HomeMy WebLinkAboutResolution No. 2018-01 RESOLUTION NO. 2018-01
A RESOLUTION OF THE CITY COUNCIL OF THE CITY
OF CAPE CANAVERAL, BREVARD COUNTY, FLORIDA;
MODIFYING AND UPDATING THE CITY'S LIST OF
STATE ROAD AlA IMPROVEMENT PRIORITIES;
REQUESTING THE FLORIDA DEPARTMENT OF
TRANSPORTATION PROVIDE AN UPDATED TRAFFIC
STUDY FOR THE PORTION OF STATE ROAD A1A
LOCATED WITHIN THE CITY OF CAPE CANAVERAL;
PROVIDING FOR THE REPEAL OF PRIOR
INCONSISTENT RESOLUTIONS,SEVERABILITY AND AN
EFFECTIVE DATE.
WHEREAS, the Florida Department of Transportation ("FDOT"), the Space Coast
Transportation Planning Organization ("TPO") and the AlA Action Team, which consists of a
group of organizations,businesses and residents along the State Road(SR) AlA Corridor, seek to
address multimodal transportation along SR A1A from the Pineda Causeway(SR 404) to SR 528
in the City of Cape Canaveral; and
WHEREAS, the City Council desires to transform SR AlA in to a safe and efficient
multimodal corridor that connects and supports the economic viability of the City of Cape
Canaveral and is also aesthetically pleasing while providing a sense of community through
innovation, design, safety and connectivity; and
WHEREAS,the City Council intends to streamline development of feasible improvement
strategies to address locally identified transportation,community planning and urban design issues
such as corridor beautification, way-finding signage, undergrounding of utilities, traffic calming
devices, pedestrian and bicycle facility enhancements, improved transit service, intersection
improvements and other infrastructure improvements; and
WHEREAS,the City Council desires to promote the safety,efficiency,innovation,design,
connectivity and aesthetics of the SR A1A corridor and has prioritized the City's desired
improvements related to that portion of the SR A1A corridor located within the City; and
WHEREAS, on July 15th, 2014 the City Council approved Resolution No. 2014-22
approving the City's initial list of SR A1A Improvement Priorities, and said list was last modified
and updated by Resolution No. 2015-06 which was adopted by the City Council on May 19, 2015;
and
WHEREAS,the City Council recognizes that circumstances continue to change since the
City last updated its list of SR A1A Improvement Priorities and therefore,the City Council desires
to modify and update its list of SR A1A Improvement Priorities; and
City of Cape Canaveral
Resolution 2018-01
Page 1 of 3
WHEREAS, particularly, the City Council is aware of an increase in City-wide bicycle
ridership and pedestrian activity that requires the City to continue to promote and prioritize safe
and attractive bicycle and pedestrian crossings and amenities along SR A1A; and
WHEREAS, the City Council is also aware of current and on-going positive growth
projections for the Space Industry, Port Canaveral, and tourism within the Cape Canaveral area
and this projected positive growth requires that the City Council promote and prioritize safety
enhancements to SR A1A consistent with the City's ongoing branding initiative and strategic
vision for the Cape Canaveral Community; and
WHEREAS,in order to manage the positive growth projections anticipated within the City
of Cape Canaveral and surrounding area, the City Council additionally desires FDOT to provide
an updated traffic study for that portion of the SR A1A corridor located within the City of Cape
Canaveral, where such traffic study accounts for the increase in bicycle ridership and pedestrian
activity, on-going growth projections for the Space Industry/Port Canaveral/tourism and seasonal
variations.
NOW THEREFORE, BE IT RESOLVED by the City Council of the City of Cape
Canaveral, Florida:
Section 1. Recitals. The foregoing recitals contained in the preamble to this Resolution are
incorporated by reference herein.
Section 2. Approval of SR A1A Priorities. The City Council of the City of Cape Canaveral
hereby approves a modified list of the City's priorities for improvements to that portion of SR
AlA within the City of Cape Canaveral, as attached hereto and incorporated herein by reference
as Exhibit"A".
Section 3. Request for Updated Traffic Study. The City Council of the City of Cape
Canaveral hereby requests FDOT provide an updated traffic study for that segment of SR A1A
located within the City of Cape Canaveral which accounts for the increase in bicycle ridership and
pedestrian activity, on-going growth projections for the Space Industry/Port Canaveral/tourism as
well as seasonal variations.
Section 4. Repeal of Prior Inconsistent Resolutions. All resolutions or parts of resolutions
in conflict herewith are hereby repealed to the extent of the conflict.
