Loading...
HomeMy WebLinkAboutOD ApplicationWater Project Application Form Preview after Data Entry. Form cannot be edited. 1 Sponsor D.. Entered Goodson 2 Proj Title City of Cape Canaveral W WTP Improvements for Oxidation Ditch Rehabilitation 3 Recipient City of Cape Canaveral 4 County Brevard 5 Contact Jeff Ratliff - Public Works Services Deputy Director 6 Contact Add P.O. Box 326 Cape Canaveral, Florida 32920 7 Contact Phone 321 868-1240 x404 8 Contact Email .ratliff cit ofca ecanaveral.or 9 Proj Description The City's wastewater treatment plant (W WTP) includes a single oxidation ditch that is used to provide aerobic conditions needed to "break down" organic compounds in wastewater. The oxidation ditch has been in operation for over 30 years, is subject to mechanical failure due to age and is in need of major structural and equipment upgrades. Several engineering reports completed over the years indicate that a second oxidation ditch is needed for emergency conditions when the primary oxidation ditch is out of service due to mechanical or structural failure. Therefore, this Project includes the conversion of the existing flow equalization basin to a "backup" or emergency oxidation ditch. This conversion will require that the equalization basin be retrofitted with a diffused aeration system, internal recycle pumps and extensive interconnecting piping. This retrofitted equalization basin will then serve as a permanent, second oxidation ditch thus providing critical redundancy to the wastewater treatment process. 10 Statewide Goal N/A 11 Project Addressed in Plan? No 12 Plan Name 13 Pro' Cost $2,395,000 14 Amt Requested $1,197,500 15 Local Match Amt $1,197,500 16 Type of Match Pledged Cash 17 In -Kind Match Description The City obtained a loan from FDEP's State Revolving Fund (SRF). 18 Financially Disadvanta ed? No 19 Population Economic Status? N/A 20 Pro' Previous) Funded? No 21 Type of State Funding 22 Fiscal Year 23 Amt $0 24 Future Funding Requested? No 25 Future Funding Date 26 Applied for Alternative Funding? No 27 If not, why not? Future funding will not be required for proqect completion. 28 Revenue Sources for Ongoing O eratin Ex enses? Wastewater Utility Fund. 29 Local Approval for the use of Identified Operating Funds? Yes 30 Status of Planninq Read 31 Status % Complete 100% 32 Est Completion Date 33 Status of Design Read 34 Design % Complete 100% 35 Est Design Completion Date 36 Identify Required Permits Permit Modification to the WWTP Permit. 37 Status of Permitting Planned 38 Status of Construction Not Read 39 Construction % Complete 0% 40 Est Construction Completion Date 4/30/2017