HomeMy WebLinkAboutAgenda Packet - 03-28-2018 RetreatCAPE CANAVERAL CITY COUNCIL
STRATEGIC PLANNING RETREAT
TO SET FISCAL YEAR 2018/2019 GOALS
Radisson Resort at the Port
8701 Astronaut Boulevard, Cape Canaveral, Florida 32920
AGENDA
Wednesday
March 28, 2018
10:30 AM – 3:00 PM
Facilitator: Tom D. Freijo, Ph.D.
WELCOME/INTRODUCTIONS/AGENDA REVIEW (10:30 – 10:45)
STRATEGIC PLANNING PROCESS REVIEW (10:45 – 11:00)
Review of Strategic Planning Process
Explanation of how the Retreat ties in with Strategic Planning Process
REVIEW 2017/18 GOAL ACCOMPLISHMENTS (11:00 – 1:30)
REVIEW PROPOSED GOALS FOR 2018/19 (11:00 – 1:30)
12:00 noon – 1:00 p.m. Working Lunch
SWOT ANALYSIS (1:30 – 2:00)
Explanation of SWOT
Review results of SWOT Analysis: Strengths, Weaknesses, Opportunities, Threats
VISION/GOALS AFFIRMATION (2:00 – 2:30)
Review/Revise current Vision Statement
Affirm 2018/2019 Goals
NEXT STEPS DISCUSSION (2:30 – 2:45)
Plan(s) of Action
Budget Allocations
Monitoring/Evaluation Process
Periodic Reports
Year-End Report and initiation of subsequent Strategic Planning Cycle
MAYOR HOOG PRESIDES (2:45 - 3:00)
THE CITY COUNCIL WILL TAKE ACTION AT THE APRIL 17, 2018 REGULAR CITY
COUNCIL MEETING: 1) TO DISCUSS THE VISION STATEMENT AND POSSIBLE
REVISIONS/UPDATES; 2) TO DISCUSS AND SET GOALS FOR FISCAL YEAR 2018/2019.
PUBLIC COMMENT (2:50 - 3:00) Time limited to 3 minutes per Speaker
WRAP UP AND ADJOURNMENT (3:00)
Community
Development
Memo
To: David L. Greene, City Manager
Dr. Thomas Freijo, Retreat Facilitator
FROM: David Dickey, Community Development Director
DATE: March 23, 2018
RE: 2017/18 Retreat Goal Accomplishments
One of the primary tasks to be completed at the City Council's upcoming Strategic Planning
Retreat is to review the goals established at the 2016/17 Retreat. The goals, as well as the
status of each (shown in blue font), are indicated below.
2017/18 Goals
1. Canaveral City Park Redevelopment. This project is proposed to be a
redevelopment of the Canaveral City Park property and would include a large, two-
story multipurpose, Multi -Generational Facility (MGF) that would house a Youth
Center, Police Athletic League programs and various athletic activities/community-
oriented events, as well as a "splash pad'', skate park and rope climbing course.
On July 18, 2017, Council authorized the issuance of up to S6.2 million in revenue
notes to finance the certain public construction projects -- including S5 million for
the MGF.
On January 18, 2018, Staff` reviewed 9 responses to IZFQ 2017-01 for services related
to the design and construction of the MGF. Architects RZK, Inc. from Cocoa was
selected based on compliance with RFQ Instructions, Technical Expertise, Quality
Control, Staff Credentials, Related Experience with Similar Projects, Location and
Local Knowledge/Experience and Project References.
By September 30, 2018, the project will he approximately 60% designed and
preliminary discussions with permitting agencies will have occurred. Although funding
has been acquired, the City continues to negotiate with Brevard County Board of
County Commission to identify another possible source of funding, the Community
Redevelopment Agency. The City intends to pay for this project using the CRA as this
fits within the scope of allowed projects. The City will seek further Funds from Brevard
County Tourist Developrent Council as the project fits within some of its grant
funding allocation requirements.
2017/18 Retreat Goal Accomplishments
March 23, 2018
Page 2
Below is a concept rendering of the MGF, prepared by GLA in 2017. The selected
architect will prepare three concept drawings – similar to the City Hall project – for
community/Council consideration and approval.
[Four-side proposed rendering of the CAPE Center]
2.Cultural Arts Preservation and Engagement (CAPE) Center. This project entails the
redevelopment of the old City Hall building at 105 Polk Avenue for a location to
promote art and the City’s history. It would include whimsical architecture
designed to be iconic and to pique interest. It would include outdoor displays and
activities such as the Farmer’s Market, art classes, future community art projects
such as murals and mid-century modern architecture tying into the era when the
City was first incorporated.
