Loading...
HomeMy WebLinkAboutPort Canaveral.Development.AgreementThis Document Prepared By: Glenn D. Storch, Esquire GLENN D. STORCH, P.A. 420 South Nova Road Daytona Beach, FL 32114 CANAVERALPORTAUTHORITY DEVELOPMENT AGREEMENT TIDS DEVELOPMENT AGREEMENT (the "Development Agreement") is made this __ day of 2017, by and between the CANAVERAL PORT AUTHORITY, a body politic and corporate existing under and by virtue of the laws of the State of Florida, whose mailing address is 445 Challenger Road, Suite 301, Cape Canaveral, Florida 32920 (the "Port Authority"), and DANIEL CORPORATION OF WINTER PARK, INC., a Florid corporation, 100 East Faith Terrance, Maitland, Florida 32751, authorized to do business in the State of Florida (the "Developer"). RECITALS WHEREAS, the Port Authority is the owner of certain property in Brevard County, Florida within the City of Cape Canaveral, also known as Port Canaveral, more particularly described in Exhibit "A" attached hereto (the "Port Authority's Property"); and WHEREAS, the Developer is the contract purchase for certain property in Brevard County, Florida, within the City of Cape Canaveral described in Exhibit "B" attached hereto for the development of a Holiday Inn Hotel (the "Holiday Inn's Property"); and WHEREAS, the Developer requires water and wastewater service, and the dedicated access for the development of the Holiday Inn Property and the Port Authority is willing to allow the utilization of Port Authority's Property right-of-way and a utility easement for same in the manner described below and subject to the terms and conditions described herein; and WHEREAS, the Developer represents that it expects to develop the Holiday Inn Property as depicted on the conceptual site plan as Exhibit "C" attached thereto (the "Conceptual Site Plan"); and NOW, THEREFORE, for and in consideration of the Recitals hereof and the mutual understanding and Agreement herein contained and assumed, and other good and valuable considerations received by each party from the other, the receipt and sufficiency of which are hereby acknowledged, the Parties do hereby agree as follows: 1. Development Plan. a. The Port Authority authorizes the Developer to utilize the Port Authority Property for construction of the utility and road improvements depicted on the Conceptual Site Plan. Notwithstanding the foregoing, the scope of said improvements on the Port Authority Property and the manner of construction for same shall be limited as described in Exhibit "D" attached hereto (the "Port Authority Limitations"). b. The sewer easement depicted on the Conceptual Site Plan shall be required to be dedicated to the City of Cocoa. c. Notwithstanding anything herein to the contrary, all requirements and restrictions of this Development Agreement shall be incorporated into any future development agreement for the Holiday Inn Property. 2. Interpretation. The Port Authority Limitations shall gQvern in case of conflict between the textual provision of this Development Agreement and the Conceptual Site Plan. 3. Conformance with Regulations and Permitting. This Development Agreement shall be contingent on the Developer complying with all State and local government regulations and permitting requirements, including providing any appropriate performance and maintenance guarantees. 4. Costs. All costs of permitting and construction shall not be borne by the Port Authority unless the Port Authority specifically agrees in writing to assume such cost. 5. Effective Date and Expiration. This Development Agreement shall be effective upon execution by both Parties and shall remain in effect until otherwise terminated by mutual agreement of both Parties in writing. The restrictions on use and development imposed by this Development Agreement shall be binding upon all successor in interest, unless this Development Agreement expires consistent with its terms. The term "development" shall mean that the Developer, his successor or assigns, shall actively be in pursuit of installation of improvements, permits for installation of improvements or installation of improvements depicted on the Conceptual Site Plan. 6. Amendments. Any amendments or modifications to this Development Agreement shall not be effective unless in writing and signed by both Parties, or their respective successors or assigns, as the case may be. 7. Severability. If any provision of this Development Agreement is held by a court of competent jurisdiction to be invalid or otherwise unenforceable, such holding shall not affect the validity or enforceability of any other provision of this Development Agreement unless the holding so states. 