HomeMy WebLinkAboutProbable Costs 09-22-16ENGINEER'S ESTIMATE OF PROBABLE CONSTRUCTION COSTS Oak Lane, Cape Canaveral, Florida Cape Canaveral, Florida As of September 22, 2016 General: This Engineer's probable construction cost estimate for Oak Lane includes the paving and drainage improvements for the existing dirt roadway of Oak Lane. Existing sanitary sewer and portable water is contained within the 50' rights of way The proposed construction drawings reflect two 11' lanes, one 5' sidewalk, and drainage improvements. Off site drainage work to the Canaveral Drainageway is included. A turn around in driveway agreement has been made with the City Fire Department to allow a reduced cul-de-sac. Special Construction Considerations for the project will include: * Water line relocations at two areas. * A resetting of FPL power poles and guide wires. * Possible adjustment of south side sewer laterals. * Resident coordination with driveways, mailboxes, landscaping, etc. in right of way. * Utility coordination and possible dewatering for outfall drainage line in City's 20' easement. * Sidewalk rails at two inlets. City will install street sign and stop sign. Future landscaping also by City including re-use water. Pay Item Power Pole Relocation Mobilization Erosion/Sediment Protection MOT Right of Way Clearing/Grubbing Clearing Roadway Grading Roadway Subbase Roadway Base 1 1/2" Asphaltic Concrete Driveway Aprons Roadway Fill Ribbon Curb Type F Curb Inlet Boxes w/Suntree Tech Grate Inlet Inlet Boxes w/o Suntree Tech Grate Inlet 18" ADS Storm Culverts 15" ADS Storm Culverts Outfall Drainage Manholes Headwall 19x30 RCP Outfall Pipe Sidewalk Detection Warnings Aluminum Sidewalk Rails at Inlet Boxes Water Line Conflicts Sanitary Sewer Lateral Conflicts Sealing/Striping Landscaping/Sod Dewatering for Outfall Mailbox Resetting, Fence Tree Removal, Mitigation 4" PVC Sleeves for Future Work Solar Lighting Re-Use Water Line SUBTOTAL 10% CONTINGENCY PROBABLE COST* * Does not include engineering or surveying. DRAFT - FOR DISCUSSION PURPOSES ONLY Description BY FPL Turbidity Curtain - Canal Easement Areas To be spread over outfall pipe. 12" Stabilized 6" Limerock 9.5 SP 8-10 - In Kind Work for Cul-de-Sac FDOT Type C FDOT Type C (Shallow) at Canal 14 Depending on Commercial 2 Areas Includes Watering To Be Determined To Be Determined QTY 5 1 1 1 1 1 720 2151 2151 1950 1 300 624 870 2 2 380 26 3 1 900 300 14 2 1 1 1 1 1 1 1 1 Unit LS LS LS LS LS LS CY SY SY SY LS CY LF LF EA EA LF LF EA LS LF SY EA EA LS LS LS LS LS LS LS LS Unit Price 9000 6000 6000 5500 500 4.25 4 10 12 15000 10 11 14 6000 4000 40 25 4000 2500 100 40 100 600 10000 4000 500 5600 6000 2000 10000 1200 Amount 0 9000 6000 6000 5500 500 3060 8604 21510 23400 15000 3000 6864 12180 12000 8000 15200 650 12000 2500 90000 12000 1400 1200 10000 4000 500 5600 6000 2000 10000 1200 314868 31486.8 346354.8