On July 18, 2017, Council authorized the issuance of up to $6.2 million in revenue
notes to finance the certain public construction projects – including $1.2 million for
the CAPE Center.
On January 18, 2018, Staff reviewed 9 responses to RFQ 2017-01 for services
related to the design and construction of the CAPE Center. Architects RZK, Inc.
from Cocoa was selected based on compliance with RFQ instructions, Technical
Expertise, Quality Control, Staff Credentials, Related Experience with Similar
Projects, Location and Local Knowledge/Experience and Project References.
By September 30, 2018, the project will be approximately 60% designed and
preliminary discussions with permitting agencies will have occurred. Quotes have
been acquired for interior demolition and asbestos abatement. This part of the
project will be paid for by the general fund. Although funding has been acquired
for the main redevelopment project, City Staff continues to negotiate with Brevard
County to identify source of funds for payback. City intends to pay for this project
using the CRA as this fits within the scope of allowed projects. City will seek
2017/18 Retreat Goal Accomplishments
March 23, 2018
Page 3
further funds from Brevard County TDC as the project fits within its grant funding
allocation requirements.
3.Inspiration & Whimsy Parks. These two projects would provide additional
park/gathering spaces along Polk Avenue, leveraging existing City facilities, to
include City Hall, Library, CAPE Center, Veterans Park and the Brevard County
Sherriff Office Building. These facilities will support the City’s efforts to become
more walkable, bikeable and engage the community at-large. Whimsy Park, which
is located adjacent to the Library, would be the site for outdoor sculptures and/or
art features, while Inspiration Park will provide outdoor seating and a place for
quiet contemplation.
Whimsy Park - Through an Out-of-School Time Grant from the National Recreation
and Park Association, the City was able to acquire a large outdoor chess game and install
a concrete pad to set the stage for future development. Staff, in conjunction with Kimley-
Horn, prepared a draft master plan in FY16/17 that included the chess game as one of
the whimsical amenities that would be offered. Families have already started to enjoy
the park more frequently and the chess game has generated a lot of buzz since no other
amenity of this kind exists on public property in Brevard County. The purpose of the
Grant was to add amenities to parks that would encourage children and families to spend
more time outdoors; the chess game has certainly achieved that goal.
[Outdoor chess board]
Inspiration Park – The dilapidated, unoccupied building on the corner of Polk and
Magnolia Avenues is reminiscent of days gone by. The location of this property affords
us the opportunity to integrate this Project into the greater Polk Avenue Redevelopment
Plan, further adding to the practical/aesthetic renewal of this corridor. With all of its
current and slated amenities, Polk Avenue will become a vibrant destination point and
Inspiration Park will serve as a tranquil alcove amidst this bustling thoroughfare. With
living walls bordering the west and north property lines, a sense of intimacy would be
2017/18 Retreat Goal Accomplishments
March 23, 2018
Page 4
created protecting not only the neighboring properties but park visitors by immersing
them in a different mind space. An ornamental labyrinth would center the property,
giving it a distinct and impressive character. Artistic design features like non-ponding
fountains, pathways, elevated planters and a half circled pergola structure would
complete the vision for this Park. This project embodies the City’s Vision Statement as
it:
Provides small gathering spaces with multiple types of built-in seating and
“platforms” or wood decks that could be used exemplifies the Complete Street:
As an extension of the Polk Avenue redevelopment project and a model for the
“mix use” paradigm, Inspiration Park will serve as a catalyst for the
redevelopment of surrounding properties.
Provides a Sense of Arrival: In addition to enhancing the character of the
Polk/Magnolia Avenue intersection and adding to the City’s unique identity,
Inspiration Park will give those traveling from Ridgewood Avenue a sense of
arrival to our downtown area.
Transforms Blighted Buildings: Neighbors will appreciate the redevelopment as
it will replace an abandoned eyesore with a green-space, filled with artistic
features and something that the community can be proud of.
Creates an Intimate Public Gathering Place: Inspiration Park would be a small,
plaza style park with ample shade and seating areas - perfect for reflection,
rejuvenation and as so aptly named, inspiration.
Design Engineer, Scott Mingonet, explains his line work vision of the Park in
saying, “We tried to incorporate a wide range of program elements. The water
features are organized along an axis down the main center line of the park that
starts with a small fountain at the corner that would appear to be linked to the
Labyrinth by a small runnel. We would like for it to be a channel that has a small
running water but in reality, it may only be a valley curb that “conceptually” ties
the 3 water features together. The runnel would pick up on the west side of the
Labyrinth and connect to the water arch and then the main water wall. Users
could walk behind the water arch and look out from behind the water feature to
the east. The pockets on each side of the centerline is for casual seating or
“stages” or to locate permanent and rotating statues/art work.”
