HomeMy WebLinkAboutUtility Plan BP#11440 CITY OF COCOA UTILITIES REQUIREMENTS
I. CITY OF COCOA UTILITY DETAILS SHALL BE FOLLOWED FOR ALL c d
PROPOSED CONSTRUCTION 02I
retention area 2. ALL WATER SERVICE LINES SHALL CONSIST OF
BRONZE SERVICE
TAP EXISTING WATER LINE PERSADDLE, CORPORATION STOP, TYPE "K" COPPER, AND CURB STOP.
NOTE: CITY OF COCOA SPECS. TAP 3. THE METER AND BACKFLOW PREVENTERS WILL BE INSTALLED BY THE
ALL DISTURBED ' ‘ 0,, SHALL BE DONE BY CITY OF CITY OF COCOA AFTER PAYMENT AND ACCEPTANCE OF THE SERVICE P
AREAS SHALL BE COCOA APPROVED CONTRACTOR GRAPHIC SCALE LINES
RESTORED TO retention area 1" = 30 4. A TAPPING CONTRACTOR ACCEPTABLE TO THE CITY OF COCOA WILL Q
THEIR ORIGINAL 16 A5 �� I BE REQUIRED FOR THE TAPS MINI 111
CONDITION NO EEDIT POUND 0 15 30 60 5. A UTILITY CONTRACTOR WILL REQUIRED FOR THE INSTALLATION OF
THE SERVICE LINES IIIi;,1
t3 ' 1 Ee'7I se-7 6. THE WATER LINE AND APPURTENANCES SHALL BE INSTALLED IN ���II J B B
- 0 3 B' nd fence ACCORDANCE WITH THE CITY OF COCOA'S LATEST TECHNICAL 8E2
E8'VS ; 0 8' SANITARY MANHOLE EXIST. WATER LINE, FIELD VERIFY PROVISIONS AND STANDARD DETAILS
Tipp EL--3.007. CALL FOR THE PRECONSTRUCTION MEETING WITH CITY OF COCOA
7.
1EMPERARY HIV= NO ACCESS EXACT, SIZE AND LOCATION ENGINEERING DIVISION PRIOR TO START OF WORK. , ‘
JUMPER, SEE m --. PRIOR TO CONSTRUCTIONR 8. MATERIAL INSPECTION BY CITY OF COCOA UTILITIES WILL BE REQUIRED
DETAIL .,,, cl fence q. A SUCCESSFUL OPEN DITCH INSPECTION BY CITY OF COCOA UTILITIES
' ' ° WILL BE REQUIRED
6" to 4" REDUCER 10. BACTERIOLOGICAL TEST SHALL BE PERFORMED BY A PRIVATE LAB IN
ACCORDANCE WITH THE CITY OF COCOA CRITERIA
PROVIDE MIN. 7 SEPEARTION II. AS-GUILTS (IN ACCORDANCE WITH SECTION 14 OF CITY OF COCOA
, BETWEEN EXIST. SEWER & PROP. TECHNICAL PROVISIONS) WILL BE REQUIRED AT THE COMPLETION OF
co 's WATER MAIN THE PROJECT. 41 NI°L.
Wer TAP EXIST. 4" WATER LINE 12. EXECUTED WATER EASEMENT FORM WILL BE REQUIRED AT THE L;
0. EXACT,SSEWER IZE ANDE, FIELD LOCATIIONVERIFY FOR THE PROPOSED WATER COMPLETION OF THE PROJECT a.a
PRIOR TO CONSTRUCTIONR SERVICE. TPPING SADDLE & 13. EXECUTED BILL OF SATE FORM WILL BE REQUIRED AT THE
VALVE SHALL BE PER CITY COMPLETION OF THE PROJECT
~`'p z" OF COCOA SPECS. TAP SHALL 14. FINAL INSPECTION OF ALL WATER APPURTENANCES WILL BE REQUIRED
`'• 6" HYD. "T" & G.V. BE PERFORMED BY CITY OF BY THE CITY OF COCOA UTILITIES AT THE COMPLETION OF THE
.1' 3" COCOA APPROVED TAPPING PROJECT
N WCONTRACTOR. AND METER
SET BY UTILITY CONTRACTOR o
F
PROP. FIRE HYDRANT a o ," J
ASSEMBLY PER CITY 3%N
OF COCOA SPEC.
co SEE DET. r---� `' '' 4" PVC WATER MAIN TO EXTEN a a
cc
�qb // \., ooD ORB test PC ssa EAST OF PARCEL A.27 ` ,
� PROJECT N0:
i .i3R6 2014-31
A° "� OAK E
SANITARY MANHOLE 0 E9 S II FILE NO:
TOP EL=3.15 DADl�12o14-a1
HIV-1.85 i DESIGNED BY:
_� — FM
L 7F • i- — D1F--- ------ & f'�F------ -11-61.1-------41,-----------+*3 a 1 2 DRAWN BY:
• NOTE: pH
/ — ¢ i>1''
C IR •oWATER LINE AS BUILT INFORMATION SHOWN HAVE
BEEN FURNISHED BY CITY OF COCOA UTILITIES AND APPROVED BY:
1 0 '3-941:1e: s---- /'O 14 mom= N.D.
Ci.Oar 5/e" , , Q°"c Deny 2" BLOW OFF VALVE AND SURVEYOUR. ALL INFORMATION SHALL BE FIELD
l
DATE:
} 'BOX PER CITY OF VERIFY PRIOR TO BIDDING AND CONSTRUCTION. 11/11/14
.iW I `,1' COCOA • SEWER LINE AS BUILT INFORMATION HAS BEEN DRAWING NO:
f ; 08,9 FURNISHED BY CITY OF CAPE CANAVERAL UTILITIES _
ARM G.i�. c & SURVEYOR. oLL INFORMATION SHALL BE FIELD C 2
UTILITYLE: l' PLAN [ sriEeT 2 OF 5
VERIFY PRIOR TO BIDDING AND CONSTRUCTION.
SCALE: 1' = 30' I � o • ALL WATER LINE CONSTRUCTION SHALL BE NOEL DROOR
G.V' t 1 Pew B au c ACCORDING TO CITY OF COCOA UTILITIES P.E. 37259
fan V c PARCEL A.27 11 ' SPECIFICATIONS.
&Q
PEEL A 1 `° PREVENCS
. �N
0 :� 5a EB-0007218
2. PROPPic-7o'
.4 !:I 57.00,eaO' ... 1