1
Sponsor
D.. Entered
Goodson
2
Proj Title
City of Cape Canaveral W WTP Improvements for Oxidation Ditch
Rehabilitation
3
Recipient
City of Cape Canaveral
4
County
Brevard
5
Contact
Jeff Ratliff - Public Works Services Deputy Director
6
Contact Add
P.O. Box 326 Cape Canaveral, Florida 32920
7
Contact Phone
321 868-1240 x404
8
Contact Email
.ratliff cit ofca ecanaveral.or
9
Proj Description
The City's wastewater treatment plant (W WTP) includes a single
oxidation ditch that is used to provide aerobic conditions needed to
"break down" organic compounds in wastewater. The oxidation
ditch has been in operation for over 30 years, is subject to
mechanical failure due to age and is in need of major structural and
equipment upgrades. Several engineering reports completed over
the years indicate that a second oxidation ditch is needed for
emergency conditions when the primary oxidation ditch is out of
service due to mechanical or structural failure. Therefore, this
Project includes the conversion of the existing flow equalization
basin to a "backup" or emergency oxidation ditch. This conversion
will require that the equalization basin be retrofitted with a diffused
aeration system, internal recycle pumps and extensive
interconnecting piping. This retrofitted equalization basin will then
serve as a permanent, second oxidation ditch thus providing critical
redundancy to the wastewater treatment process.
10
Statewide Goal
N/A
11
Project Addressed in Plan?
No
12
Plan Name
13
Pro' Cost
$2,395,000
14
Amt Requested
$1,197,500
15
Local Match Amt
$1,197,500
16
Type of Match Pledged
Cash
17
In -Kind Match Description
The City obtained a loan from FDEP's State Revolving Fund (SRF).
18
Financially Disadvanta ed?
No
19
Population Economic Status?
N/A
20
Pro' Previous) Funded?
No
21
Type of State Funding
22
Fiscal Year
23
Amt
$0
24
Future Funding Requested?
No
25
Future Funding Date
26
Applied for Alternative Funding?
No
27
If not, why not?
Future funding will not be required for proqect completion.
28
Revenue Sources for Ongoing
O eratin Ex enses?
Wastewater Utility Fund.
29
Local Approval for the use of
Identified Operating Funds?
Yes
30
Status of Planninq
Read
31
Status % Complete
100%
32
Est Completion Date
33
Status of Design
Read
34
Design % Complete
100%
35
Est Design Completion Date
36
Identify Required Permits
Permit Modification to the WWTP Permit.
37
Status of Permitting
Planned
38
Status of Construction
Not Read
39
Construction % Complete
0%
40
Est Construction Completion Date
4/30/2017