The City’s effort to acquire this property continues to run its course through the
legal system. In summary, the City has approximately $175k in Code
Enforcement fines on the property, which the City attempted to foreclose on in
2017. However, the owner filed for bankruptcy one day before the sale, which
carries with it an automatic stay. In conjunction with the City Attorney’s Office,
the stay is being contested, which, if lifted, would allow the sale to move forward.
Below is a concept drawing of the Park prepared by Kimley-Horn.
2017/18 Retreat Goal Accomplishments
March 23, 2018
Page 5
[Rendering of proposed Inspiration Park]
4.Polk Avenue Streetscape. This Project includes a streetscape treatment of Polk
Avenue from the City Hall Building, east to Ridgewood Avenue.
A preliminary Master Plan and hardscape palette have been completed by Kimley Horn
for the Polk Avenue Corridor running east from the new City Hall to the beach end. The
automobile-oriented space is replaced with paths that focus on pedestrian and bicyclist
experiences. The design incorporates a curvilinear approach at each intersection that
emphasizes the City slogan of “Sun, Space & Sea”. The concept includes colored
concrete patterns that flow into the street and throughout the cross walks as the main 10’
shared sidewalk switches sides of the street. A corresponding street end park is designed
around a curvilinear pattern that includes an overhead shade structure, plaza and outdoor
shower. Traffic calming measures and designs are incorporated throughout to make the
corridor more pedestrian friendly. The design includes additional street trees, hardscape,
as well as seat walls to provide strategic locations for viewing proposed park amenities
along the corridor. Brick pavers are proposed to be installed on Polk Avenue between
the Magnolia Avenue intersection and the City Hall building.
Due to the linear nature of the project, a phased approach could be taken to lessen
impacts on residents along the corridor. Final design/permitting/construction could be
accomplished over a multi-year time-frame. Design work could be started as early as
the 2018/19 fiscal year.
The project was designed within the existing City right-of-way; therefore, no
easements/property acquisition will be required. Costs will increase due to the
decorative concrete/paving work and chicaning of Polk Avenue. Project cost of $2.9
million is estimated. CRA and Capital financing may be available.
2017/18 Retreat Goal Accomplishments
March 23, 2018
Page 6
See Attachment 1 for concept drawings prepared by Kimley-Horn of the project.
5.Cherie Down Park. Cherie Down Park is a 6.99 acre facility located on Ridgewood
Avenue in the City of Cape Canaveral. It is the only beachfront park located within
City limits. The property is owned by Brevard County BOCC (BOCC) and the
Brevard County School District (District). The BOCC leases the District’s portion
of the property to use as a Park with beach access until 2080. The parking capacity
of the park is estimated at 106 spaces, a number of which are part of an unimproved
area which is reserved in perpetuity for use by the Army Corp of Engineers (ACOE)
as a staging area for beach re-nourishment and conservation.
The current amenities at Cherie Down include restroom facilities, pedestal shower,
lifeguard shack, boardwalk and small picnic pavilion. Sadly, the Park is currently in an
embarrassing state of disrepair, the details of which have been explicated in previous
Council communications. Acquisition of this property presents the City with an
opportunity to create a branded beachfront facility that will become a welcoming,
family-centric destination point for residents and tourists alike.
The proposed redevelopment exemplifies the City’s Vision Statement in that it:
Transforms blighted/unfinished structures: Years of neglect have left their mark
throughout the entire facility and given its location, visitors immediately assume
it is a City owned park. Culture and Leisure Services Staff field complaint calls
about its condition regularly.
Embraces the seaside as a main amenity: As a branded destination, Cherie Down
would become an oceanfront venue for recreation activities, public engagement
and entertainment.
Open shorelines accessible to the public: The amenities at this facility would take
advantage of its value as a beachfront gathering place. Public pavilions,
connectivity within the park, playful amenities, open green space and a banquet
area would all be part of the conversation for redevelopment.
Supports local culture, commerce and education: The amenities envisioned for
this property include interactive elements that focus on art, environmental
education and local history as well as a small concession area offering goods and
services relevant to the location. The redevelopment of the property into a
destination point of this capacity, will be remunerated by its positive economic
impact on the City.
As private redevelopment continues to thrive, public facilities must evolve to stay
relevant and inviting to incoming populations. Cherie Down has the potential to be one
of the crown jewels of the City’s recreation facilities – a property that showcases our
unique community identity and exemplifies our brand as “The Space Between”. The
City is in position to make this dream a reality.
