Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
Bid Tabulation (3)
Unit Cost (B) Item Cost (AxB) Unit Cost (B) Item Cost (AxB) Unit Cost (B) Item Cost (AxB) Unit Cost (B) Item Cost (AxB) 1 Mobilization and Demobilization 1 LS 10,000.00$ 10,000.00$ 110,000.00$ 110,000.00$ 114,000.00$ 114,000.00$ 140,000.00$ 140,000.00$ 2 General Requirements 1 LS 276,000.00$ 276,000.00$ 110,000.00$ 110,000.00$ 10,100.00$ 10,100.00$ 25,000.00$ 25,000.00$ 3 Indemnification 1 LS $ 1,000.00 1,000.00$ $ 1,000.00 1,000.00$ $ 1,000.00 1,000.00$ $ 1,000.00 1,000.00$ 4 Drain the Oxidation Ditch 460 1,000 GAL 11.00$ 5,060.00$ 40.00$ 18,400.00$ 60.00$ 27,600.00$ 3.00$ 1,380.00$ 5 Clean the Oxidation Ditch 3,000 TON 5.00$ 15,000.00$ 90.00$ 270,000.00$ 100.00$ 300,000.00$ 20.00$ 60,000.00$ 6 Structural Repair/Rehabilitation Allowance 1 LS 60,000.00$ 60,000.00$ 60,000.00$ 60,000.00$ 60,000.00$ 60,000.00$ 60,000.00$ 60,000.00$ 7 All Other Work Not Included in Items 1 through 6 1 LS $ 2,045,000.00 2,045,000.00$ $ 2,004,600.00 2,004,600.00$ $ 2,175,000.00 2,175,000.00$ $ 2,695,000.00 2,695,000.00$ 2,412,060.00$ 2,574,000.00$ 2,687,700.00$ 2,982,380.00$ Total Quantity (A)UnitBid Item Bid Item Name & Category **Wharton-Smith had addition error on Line 4 ($13,800 vs. $1,380) TOTAL BASE BID Bid Opening: June 30, 2016 R2T Florida Design L7 BID TABULATION CITY OF CAPE CANAVERAL WWTP IMPROVEMENTS FOR OXIDATION DITCH REHABILITATION Wharton-Smith Page 1 of 1