HomeMy WebLinkAboutRe-Bid Addendum #1CITY OF
CAPE CANAVERAL
ADDENDUM # 1
CITY OF CAPE CANAVERAL
BID #2015-05
CITY OF CAPE CANAVERAL LIFT STATIONS NOS, 6&7 IMPROVEMENTS
March 20, 2015
All contents of this addendum shall be incorporated into the solicitation documents
and the ensuing contract with the awarded contractor.
Questions will be accepted up to seven days prior to the bid opening -.—The last day questions and
RFI's for this bid. is 2:00 pm on March 20, 201S. No further questions or RFPs will be accepted after
that date and time.
Addendums may be issued up to seven days (March 20, 2015) prior to the bid opening due time. It is the
responsibility of all potential bidders to ensure they have received all addendums issued.
All documents pertaining to this solicitation may be obtained free of charge on CD from the City of Cape
Canaveral, City Clerk's Office, 105 Polk Avenue, Cape Canaveral, FL 32920.
This addendum is to clarify items.
A. SPECIFICATION CHANGES:
1. Delete the paragraph in Section 010101.03 Band replace with the following Cafterdeletingthe strikethrou h
text
B. "This Contract requires a portion of the work to be connected to work done under other contract(s).
It will be necessary for the Contractor to plan his work and cooperate with other contractors insofar
as possible to prevent any interference and delay. This contract requires that the portion of work
related to Lift Station No. 6, including the sanitary sewer improvements, water main and lift station
improvements, be substantially complete and ready to be brought online no later than the substantial
completion date per the agreement or- july 31, 20!5, "is-flewe-r- A-eeiffs first for the LS No. b.
Contractor shall consider construction sequence, duration of work, and resources required to meet
this requirement when developing the Project Schedule. "
2. Delete the paragraph in Section 011001.11 B and re lace with the following (aftgr deletin the strikethrou h
text
B. "This contract requires that the portion of work related to Lift Station No. 6, including the sanitary
sewer improvements, water main and lift station improvements, be substantially complete and ready
Page 1 of 1
to be brought online no later than the substantial completion date per the agreement for the LS No.
6. or july 31, 2015, whiehevef oecurs first. Contractor shall coordinate activities and resources
required to meet this requirement. in the eventthe projeet substantial eemplefien data is extendbehind july
2015 for any
the se-hedule shall maintain the july
2015 deadlift
5 , ,
substantially eornpletewer& related te Lift Station No. 6 unless appreved in writing by the ,±
3. Delete the parug ra ph in Section 013101.03 E and replace with the ollowin a ter deleting the strike through
text
E. "Scheduling Constraints: The work within Owner's property must be completed within the
maximum number of days start to finish, as indicated in the Contract. Additionally, work must
proceed on a continuous basis, without stoppages, except for nights and weekends. There shall be
no lapses between phases of construction. This contract requires that the portion of work related to
Lift Station No. 6, including the sanitary sewer improvements, water main and lift station
improvements, be substantially complete and ready to be brought online no later than the substantial
completion date per the agreement for the LS No. 6.e T� Rl-y 31, 2015, whiehever eeeurs first.
Contractor shall consider construction sequence, duration of work, and resources required to meet
this requirement.
,
-2015 for- any feasen, the sehedule shall m—Aintain the Ady 31, 2015 deadline to substantially eempL4e
Vav related to Lift CtUtLVLNV. 6 unless appr-eved in f4 . by the O
The bid due date remains March 27, 2015 at 2:00 p.m. All prospective bidders are hereby instructed not to
contact the City of Cape Canaveral Council, City Manager, or City of Cape Canaveral Staff members other
than the noted contact person regarding this Invitation to Bid or their bid proposal at any time during the
bid process, all the way up to an award. Any such contact shall be cause for rejection of your bid proposal.
ALL OTHER SPECIFICATIONS AND CONDITIONS REMAIN UNCHANGED.
RECEIPT OF THIS ADDENDUM IS HEREBY ACKNOWLEDGED
NAME OF BUSINESS
SIGNATURE/DATE
NAME & TITLE, TYPED OR PRINTED
MAILING ADDRESS
CITY, STATE, ZIP CODE
Page 2 of 2