2017/18 Retreat Goal Accomplishments
March 23, 2018
Page 7
With estimated redevelopment costs of $3 million, capital financing would be the
biggest contributor to the project with grants and SPIA funds supplementing when
possible. Not having to purchase land further adds to the value of this project. Revenue
from facility rentals, concessionaires and possible beach parking would assist with
operating and maintenance costs.
Negotiations have been on-going with BOCC and the CRA since last year’s Retreat.
The BOCC is interested in transferring this property to the City; however, the District 2
Commissioner’s position is to condition the transfer to require that County residents not
be subject to any imposed parking fees. Staff will continue to explore possible scenarios
that address the various parties concerns.
The School Board is potentially willing to transfer lease rights for its portion of the Park
to the City. However, the Board desires to retain ownership of their portion of the Park.
See Attachment 2 for a detailed report on Cherie Down Park.
Let me know if you have any questions related to any of these items. Thank you.
Attachments
15
[POLK AVENUE RENDERING]
[Kimley Horn logo]
[POLK AVENUE SITE DIAGRAM]
[Kimley Horn logo]
[POLK AVENUE - IMAGE BOARD]
[Kimley Horn logo]
[POLK AVENUE-IMAGE BOARD]
[Kimley Horn logo]
[POLK AVENUE - OVERALL SITE PLAN]
[Kimley Horn logo]
[POLK AVENUE - INTERSECTION OPTION 1]
[Kimley Horn logo]
[POLK AVENUE - ENDING OPTION 1]
[Kimley Horn logo]
[POLK AVENUE - INTERSECTION OPTION 2]
[Kimley Horn logo]
[POLK AVENUE - ENDING OPTION 2]
[Kimley Horn logo]
[POLK AVENUE - STREET SECTION]
[Kimley Horn logo]
[POLK AVENUE - STREET SECTION]
[Kimley Horn logo]
[POLK AVENUE - STREET SECTION]
[Kimley Horn logo]
Cherie Down Park Bullet Points
Overview:
Cherie Down Park is a 6.99 acre facility located on Ridgewood Avenue in the City of Cape
Canaveral.
Currently owned by Brevard County BOCC and the Brevard County School Board.
Brevard County BOCC has a lease from the School Board to use the property as a park and
beach access until 2080.
The property hosts, on paper, 106 parking places. Part of this number is derived from an
unimproved area (delineated in green in the map below) which is reserved for use by the
Army Corp of Engineers (ACOE) as a staging area for beach re-nourishment in perpetuity.
This area cannot be paved but can be parked on.
Amenities include a bathroom, small pavilion, lifeguard shack, outdoor shower and
boardwalk.
There are a number of restrictions that will remain in place regarding usage as a public
park and ACOE staging/conservation area.
Current Condition:
In its current condition, much of the facility is dated, dilapidated and unusable. Photos below
indicate the facility is a poor reflection on the City, BPS and the County:
Boardwalk. Approximately $100,000 in repairs required using recycled plastic materials.
Overgrowth. Foliage throughout the entire facility needs to be removed and cleaned up.
Estimated at 160 man hours.
Restrooms. Small/outdated/neglected.
Outdoor shower. In working condition.
Lifeguard storage shed on the south side of the property. In working condition.
[4 photos of current park conditions]
[pictures]
Examples of needed carpentry repairs
Evidence of years of "Band-Aid" repairs
[pictures]
Piles of debris and fallen limbs go uncollected.
Old/rusty amenities in need of replacement.
Propane torch damage Restroom louvers pried open
Untended vandalism
[pictures]
Joist lag bolt needed Advanced rust damage Rusting bolts and hurricane clips
hurricane strapping gone
Structural deterioration
Intermediate rust damage Sheared bolts Hurricane clips near failure
Structural deterioration
[Photos of Neglect]
Maintenance Needs:
Brevard County Parks & Recreation currently allocates approximately 1,542 man hours for
maintenance/facility repairs. Approximately $22,961 annually.
Mowing is contracted through a vendor: $1,450 annually.
Water consumption: $6,585 annually.
FY 14/15 budget for repairs and maintenance: $1,723.
Total operating and maintenance budget for Brevard County:
o FY 13/14: $33,000
o FY 14/15: $32,719
o FY 15/16: $33,000
Future of Park if City-owned:
The facility will remain available to Cape View students and Staff, BPS and the general
public.
The City is supportive of a Reverter Clause benefitting BPS/BOCC should the facility ever
fall out of City-ownership or into disrepair.
