Loading...
HomeMy WebLinkAboutCO Application CITY OF CAPE CANAVERAL APPLICATION FOR CERTIFICATE OF OCCUPANCY/COMPLETION Certificate of Occupancy Certificate of Completion (Habitable Space) (Non-Habitable Space) Application is hereby made by the undersigned for a Certificate of Completion at the below specified premises as reflected on Building Permit Number /j 51p3 . Street Address: 13 1 C C 1 On e Type and/or Name of Building: 8f11. J GGV \Cft Legal Description: Z Li - 3i - n Zoning District: Special Conditions: Name of Owner: ��'� ` LLC Mailing Address of Owner: IC ) 1-kc � Oiue_ treet Add ess or P.O. Box Q,vecCIN fl &qw City,, tate and Zip Code Area Code an; '; ephone Number Z Owner(s) . e D to BUILDING AND FIRE DEPARTMENT APPROVAL Fire Inspector: Building Inspector: Building Official: A d FINAL INSPECTION CHECK-LIST FOR ISSUANCE OF CERTIFICATE OF OCCUPANCY/COMPLETION 1. Architects or Engineers statement that building is built in accordance with approved plans and specifications on - file with the City. £See Note Below) (Include ALL Original Threshold Reports) Date 2. Engineers or Architects statement that site construction is in accordance with the approved Site Plan and that all construction has been in compliance with applicable codes. (See Note Below) Date NOTE: The above requirements pertain to multi-family(over three units)and all commercial projects. 3. Plumbing Final • Inspector, 4. Electrical Final I( Vh Inspect 5. Mechanical Final (KY►'1 Inspector 6. Sidewalk/Driveway Inspectorii 7. Sewer Connection Inspector in 8. All debris removed from site Inspector 9. Approved for Electric Service �✓� Inspector p 10. Building Permit Final 1\.� Inspector 11. Approved for Hydrant Service N //A (Contact CCVFD)(if applicable) Inspector or Fire Marshall 12. Dune Crossover(if applicable) N hPector 13. D.O.T.Approval(if applicable) N�13 Inspector 2 � 14. Recorded Final PIat/Survey Inspector or Plap Reviewer 15. F.E.M.A.Certificate N Inspector or Plan Reviewer 16. Post Construction Vertical Termite Barrier Yes ✓/ No (PBC 1816.1) 17. County Impact Fees Paid Yes No 18. Capital Expansion Impact Fees Paid Yes / No (Paid Receipt) 19. Sewer Impact Fee Paid Yes // No (Paid Receipt) 20. Sidewalk Impact Fee Paid Yes No (Paid Receipt) 21. Final re-plat recorded(Sec.98-62) Yes No (NOTE:ALL LMPACT FEES SHALL BE PAID BY CERTIFIED FUNDS) G:\Bldg.Dept.Forms\Applications\c.o.s-2nd page.doc Rev.5/29/07 f':