Loading...
HomeMy WebLinkAboutUtility Plan BP#11440 CITY OF COCOA UTILITIES REQUIREMENTS I. CITY OF COCOA UTILITY DETAILS SHALL BE FOLLOWED FOR ALL c d PROPOSED CONSTRUCTION 02I retention area 2. ALL WATER SERVICE LINES SHALL CONSIST OF BRONZE SERVICE TAP EXISTING WATER LINE PERSADDLE, CORPORATION STOP, TYPE "K" COPPER, AND CURB STOP. NOTE: CITY OF COCOA SPECS. TAP 3. THE METER AND BACKFLOW PREVENTERS WILL BE INSTALLED BY THE ALL DISTURBED ' ‘ 0,, SHALL BE DONE BY CITY OF CITY OF COCOA AFTER PAYMENT AND ACCEPTANCE OF THE SERVICE P AREAS SHALL BE COCOA APPROVED CONTRACTOR GRAPHIC SCALE LINES RESTORED TO retention area 1" = 30 4. A TAPPING CONTRACTOR ACCEPTABLE TO THE CITY OF COCOA WILL Q THEIR ORIGINAL 16 A5 �� I BE REQUIRED FOR THE TAPS MINI 111 CONDITION NO EEDIT POUND 0 15 30 60 5. A UTILITY CONTRACTOR WILL REQUIRED FOR THE INSTALLATION OF THE SERVICE LINES IIIi;,1 t3 ' 1 Ee'7I se-7 6. THE WATER LINE AND APPURTENANCES SHALL BE INSTALLED IN ���II J B B - 0 3 B' nd fence ACCORDANCE WITH THE CITY OF COCOA'S LATEST TECHNICAL 8E2 E8'VS ; 0 8' SANITARY MANHOLE EXIST. WATER LINE, FIELD VERIFY PROVISIONS AND STANDARD DETAILS Tipp EL--3.007. CALL FOR THE PRECONSTRUCTION MEETING WITH CITY OF COCOA 7. 1EMPERARY HIV= NO ACCESS EXACT, SIZE AND LOCATION ENGINEERING DIVISION PRIOR TO START OF WORK. , ‘ JUMPER, SEE m --. PRIOR TO CONSTRUCTIONR 8. MATERIAL INSPECTION BY CITY OF COCOA UTILITIES WILL BE REQUIRED DETAIL .,,, cl fence q. A SUCCESSFUL OPEN DITCH INSPECTION BY CITY OF COCOA UTILITIES ' ' ° WILL BE REQUIRED 6" to 4" REDUCER 10. BACTERIOLOGICAL TEST SHALL BE PERFORMED BY A PRIVATE LAB IN ACCORDANCE WITH THE CITY OF COCOA CRITERIA PROVIDE MIN. 7 SEPEARTION II. AS-GUILTS (IN ACCORDANCE WITH SECTION 14 OF CITY OF COCOA , BETWEEN EXIST. SEWER & PROP. TECHNICAL PROVISIONS) WILL BE REQUIRED AT THE COMPLETION OF co 's WATER MAIN THE PROJECT. 41 NI°L. Wer TAP EXIST. 4" WATER LINE 12. EXECUTED WATER EASEMENT FORM WILL BE REQUIRED AT THE L; 0. EXACT,SSEWER IZE ANDE, FIELD LOCATIIONVERIFY FOR THE PROPOSED WATER COMPLETION OF THE PROJECT a.a PRIOR TO CONSTRUCTIONR SERVICE. TPPING SADDLE & 13. EXECUTED BILL OF SATE FORM WILL BE REQUIRED AT THE VALVE SHALL BE PER CITY COMPLETION OF THE PROJECT ~`'p z" OF COCOA SPECS. TAP SHALL 14. FINAL INSPECTION OF ALL WATER APPURTENANCES WILL BE REQUIRED `'• 6" HYD. "T" & G.V. BE PERFORMED BY CITY OF BY THE CITY OF COCOA UTILITIES AT THE COMPLETION OF THE .1' 3" COCOA APPROVED TAPPING PROJECT N WCONTRACTOR. AND METER SET BY UTILITY CONTRACTOR o F PROP. FIRE HYDRANT a o ," J ASSEMBLY PER CITY 3%N OF COCOA SPEC. co SEE DET. r---� `' '' 4" PVC WATER MAIN TO EXTEN a a cc �qb // \., ooD ORB test PC ssa EAST OF PARCEL A.27 ` , � PROJECT N0: i .i3R6 2014-31 A° "� OAK E SANITARY MANHOLE 0 E9 S II FILE NO: TOP EL=3.15 DADl�12o14-a1 HIV-1.85 i DESIGNED BY: _� — FM L 7F • i- — D1F--- ------ & f'�F------ -11-61.1-------41,-----------+*3 a 1 2 DRAWN BY: • NOTE: pH / — ¢ i>1'' C IR •oWATER LINE AS BUILT INFORMATION SHOWN HAVE BEEN FURNISHED BY CITY OF COCOA UTILITIES AND APPROVED BY: 1 0 '3-941:1e: s---- /'O 14 mom= N.D. Ci.Oar 5/e" , , Q°"c Deny 2" BLOW OFF VALVE AND SURVEYOUR. ALL INFORMATION SHALL BE FIELD l DATE: } 'BOX PER CITY OF VERIFY PRIOR TO BIDDING AND CONSTRUCTION. 11/11/14 .iW I `,1' COCOA • SEWER LINE AS BUILT INFORMATION HAS BEEN DRAWING NO: f ; 08,9 FURNISHED BY CITY OF CAPE CANAVERAL UTILITIES _ ARM G.i�. c & SURVEYOR. oLL INFORMATION SHALL BE FIELD C 2 UTILITYLE: l' PLAN [ sriEeT 2 OF 5 VERIFY PRIOR TO BIDDING AND CONSTRUCTION. SCALE: 1' = 30' I � o • ALL WATER LINE CONSTRUCTION SHALL BE NOEL DROOR G.V' t 1 Pew B au c ACCORDING TO CITY OF COCOA UTILITIES P.E. 37259 fan V c PARCEL A.27 11 ' SPECIFICATIONS. &Q PEEL A 1 `° PREVENCS . �N 0 :� 5a EB-0007218 2. PROPPic-7o' .4 !:I 57.00,eaO' ... 1