The Park will become a flagship beachfront facility for the City as a resident/tourist,
family-centric attraction and destination, further enhancing community-offered amenities.
We envision building a 2,000 3,000 s.f. facility on site that would be a highly interactive
Resource Center focusing on environmental education elements including Eco-
Friendly/Sustainability Initiatives, Local History and Nature, geared to K-6. Significant
BPS interaction would be anticipated with Cape View Elementary Students, but certainly
not limited to just one school. Community programs are envisioned as well (oyster mat
making, mussel mats,sea oat planting, marine education, etc.). Permanent signage
would be installedat the parkrecognizingBrevardPublic Schools
theirdonation.
The first step would be a community wide master planning process at a cost of
approximately $50,000. The master planning outcome would include construction
documents and project phasing.
Capital Improvement/Expansion projects would be phased in as funds become available.
New revenue opportunities would be explored to offset upgrading, operating and
maintenance costs, including Pavilion Rentals and a Concessionaire.
The City would hire one weekend part-time employee to maintain the facility who would
also assist with maintenance of other City facilities. The weekday upkeep would be
absorbed by existing Staff.
The park would become a community-engaging facility showcasing public art;
[Map displaying location of Cape View Elementary and Cherie Down Park]
Cherie Down Park
[Map displaying portions of park owned by County & School Board, Property Purchased with LWCF Funds and Shore Protection Overflow Parking]
Community Development
Memo
TO: City Council
VIA: David L. Greene, City Manager 11
FROM: David Dickey, Community Development Director 1
DATE: March 23, 2018
RE: 2017/18 City Council Strategic Planning Retreat — Project Report
Staff has compiled the following materials to provide background information related to projects to be
discussed at the upcoming City Council Strategic Planning Retreat. The projects include:
• Canaveral City Park Redevelopment/Multi-Generational. Facility (MGF) - $5 million
• Cultural Arts Preservation Enrichment (CAPE) Center - $1.2 million
• W. CentraliThurm Avenue Streetscape - $1.42 million
• Central Avenue Streetscape — $1 million
• Cumberland Farms Pocket Park - $30.000
• Wagner Park - $100,000
• Long Point Estuary Park - $1.38 million
• Community Survey - $4,000
TOTAL $14.034 million
There are a number of predictable sources of funding for projects of this nature, capital financing
through a revenue -pledge, Community Redevelopment Agency funds and state/federal grants. Note
that the City is currently negotiating an Interlocal Agreement with Brevard County related to the CRA
that will specify how CRA funds can be spent.
No additional bonding/increase of ad -valorem is required to fund these projects.
PROJECT: Canaveral City Park Redevelopment
Overview: Canaveral City Park is the most centrally located park in the City. A recent needs study
revealed many deficiencies exist at the Park relating to mobility and amenities to serve the
community. Outside of improved mobility within and around the Park, the following amenities were
found to he desperately wanted by the community:
• Multigenerational Facility — This type of facility can be a catalyst for community health and
engagement. The City is one of the few municipalities in Brevard County that lacks a public
or private facility of this nature. Desired community amenities have been expressed and
include indoor basketball/volleyball, fitness area, youth/teen area, banquet/gathering area,
and indoor walking path. The facility would be utilized by all demographics and would serve
as the host site for the City's Youth Center. summer camp, PAL and youth basketball
programs. The facility would he the area's only public/private indoor fitness facility open to
the general public.
2017/18 City Council Planning Retreat – Project Report
March 23, 2018
Page 2
Skate Park – A public skate park is another community engaging amenity that crosses age
and race barriers. The right design not only becomes a central gathering place for a
community but also a tourist attraction, further enhancing the economic impact of a public
facility.
Splash Pad – Operating and maintenance costs, as well as lack of property, prohibit the City
from owning and operating a public pool. A splash pad serves the community by bringing
people together while having the experience of a water park. With almost 10% of the
population under 18 years old, this would not only be a heavily used feature at the park but
one that could also have a positive economic impact.
Design Features – To complete the park, improved playground equipment, pedways and
landscaping will make this the most visited park in the City.
Timeline:Thanks to a grant acquired FY 16/17, a preliminary Master Plan has been created which
includes all community desired amenities.
On January 18, 2018, Staff reviewed 9 responses to RFQ 2017-01 for services related to the design
and construction of the Multi-Generational Facility (MGF) and CAPE Center. Architects RZK, Inc.
from Cocoa was selected based on compliance with RFQ Instructions, Technical Expertise, Quality
Control, Staff Credentials, Related Experience with Similar Projects, Location, Local
Knowledge/Experience and Project References.
