Loading...
HomeMy WebLinkAboutBid Tabulation (3) Unit Cost (B) Item Cost (AxB) Unit Cost (B) Item Cost (AxB) Unit Cost (B) Item Cost (AxB) Unit Cost (B) Item Cost (AxB) 1 Mobilization and Demobilization 1 LS 10,000.00$ 10,000.00$ 110,000.00$ 110,000.00$ 114,000.00$ 114,000.00$ 140,000.00$ 140,000.00$ 2 General Requirements 1 LS 276,000.00$ 276,000.00$ 110,000.00$ 110,000.00$ 10,100.00$ 10,100.00$ 25,000.00$ 25,000.00$ 3 Indemnification 1 LS $ 1,000.00 1,000.00$ $ 1,000.00 1,000.00$ $ 1,000.00 1,000.00$ $ 1,000.00 1,000.00$ 4 Drain the Oxidation Ditch 460 1,000 GAL 11.00$ 5,060.00$ 40.00$ 18,400.00$ 60.00$ 27,600.00$ 3.00$ 1,380.00$ 5 Clean the Oxidation Ditch 3,000 TON 5.00$ 15,000.00$ 90.00$ 270,000.00$ 100.00$ 300,000.00$ 20.00$ 60,000.00$ 6 Structural Repair/Rehabilitation Allowance 1 LS 60,000.00$ 60,000.00$ 60,000.00$ 60,000.00$ 60,000.00$ 60,000.00$ 60,000.00$ 60,000.00$ 7 All Other Work Not Included in Items 1 through 6 1 LS $ 2,045,000.00 2,045,000.00$ $ 2,004,600.00 2,004,600.00$ $ 2,175,000.00 2,175,000.00$ $ 2,695,000.00 2,695,000.00$ 2,412,060.00$ 2,574,000.00$ 2,687,700.00$ 2,982,380.00$ Total Quantity (A)UnitBid Item Bid Item Name & Category **Wharton-Smith had addition error on Line 4 ($13,800 vs. $1,380) TOTAL BASE BID Bid Opening: June 30, 2016 R2T Florida Design L7 BID TABULATION CITY OF CAPE CANAVERAL WWTP IMPROVEMENTS FOR OXIDATION DITCH REHABILITATION Wharton-Smith Page 1 of 1