Loading...
HomeMy WebLinkAboutP&Z 11-15-2017 Add'l Condition Springhill (as presented) Within 90 days of the Planning and Zoning Board recommendation and prior to final site plan approval, the Applicant shall submit a traffic analysis utilizing trip generation standards promulgated in the latest edition of the Institute of Transportation Engineers (ITE)manual. Said report will identify traffic impacts resulting from the proposed hotels (301 rooms) on that segment of W. Central Blvd. east of Thurm Blvd. directly impacted by the proposed project to include an intersection analysis of its intersection with Astronaut Blvd. The analysis shall include recommendations for improvements necessary to maintain an adequate level-of-service and safe pedestrian and vehicular traffic flow of the studied road segment/intersection. The Applicant will be responsible for causing any recommended improvements on the analyzed road segment/intersection prior to the issuance of a Certificate of Occupancy(CO)by the City.