By September 30, 2018, the MGF will be approximately 60% designed and preliminary discussions
with permitting agencies will have occurred.
Funding:Due to funding considerations, construction of the project has been phased. Phase I
consists of the MGF at a cost of $5 million. Funding of Phase I is already in place as part of the
$6.2 million in revenue notes issued in July of 2017. Funding of subsequent phases will explore
sources including capital financing/grants/SPIA funds.
PROJECT: Culture Arts Preservation Enrichment (CAPE) Center
Overview: Repurposing the old City Hall building as an accredited institution of Cultural
Enrichment, with a focus on Public Engagement in all aspects of the Arts as well as the
Promotion and Preservation of Cape Canaveral’s history. Supporting culture and education is
one of the tenets outlined by the residents in the City’s Vision Statement. This project would
fulfill that expectation and serve to address other ideals outlined during the visioning process,
to include:
2
2017/18 City Council Planning Retreat — Project Report
March 23, 2018
Page 3
• Create inclusive destination point
• Entertain myriad of cultural interests
• Engage multiple generations
• Operate at a capacity that is purposeful year-round
• Create a sense of place
• Celebrate the City's identity
These goals would be achieved through the development of enrichment/educational programs,
implementing a multifaceted public art program, promoting/preserving local history and hosting
cultural events. Some of the possibilities include:
ENGAGEMENTS
PUBLIC EVENTS
• Commerce & Culture Socials
• Art Shows
• Rotating Art Exhibits
• Senior Field Trips
• Public Art Program Center
• Public History Program Center
ENRICHMENT &-
EDUCATION
• Art Writing Classes
• Historical Research Instruction
• Cultural Lecture Series
• Student Speaker Opportunities
• Educator Networking Socials
• Student Volunteerism
PROMOTING 8&,
PRESERVING
• Local Artifact Repository
• Rotating Historical Exhibits
• Youth History Fairs
• Preservation Projects
• Historical Site Registration
• Public Archaeology Activities
Timeline: On January 18, 2018, Staff reviewed 9 responses to RFQ 2017-01 for services related to
the design and construction of the MGF. Architects RZK, Inc. from Cocoa was selected based on
compliance with RFQ Instructions, Technical Expertise, Quality Control, Staff Credentials, Related
Experience with Similar Projects, Location, Local Knowledge/Experience and Project References.
Design, permitting, construction documents and interior demolition would be accomplished in FY
17/18. Exterior construction would be accomplished FY 18/19.
Funding: Funding for the design/permitting/construction of the CAPE Center is already in place
as part of the $6.2 million in revenue notes issued in July of 2017.
PROJECT: W. Central Avenue/Thurm Avenue Streetscape
Overview: The proposed project represents a complete street project for W. Central Boulevard
and Thurm Boulevard, roads which together represent a major transportation corridor through
the City. The total length of the two segments is 4,940 feet and includes the following notable
components (See Attachment 1):
3
2017/18 City Council Planning Retreat – Project Report
March 23, 2018
Page 4
Street Improvements ($825k);
Construct an 8-foot wide pedway where appropriate;
Construct 6-foot wide sidewalks where appropriate;
Install pedestrian benches;
Replace concrete curbing where appropriate;
Mill and resurface W. Central Boulevard from Thurm Boulevard to Astronaut (5k sq.yds. per
side);
Stripe roadway to include bicycle lanes in both directions;
Install solar-powered, LED-lighting along both sides of the roadway ($300k - 20 lights @
$15k/per);
Sanitary Sewer Relocation in the W. Central Boulevard right-of-way ($180k);
Plant native vegetation “islands” ($80k); and
Misc. Striping, Signs, Upgraded Intersection Paving ($50k).
The total cost as proposed is $1.435 million. This does not include engineering for plans,
permitting, surveys, contingencies, etc.
Please note this project is contained in the City’s Capital Improvement Plan and is consistent
with the City’s Comprehensive Plan and the City’s Vision Statement. In addition, the project is
consistent with Resolution 2011-09, which the City Council adopted to establish a Complete
Streets Policy.
Timeline: The City Engineer is currently working on preliminary design/engineering
documents in support of this project.
Actual construction will occur once Impact Fees are paid, which happens at the time a
Certificate of Occupancy is issued. Due to the scope of the hotel projects, this may not occur
until sometime in FY 19/20.
Funding:Funding for this project will be from an allocation of County Transportation Impact
Fees being generated by several hotel projects in the City limits. City Staff recently appeared
before the Brevard County Impact Fee Advisory Committee and received a favorable
recommendation for funding. The recommendation now requires approval from the County
Commission.
