofcapecanaveral.org
<mailto:T.Morley@cityofcapecanaveral.org> >
Cc: David Greene <D.Greene@cityofcapecanaveral.org
<mailto:D.Greene@cityofcapecanaveral.org> >, David Dickey
<D.Dickey@cityofcapecanaveral.org
<mailto:D.Dickey@cityofcapecanaveral.org> >, Gustavo Vergara
<G.Vergara@cityofcapecanaveral.org
<mailto:G.Vergara@cityofcapecanaveral.org> >
Subject: Cocoa Beach bike share...
Cocoa Beach is "potentially" getting a bike share from a company called
Zagster in January. The TDC voted 8-1 to "cover" the start up cost of
110k. We are listed as a "future site", let's strongly express our
interest to the TDC / Zagster in being the FIRST site! Are only other
option is to beat them to it.
http://www.floridatoday.com/story/news/local/2016/09/23/bicycle-sharing
-program-planned-cocoa-beach-2017/90830282/
Thanks,
Joshua
Joshua Surprenant
Interim Public Works Services Director
Community Engagement Director
City of Cape Canaveral
321.868.1240
j.surprenant@cityofcapecanaveral.org
<mailto:j.surprenant@cityofcapecanaveral.org>
Florida has a very broad public records law. As a result, any written
communication created or received by the City of Cape Canaveral
officials and employees will be made available to the public and/or
media upon request, unless otherwise exempt. Under Florida Law, email
addresses are public records. If you do not want your email address
released in response to a public-records request, do not send electronic
email to this entity. Instead, contact our office by phone or in writing
Florida has a very broad public records law. As a result, any written
communication created or received by the City of Cape Canaveral
officials and employees will be made available to the public and/or
media upon request, unless otherwise exempt. Under Florida Law, email
addresses are public records. If you do not want your email address
released in response to a public-records request, do not send electronic
email to this entity. Instead,