HomeMy WebLinkAboutFW Sunbelt Hotel CS05-0331881-001 (19)Rasesh:
This doesn’t seem correct?
Thanks,
<http://www.cityofcapecanaveral.org/>
Launch your connection…
<https://www.facebook.com/CityofCapeCanaveral>
<https://www.instagram.com/cityofcapecanaveral/>
<https://www.linkedin.com/company/city-of-cape-canaveral-the>
<https://twitter.com/CapeCanaveralFL>
From: Noel Droor [mailto:noel@dai.us.com]
Sent: Wednesday, January 27, 2016 2:42 PM
To: Jeff Ratliff <J.Ratliff@cityofcapecanaveral.org>
Cc: 'Mark Robbins' <MarkR@lbaproperties.com>
Subject: FW: Sunbelt Hotel CS05-0331881-001
Jeff:
Since City did not have the sewer line in place and cleared for use, we
only could file for FDEP dry line sewer permit. Based on the following
email from FDEP, we need an approval from city of Cape Canaveral. I have
also attached copy of the FDEP as built certification form along with
the as built survey for your review and approval prior to forwarding to
FDEP.
Please review attached certification form, sign section 3; attach any
required documentation so we can forward them to FDEP for their
approval.
Mark, please sign the application sections 1 & 2 as applicant & owner
responsible for maintenance after being placed in service.
Please call or email if you have any questions.
Noel
From: Judy, Dennise [mailto:Dennise.Judy@dep.state.fl.us]
Sent: Wednesday, January 27, 2016 8:14 AM
To: Elliott, Gene <Gene.Elliott@dep.state.fl.us
<mailto:Gene.Elliott@dep.state.fl.us> >; Noel Droor
<noel@droorassociates.com <mailto:noel@droorassociates.com> >
Cc: LeGros, Charles <Charles.LeGros@dep.state.fl.us
<mailto:Charles.LeGros@dep.state.fl.us> >
Subject: RE: Sunbelt Hotel CS05-0331881-001
If the dryline hasn’t been cleared for use yet, the utility could
provide that “approval” with their certification of the form. If it has
been cleared, a letter from the utility from the file would be
required.
Dennise
Dennise Judy, CPM
Wastewater Permitting
Florida Department of Environmental Protection
Central District - Orlando
Dennise.Judy@dep.state.fl.us <mailto:Dennise.Judy@dep.state.fl.us>
Office: 407.897.4154
Permitting Consistency Initiative: The Florida Department of
Environmental Protection is committed to providing efficient, consistent
and quality service to the citizens of Florida. In keeping with these
objectives, we are pleased to announce ongoing improvements to our
permitting process by standardizing and simplifying our documents.
During the fall of this year, the Department will begin issuing
permitting correspondence formatted consistently throughout all
programs. Although the document formatting will look different from past
correspondence, please be assured that the content continues to be
driven by applicable Rule and Statute. As always, if you have any
questions, please contact your local DEP District office.
From: Elliott, Gene
Sent: Wednesday, January 27, 2016 7:18 AM
To: Noel Droor <noel@droorassociates.com
<mailto:noel@droorassociates.com> >
Cc: Judy, Dennise <Dennise.Judy@dep.state.fl.us
<mailto:Dennise.Judy@dep.state.fl.us> >
Subject: RE: Sunbelt Hotel CS05-0331881-001
I am doing both programs still. To answer the question I would say a
document from the utility to indicate they were approving the required
flow commitment should be adequate.
Dennise, am I correct? Please advise. Thank you. Gene Elliott.
407-897-4151.
From: Noel Droor [mailto:noel@droorassociates.com]
Sent: Tuesday, January 26, 2016 4:28 PM
To: Elliott, Gene <Gene.Elliott@dep.state.fl.us
<mailto:Gene.Elliott@dep.state.fl.us> >
Subject: Sunbelt Hotel CS05-0331881-001
Gene:
I hope everything is going well. I do not know if you are back to
industrial waster permit review or you still do the domestic waste
permit review also.
We had a dry line permit for the Sunbelt Hotel (CS05-0331881-001) since
Cape Canaveral did not have their sewer line constructed. Since then,
City of Cape Canaveral has installed the sewer line and to my
understanding, the FDEP has cleared the line for use. City of Cape
Canaveral permit number is 0028786-004.