Funding will be generated from three hotel projects, representing 525 rooms, which are
currently moving through the City’s development approval process. These include:
4
2017/18 City Council Planning Retreat – Project Report
March 23, 2018
Page 5
Dual Branded Hotel (116 room Hampton and 108 room Home2) located at 9004 Astronaut
Boulevard; and
Springhill Suites (301 rooms) located at 8701 Astronaut Boulevard, west of the existing
Radisson Hotel.
Given the current County Transportation Impact Fee amount of $2,735/room, the listed hotel
projects will generate $1.435 million in revenue.
PROJECT: Central Avenue Streetscape
Overview: This proposed project represents a phased complete street project for Central
Boulevard from Astronaut Boulevard to Ridgewood Avenue. Phase 1 consists of E. Central
Boulevard from Ridgewood Avenue to N. Atlantic Avenue. Phase 2 consists of W. Central
Boulevard from N. Atlantic Avenue to Astronaut Boulevard. This is a significant east-west
corridor through the City which connects the river and ocean sides of the City. The total length
of the two segments is 5,100 feet and includes the following notable components (See
Attachment 1):
Street Improvements;
Construct pedways where appropriate;
Construct sidewalks where appropriate;
Install pedestrian benches;
Replace concrete curbing where appropriate;
Stripe roadway to include bicycle lanes in both directions;
Install solar-powered, LED-lighting along both sides of the roadway;
Plant native vegetation “islands” where appropriate; and
Misc. Striping, Signs, Upgraded Intersection Paving.
The total cost is estimated to be $1.2 million. This does not include engineering for plans,
permitting, surveys, contingencies, etc.
The project is consistent with Resolution 2011-09, which the City Council adopted to establish
a Complete Streets Policy.
Timeline: The design work related to the 2 phases will be completed by the City Engineer and
will occur in the FY18/19. Construction of Phase 1 may occur in FY 19/20 with Phase 2 in FY
20/21.
5
2017/18 City Council Planning Retreat – Project Report
March 23, 2018
Page 6
Funding:Funding for this project may come from a variety of sources to include City General
Funds, County Transportation Impact Fees or CRA funds.
PROJECT: Cumberland Farms Pocket Park
Overview: With the approval of Special Exception No. 2016-03, the City was granted an
easement for construction of a pocket park at the south end of the Cumberland Farms project
located at 9000 Astronaut Boulevard. The easement allows for signage, landscaping, public
amenities (sidewalk, outdoor furniture, bike rack, water fountain or public art) and utilities.
The City Engineer has prepared a concept site plan that indicates how the park may be laid out
with a theme related to space exploration.
Timeline:Final engineering of this park will occur in FY 18/19 with construction taking place
in FY 19/20.
Funding:This project is estimated to cost $30,000 and will be paid from General Fund and/or
the CRA.
PROJECT: Wagner Park
Overview: This proposed park is located at 8817 N. Atlantic Avenue just south of Anchorage
Avenue. The project represents the next step in the N. Atlantic Avenue Streetscape Project and
consists of additional hardscape, bike racks, a butterfly garden, permanent seating and a dog
watering station. The property was donated to the City in December of 2016 by the owners of
the Southgate Mobile Home Park, immediately to the west of the proposed park.
The City Engineer has prepared a site plan that recognizes the pedestrian nature of N. Atlantic
Avenue and its function of connecting the City and Port Canaveral.
Timeline:This will be a phased project, with the Phase I occurring in FY 18/19 and consisting
of hardscape improvements/colored concrete walkway and landscaping. Phase 2, occurring in
FY 2019/20 will consist of benches, shade structures, public art, new crosswalk improvements
and a dog watering station.
6
2017/18 City Council Planning Retreat – Project Report
March 23, 2018
Page 7
Funding:Phase 1 and 2 will cost $40,000 and $60,000 respectively and will be paid from
General Fund and/or the CRA.
PROJECT: Long Point Estuary Park
Overview: This proposed 7.9 acre park is located at the western end of Long Point Road and
will include passive amenities. The property consists of 5 acres of forested wetlands and 3 acres
of mangrove swamp and represents one of the last natural habitats in the City. Phase 1 of the
project will consist of removing the invasive species. Phase 2 will consist of the actual
improvements to the park including:
Installation of pre-fab restrooms;
Construction of a kayak dock;
Construction of elevated boardwalks;
Construction of a nature center/pavilion; and
Construction of educational kiosks around the property.
Timeline:This is going to be a phased project, with Phase 1 (clearing of invasive species)
occurring in the FY 18/19. Grant application for the proposed Phase 2 improvements will occur
in FY 18/19 with construction occurring in FY19/20.
