HomeMy WebLinkAboutCO Application CITY OF CAPE CANAVERAL
APPLICATION FOR CERTIFICATE OF OCCUPANCY/COMPLETION
Certificate of Occupancy Certificate of Completion
(Habitable Space) (Non-Habitable Space)
Application is hereby made by the undersigned for a Certificate of Completion at the
below specified premises as reflected on Building Permit Number /j 51p3 .
Street Address: 13 1 C C 1 On e
Type and/or Name of Building: 8f11. J GGV \Cft
Legal Description: Z Li - 3i - n
Zoning District:
Special Conditions:
Name of Owner: ��'� ` LLC
Mailing Address of Owner: IC ) 1-kc � Oiue_
treet Add ess or P.O. Box
Q,vecCIN fl &qw
City,, tate and Zip Code
Area Code an; '; ephone Number
Z
Owner(s) . e D to
BUILDING AND FIRE DEPARTMENT APPROVAL
Fire Inspector:
Building Inspector:
Building Official: A d
FINAL INSPECTION CHECK-LIST
FOR ISSUANCE OF CERTIFICATE OF OCCUPANCY/COMPLETION
1. Architects or Engineers statement that
building is built in accordance with
approved plans and specifications on -
file with the City. £See Note Below)
(Include ALL Original Threshold Reports) Date
2. Engineers or Architects statement that
site construction is in accordance with
the approved Site Plan and that all
construction has been in compliance
with applicable codes. (See Note Below) Date
NOTE: The above requirements pertain to multi-family(over three units)and all
commercial projects.
3. Plumbing Final
• Inspector,
4. Electrical Final I( Vh
Inspect
5. Mechanical Final (KY►'1
Inspector
6. Sidewalk/Driveway
Inspectorii
7. Sewer Connection
Inspector
in
8. All debris removed from site
Inspector
9. Approved for Electric Service �✓�
Inspector p
10. Building Permit Final 1\.�
Inspector
11. Approved for Hydrant Service N //A
(Contact CCVFD)(if applicable) Inspector or Fire Marshall
12. Dune Crossover(if applicable) N
hPector
13. D.O.T.Approval(if applicable) N�13
Inspector 2 �
14. Recorded Final PIat/Survey
Inspector or Plap Reviewer
15. F.E.M.A.Certificate N
Inspector or Plan Reviewer
16. Post Construction Vertical Termite Barrier Yes ✓/ No
(PBC 1816.1)
17. County Impact Fees Paid Yes No
18. Capital Expansion Impact Fees Paid Yes / No
(Paid Receipt)
19. Sewer Impact Fee Paid Yes // No
(Paid Receipt)
20. Sidewalk Impact Fee Paid Yes No
(Paid Receipt)
21. Final re-plat recorded(Sec.98-62) Yes No
(NOTE:ALL LMPACT FEES SHALL BE PAID BY CERTIFIED FUNDS)
G:\Bldg.Dept.Forms\Applications\c.o.s-2nd page.doc Rev.5/29/07
f':