Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
Bid Tabulation (2)
BID TABULATION CITY OF CAPE CANAVERAL WWTP IMPROVEMENTS FOR OXIDATION DITCH REHABILITATION Bid Opening: June 30, 2016 Bid Item 1 2 3 4 5 6 7 TOTAL BASE BID **Wharton-Smith had addition error on Line 4 ($13,800 vs. $1,380) Bid Item Name & Category Mobilization and Demobilization General Requirements Indemnification Drain the Oxidation Ditch Clean the Oxidation Ditch Structural Repair/Rehabilitation Allowance All Other Work Not Included in Items 1 through 6 Total Quantity (A) 1 1 1 460 3000 1 1 Unit LS LS LS 1,000 GAL TON LS LS R2T Unit Cost (B) 10000 276000 1000 11 5 60000 2045000 Item Cost (AxB) 10000 276000 1000 5060 15000 60000 2045000 2412060 Florida Design Unit Cost (B) 110000 110000 1000 40 90 60000 2004600 Item Cost (AxB) 110000 110000 1000 18400 270000 60000 2004600 2574000 161940 L7 Unit Cost (B) 114000 10100 1000 60 100 60000 2175000 Item Cost (AxB) 114000 10100 1000 27600 300000 60000 2175000 2687700 275640 Wharton-Smith Unit Cost (B) 140000 25000 1000 3 20 60000 2695000 Item Cost (AxB) 140000 25000 1000 1380 60000 60000 2695000 2982380 570320