Section 5. Severability. If any section, subsection, sentence, clause, phrase, word or portion
of this Resolution is for any reason held invalid or unconstitutional by any court of competent
jurisdiction, such portion shall be deemed a separate, distinct and independent provision and such
holding shall not affect the validity of the remaining portion hereto.
Section 6. Effective Date.This Resolution shall become effective immediately upon adoption
by the City Council of the City of Cape Canaveral, Florida.
City of Cape Canaveral
Resolution 2018-01
Page 2 of 3
ADOPTED in a Regular Meeting of the City Council of the City of Cape Canaveral, Florida,this
20th day of February 2018.
Bob Hoog,Mayor
ATTEST: Name FOR AGAINST
Mike Brown Second
Mia Goforth, CMC Bob Hoog x
City Clerk
Wes Morrison x
Rocky Randels Motion
Angela Raymond x
Approved as to legal form and sufficiency
For the city of Cape Canaveral only by:
Anthony A.Garganese, City Attorney
City of Cape Canaveral
Resolution 2018-01
Page 3 of 3
Exhibit "A"
City of Cape Canaveral
Prioritized SR A1A Improvements
Resolution No. 2018-01
Public Safety Priority Items
I. Lower speed limits to 35 m.p.h.
2. More crosswalks:
A. Crosswalks:
• North side of the signalized intersection of Central Avenue/Astronaut
Boulevard
• South side of the signalized intersection of Holman Road/North Atlantic
Avenue
B. Midblock Signalized Crosswalks (north to south):
• Burger King/SCAT bus stop
• Thurm Boulevard
• Columbia Drive
• Jackson Avenue
• Taylor Avenue
• Cape Shores/East Hayes Avenue
3. Realignment of International Drive:
Realign International Drive with North Atlantic Avenue. This improvement will require
right-of-way (ROW) acquisition funding and must address not only the roadway
alignments, but also stormwater drainage (possible wet detention pond) and
pedestrian/bike crossings. Include marked crosswalks on all sides of this intersection. The
International Drive Realignment Project Design is currently the only project funded and
underway.
4. Urban roadway profile safety improvements:
A. Installation of wider landscaped medians with managed turning movement areas;
low landscaping in medians to maintain driver visibility, with higher landscaping along
sidewalks/pedways.
B. Installation of landscaping along SR A1A including, where appropriate, cluster
landscape features.
Resolution No. 2018-01
Exhibit "A"
C. Installation of street furniture and decorative lighting(solar powered lighting where
possible) and traffic signage.
D. Construction of curb and gutter along both sides of roadway. This will require
limited/as-necessary right-of-way acquisition funding for stormwater ponds and clipped
corners at intersecting roadways. Consider bio-swales within landscaping plan for SR
A1A; bio-swales will need to be located near existing storm drain inlets so stormwater
overflow can enter system.
E. Construction of wide sidewalks or pedways (appropriately marked/stenciled for
bicycles), along SR Al A to more safely accommodate pedestrians and bicyclists; improve
sidewalks along SR AlA in an ADA compliant manner. Construction of wider pedway(8'
— 10') along east side of SR Al A in coordination with any affected commercial property
owners.
F. Construction of low-maintenance stormwater improvements near stormwater
outfalls that address ponding and water quality, including pre-treatment for nitrogen and
phosphorus. Stormwater gardens might be considered in historic ponding areas.
G. Where appropriate and needed to improve pedestrian and bicycle safety, install
native vegetation "islands," crosswalk striping including on side-streets feeding into SR
A1A and other arterial roadways, traffic calming devices, and pedestrian/vehicle barriers.
City Vision Priority Items
1. Reduction in overhead lines to include undergrounding of utilities and replacement of
existing utility poles with decorative poles. There are over 100+ overhead wires crossing
SR A1A in the City. Any reduction in these wires (without impacting existing services)
would improve the aesthetics of the entire corridor.
2. Support City signage at north (SR A1A and North Atlantic) and south (SR A1A and
Ridgewood) entrances of the City.
3. Wayfinding signage. Authorize the City to install and maintain an appropriate number of
effective and efficient decorative wayfinding signage (with landscaping) directing
pedestrians to parks, police, fire and other City and government facilities that pedestrians
commonly need to travel.
4. Ensure that all SR AlA public safety and vision priorities are implemented in a manner
that is not only functional, but aesthetically pleasing and consistent with the City's on-
going branding and strategic planning efforts.