8. Complete Agreement. This Development Agreement represents the complete understanding by and between the Parties with respect to the use and development of the Port Authority's Property. Any and all prior agreements between the parties with respect to any subject comprehended by this Agreement is hereby voided and superseded by this Development Agreement. IN WITNESS WHEREOF, the parties hereto attached their hands and seals on the dates set forth below. Signed, sealed and delivered in the presence of: WITNESSES: Print Name: Print Name: STATE OF FLORIDA COUNTY OF BREVARD CANAVERAL PORT AUTHORITY, a body politic and corporate existing under and and by virtue of the laws of the State ofFlorida By: Print Name: Thomas W. Weinberg, Chairman Date: The foregoing instrument was acknowledged before me this __ day of 2017, by Thomas W. Weinberg, as Chairman of the Canaveral Port Authority. He is personally known to me and did not take an oath. · · (Seal) Notary Public Signed, sealed and delivered in the presence of: WITNESSES: Print Name: Print Name: STATE OF FLORIDA COUNTY OF VOLUSIA DANIEL CORPORATION OF WINTER PARK, INC., a Florida corporation By: Print Name: Laila Witwicky, President Date: The foregoing instrument was acknowledged before me this day of , 2017, by Laila Witwicky, as President of Daniel Corporation of Winter Park, Inc. She is personally known to me and did not take an oath. · (Seal) Notary Public EXHIBIT \) March 17, 2017 Jean Abi-Aoun, P.E. 5127 S. Orange Avenue, Suite 200 Orlando, Florida 32809 Phone: (407) 895-0324 RE: CAPE CANAVERAL HOTEL PROJECT Request for Additional Information Dear Mr. Abi-Aoun: PORT AUTHORITY This letter is being sent as follow up to the Development Review Committee (DRC) meeting held on Monday 3/13 at the Canaveral Port Authorities offices in the Maritime Center. The following comments and requests for additional information should be considered subsequent to the email request transmitted to Florida Engineering Group (FEG), Orlando, FL, on 11/29/16 regarding plans for the above referenced hotel development, received via email on 2/22/17, as proposed on a certain parcel adjacent to Canaveral Port Authority (CPA) lands at the southern terminus of Columbia Road. The proposed increase in vehicular traffic and the propensity for the development to produce pedestrian traffic accessing the Port may require certain improvements to the Columbia Road cross section to address public safety concerns. These improvements include: 1) A dedicated left-turn lane and associated signal modifications at the intersection of Columbia Road and George King Boulevard 2) A pedestrian walk to include new and/or modified signalized cross walks at the intersection of Columbia Road and George King Boulevard. Alternate potential alignments of the walk were conceptually discussed at the DRC. 3) An emergency signal at the drive way entrance on Columbia Road from the existing Canaveral Fire Rescue (CFR) Fire Station #52. The emergency signal beacon is intended to operate during times of emergency egress during response activities and to warn of the potential for wind-driven smoke during training exercises. 4) It was recommended by Port Staff and CFR that the curved transition from Columbia Road to the hotel entrance be replaced with a "T" intersection with a stop sign and bar for the east bound hotel exit. Following a review of the proposed stormwater system, we have thE! following comments: 5) The proposed retaining wall along the northern boundary of the hotel property will block the natural southerly flow of runoff from CPA property causing ponding along this boundary. Stormwater facilities shall be constructed to accept and convey this runoff through or around the proposed development. 6) The existing property naturally drains to the south and to the west. The proposed stormwater system, as indicated in the drawings submitted on 2/22, will redirect all run off to the western boundary. CPA requests concurrence from St. John's River Water Management District (SJRWMD) and/or FDEP that this is acceptable. 7) If proposed discharge rates are increased at the western boundary with the adjacent Port-owned lands a drainage easement will be required. 8) A review of the existing condition of the twin outfall pipes under FOOT R/W to the west of the proposed property may be necessary. As discussed during the DRC, CPA is in process of conducting a South Port Potable Water and Traffic capacity study. Draft results from these studies should be available in May 2017; further comments may result from the conclusions drawn by these studies and these comments will be incorporated into the review of the proposed Hotel project at that time. In the interim, please see the following utility comments: · Canaveral Port Authority 445 Challenger Road, Suite 301, Cape Canaveral FL 32920 321.783.7831 www.portcanaveral.com