Funding:Phase 1 costs will be funded through a $114,000 grant by the U.S. Army Corp of
Engineers for purposes of the eradication of non-native plant species (primarily Brazilian pepper
trees). For purposes of the grant, the City is matching the funding with $76,000. Also, funding
will be augmented by a local developer who is in need of mitigation credits through the St. Johns
River Water Management District. Funding of Phase 2 ($1.2 million) will be pursued through
the Brevard County Tourist Development Council as well as grants from the Florida Inland
Navigation District.
PROJECT: Community Survey
Overview: On-line community surveys are a tool which permit the collection of relatively large
quantities of data regarding citizen perspectives, at a relatively low cost. Moreover, they permit the
7
2017/18 City Council Planning Retreat – Project Report
March 23, 2018
Page 8
establishing of baseline data and the tracking of trends through time. Well-designed surveys will
permit the analysis and reporting not only of overall results, but results specific to given demographic
groups such as by age, neighborhood, size of household, etc.
The proposed Project entails: (1) the development, administration, analysis, and reporting of a
Community Survey, and (2) a yearly Community Brainstorm Meeting to discuss Survey results.
The purpose of the Survey will be to systematically gather and use the perspectives of the
Community concerning matters of public interest over which City leaders have some reasonable
level of control. Results from the Survey will be used by the City Council, City Manager, and
City Staff as one source of input in the Strategic Planning process. It will also be used to gauge
community reactions to current amenities and services and to potential quality of life projects.
The survey will be constructed collaboratively by the Community Engagement Department and
Dr. Tom Freijo, with input from all Department Directors. Dr. Freijo has considerable
experience in developing, analyzing, and reporting survey results. The Community Survey will
use SurveyMonkey as a platform and will be advertised by various means, as identified by the
Community Engagement Director. Dr. Freijo will analyze the results and prepare a detailed
report on survey results.
The Project cost is approximately $4,000 per year, which includes the annual subscription cost
of approximately $400 for the web-based service SurveyMonkey. (The SurveyMonkey
subscription will permit the use of the technology for any other survey projects conducted by
Community Engagement or other City Departments.) The remainder of the cost will be for
developing (or updating) the Survey Questionnaire, results analysis and report preparation. The
Community Survey will be administered yearly or every other year, as is deemed appropriate at
the time.
Timeline: The first Community Survey will be implemented during the April-August, 2018
timeframe. An approximate timeline is as follows:
April 1-15: Identify matters of interest for which Survey results will provide data
April 16-30: Design the Survey Questionnaire
May 1-31:Identify respondents and Survey dissemination venues
June 1- July 15: Gather Survey responses
July 16-August 15: Analyze Survey results and prepare report
August 16-31: Disseminate report
8
2017/18 City Council Planning Retreat – Project Report
March 23, 2018
Page 9
Funding:Cost of this project is anticipated to be $4,000 and will come from the Community
Engagement Department budget.
9
[map of project limits]
5-16-2017
Cape Canaveral Vision Statement
We envision: A bikeable and walkable Cape Canaveral that retains and enhances its welcoming
residential feel, characterized by low-rise buildings. This residential and business friendly
atmosphere is a livable, attractive, safe, inclusive and sustainable coastal community that embraces
the oceanside and riverside as the main amenities, and supports and promotes local tourism,
culture, recreation, commerce, municipal civic interests and education.
We envision: -landscaped and tree-lined median
with traffic calming elements and dark-
bicycle facilities, covered transit stops and safe pedestrian crossings that invite pedestrians and
bicyclists to access the beach, river, local neighborhoods and adjacent communities. Our
improved
walkable uptown core. Multi-use paths lined with shade trees should be wide enough for bikes
and pedestrians and lighted so anyone can walk or bicycle safely anywhere in town, day or night.
We envision: Welcoming community entrance features that create a sense of arrival and
unique commu
architecturally rich and unique mix of uses, with wide tree shaded sidewalks and umbrella covered
café tables at restaurants and bistros where friends gather, interact and enjoy drinks and dinner.
We envision: An engaged and compassionate community that; removes or transforms blighted and
unfinished buildings into attractive structures, offers city-wide green spaces, provides a pet-friendly
park with ample shade, acts progressively but deliberately and actively recruits and supports
businesses that enhance economic viability and serve our residents and visitors with goodwill.
We envision: Open shorelines and rivers accessible to the public including amenities that
take advantage of the water, such as limited and quaint water-view establishments and intimate
public gathering and entertainment places that may include pavilions, gazebos or a performance
stage.