Based on our permit condition #6, "This permit is for the "Dryline"
collection/transmission mains only. No wet connections shall be
made without the separate prior written approval and flow allocations
by DEP and the Utility".
Please let me know what kind of written approval is required. The
required flow calculations were shown in our previous permit submittal
that was approved by city of Cape Canaveral Utility Department.
Look forward to hearing from you soon. You can contact me at
321-253-8233 (office) or 321-258-9139 (cell).
Noel
<http://www.surveygizmo.com/s3/2270308/Internet-Improvement-Survey/?refe
mail=Dennise.Judy@dep.state.fl.us>
<http://survey.dep.state.fl.us/?refemail=Dennise.Judy@dep.state.fl.us>
Florida has a very broad public records law. As a result, any written
communication created or received by the City of Cape Canaveral
officials and employees will be made available to the public and/or
media upon request, unless otherwise exempt. Under Florida Law, email
addresses are public records. If you do not want your email address
released in response to a public-records request, do not send electronic
email to this entity. Instead, contact our office by phone or in writing
Florida has a very broad public records law. As a result, any written
communication created or received by the City of Cape Canaveral
officials and employees will be made available to the public and/or
media upon request, unless otherwise exempt. Under Florida Law, email
addresses are public records. If you do not want your email address
released in response to a public-records request, do not send electronic
email to this entity. Instead, contact our office by phone or in writing
䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑
䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑
䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑
䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑
䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑
䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑
䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑
䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑
䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑
䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑
䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑䕑Ĕ�湥獤牴慥൭湥潤橢㤍〠漠橢㰍‼䰯湥瑧㜴ഠ㸾猍牴慥൭ⁱㄶ⸲〰〠〠㜠㈹〮‰⸰〰〠〮‰浣ㄠ朠⼠浉″潄儠攍摮瑳敲浡攍摮扯൪〱〠漠橢㰍഼启灹倯条䴯摥慩潂⁸せ〠㘠㈱㜠㈹൝倯牡湥⁴‴‰⁒⼍潒慴整〠⼠敒潳牵散㰼⼍牐捯敓⁴⽛䑐⁆
䤯慭敧⁃䤯慭敧⁂䤯慭敧嵉⼍佘橢捥⁴㰼⼍浉″‸‰㸠ാ㸠ാ䌯湯整瑮⁛‹‰൝㸾攍摮扯൪‴‰扯൪㰼⼍祔数⼠慐敧൳䬯摩⁛″‰⁒‷‰⁒〱〠删൝䌯畯瑮㌠㸍ാ湥潤橢ㄍ‱‰扯൪㰼⼍祔数⼠慃慴潬൧倯条獥㐠〠删†㸍ാ湥潤橢ㄍ′‰扯൪㰼⼠牃慥潴⤨⼍牃慥楴湯慄整⠠ഩ䄯瑵潨⤨⼍牐摯捵牥⠠ഩ启瑩敬⠠ഩ匯扵敪瑣⠠ഩ㸾攍摮扯൪牸晥ㄍㄠള〰〰〰〰〰㘠㔵㔳映ഠ〰〰〰〰㤰〠〰〰渠ഠ〰〰〸㜷㘶〠〰〰渠ഠ〰〰〸㠷㌶〠〰〰渠ഠ〰
㈰㈴㤲㘹〠〰〰渠ഠ〰〰〸〸〵〠〰〰渠ഠ〰㔶㤷㔸〠〰〰渠ഠ〰㔶〸㈸〠〰〰渠ഠ〰㔶㈸㤶〠〰〰渠ഠ〰㈰㈴㜲ㄱ〠〰〰渠ഠ〰㈰㈴㠲㠰〠〰〰渠ഠ〰㈰㈴〳㜶〠〰〰渠ഠ〰㈰㈴ㄳ㤱〠〰〰渠ഠ牴楡敬൲㰼⼍楓敺ㄠള刯潯⁴ㄱ〠删⼍湉潦ㄠ′‰㸾猍慴瑲牸晥㈍㈴㈳㘱┍䔥䙏